{"id":19851,"date":"2025-12-25T11:09:43","date_gmt":"2025-12-25T10:09:43","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19851"},"modified":"2026-05-26T11:20:02","modified_gmt":"2026-05-26T09:20:02","slug":"non-explosive-rock-removal","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-rock-removal","title":{"rendered":"Non-explosive rock removal"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Non-explosive rock removal stands for the controlled loosening and fragmentation of rock without the use of explosives. The method is used wherever vibrations, noise and exhaust gases must be minimized, such as in densely built urban areas, sensitive infrastructures, tunnels, or geologically complex settings. The focus is on mechanical-hydraulic methods that split rock along prepared rows of boreholes or remove it edge by edge (edge demolition). In practice, this frequently involves the use of <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\"><strong>hydraulic rock and concrete splitters<\/strong><\/a> together with matching <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\"><strong>hydraulic power units<\/strong><\/a>; at interfaces to structures, <strong>concrete pulverizers<\/strong> can also be useful when rock and concrete are monolithic or interlocked. Compared with blasting, approvals and neighborhood compatibility often improve, while fracture progress remains predictable and traceable.<\/p>\n<h2>Definition: What is meant by non-explosive rock removal?<\/h2>\n<p>Non-explosive rock removal encompasses all approaches by which rock structures are reduced, released, or removed to shape without explosives. A typical application is hydraulic splitting technology: split cylinders are placed into boreholes and, via the <em>wedge principle<\/em>, generate controlled cracks. The process features <em>low vibration levels<\/em>, is highly controllable, and produces fracture surfaces along defined lines. The measure is suitable in confined spaces, in water protection areas, in excavation pits next to existing buildings, in tunnel heading in delicate geologies, and for preparing connection faces to structures. In contrast to sawing and milling, splitting overcomes material strength by locally applied compressive forces, allowing blocks to be released systematically. Other non-blasting options such as expansive agents exist for specific boundary conditions, yet hydraulic splitting generally offers higher process speed and fewer temperature dependencies.<\/p>\n<h2>Methods and working principles<\/h2>\n<p>The basic principle of splitting technology is based on high, radially acting forces generated in the borehole by hydraulically actuated wedges. These forces exceed the tensile strength of the rock and drive crack fronts along natural weaknesses (joints, bedding planes) or along the planned hole pattern. <strong>Split cylinders<\/strong> are dimensioned according to the geometry and strength of the rock as well as the desired block format. The heart of the system is hydraulics: <strong>hydraulic power packs<\/strong> provide flow and pressure, and the splitting devices convert this energy into controlled deformation work. In practice, relief hole rows and edge distances guide the crack path and reduce scatter; pre-splitting near sensitive areas can further limit energy input. Where rock transitions into structural areas, <strong>concrete pulverizers<\/strong> are additionally used to detach cantilevering concrete parts, anchor heads or linings before continuing with rock release.<\/p>\n<h2>Rock analysis and planning<\/h2>\n<p>Robust planning begins with geological assessment: rock type, grain bonding, joint orientations, degree of weathering, and water flow determine the appropriate hole pattern and the choice of splitting tools. Particularly important is aligning the drillings with the preferred crack direction; this reduces force demand, drilling meters and cycle times. In hard rock with high compressive resistance, smaller hole diameters with a tighter grid are preferred; in layered or jointed rock, a coarser grid can suffice. For mixed tasks &#8211; rock meets concrete &#8211; the transition should be planned so that <strong>concrete pulverizers<\/strong> handle near-structure dismantling steps while split cylinders release the rock volume in a controlled manner.<\/p>\n<ul>\n<li><strong>Key planning parameters<\/strong>: target geometry and lift height, permissible vibration and noise levels, drilling tolerances, access and removal paths, groundwater and fines management, and sequencing with adjacent trades.<\/li>\n<\/ul>\n<h2>Tools and equipment for non-explosive rock removal<\/h2>\n<p>The selection of equipment is based on geometry, accessibility and material properties:<\/p>\n<ul>\n<li><strong>Hydraulic splitter<\/strong>: Hydraulic split cylinders for boreholes; high splitting forces with low emissions. Suitable for rock and &#8211; if required &#8211; for massive concrete. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-splitters\">Rock splitters<\/a>.<\/li>\n<li><strong>Hydraulic power pack<\/strong>: Power supply for the splitters; modularly matched to performance and the deployment environment, e.g., in tunnels or city centers.<\/li>\n<li><strong>Concrete pulverizers<\/strong>: For edge demolition, exposing connection reinforcement, and detaching concrete that covers or interlocks with the rock.<\/li>\n<li><strong>Attachment shear<\/strong> and <strong>multi cutters<\/strong>: For cutting mixed materials around the rock removal area, e.g., inserts, utility line components or light steel sections.<\/li>\n<li><strong>Steel shear<\/strong> and <strong>cutting torch<\/strong>: For peripheral tasks, such as removing steel components or vessels in the work area to create access to the rock.<\/li>\n<li><strong>Drilling rigs and accessories<\/strong>: Suitable for the required diameter and depth, with guides for collaring accuracy and options for wet or dry drilling.<\/li>\n<li><strong>Dust extraction and misting systems<\/strong>: For compliant dust control and improved visibility in confined or underground works.<\/li>\n<\/ul>\n<h2>Drilling technology and hole patterns<\/h2>\n<p>The hole pattern defines the subsequent fracture line. Criteria include hole diameter, center spacing, staggering and edge distances. Drilling depth generally matches the planned removal lift; a slight inclination can help guide crack fronts. In compact rock, evenly distributed rows are advantageous, while in jointed rock, aligning along joint systems boosts efficiency. Clean borehole cleaning is crucial to allow split wedges to act concentrically. Where structural components overlap with rock, <strong>concrete pulverizers<\/strong> can be used in advance to remove overlay concrete, shotcrete or leveling layers to optimize drilling in rock. Typical practice includes verifying diameter and straightness with gauges, flushing or vacuum cleaning fines, and maintaining sufficient collar distance to avoid spalling at edges.<\/p>\n<h2>Application areas at a glance<\/h2>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>At component-rock interfaces, rock is often reduced without blasting to relieve structures or to create new <strong>foundation slab<\/strong>s. <strong>Concrete pulverizers<\/strong> handle edge-near demolition, while split cylinders release the rock mass block by block. Controlled pre-relief and staged splitting reduce constraint stresses and protect sensitive fixtures.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>In complex existing structures with rock embedment, e.g., during <strong>underpinning<\/strong>, non-explosive rock removal supports the building gutting. Cutting edges are prepared with splitting; utility lines and built-in components can be removed with <strong>attachment shear<\/strong> or <strong>multi cutters<\/strong>. The low-emission approach simplifies coordination with occupancy, logistics and dust management plans.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In tunnel and gallery works, splitting devices are used in sensitive sections, during periods with vibration restrictions, or near existing structures. Removal proceeds in stages; emissions remain low, which simplifies <strong>occupational safety<\/strong> and <strong>construction logistics<\/strong>. Phased advance with short rounds supports ventilation concepts and maintains clear sightlines.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>For quarrying, splitting is used to release raw blocks along desired formats. Precise hole-pattern planning and alignment with natural bedding determine quality and yield. Orientation to rift and grain directions improves surface integrity and reduces waste.<\/p>\n<h3>Special applications<\/h3>\n<p>In protected areas, water intakes, or in the immediate vicinity of sensitive installations, low-vibration methods are often prescribed. Splitting minimizes far-field effects, dust and noise; additional measures such as mist binding or coverings improve immissions control. Monitoring with vibration and noise meters documents compliance with project-specific thresholds.<\/p>\n<h2>Workflow: step by step<\/h2>\n<ol>\n<li>Survey and documentation of geology, utility lines and boundary conditions.<\/li>\n<li>Definition of the hole pattern and removal stages, including access and laydown areas.<\/li>\n<li>Drilling works with compliant execution in terms of dust removal and water management.<\/li>\n<li>Insertion of split cylinders, controlled activation of hydraulics, release of blocks.<\/li>\n<li>Rework: lifting, sorting, size reduction; at structure edges, if necessary, use of <strong>concrete pulverizers<\/strong>.<\/li>\n<li>Securing the exposed faces (rockfall net, shotcrete, rock bolt) based on the structural concept.<\/li>\n<li>Final inspection, as-built documentation and handover for subsequent trades.<\/li>\n<\/ol>\n<h2>Performance factors and cycle planning<\/h2>\n<p>Performance is determined by rock strength, hole pattern, accessibility, block handling, and hydraulic output. Short routes for removal (<strong>haulage logistics<\/strong>), optimized drilling meters per cycle, and suitable block sizes increase throughput. A well-coordinated interplay of <strong>hydraulic splitter<\/strong> and <strong>hydraulic power packs<\/strong> directly impacts cycle times. Representative performance indicators include drilling penetration rate, splitting pressure-time curves, block mass per cycle, and handling cycle efficiency.<\/p>\n<ul>\n<li><strong>Productivity levers<\/strong>: precise borehole positioning, minimal tool changeover, multi-cylinder staggered operation, and synchronized haulage.<\/li>\n<li><strong>Availability management<\/strong>: preventive maintenance of hydraulics, hoses and couplers to avoid unplanned downtime.<\/li>\n<\/ul>\n<h2>Occupational safety and emissions<\/h2>\n<p>Even low-vibration methods require comprehensive protective measures: control of drilling dust and water, safe handling of the <strong>hydraulic hose lines<\/strong>, stability of removal lifts, and controlled <strong>fall direction<\/strong> of released blocks. Personal <strong>safety equipment<\/strong>, exclusion zones, and clear hand signals are mandatory parts of execution. Noise and dust can be reduced by appropriate drilling technology, <strong>dust extraction<\/strong>, or mist. Stored-energy hazards in hydraulic systems must be managed by pressure relief, lockout-tagout and protective covers at pinch points. Legal requirements for labor and environmental protection are location-dependent and must be observed.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>Structured documentation of the hole pattern, applied pressures, removal stages, and the <strong>material flow<\/strong> enables continuous optimization. Visual inspections of fracture surfaces and regular checks of tools as well as the <strong>hydraulic connections<\/strong> ensure execution quality. At transitions between rock and concrete, seamless recording of the interfaces is important to allow subsequent trades to connect precisely. Checklists for drilling tolerances, cleaning quality and splitter seating contribute to reproducible outcomes.<\/p>\n<h2>Environmental and disposal aspects<\/h2>\n<p>Non-explosive rock removal reduces vibrations and secondary immissions. Nevertheless, water and soil protection, dust suppression, clean <strong>construction waste separation<\/strong> between rock, concrete and steel, and short transport routes are important. Reuse of aggregates as backfill or frost protection material is possible after suitability testing. Additional requirements often apply in protected areas; these must be considered on a project-specific and general basis. Closed-loop water treatment with settling stages and silt management reduces turbidity and discharge loads.<\/p>\n<h2>Limits and combination with other methods<\/h2>\n<p>For very large volumes or extremely high strength, a combination of splitting, sawing and selective chiseling can be expedient. Splitting creates defined crack lines along which other methods can proceed in a material-friendly way. In construction areas with reinforcement and embedded parts, the targeted use of <strong>concrete pulverizers<\/strong>, <strong>attachment shear<\/strong> or <strong>steel shear<\/strong> supports the process without losing the advantages of non-explosive removal. Where necessary, pre-cuts by core drills or wire saws can refine edges and reduce breakout.<\/p>\n<h2>Practice-oriented notes on selecting equipment<\/h2>\n<p>Essential is the coordination of hole diameter, split cylinder and hydraulic output. In tight spaces, compact <strong>hydraulic splitters<\/strong> are advantageous; along long removal fronts, multiple cylinders can be operated in a staggered sequence. Proximity to structural components often requires additional <strong>concrete pulverizers<\/strong> to define intended fracture lines cleanly. Early integration into <strong>work planning<\/strong> reduces downtime and rework. Trial splits and small test fields validate the planned hole grid and pressure regime before full-scale execution.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Non-explosive rock removal stands for the controlled loosening and fragmentation of rock without the use of explosives. The method is used wherever vibrations, noise and exhaust gases must be minimized, such as in densely built urban areas, sensitive infrastructures, tunnels, or geologically complex settings. The focus is on mechanical-hydraulic methods <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-rock-removal\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19851","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Non-Explosive Rock Removal | Hydraulic Splitting<\/title>\n<meta name=\"description\" content=\"Controlled, low vibration non-explosive rock removal for urban sites, tunnels and structures \u2713 hydraulic splitting.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-rock-removal\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Non-Explosive Rock Removal | Hydraulic Splitting\" \/>\n<meta property=\"og:description\" content=\"Controlled, low vibration non-explosive rock removal for urban sites, tunnels and structures \u2713 hydraulic splitting.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-rock-removal\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-26T09:20:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/non-explosive-rock-removal\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/non-explosive-rock-removal\",\"name\":\"Non-Explosive Rock Removal | Hydraulic Splitting\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-25T10:09:43+00:00\",\"dateModified\":\"2026-05-26T09:20:02+00:00\",\"description\":\"Controlled, low vibration non-explosive rock removal for urban sites, tunnels and structures \u2713 hydraulic splitting.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/non-explosive-rock-removal#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/non-explosive-rock-removal\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/non-explosive-rock-removal#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Non-explosive rock removal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Non-Explosive Rock Removal | Hydraulic Splitting","description":"Controlled, low vibration non-explosive rock removal for urban sites, tunnels and structures \u2713 hydraulic splitting.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-rock-removal","og_locale":"en_US","og_type":"article","og_title":"Non-Explosive Rock Removal | Hydraulic Splitting","og_description":"Controlled, low vibration non-explosive rock removal for urban sites, tunnels and structures \u2713 hydraulic splitting.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-rock-removal","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-26T09:20:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-rock-removal","url":"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-rock-removal","name":"Non-Explosive Rock Removal | Hydraulic Splitting","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-25T10:09:43+00:00","dateModified":"2026-05-26T09:20:02+00:00","description":"Controlled, low vibration non-explosive rock removal for urban sites, tunnels and structures \u2713 hydraulic splitting.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-rock-removal#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/non-explosive-rock-removal"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/non-explosive-rock-removal#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Non-explosive rock removal"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19851","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19851"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19851\/revisions"}],"predecessor-version":[{"id":27795,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19851\/revisions\/27795"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}