{"id":19852,"date":"2025-12-25T12:22:03","date_gmt":"2025-12-25T11:22:03","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19852"},"modified":"2026-05-26T11:12:03","modified_gmt":"2026-05-26T09:12:03","slug":"blasting-test","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/blasting-test","title":{"rendered":"Blasting test"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A <em>blasting test<\/em> serves the safe, traceable determination of the effects of a targeted blast under real-world boundary conditions. It provides reliable data on fragmentation, vibrations, air overpressure, throw distance, and impact on structures or infrastructure. In construction and deconstruction projects, in rock excavation as well as in natural stone extraction, a blasting test often determines whether a blasting approach is responsible or whether mechanical, hydraulic methods are preferable. Especially in sensitive environments, alternatives such as <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong> or <strong>concrete demolition shears<\/strong> from Darda GmbH are essential building blocks to achieve objectives in a low-emission, low-vibration, and controlled manner. When planned correctly, a blasting test establishes quantifiable <em>acceptance criteria<\/em> and creates a defensible basis for further method selection.<\/p>\n<h2>Definition: What is meant by a blasting test?<\/h2>\n<p>A blasting test is a systematically prepared and officially approved test blast (also referred to as trial blast or proof blast) used to verify and optimize blasting parameters in the specific project context. Typical target values are the desired rock or concrete fragmentation, compliance with specified vibration limits, the protection of people and property, and the validation of the loading and initiation concept. Where relevant, <em>charge per delay<\/em> and dominant frequency ranges are established for subsequent design. Results from blasting tests feed into the further <strong>blasting plan<\/strong> or justify the decision for alternative demolition and separation methods.<\/p>\n<h2>Objectives, applications, and distinction<\/h2>\n<p>Blasting tests are used, among others, in quarries (natural stone extraction), for rock excavation and in tunnel construction, in concrete demolition and special demolition, as well as in special operations with challenging boundary conditions. They differ from production blasting in that the <em>measurement and evaluation function<\/em> is paramount. Test sequences are often stepped and deliberately conservative to isolate parameter effects and ensure repeatability. Where limits for vibrations, airblast, or dust emissions are very low, a blasting test can demonstrate that a blast-free approach &#8211; e.g., with <strong>rock splitting cylinders<\/strong> and <strong>concrete demolition shears<\/strong> in combination with <strong>hydraulic power packs<\/strong> from Darda GmbH &#8211; is technically more sensible and environmentally compatible. A baseline survey of ambient vibration and noise frequently precedes the test series to secure meaningful comparisons.<\/p>\n<h2>Process and planning of a blasting test<\/h2>\n<h3>Pre-investigation and geotechnical basics<\/h3>\n<p>At the beginning are geological and materials engineering investigations: jointing, fracture pattern, compressive strength, drillability, and any reinforcement in the concrete determine the borehole pattern, charge amount, and stemming. In existing structures, adjacent structural elements, utilities, and vibration sensitivities are recorded. Rock mass classification, discontinuity orientation, groundwater, and access conditions are documented to enable a robust parameter window.<\/p>\n<h3>Loading and initiation concept<\/h3>\n<p>The loading plan defines borehole diameter, depth, spacing, charge density, stemming material, and delay intervals. The goal is controlled energy release with reproducible fragmentation and minimized throw. Initiation systems are selected so that measurements can be clearly separated and evaluated. The plan specifies <em>charge per delay<\/em>, timing accuracy, and sequencing so that spectral content and attenuation with distance can be characterized.<\/p>\n<h3>Safety and exclusion concept<\/h3>\n<p>Evacuation, exclusion zones, shrapnel protection, fire and explosion protection measures are adapted to the location and topography. The instrumentation (e.g., vibration monitoring points) is defined and calibrated in advance. Roles and communication paths are clearly regulated. Weather, wind direction, and visibility rules are set, and contingencies are prepared for premature stop or postponement.<\/p>\n<h3>Measurement plan and acceptance criteria<\/h3>\n<p>A formal measurement plan defines sensor types and classes, mounting, sampling rates, trigger levels, and synchronization. Acceptance criteria cover PPV thresholds at sensitive receptors, air overpressure maxima, fragmentation targets (e.g., P80), and permissible throw envelopes. The number of shots and parameter steps is limited to ensure statistical clarity without compromising safety.<\/p>\n<h2>Measured quantities, instrumentation, and evaluation<\/h2>\n<p>The quality of a blasting test is reflected in the depth of data and in the analysis. Common measurement and evaluation parameters are:<\/p>\n<ul>\n<li><strong>Vibrations (PPV, frequency spectrum)<\/strong>: Geophones record peak particle velocity at structures and defined monitoring points. Placement follows governing propagation paths and critical foundations; frequency bands are evaluated in relation to building-friendly ranges.<\/li>\n<li><strong>Air overpressure<\/strong>: Pressure sensors quantify the acoustic component and support neighborhood protection. Results are assessed with standardized weighting and time histories to capture rise time and peak levels.<\/li>\n<li><strong>Fragmentation<\/strong>: Sieve curves, photogrammetry, and optical analysis provide P80\/P50 metrics for rock or concrete. Image-based results are validated by spot checks to avoid bias from fines or oversize.<\/li>\n<li><strong>Throw distance and flyrock<\/strong>: Visual inspection, barrier verification, and documented throw distances support hazard assessment. Markers and drone imagery help delineate the maximum throw envelope.<\/li>\n<li><strong>Deformations and cracking<\/strong>: For concrete structures, crack monitors and visual findings are included. Where necessary, strain gauges or displacement transducers supplement qualitative observations.<\/li>\n<\/ul>\n<p>The evaluation compares measured values with project-specific limits and with reference curves (e.g., building-friendly frequency ranges). If necessary, charge amount, delays, drilling pattern, and stemming are adjusted. Regression against distance and charge per delay enables scaling to production conditions with defined confidence margins.<\/p>\n<h2>Legal and organizational framework<\/h2>\n<p>Blasting tests are generally subject to explosives regulations and local permits. They may only be planned and executed by competent persons. Stand-off distances, emissions protection, documentation obligations, and the involvement of residents must be carefully observed. Handling, transport, storage, and return of explosives follow the applicable licensing and chain-of-custody rules. Data and photographic documentation are archived in accordance with permit requirements and retention periods.<\/p>\n<h2>Safety, environmental, and emissions protection<\/h2>\n<p>Priority is the safety of people, the protection of neighboring buildings and infrastructure, and the minimization of noise, dust, and vibrations. Dust suppression (water mist), coverings, temporal scheduling, and wind monitoring are standard. Where vibration limits are very low &#8211; such as in densely built-up areas &#8211; blast-free techniques with <strong>concrete demolition shears<\/strong> and <strong>rock and concrete splitters<\/strong> from Darda GmbH offer a <em>low-vibration<\/em> alternative. Additional measures can include mobile noise barriers, wheel-wash and cleaning concepts, and wildlife or heritage protection time windows.<\/p>\n<h2>Alternatives and complementary methods to a blasting test<\/h2>\n<p>Depending on project objectives, a blasting test may show that mechanical-hydraulic methods are more suitable or that blasting should only complement selectively. Typical options:<\/p>\n<ul>\n<li><strong>Rock and concrete splitters<\/strong>: Create controlled cracking in boreholes, reduce stresses, and enable removal without initiation energy &#8211; helpful in rock excavation, tunnel headings, and special demolition.<\/li>\n<li><strong>Concrete demolition shears<\/strong>: For selective concrete demolition, especially during strip-out and cutting in existing structures; low vibrations protect sensitive components.<\/li>\n<li><strong>Combination shears and multi cutters<\/strong>: Universally applicable for masonry, concrete, and mixed composites when granular blasting fragmentation is not desired.<\/li>\n<li><strong>Steel shears<\/strong>: For reinforcing steel, beams, and steel structures; useful after partial exposure following core drilling or splitting operations.<\/li>\n<li><strong>Tank cutters<\/strong>: For thick-walled vessels and boilers when thermal or blasting methods are excluded for safety reasons.<\/li>\n<li><strong>Hydraulic power packs<\/strong>: Reliably supply the above tools with energy and allow finely metered, reproducible work cycles.<\/li>\n<\/ul>\n<p>In natural stone extraction, pre- or post-splitting with rock splitting cylinders can reduce the explosive charge and increase block quality. In special demolition of urban structures, <strong>concrete demolition shears<\/strong> often replace blasting entirely. The combined approach reduces approval complexity and stabilizes schedules where interfaces are tight.<\/p>\n<h2>Interfaces with products and application areas of Darda GmbH<\/h2>\n<p>The decision for or against blasting is rarely binary. A <em>hybrid workflow<\/em> often emerges:<\/p>\n<ol>\n<li><strong>Rock excavation and tunnel construction<\/strong>: An initial blasting test provides vibration metrics. Based on this, critical zones are de-stressed in a blast-free manner with <strong>rock and concrete splitters<\/strong>; remaining blocks are sized with <strong>concrete demolition shears<\/strong> or <strong>multi cutters<\/strong>. This sequencing preserves face stability while meeting vibration criteria.<\/li>\n<li><strong>Concrete demolition and special demolition<\/strong>: For massive foundations, a blasting test checks feasibility and limits. When limits are tight, controlled disassembly is performed with <strong>concrete demolition shears<\/strong>, supported by <strong>hydraulic power packs<\/strong>; reinforcement is cut with <strong>steel shears<\/strong>. Access and logistics are planned to maintain exclusion zones without disrupting adjacent operations.<\/li>\n<li><strong>Strip-out and cutting<\/strong>: Blasting tests are seldom expedient here. Mechanical methods, such as <strong>combination shears<\/strong> and <strong>multi cutters<\/strong>, enable precise work without initiation energy. Noise and dust can be managed within typical building management frameworks.<\/li>\n<li><strong>Natural stone extraction<\/strong>: Test blasts optimize block formation; if block quality suffers, switch to <strong>rock splitting cylinders<\/strong> or combine. Splitters help align fracture planes with the desired block geometry.<\/li>\n<li><strong>Special operation<\/strong>: In areas with critical infrastructure, a blasting test may serve exclusively for risk quantification; execution then proceeds blast-free with the tools mentioned above. Communication with stakeholders is aligned with the measurement plan to maintain transparency.<\/li>\n<\/ol>\n<h2>Documentation, evaluation, and optimization of blasting parameters<\/h2>\n<p>A structured documentation ensures comparability:<\/p>\n<ul>\n<li><strong>Test log<\/strong>: Geometries, charge amounts, initiation sequence, stemming, weather, soil and structural data. Photographs and annotated plans complete the record.<\/li>\n<li><strong>Measurement data<\/strong>: Raw data, filters, evaluation steps, calibration logs. Time synchronization and sensor certificates are included.<\/li>\n<li><strong>Proof of effect<\/strong>: Fragmentation analysis, throw distances, assessment of adjacent structures. Deviations from plan and corrective actions are noted.<\/li>\n<li><strong>Optimization<\/strong>: Adjustments to drilling pattern, charge, and delay; decision matrix for mechanical-hydraulic alternatives such as <strong>concrete demolition shears<\/strong> or <strong>rock and concrete splitters<\/strong>. Scaling rules and assumptions are stated for traceability.<\/li>\n<li><strong>Reporting and archiving<\/strong>: Delivery of a concise test report with conclusions, limit compliance, and recommendations, archived per legal and client requirements.<\/li>\n<\/ul>\n<h2>Typical sources of error and how to avoid them<\/h2>\n<ul>\n<li><strong>Insufficient pre-investigation<\/strong>: Variability in geology or reinforcement leads to scatter. Remedy: test drilling, inspections, and, if necessary, materials testing.<\/li>\n<li><strong>Overcharging\/undercharging<\/strong>: Incorrect charge density distorts vibration and fragmentation data. Remedy: stepwise parameter variation.<\/li>\n<li><strong>Poor stemming<\/strong>: Increases air overpressure and throw. Remedy: suitable stemming material and correct placement.<\/li>\n<li><strong>Unclear measurement strategy<\/strong>: Poorly placed sensors produce irrelevant data. Remedy: monitoring points along critical structures and at governing distances.<\/li>\n<li><strong>Communication gaps<\/strong>: Unclear roles in the initiation chain jeopardize success. Remedy: clear responsibilities, checklists, approvals.<\/li>\n<li><strong>Ignoring alternatives<\/strong>: When limits must be kept below stringent thresholds, <strong>rock and concrete splitters<\/strong> and <strong>concrete demolition shears<\/strong> are often the means of choice &#8211; evaluate these options early.<\/li>\n<li><strong>Missing synchronization and calibration<\/strong>: Unsynchronized time bases or uncalibrated sensors invalidate comparisons. Remedy: pre-test checks and cross-verification.<\/li>\n<li><strong>Weather and boundary conditions<\/strong>: Unfavorable wind and thermal stratification elevate dust and air overpressure. Remedy: weather windows and on-site monitoring.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A blasting test serves the safe, traceable determination of the effects of a targeted blast under real-world boundary conditions. It provides reliable data on fragmentation, vibrations, air overpressure, throw distance, and impact on structures or infrastructure. In construction and deconstruction projects, in rock excavation as well as in natural stone <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/blasting-test\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19852","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Blasting Test - Construction &amp; Quarrying Guide<\/title>\n<meta name=\"description\" content=\"Guide to the blasting test in construction and rock excavation with metrics, vibration limits &amp; options \u27a4 Learn more.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/blasting-test\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Blasting Test - Construction &amp; Quarrying Guide\" \/>\n<meta property=\"og:description\" content=\"Guide to the blasting test in construction and rock excavation with metrics, vibration limits &amp; options \u27a4 Learn more.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/blasting-test\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-26T09:12:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-test\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-test\",\"name\":\"Blasting Test - Construction & Quarrying Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-25T11:22:03+00:00\",\"dateModified\":\"2026-05-26T09:12:03+00:00\",\"description\":\"Guide to the blasting test in construction and rock excavation with metrics, vibration limits & options \u27a4 Learn more.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-test#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-test\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-test#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Blasting test\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Blasting Test - Construction & Quarrying Guide","description":"Guide to the blasting test in construction and rock excavation with metrics, vibration limits & options \u27a4 Learn more.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/blasting-test","og_locale":"en_US","og_type":"article","og_title":"Blasting Test - Construction & Quarrying Guide","og_description":"Guide to the blasting test in construction and rock excavation with metrics, vibration limits & options \u27a4 Learn more.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/blasting-test","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-26T09:12:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/blasting-test","url":"https:\/\/www.darda.de\/en\/knowledge\/blasting-test","name":"Blasting Test - Construction & Quarrying Guide","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-25T11:22:03+00:00","dateModified":"2026-05-26T09:12:03+00:00","description":"Guide to the blasting test in construction and rock excavation with metrics, vibration limits & options \u27a4 Learn more.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/blasting-test#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/blasting-test"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/blasting-test#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Blasting test"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19852","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19852"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19852\/revisions"}],"predecessor-version":[{"id":27793,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19852\/revisions\/27793"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19852"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}