{"id":19855,"date":"2025-12-25T13:48:21","date_gmt":"2025-12-25T12:48:21","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19855"},"modified":"2026-05-26T13:25:03","modified_gmt":"2026-05-26T11:25:03","slug":"spray-nozzle","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/spray-nozzle","title":{"rendered":"Spray nozzle"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The spray nozzle is an inconspicuous yet central component when it comes to dust suppression, cooling, wetting, and cleaning in demolition, deconstruction, and natural stone extraction. Whether separating and crushing concrete with concrete demolition shears, controlled splitting with hydraulic wedge splitters, or rock excavation in tunnel construction: the right spray pattern, the appropriate droplet size, and a robust nozzle determine efficiency, occupational safety, and the quality of the work result. This article combines the technical classification of the spray nozzle with practice-oriented notes from the application areas of Darda GmbH, without being promotional. In addition, it outlines criteria for selection, integration, and verification so that spray nozzles function as a reliable part of a coherent dust-control and cooling strategy.<\/p>\n<h2>Definition: What Is a Spray Nozzle?<\/h2>\n<p>A spray nozzle is an assembly that converts an applied pressurized volumetric flow into a defined liquid jet or mist. Depending on the nozzle geometry, this produces flat sprays, full or hollow cones, and fine or coarse mists. The goal is the targeted distribution of water or media with additives to wet surfaces, bind dust, cool tools, or clean material. In demolition and special deconstruction, the spray nozzle is often used as a water-mist or atomizing nozzle to capture fine dust fractions at the point of origin &#8211; such as at the crushing and cutting edges of concrete demolition shears or directly at the splitting zone of hydraulic wedge splitters. In technical classification, the decisive parameters include <strong>spray pattern<\/strong>, <strong>droplet-size spectrum<\/strong> (e.g., Dv50 or Sauter mean diameter D32), <strong>spray angle<\/strong>, and <strong>volumetric flow<\/strong> at the operating pressure.<\/p>\n<h2>Design and Operating Principle of Spray Nozzles<\/h2>\n<p>Typical spray nozzles consist of a nozzle body with inlet thread, a filter seat (optional), a flow chamber, and the actual orifice or outlet opening. In swirl-chamber nozzles, the liquid is imparted with a swirl; it leaves the nozzle as a hollow- or full-cone spray. Flat-spray nozzles shape the stream over an edge into a fan-shaped spray pattern. Atomization &#8211; i.e., the breakup into droplets &#8211; depends primarily on pressure, nozzle geometry, medium viscosity, and temperature. Higher pressure and smaller orifices generally produce <em>finer<\/em> droplets; larger openings deliver <strong>coarser<\/strong> drops with higher momentum density and throw distance. Two-fluid atomizers use an additional gas flow to shear the liquid and generate very fine aerosols at lower water flow, which is relevant close to the point of origin where overspray must be minimized.<\/p>\n<h2>Nozzle Geometries and Spray Patterns<\/h2>\n<p>The choice of geometry depends on the task, distance, and desired droplet size. In dust-intensive applications around <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, building gutting, and tunnel heading, the following types are primarily used: The general distinction is between <em>impact-based<\/em> wetting (flat fans on linear edges) and <em>enveloping<\/em> wetting (cone sprays around emission zones).<\/p>\n<h3>Flat-Spray Nozzle<\/h3>\n<p>A uniformly distributed fan for linear wetting, e.g., along the jaw and cutting edges of concrete demolition shears. Suitable when a targeted, slender spray zone is needed without soaking adjacent areas. Typical spray angles lie between 15\u00b0 and 60\u00b0; working distances in practice range from approximately 0.2 to 0.6 m, depending on jaw width and the desired coverage. Narrower angles concentrate impact energy, improving dust capture in turbulent airstreams along the tool.<\/p>\n<h3>Full-Cone and Hollow-Cone Nozzle<\/h3>\n<p>Full cones distribute water homogeneously over a circular cross-section and are versatile for dust binding over a work area. Hollow cones are efficient when a ring-shaped droplet cloud should enclose the dust, for example around the breakout point of a hydraulic wedge splitter. For both, the swirl insert and orifice size define the achieved droplet spectrum; common spray angles span about 30\u00b0 to 90\u00b0. At short standoff distances, a medium angle often provides the best compromise between coverage and surface intensity.<\/p>\n<h3>Mist Nozzle for Fine Aerosols<\/h3>\n<p>Fine-atomizing nozzles &#8211; single- or two-fluid &#8211; produce very small droplets for binding respirable fine dusts at the point of origin. They should be positioned close to the dust source, as fine mist is wind-sensitive and easily drifts. Two-fluid designs require an additional compressed-air supply; in return, they allow precise metering at low water throughput and can reduce rebound effects in confined spaces.<\/p>\n<h2>Relevance in Concrete Demolition and Special Deconstruction<\/h2>\n<p>Breaking, splitting, crushing, and cutting concrete generate mineral dusts with variable grain sizes. Here, the spray nozzle is a central means of dust reduction directly at the source. Specific tasks include:<\/p>\n<ul>\n<li>Dust binding in the jaw and cutting area of concrete demolition shears using directed flat sprays.<\/li>\n<li>Wetting the splitting zone on hydraulic wedge splitters to effectively bind released fine dust.<\/li>\n<li>Cooling of tool cutting edges and bearing areas, if this is intended for the work process.<\/li>\n<li>Securing the operator\u2019s field of view through a stable, tuned spray cloud with sufficient momentum.<\/li>\n<li>Pre-wetting of surfaces before high-dust interventions and light follow-up rinsing to remove residual fines where feasible.<\/li>\n<\/ul>\n<h2>Use in Rock Excavation and Tunnel Construction<\/h2>\n<p>In <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>, spray nozzles are exposed to high loads: abrasive particles, fluctuating water quality, limited accessibility, and drafts. Robustly designed full- or hollow-cone nozzles with wear-resistant inserts (ceramic, carbide) have proven themselves. They are positioned in the immediate vicinity of the attack point so that the droplets envelop the dust before it enters the air. Short distances, sufficient pressure, and a spray angle aligned with the work geometry are crucial. Depending on the installation, non-drip valves and protected hose routing minimize unintentional dripping during pauses and prevent mechanical damage.<\/p>\n<h2>Natural Stone Extraction as Well as Gutting and Cutting<\/h2>\n<p>In natural stone extraction, spray nozzles are used for dust binding during loosening, separating, and sorting. Indoors &#8211; such as during gutting works &#8211; finely metered wetting is required to bind dust without soaking components. Flat sprays with lower flow and limited angle provide precise control, while finer mists work optimally only at very low air movement. Where sensitive surfaces or electrical components are nearby, coarse droplets with short throw reduce stray wetting and support targeted application.<\/p>\n<h2>Sizing: Pressure, Flow Rate, Droplet Size<\/h2>\n<p>The sizing of a spray nozzle results from the interplay of pump performance, desired droplet size, and spray range. In principle: coarser droplets (e.g., 200 to 400 \u00b5m) have more momentum, penetrate turbulent zones, and are well suited for dust binding in moving air. Finer droplets (e.g., 20 to 100 \u00b5m) wet sensitive areas more uniformly but are more wind-sensitive and require a very close position to the emission source. In addition to nominal orifice size, consider the nozzle\u2019s flow coefficient and the expected Dv50 at the intended pressure to ensure reproducible results.<\/p>\n<ul>\n<li>Flow rate: size to match the available water delivery and the desired degree of wetting.<\/li>\n<li>Pressure: choose so that the nozzle operates in its optimal range; too low a pressure leads to coarse jets, too high a pressure to unwanted fogging.<\/li>\n<li>Spray angle: adapt to working distance and tool width; angles that are too large reduce surface intensity.<\/li>\n<li>Medium properties: temperature and viscosity influence droplet formation; clean, filtered water reduces wear.<\/li>\n<li>Distance to source: shorter standoff improves capture efficiency and reduces drift; verify reach with a test spray.<\/li>\n<li>Ambient air velocity: counterflows and crosswinds require larger droplets or directional shielding to maintain capture.<\/li>\n<\/ul>\n<h2>Materials, Resistance, and Service Life<\/h2>\n<p>Nozzle bodies are manufactured from brass, stainless steel, or high-grade plastics; with abrasive media, ceramic or carbide inserts offer a significantly increased service life. Corrosion and chemical resistance are relevant with varying water qualities. A regular visual inspection of the outlet is sensible: even slight edge erosion changes the spray pattern and thus the dust-binding performance. In mixed-metal assemblies, attention to electrochemical compatibility and suitable thread sealants prevents seizure and facilitates defined torque during maintenance.<\/p>\n<h2>Positioning on Concrete Demolition Shears and Splitters<\/h2>\n<p>For effective dust binding, the spray nozzle must operate close to the emission source without disturbing the workflow. Mounting positions that follow the material flow and account for the opening and closing movements of the tools have proven effective. Hose routing must be protected against crushing and abrasion. Where feasible, bracket systems with vibration damping and defined alignment marks simplify repeatable setup after tool changes.<\/p>\n<ol>\n<li>Align the discharge direction with the process (near the breakout, opposite to the dust plume).<\/li>\n<li>Select the spray angle based on the working distance; check and document a test spray pattern in advance.<\/li>\n<li>Ensure uniform wetting; stagger multiple nozzles on wide tools.<\/li>\n<li>Observe splash-back and misting; if necessary, adjust droplet size by changing the nozzle.<\/li>\n<li>Provide shut-off or quick-change options for nozzles to adapt flow on demand and to ease maintenance.<\/li>\n<\/ol>\n<h2>Maintenance, Cleaning, and Operation<\/h2>\n<p>Simple measures are sufficient to keep spray nozzles reliably operating over time when implemented consistently.<\/p>\n<ul>\n<li>Filtration: use upstream filters to keep particles out of the supply; flush filters regularly.<\/li>\n<li>Descaling: in regions with hard water, remove deposits early using suitable, material-compatible methods.<\/li>\n<li>Flushing cycles: after dust-intensive use and before downtime, flush the lines with clear water.<\/li>\n<li>Winter operation: drain water from exposed lines or use frost-protected media.<\/li>\n<li>Hygiene: avoid stagnation; regularly flush systems completely to reduce microbial growth.<\/li>\n<li>Nozzle identification: record nozzle codes and replacement intervals; replace worn or damaged inserts promptly.<\/li>\n<\/ul>\n<h2>Occupational Safety and Environmental Aspects<\/h2>\n<p>A well-designed spray nozzle reduces airborne fine dusts and supports health protection. At the same time, sparing use of water is important: it is advisable to match water delivery to dust generation and to drain collected water in a controlled manner. Slip hazards due to puddles should be minimized through targeted spray directions and drainage. The applicable local regulations and organizational protective measures are always decisive. Where water is collected, sedimentation or filtration steps help retain solids before discharge or reuse.<\/p>\n<h2>Quality Control and Documentation<\/h2>\n<p>The performance of a spray nozzle can be checked with simple means. A practical approach is to determine flow rate over time in a measuring container and visually check the spray pattern for homogeneity and reach. Deviations indicate wear, blockages, or unsuitable operating pressures. A brief record with date, nozzle code, pressure, flow rate, and observed spray pattern facilitates repeatability. Reference photos of correct patterns and periodic verification with simple gauges or pin sets for orifice checks increase process reliability.<\/p>\n<h2>Typical Failure Patterns and Countermeasures<\/h2>\n<ul>\n<li>Mist too fine and drifting: choose a nozzle with a larger orifice or reduce pressure, decrease distance.<\/li>\n<li>Insufficient dust binding: increase droplet size, place the nozzle closer to the source, correct the spray angle.<\/li>\n<li>Unstable spray pattern: check filters, remove deposits, replace worn nozzle.<\/li>\n<li>Over-wetting of surroundings: focus the spray pattern, use a flat spray instead of a full cone, consider interval operation.<\/li>\n<li>Unsuitable pump sizing: match delivery flow and pressure range to the nozzle data.<\/li>\n<li>Pulsating jet: eliminate air entrainment, reduce suction lift, check for cavitation and stabilize inlet conditions.<\/li>\n<li>Progressive narrowing: scaling or biofilm increases back pressure; descale and sanitize, then revalidate the pattern.<\/li>\n<\/ul>\n<h2>Relation to Other Tools and Processes<\/h2>\n<p>The spray nozzle can also contribute to dust reduction, cooling, and spark reduction on multi cutters, steel shears, and combi shears, provided the process allows it. With a <a href=\"https:\/\/www.darda.de\/en\/product\/tank-cutter-tc120\">tank cutter<\/a>, nozzle selection and arrangement must be planned with particular care; water-carrying systems should be operated so that they support the intended safe sequence. Hydraulic power packs provide the drive power for tools, while the supply and control of spray nozzles in practice often run via separate pumps or supply lines. Decisive is an overall design tuned to the process: suitable nozzle, adequate filtration, correct pressure, and proper positioning on the tool. In addition, robust controls with shut-off or solenoid valves, pressure regulation, and simple diagnostics enhance consistency and facilitate documentation.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The spray nozzle is an inconspicuous yet central component when it comes to dust suppression, cooling, wetting, and cleaning in demolition, deconstruction, and natural stone extraction. Whether separating and crushing concrete with concrete demolition shears, controlled splitting with hydraulic wedge splitters, or rock excavation in tunnel construction: the right spray <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/spray-nozzle\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19855","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Spray Nozzle for Dust Suppression in Demolition<\/title>\n<meta name=\"description\" content=\"Master the spray nozzle for dust control, cooling &amp; cleaning in demolition and stone work \u2713 Practical sizing tips.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/spray-nozzle\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Spray Nozzle for Dust Suppression in Demolition\" \/>\n<meta property=\"og:description\" content=\"Master the spray nozzle for dust control, cooling &amp; cleaning in demolition and stone work \u2713 Practical sizing tips.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/spray-nozzle\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-26T11:25:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/spray-nozzle\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/spray-nozzle\",\"name\":\"Spray Nozzle for Dust Suppression in Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-25T12:48:21+00:00\",\"dateModified\":\"2026-05-26T11:25:03+00:00\",\"description\":\"Master the spray nozzle for dust control, cooling & cleaning in demolition and stone work \u2713 Practical sizing tips.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/spray-nozzle#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/spray-nozzle\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/spray-nozzle#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Spray nozzle\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Spray Nozzle for Dust Suppression in Demolition","description":"Master the spray nozzle for dust control, cooling & cleaning in demolition and stone work \u2713 Practical sizing tips.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/spray-nozzle","og_locale":"en_US","og_type":"article","og_title":"Spray Nozzle for Dust Suppression in Demolition","og_description":"Master the spray nozzle for dust control, cooling & cleaning in demolition and stone work \u2713 Practical sizing tips.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/spray-nozzle","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-26T11:25:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/spray-nozzle","url":"https:\/\/www.darda.de\/en\/knowledge\/spray-nozzle","name":"Spray Nozzle for Dust Suppression in Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-25T12:48:21+00:00","dateModified":"2026-05-26T11:25:03+00:00","description":"Master the spray nozzle for dust control, cooling & cleaning in demolition and stone work \u2713 Practical sizing tips.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/spray-nozzle#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/spray-nozzle"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/spray-nozzle#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Spray nozzle"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19855","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19855"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19855\/revisions"}],"predecessor-version":[{"id":27803,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19855\/revisions\/27803"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19855"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}