{"id":19859,"date":"2025-12-26T16:38:39","date_gmt":"2025-12-26T15:38:39","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19859"},"modified":"2026-05-26T08:00:04","modified_gmt":"2026-05-26T06:00:04","slug":"splash-zone","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/splash-zone","title":{"rendered":"Splash zone"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The splash zone plays a central role in concrete demolition, interior demolition, rock excavation, and natural stone extraction. Wherever water impacts surfaces through rain, cleaning, cooling, infiltration, or traffic splash, occupational safety, material behavior, and equipment requirements change. This particularly affects hydraulic methods and tools from Darda GmbH such as <strong>concrete demolition shear<\/strong> or <strong>hydraulic splitter<\/strong>, which are frequently used in damp and wet environments. A precise understanding of the splash zone helps select appropriate methods, minimize risks, and plan execution professionally. It also supports compliance with environmental discharge limits and increases operational reliability by reducing unplanned downtime.<\/p>\n<h2>Definition: What is meant by the splash zone?<\/h2>\n<p>The splash zone refers to areas where components, machines, or work surfaces are regularly exposed to <em>impacting water<\/em> in the form of droplets, spray mist, or short-term jet contact, without being permanently under water pressure or fully submerged. Typical sources include precipitation, cleaning and cooling water, melting snow, dust suppression sprays, and water stirred up by traffic or machinery. In construction practice, the term includes, among other things, the <em>base\/plinth zone<\/em> of facades, areas around floor drains and gutters, zones near water-carrying lines, or openings in tunnels with water ingress. In equipment technology, it describes environments where equipment should be protected against splash water (e.g., housings, seals, plug connections) without requiring suitability for permanent submersion. In terms of ingress protection, splash-exposed operation often aligns with IPX4 to IPX6 concepts, whereas immersion requires separate sealing and testing regimes.<\/p>\n<h2>Impact on deconstruction and demolition processes<\/h2>\n<p>Splash water influences the choice of methods, logistics on the construction site, the structural stability of temporary shoring, and the durability of equipment. Water on surfaces reduces adhesion, increases slip hazard, and can alter visibility and acoustics. In concrete and steel structures, splash water &#8211; often in combination with de-icing salts &#8211; promotes corrosion processes and damages edge zones. In execution, splash water requires additional action for <strong>sealing, water routing, retention, and cleaning<\/strong> as well as when selecting <em>hydraulic tools<\/em> that operate without water-intensive auxiliary techniques (e.g., saw slurry).<\/p>\n<ul>\n<li><strong>Practical implications<\/strong>: adapt sequencing to drying windows; keep circulation areas free of runoff; introduce anti-slip measures at access points.<\/li>\n<li><strong>Temporary works<\/strong>: consider reduced friction and bearing capacity on wet interfaces; verify uplift and scour effects at supports.<\/li>\n<li><strong>Quality and tolerances<\/strong>: anticipate altered break behavior at saturated edges; verify cut accuracy where visibility is impaired by mist.<\/li>\n<li><strong>Documentation<\/strong>: record moisture exposure and water handling to substantiate later acceptance and maintenance decisions.<\/li>\n<\/ul>\n<h2>Typical sources and situations for splash water on the construction site<\/h2>\n<ul>\n<li>Precipitation and dripping at projections, cornices, bridge parapet caps, and tunnel tubes<\/li>\n<li>Dust suppression, cooling and cleaning water during separation and cutting operations<\/li>\n<li>Traffic splash water at bridges, retaining walls, noise barrier walls, and columns<\/li>\n<li>Infiltration in tunnels and adits, ponded water on slabs, gutter overflows<\/li>\n<li>High-pressure cleaning, tank interior cleaning, degreasing, and component flushing<\/li>\n<li>Slurry overspray during wet cutting or coring in confined spaces<\/li>\n<li>Condensation on cold surfaces and ceilings in humid interiors<\/li>\n<li>Leak tests, firefighting water, and flushing of pipe systems<\/li>\n<\/ul>\n<h2>Requirements for tools and equipment in the splash zone<\/h2>\n<h3>Hydraulic core components<\/h3>\n<ul>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a><\/strong>: Splash protection for housing openings, air routing, electrical connections, and control panels; set up outside run-off lines and puddles; use splash protection hoods if needed. Verify suitable ingress protection (e.g., IPX5 or higher) for switchgear and ensure drip trays are in place.<\/li>\n<li>Hose systems and couplings: Condition of seals, kink protection, low-drip connections; route so no drip channels form across traffic routes. Provide strain relief at connection points and define inspection intervals with tagging for wet-duty hoses.<\/li>\n<\/ul>\n<h3>Attachments and handheld tools<\/h3>\n<ul>\n<li><strong>Concrete demolition shear<\/strong>, <strong>hydraulic splitter<\/strong>, <em>rock wedge splitter<\/em>: preferred when working without water-intensive cooling; suitable for reducing slurry and splash water from separation cuts.<\/li>\n<li><em>Combination shears<\/em>, <em>multi cutters<\/em>, <em>steel shear<\/em>, <em>tank cutter<\/em>: ensure splash resistance of moving parts; after wet use, clean, dry, and lightly preserve.<\/li>\n<li>Wet-duty care: protect cylinder rods with wiper-seal covers where possible; use water-resistant lubricants on pins and bushings to reduce corrosion.<\/li>\n<\/ul>\n<h3>Electrical and control<\/h3>\n<ul>\n<li>Splash-proof plug connections and switches; route supply lines elevated to avoid capillary effects and contact with puddles.<\/li>\n<li>Choose operator positions so operators are not standing directly in the splash area.<\/li>\n<li>Use residual current protection (RCD\/GFCI 30 mA) and distribution boxes with IP65 or higher; avoid daisy-chaining temporary power in wet zones.<\/li>\n<\/ul>\n<h2>Materials and structural aspects in the splash zone<\/h2>\n<p>Splash water often hits component zones with increased stress. Concrete in the splash zone of traffic areas is exposed not only to moisture but often also to <em>chloride contamination<\/em> and freeze-thaw cycles with de-icing salts. This affects concrete cover, concrete carbonation, and the durability of the reinforcement. Natural stone shows different water absorption depending on rock type; water can freeze in joints and fissures and cause splitting effects. In deconstruction, it is worthwhile to open edges and perimeter zones with visibly damaged surfaces preferably with <strong>concrete demolition shear<\/strong> or <strong>hydraulic splitter<\/strong> to create defined fracture lines and avoid unwanted spalling. Persistent wetting can also accelerate alkali-silica reactions and leaching; efflorescence and rust staining are early indicators of deterioration.<\/p>\n<ul>\n<li><strong>Indicators to assess<\/strong>: scaling at edges, delamination of surface coatings, rust streaks at cracks, hollow sounds on percussion testing in saturated areas.<\/li>\n<\/ul>\n<h2>Planning, site setup, and water routing<\/h2>\n<ul>\n<li><strong>Hazard analysis<\/strong>: slip, visibility, and electric shock risk; falling water; turbulence; aerosols; contaminated slurry.<\/li>\n<li><strong>Water routing<\/strong>: channels, hoses, catch trays, sump pumps; separation of clean and contaminated water.<\/li>\n<li><strong>Setup areas<\/strong>: place power packs and storage on raised platforms; anti-slip underlays at operator stations.<\/li>\n<li><strong>Weather<\/strong>: stagger work during thaw and rain events; avoid material changes when surfaces are heavily saturated.<\/li>\n<li><strong>Permits and discharge<\/strong>: verify limits for turbidity and contaminants; plan on-site filtration and documentation of disposal routes.<\/li>\n<li><strong>Monitoring<\/strong>: assign responsibility for regular checks of drains, sumps, and hose routing; keep spill response materials ready.<\/li>\n<\/ul>\n<h2>Occupational and environmental protection in the splash zone<\/h2>\n<ul>\n<li><strong>Slip hazard<\/strong>: increase grip on traffic routes, drain standing water.<\/li>\n<li><strong>Aerosols<\/strong>: minimize misting; if dust suppression is necessary, dose water finely and route it precisely.<\/li>\n<li><strong>Media ingress<\/strong>: prevent hydraulic oil losses; drip protection at couplings; keep absorbents and containment ready.<\/li>\n<li><strong>Visibility and communication<\/strong>: adjust lighting, create low-glare sightlines; clearly define hand signals and radio use.<\/li>\n<li><strong>PPE<\/strong>: waterproof gloves and boots with high slip-resistance, eye and face protection against jets and rebound; consider respiratory protection where aerosol exposure is plausible.<\/li>\n<li><strong>Hygiene<\/strong>: handle potentially contaminated water and slurry separately; provide hand-wash and decontamination options.<\/li>\n<\/ul>\n<h2>Method selection depending on splash water<\/h2>\n<p>In zones with high splash water exposure, methods that operate without additional water supply and produce few by-products have advantages. <strong>Hydraulic splitter<\/strong> as well as <strong>concrete demolition shear<\/strong> enable <em>blast-free, low vibration levels, and low-emission<\/em> working methods that do not further burden the local water balance. Cutting and separation operations with water supply remain appropriate where required cutting quality or joints demand it; in that case, plan collection and separation systems for slurry.<\/p>\n<ul>\n<li><strong>Selection criteria<\/strong>: target geometry and tolerances, accessibility in wet conditions, permissible emissions, and downstream cleaning effort.<\/li>\n<li><strong>Interface risks<\/strong>: evaluate effects on adjacent waterproofing, coatings, or sensitive installations.<\/li>\n<\/ul>\n<h2>Application areas: specific guidance<\/h2>\n<h3>Concrete demolition and specialized deconstruction<\/h3>\n<ul>\n<li>Parapet caps, brackets, and plinths in the splash zone can be separated in a controlled manner with <strong>concrete demolition shear<\/strong>; limit edge spalling by staged pre-cracking.<\/li>\n<li>When exposing reinforcement in wet environments, avoid having cutting slurry cover the rebar again; route it away deliberately.<\/li>\n<li>For saturated concrete, prefer pre-cracking to reduce uncontrolled crack propagation along wet interfaces.<\/li>\n<\/ul>\n<h3>Interior demolition and cutting<\/h3>\n<ul>\n<li>Interiors with wet zones: seal water distributors, provide collection trays and filters; switch to splitting techniques in partial areas to reduce slurry.<\/li>\n<li>Plan separation cuts so splash water does not hit the <em>control cabinet<\/em> and power packs.<\/li>\n<li>Use negative-pressure enclosures with targeted water routing where hygiene or contamination control applies.<\/li>\n<\/ul>\n<h3>Rock excavation and tunnel construction<\/h3>\n<ul>\n<li>With infiltration: choose work points above the drainage level; use <em>rock wedge splitter<\/em> with low-splash hydraulic operation.<\/li>\n<li>Deflect splash water from crown and haunch areas laterally to reduce interference at coupling points.<\/li>\n<li>Stabilize work platforms against softening; ensure safe anchor pull-out tests under wet conditions.<\/li>\n<\/ul>\n<h3>Natural stone extraction<\/h3>\n<ul>\n<li>Wet fracture planes can influence wedge friction; adapt splitting sequences, desludge standing surfaces.<\/li>\n<li>Mark damp transition zones and plan protection against freezing mists.<\/li>\n<li>Consider variable water uptake of different strata; test pilot splits to calibrate wedge spacing in moist rock.<\/li>\n<\/ul>\n<h3>Special operations<\/h3>\n<ul>\n<li>Work on vessels and tanks: operate <em>tank cutter<\/em> and <em>steel shear<\/em> with attention to spray mist from residual media; provide splash shields.<\/li>\n<li>In sensitive areas (laboratory, food, infrastructure): strictly separate emissions and splash water; prefer low-carryover methods.<\/li>\n<li>For confined spaces, verify drainage and ventilation before energizing hydraulic systems; prevent pooling beneath equipment.<\/li>\n<\/ul>\n<h2>Protective measures for hydraulic power packs and attachments<\/h2>\n<ul>\n<li><strong>Enclosure protection<\/strong>: splash guards, sealed service openings; position the operator side away from splash.<\/li>\n<li><strong>High points<\/strong>: route cable and <em>hydraulic hose line<\/em> from above; avoid drip loops.<\/li>\n<li><strong>Maintenance<\/strong>: after wet use, clean, dry, lightly preserve joints; check seals and renew in good time.<\/li>\n<li><strong>Storage<\/strong>: dry, well-ventilated environment; avoid condensate.<\/li>\n<li><strong>Connectors<\/strong>: fit dust and water caps immediately after decoupling; use desiccant pouches in tool cases to limit residual humidity.<\/li>\n<\/ul>\n<h2>Building-physics background in the splash zone<\/h2>\n<p>Splash water often penetrates pores and cracks. With temperature effects, freeze-thaw cycles with de-icing salts can lead to weathering. Chlorides from traffic splash accelerate reinforcement corrosion. In deconstruction, therefore, <strong>altered edge-zone load-bearing capacity<\/strong> must be expected. A careful approach using <strong>concrete demolition shear<\/strong> (pre-cracking, load-free removal) or <strong>hydraulic splitter<\/strong> (controlled crack formation) reduces uncontrolled breaks and protects remaining structures.<\/p>\n<p>Alternating wetting and drying increases capillary suction and can accelerate carbonation, especially where cover is thin. Combined chloride ingress and carbonation lower the corrosion threshold of reinforcement; mapping moisture and visible damage helps prioritize protection and removal sequences.<\/p>\n<h2>Decision aid: selecting the appropriate method<\/h2>\n<ol>\n<li>Clarify the water situation: source, quantity, duration, possible contaminants.<\/li>\n<li>Define the objective: separation, sizing, exposure, controlled release.<\/li>\n<li>Weigh methods: splitting versus cutting technology; need for water supply.<\/li>\n<li>Plan water routing: collect, filter, discharge.<\/li>\n<li>Protect equipment: hydraulic power pack location, hose routing, sealing concept.<\/li>\n<li>Trial: test cut or test splitting, check side effects.<\/li>\n<li>Compliance: verify IP requirements and electrical protection; confirm disposal paths for slurry and wash water.<\/li>\n<li>Contingencies: prepare for weather swings and inflow surges; specify stop criteria and fallback procedures.<\/li>\n<\/ol>\n<h2>Maintenance and follow-up after work in the splash zone<\/h2>\n<ul>\n<li>Clean tools externally, remove moisture, lightly preserve moving parts.<\/li>\n<li>Check hydraulic connections; dry <em>quick coupling<\/em>, fit caps.<\/li>\n<li>Properly drain filter and water collection systems, ensure correct disposal of slurry.<\/li>\n<li>Record where moisture exposure occurred to prevent subsequent damage.<\/li>\n<li>Regrease pivot points and apply corrosion inhibitors on exposed steel; ventilate housings and check breather filters.<\/li>\n<\/ul>\n<h2>Terminology distinction in the execution context<\/h2>\n<ul>\n<li><strong>Splash water<\/strong>: short-term, directional water ingress (droplets\/jet), often without hydrostatic pressure.<\/li>\n<li><strong>Water jet<\/strong>: concentrated, high-energy water jet (e.g., high-pressure cleaner) with correspondingly greater penetration depth.<\/li>\n<li><strong>Pressurized water\/submersion<\/strong>: permanent exposure below the waterline; significantly higher requirements for sealing and equipment.<\/li>\n<li><strong>Spray mist\/aerosols<\/strong>: fine droplets suspended in air with increased transport range and inhalation relevance, requiring targeted capture and ventilation.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The splash zone plays a central role in concrete demolition, interior demolition, rock excavation, and natural stone extraction. Wherever water impacts surfaces through rain, cleaning, cooling, infiltration, or traffic splash, occupational safety, material behavior, and equipment requirements change. This particularly affects hydraulic methods and tools from Darda GmbH such as <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/splash-zone\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19859","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Splash Zone in Construction &amp; Demolition Explained<\/title>\n<meta name=\"description\" content=\"Practical guide to the splash zone for construction and demolition \u2713 safety, equipment care, and water control.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/splash-zone\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Splash Zone in Construction &amp; Demolition Explained\" \/>\n<meta property=\"og:description\" content=\"Practical guide to the splash zone for construction and demolition \u2713 safety, equipment care, and water control.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/splash-zone\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-26T06:00:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/splash-zone\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/splash-zone\",\"name\":\"Splash Zone in Construction & Demolition Explained\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-26T15:38:39+00:00\",\"dateModified\":\"2026-05-26T06:00:04+00:00\",\"description\":\"Practical guide to the splash zone for construction and demolition \u2713 safety, equipment care, and water control.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/splash-zone#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/splash-zone\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/splash-zone#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Splash zone\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Splash Zone in Construction & Demolition Explained","description":"Practical guide to the splash zone for construction and demolition \u2713 safety, equipment care, and water control.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/splash-zone","og_locale":"en_US","og_type":"article","og_title":"Splash Zone in Construction & Demolition Explained","og_description":"Practical guide to the splash zone for construction and demolition \u2713 safety, equipment care, and water control.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/splash-zone","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-26T06:00:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/splash-zone","url":"https:\/\/www.darda.de\/en\/knowledge\/splash-zone","name":"Splash Zone in Construction & Demolition Explained","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-26T15:38:39+00:00","dateModified":"2026-05-26T06:00:04+00:00","description":"Practical guide to the splash zone for construction and demolition \u2713 safety, equipment care, and water control.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/splash-zone#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/splash-zone"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/splash-zone#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Splash zone"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19859","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19859"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19859\/revisions"}],"predecessor-version":[{"id":27787,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19859\/revisions\/27787"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19859"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}