{"id":19849,"date":"2025-12-25T14:28:38","date_gmt":"2025-12-25T13:28:38","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19849"},"modified":"2026-05-26T15:37:02","modified_gmt":"2026-05-26T13:37:02","slug":"blasting-plan","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/blasting-plan","title":{"rendered":"Blasting plan"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A blasting plan is the strategic and technical core of any controlled blasting operation-from selective concrete demolition and special demolition to <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition in tunnel construction<\/a>. It links objectives, geology, structural analysis, safety measures, and execution steps into a traceable sequence. In practice, blasting is often combined with mechanical methods. For example, <strong>concrete demolition shears<\/strong> can supplement, prepare, or replace blasting in areas close to load-bearing structures, or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\"><strong>hydraulic rock and concrete splitters<\/strong><\/a> can do so for sensitive structures when vibration limits and emissions control require it. This interlinking is made plannable and measurable in the blasting plan.<\/p>\n<p>As a living, project-specific document, the blasting plan turns constraints into defined procedures: it translates objectives into drill-and-load parameters, assigns responsibilities, defines acceptance criteria, and specifies how compliance with limits is verified by measurements and documentation.<\/p>\n<h2>Definition: What is meant by a blasting plan?<\/h2>\n<p>A blasting plan is a project-specific, written plan for the safe, compliant, and goal-oriented execution of a blasting operation. It describes the <em>blasting objectives<\/em> (e.g., loosening, fragmenting, separating), the <em>boundary conditions<\/em> (location, structural and rock properties, surrounding use), the <em>technical concept<\/em> (drill pattern, loading scheme, initiation sequence), the <em>safety and emissions control concept<\/em> (exclusion zones, vibration and dust management, flyrock protection), the <em>organization<\/em> (responsibilities, qualifications, schedule), as well as the <em>documentation and monitoring<\/em> (measurements, logs). The blasting plan thus forms the basis for preparation, permitting, execution, and verification.<\/p>\n<ul>\n<li><strong>Deliverables<\/strong>: drawings, calculation notes, method statement, risk assessment, monitoring plan, and a clear definition of acceptance and clearance criteria.<\/li>\n<\/ul>\n<h2>Structure and contents of a blasting plan<\/h2>\n<p>A robust blasting plan is clearly structured and covers all safety-relevant and technical aspects. Typical core components are:<\/p>\n<ul>\n<li><strong>Objective definition and scope<\/strong>: What is to be loosened, relaxed, or dismantled in which section?<\/li>\n<li><strong>Initial situation<\/strong>: Structural analysis or geological survey, material properties, reinforcement, stratification, joints, groundwater.<\/li>\n<li><strong>Process selection<\/strong>: Justification of the blasting technique and, where applicable, combination with mechanical methods such as concrete demolition shears or rock and concrete hydraulic wedge splitters.<\/li>\n<li><strong>Drilling and loading scheme<\/strong>: Hole diameter, depth, spacing, charge types, charge density, stemming, delays.<\/li>\n<li><strong>Initiation and sequencing plan<\/strong>: Initiation devices, order, millisecond delays, sequence per field.<\/li>\n<li><strong>Safety concept<\/strong>: Exclusion zones, personnel routes, flyrock protection, blowout prevention, emergency measures.<\/li>\n<li><strong>Vibration and emissions forecast<\/strong>: Calculation\/estimation of particle velocities, air overpressure, noise, dust; limits and protective measures.<\/li>\n<li><strong>Measurement and monitoring plan<\/strong>: Monitoring points, sensors, calibration, evaluation, evidentiary recording.<\/li>\n<li><strong>Organization<\/strong>: Responsible persons, qualifications, equipment, schedule and communications plan.<\/li>\n<li><strong>Disposal and logistics concept<\/strong>: Material removal, intermediate storage, transport, access routes.<\/li>\n<li><strong>Stakeholder and permitting<\/strong>: Coordination with neighbors and site users, authority notifications, access control and signage.<\/li>\n<li><strong>Acceptance criteria<\/strong>: Clearance procedures, vibration and air overpressure limits, post-blast inspection and documentation requirements.<\/li>\n<\/ul>\n<h3>Drilling and loading scheme in detail<\/h3>\n<p>The drill pattern follows the blasting objective: a tight grid for fragmentation, a wider grid for loosening. Charge density and distribution take into account the concrete structure (matrix), reinforcement ratio, or joint spacing in rock. Where reinforcement forms massive tension ties, pre-work with <strong>concrete demolition shears<\/strong> can improve the blasting result and avoid secondary blasting.<\/p>\n<p>Rules of thumb help when defining initial parameters for trials: in competent rock, burden-to-spacing often starts between 1:1 and 1:1.5; in reinforced concrete, initial spacing typically references 8-15 diameters of the planned hole size. Deck charging and decoupled charges reduce coupling and control maximum instantaneous charge (MIC). These values are verified and adjusted through test fields.<\/p>\n<h3>Initiation sequence and sequencing<\/h3>\n<p>An optimized initiation sequence controls break direction and fragment size, reduces airblast, and limits the maximum charge per delay. Inter-delay times are selected so that stresses dissipate and free faces are created step by step.<\/p>\n<p>Where precision is critical, electronic initiation improves timing accuracy and enables fine millisecond sequencing. Sequencing should control MIC per delay, avoid sympathetic detonation, and support progressive relief toward free faces.<\/p>\n<h3>Safety and emissions control<\/h3>\n<p>Stand-off distances, flyrock reduction, dust suppression (e.g., wetting), and shielding must be defined. In sensitive zones, combining with <em>mechanical removal<\/em>-for example using rock and concrete hydraulic wedge splitters-can significantly reduce vibration levels and air overpressure peaks.<\/p>\n<p>Weather windows and wind direction are to be considered for dust and noise dispersion. Where appropriate, use blast mats, geotextile coverings, water curtains, and in tunnels a defined ventilation regime with re-entry times. A pre-blast checklist and a clear all-clear procedure strengthen operational safety.<\/p>\n<h3>Interfaces with mechanical methods<\/h3>\n<p>The blasting plan specifies where mechanical methods are used upstream or downstream: exposing reinforcement with concrete demolition shears, controlled downsizing of oversize, or non-explosive sectional work using split cylinders where tolerance to vibration is low.<\/p>\n<p>Defined hold points, inspection before switching methods, and sequenced access rights prevent overlaps and ensure that exclusion zones remain effective throughout the operation.<\/p>\n<h2>Legal and organizational framework<\/h2>\n<p>Blasting operations are subject to specific legal regulations in many countries. The blasting plan serves as the documented basis for workflows, responsibilities, and protective measures. Responsible parties must have appropriate qualifications; approvals and notifications to authorities as well as coordination with surrounding users must be reviewed on a project-specific basis. Information in a blasting plan should always comply with applicable regulations and recognized rules of technology, without replacing case-specific professional advice.<\/p>\n<p>Core organizational elements include a project-specific risk assessment and method statement, competence and training records, explosive storage and reconciliation procedures, site access control, signage, and communication rules for interruptions and emergencies.<\/p>\n<h2>From investigation to execution: the planning workflow<\/h2>\n<ol>\n<li>Information gathering: as-built documents, structural or geological investigation, utilities, adjacent structures.<\/li>\n<li>Define objectives and boundary conditions: blasting objective, tolerances, time windows, emission limits.<\/li>\n<li>Process decision: blasting alone or combined with concrete demolition shears and rock and concrete hydraulic wedge splitters.<\/li>\n<li>Pre-tests\/test fields: calibration of drill pattern, charge density, and delays.<\/li>\n<li>Vibration forecast and protection concept: calculation, protective measures, monitoring plan.<\/li>\n<li>Finalize the blasting plan: drawings, initiation plan, safety and communication concept.<\/li>\n<li>Execution: setup, barricading, briefing, implementation, monitoring.<\/li>\n<li>Evaluation and optimization: compare measurements, adjust parameters, complete documentation.<\/li>\n<li>Stakeholder communication: notifications, briefings for neighboring operations, and documentation of planned time windows.<\/li>\n<li>Clearance and acceptance: verify re-entry criteria, collect measurement data, and confirm fulfillment of acceptance limits.<\/li>\n<\/ol>\n<h2>Application areas and specifics<\/h2>\n<p>Every application sets distinct constraints on MIC, grid, coverings, and monitoring. The blasting plan translates these into practical sequences that achieve the objective while maintaining verifiable compliance with limits.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>In urban deconstruction, vibration and noise limits are tight. Blasting plans here focus on minimal charge per delay, precise sequencing, and often on <strong>mechanical methods accompanying blasting<\/strong>: concrete demolition shears selectively separate components, reduce reinforcement ties, and create free faces so that smaller charge quantities can be used. Where blasting is not permitted, rock and concrete hydraulic wedge splitters can loosen sections non-explosively.<\/p>\n<p>Additional measures include pre-cutting of connections, micro-charges with strict MIC control, and protective coverings for glazing and sensitive finishes.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>When separating building components, dust, air overpressure, and flyrock protection are paramount. Blasting plans often do without fragmentation and rely on <em>pre-cutting<\/em> by sawing, nibbling with concrete demolition shears, and careful loosening in areas that must not be subjected to vibration.<\/p>\n<p>Interfaces with existing services, lift shafts, and shafts for building services demand dedicated exclusion and inspection routines before and after each step.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In massive rock, coordinated drilling and initiation concepts enable high efficiency. Pre-splitting for crack control, deck charging and stemming materials for blowout prevention are typical elements. For disturbed zones near structures or utilities, the blasting plan may provide for transitions to <strong>rock wedge splitters<\/strong> to minimize vibrations.<\/p>\n<p>Perimeter holes with reduced charge concentration and smooth blasting techniques improve contour quality; ventilation and re-entry times are defined to control dust and gases.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Here, rock is often loosened in <em>block-sized<\/em> form. Blasting plans aim for fracture surface quality and gentle separation. Mechanical finishing with splitters reduces waste, while targeted small charges exploit joint patterns.<\/p>\n<p>Minimizing micro-cracking preserves marketable surfaces; combined methods with wedges support clean lift-off along natural planes.<\/p>\n<h3>Special applications<\/h3>\n<p>When working in sensitive areas-such as near protected building fabric or critical infrastructure-blasting plans combine strict monitoring, tightly limited charge quantities, and, where applicable, non-explosive sections using rock and concrete hydraulic wedge splitters to reduce risks.<\/p>\n<p>Acceptance criteria place emphasis on vibration frequency content, settlement control, and demonstrable protection of sensitive assets.<\/p>\n<h2>Interaction of blasting technology and mechanical demolition<\/h2>\n<p>Integrated planning leverages the strengths of both worlds:<\/p>\n<ul>\n<li><strong>Preparation<\/strong>: concrete demolition shears reduce cross-sections, separate components, and lower restraint forces.<\/li>\n<li><strong>Execution<\/strong>: small charges loosen material; splitters take over in zones with low vibration tolerance.<\/li>\n<li><strong>Finishing<\/strong>: oversize is broken mechanically, edges are re-profiled, reinforcement is exposed.<\/li>\n<li><strong>Scheduling and interfaces<\/strong>: handover points, lockout-tagout rules, and coordinated access ensure uninterrupted, safe sequencing.<\/li>\n<\/ul>\n<p>The blasting plan defines clear interfaces so that workflows, exclusion areas, and time windows are harmonized.<\/p>\n<h2>Vibration management and monitoring<\/h2>\n<p>Limiting particle velocity is often decisive. Key levers are maximum charge per delay, initiation sequence, stemming, and charge coupling. Prediction models are validated with measurements. Where limits are tight, the plan provides for the <em>substitution<\/em> of individual blasting sections with rock and concrete hydraulic wedge splitters. Airblast, dust, and flyrock risks are minimized by coverings, wetting, and shielding.<\/p>\n<ul>\n<li><strong>Prediction<\/strong>: scaled distance methods and site-specific attenuation models inform MIC and delay design.<\/li>\n<li><strong>Frequency awareness<\/strong>: limits often depend on frequency; coupling and delay optimization help shift damaging frequencies.<\/li>\n<li><strong>Instrumentation<\/strong>: triaxial geophones at defined stand-off distances, with synchronized timing and calibrated settings.<\/li>\n<li><strong>Thresholds<\/strong>: warning and stop thresholds enable immediate adaptation of parameters during trial phases.<\/li>\n<\/ul>\n<p>Monitoring locations, trigger levels, and reporting formats are fixed in advance; results feed back into iterative optimization and stakeholder communication.<\/p>\n<h2>Quality assurance, documentation, and verification<\/h2>\n<p>Traceability includes logs of drilling and loading work, initiation lists, exclusion and clearance times, measurement reports as well as photo and video documentation. Deviations and optimization steps are recorded. These documents support evaluation, communication with stakeholders, and future planning.<\/p>\n<ul>\n<li><strong>Minimum records<\/strong>: hole coordinates and depths, explosives and accessories used, MIC per delay, initiation map, monitoring data, and reconciliation of materials.<\/li>\n<li><strong>Evidence<\/strong>: signatures of responsible persons, calibration certificates, and structured post-blast inspection reports.<\/li>\n<\/ul>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li>Insufficient investigation: verify material and structural assumptions, e.g., by trial holes or test fields.<\/li>\n<li>Overly coarse delay intervals: finer delays reduce coupling and peaks.<\/li>\n<li>Unclear interfaces: define early where concrete demolition shears and splitters are used.<\/li>\n<li>Neglecting emissions: integrate dust and airblast measures into the plan.<\/li>\n<li>Lack of a monitoring strategy: validate forecasts through monitoring and adjust parameters.<\/li>\n<li>Ignoring weather and wind: align blast timing with dispersion conditions and plan for coverings and wetting.<\/li>\n<li>Unspecified acceptance criteria: define re-entry, clearance, and documentation requirements before execution.<\/li>\n<\/ul>\n<h2>Practical tips for preparing a project-specific blasting plan<\/h2>\n<ul>\n<li><strong>Clear purpose<\/strong>: loosening, fragmenting, or separating-each objective requires a different drilling and initiation concept.<\/li>\n<li><strong>Plan to suit the material<\/strong>: concrete matrix, reinforcement, rock joints, and moisture determine charge and grid.<\/li>\n<li><strong>Leverage combinations<\/strong>: plan concrete demolition shears for selective separation and hydraulic wedge splitters for low-vibration areas.<\/li>\n<li><strong>Safety first<\/strong>: specify exclusion zones, flyrock protection, emergency routes, and communication clearly.<\/li>\n<li><strong>Make it measurable<\/strong>: define predictions, limits, monitoring points, and evaluation.<\/li>\n<li><strong>Stay adaptable<\/strong>: schedule trials and plan for iterative optimization.<\/li>\n<li><strong>State MIC unambiguously<\/strong>: communicate maximum charge per delay, and ensure it is verifiable in the field.<\/li>\n<li><strong>Use structured templates<\/strong>: standardized checklists and drawing layers increase clarity and reduce errors.<\/li>\n<\/ul>\n<p>This is how the blasting plan becomes a reliable instrument that connects safety, technology, and practice-and purposefully orchestrates the interaction of blasting technology with mechanical methods such as <strong>concrete demolition shears<\/strong> and <strong>hydraulic wedge splitters<\/strong>. Darda GmbH provides application-oriented tools for this, whose use should be clearly scoped and integrated in the planning process. Continuous evaluation of measurements and outcomes ensures that subsequent blasts benefit from verified parameters and lessons learned.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A blasting plan is the strategic and technical core of any controlled blasting operation-from selective concrete demolition and special demolition to rock demolition in tunnel construction. It links objectives, geology, structural analysis, safety measures, and execution steps into a traceable sequence. In practice, blasting is often combined with mechanical methods. <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/blasting-plan\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19849","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Blasting Plan Guide for Demolition &amp; Tunneling<\/title>\n<meta name=\"description\" content=\"Master the blasting plan for controlled demolition and rock excavation \u2713 covering safety, sequencing &amp; monitoring.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/blasting-plan\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Blasting Plan Guide for Demolition &amp; Tunneling\" \/>\n<meta property=\"og:description\" content=\"Master the blasting plan for controlled demolition and rock excavation \u2713 covering safety, sequencing &amp; monitoring.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/blasting-plan\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-26T13:37:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-plan\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-plan\",\"name\":\"Blasting Plan Guide for Demolition & Tunneling\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-25T13:28:38+00:00\",\"dateModified\":\"2026-05-26T13:37:02+00:00\",\"description\":\"Master the blasting plan for controlled demolition and rock excavation \u2713 covering safety, sequencing & monitoring.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-plan#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-plan\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-plan#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Blasting plan\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Blasting Plan Guide for Demolition & Tunneling","description":"Master the blasting plan for controlled demolition and rock excavation \u2713 covering safety, sequencing & monitoring.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/blasting-plan","og_locale":"en_US","og_type":"article","og_title":"Blasting Plan Guide for Demolition & Tunneling","og_description":"Master the blasting plan for controlled demolition and rock excavation \u2713 covering safety, sequencing & monitoring.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/blasting-plan","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-26T13:37:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/blasting-plan","url":"https:\/\/www.darda.de\/en\/knowledge\/blasting-plan","name":"Blasting Plan Guide for Demolition & Tunneling","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-25T13:28:38+00:00","dateModified":"2026-05-26T13:37:02+00:00","description":"Master the blasting plan for controlled demolition and rock excavation \u2713 covering safety, sequencing & monitoring.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/blasting-plan#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/blasting-plan"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/blasting-plan#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Blasting plan"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19849","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19849"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19849\/revisions"}],"predecessor-version":[{"id":27809,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19849\/revisions\/27809"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19849"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}