{"id":19848,"date":"2025-12-25T15:46:19","date_gmt":"2025-12-25T14:46:19","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19848"},"modified":"2026-05-25T07:20:03","modified_gmt":"2026-05-25T05:20:03","slug":"explosives","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/explosives","title":{"rendered":"Explosives"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Explosives are among the most important tools of blasting technology in construction, mining and tunneling, as well as in natural stone extraction. They enable the targeted loosening, fragmentation, and removal of rock and concrete when mechanical methods alone are insufficient or uneconomical. At the same time, numerous situations exist in which, for reasons of emissions control, safety, compliance, or tight boundary conditions, hydraulic and cutting methods are preferred. In these cases, for example at Darda GmbH, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a>, concrete demolition shears, combi shears, multi cutters, steel shears, tank cutters, hydraulic power packs, and rock wedge splitters are used, often in combination with or as an alternative to explosives. This approach supports precise, low-emission workflows and stable schedules in sensitive environments.<\/p>\n<h2>Definition: What is meant by explosives?<\/h2>\n<p>The term <em>explosives<\/em> refers to explosive substances along with their initiation and auxiliary means, designed to release large amounts of energy in a very short time. This rapid energy transfer breaks rock and concrete, separates components, and releases bonded materials. In practical usage, the term encompasses both the actual explosive (e.g., emulsion explosives, ANFO, cartridged explosives) and initiation devices (electric, non-electric, electronic), detonating cord, boosters, and additional accessories. Explosives are used exclusively by appropriately trained personnel and are subject to strict rules for storage, transport, work planning, and documentation. Depending on the project, legal definitions and approval paths may vary, but the core safety principles remain consistent.<\/p>\n<h2>Types, properties, and operating principles of explosives<\/h2>\n<p>Explosives act through a rapid chemical reaction that generates pressure and shock waves. These waves exceed the tensile and shear strength of concrete or rock and lead to fragmentation. Key distinctions concern energy content, brisance, water resistance, temperature behavior, handling, and compatibility with initiation systems. The right combination of explosive and initiation technology determines efficiency, fracture pattern, vibrations, air overpressure, and safety at the place of use. Selection is guided by borehole conditions, desired break size, permissible vibration levels, and access logistics.<\/p>\n<h3>High and low explosives<\/h3>\n<p>High explosives are brisant, produce high detonation velocities, and cause intensive fragmentation and sharp fracture surfaces. Low explosives release energy more slowly and are used primarily where heave is more important than strong fragmentation. Typical practice in construction and rock applications relies on water-resistant emulsion explosives, ANFO mixtures (for dry boreholes), cartridged explosives for smaller borehole diameters, as well as detonating cord for transfer and synchronization of initiation impulses. Detonation velocity, density, and confinement strongly influence the resulting fragment size and crack propagation.<\/p>\n<ul>\n<li><strong>Emulsion explosives:<\/strong> Robust, adaptable, frequently used in rock and in wet boreholes; available in different water resistance classes.<\/li>\n<li><strong>ANFO:<\/strong> For dry use, economical for large-volume borehole charges; requires sufficient confinement for effective energy release.<\/li>\n<li><strong>Cartridged explosives:<\/strong> Easy to dose, suitable for smaller boreholes in concrete and rock; useful for contouring and controlled breaking.<\/li>\n<li><strong>Detonating cord:<\/strong> Transfers initiation energy, used for coupling charges; enables reliable timing networks when correctly stemmed.<\/li>\n<\/ul>\n<h3>Initiation systems and accessories<\/h3>\n<p>Initiation devices provide the starting impulse and structure the temporal sequence. Non-electric systems (e.g., shock tube) are insensitive to electromagnetic influences; electric systems allow clear signals and remote diagnostics; electronic detonators enable finely graduated delays for precise control of vibrations and fracture patterns. Boosters establish reliable coupling between the initiator and the main charge. For reasons of stability and safety, initiation devices and explosives are stored strictly separately and only combined at the jobsite. Clear marking, delay design, and continuity checks reduce misfire risk and support reproducibility.<\/p>\n<h3>Effects in construction and rock<\/h3>\n<p>The effect of an explosive manifests as fragmentation, heave, vibrations, and airborne sound. In concrete demolition, controlled fracture patterns are crucial to avoid damaging remaining structures. In rock excavation, the rock mass is deliberately loosened; in tunneling, the tunnel face must remain stable and the excavation contour clean. <em>Delayed initiation sequences<\/em> reduce vibration peaks and improve break quality, but require careful planning and documentation. Monitoring parameters such as peak particle velocity (PPV), air overpressure, and flyrock distances is common practice for quality and compliance control.<\/p>\n<h2>Application contexts and selection criteria<\/h2>\n<p>Whether explosives are used depends on geology or component build-up, boundary conditions (distances, neighboring buildings, protected assets), time and cost frameworks, and legal requirements. Blasting measures are often combined with hydraulic methods to perform fine demolition, selective deconstruction, or secondary fragmentation efficiently and with low emissions. Sustainability targets, waste separation, and noise constraints increasingly influence the choice of method and tool chain.<\/p>\n<ul>\n<li><strong>Substrate and structure:<\/strong> Strength, jointing, reinforcement content, moisture, and access for drilling or clamping.<\/li>\n<li><strong>Constraints:<\/strong> Minimum distances, vibration and noise limits, heritage protection, operational continuities.<\/li>\n<li><strong>Logistics:<\/strong> Work windows, supply security, evacuation concepts, and debris handling.<\/li>\n<li><strong>Compliance:<\/strong> Permits, documentation depth, and qualification requirements for personnel.<\/li>\n<\/ul>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>In the controlled deconstruction of bridges, foundations, shafts, or massive concrete blocks, clean separation joints and limited vibrations are important. Explosives enable the release of large cross-sections. For subsequent sorting and the controlled removal of remaining zones, <strong>concrete demolition shears<\/strong> are used, reinforcement is cut with <em>steel shears<\/em>, and component edges are reworked with <em>combi shears<\/em> or <em>multi cutters<\/em>. Where blasting is ruled out for reasons of emissions or heritage protection, <strong>stone and concrete splitters<\/strong> and <em>rock wedge splitters<\/em> are deployed, supported by powerful <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a>. Pre-scanning of reinforcement and controlled sequencing shorten downtimes between phases.<\/p>\n<h3>Rock excavation and tunneling<\/h3>\n<p>In rock, explosives have traditionally been used for extraction and advance. The excavation contour must be stable and reproducible. In sensitive sections, near structures, or in geological fault zones, low-vibration methods are required &#8211; especially in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>. <strong>Stone and concrete splitters<\/strong> and <em>rock wedge splitters<\/em> allow controlled separation without detonation pressure and are therefore established as an alternative or complement to explosives. At the tunnel face, mechanical pre-cutting can reduce the blasting burden, and final profiling is often performed hydraulically to minimize overbreak.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In the production of dimension stone, minimizing microcracks is crucial. While explosives are suitable for mass breakage, <em>hydraulic splitting methods<\/em> produce calm, straight separation joints and high block qualities. <strong>Stone and concrete splitters<\/strong> are a proven option here for obtaining value-adding blocks with minimal waste. Pre-splitting along natural discontinuities and careful handling during lifting help retain surface integrity and color consistency.<\/p>\n<h3>Interior demolition and cutting<\/h3>\n<p>In interior areas and confined conditions, the use of explosives is usually not expedient. Instead, <strong>concrete demolition shears<\/strong>, <em>multi cutters<\/em>, and <em>combi shears<\/em> dominate for the selective separation of concrete, masonry, steel, and composite materials. For metallic tanks and thick-walled structures, a <em>tank cutter<\/em> can support safe disassembly. This limits dust, noise, and vibrations, and material streams can be separated by type directly at the source. Ventilation constraints and fire load assessments additionally favor hydraulic and mechanical approaches.<\/p>\n<h2>Distinction and alternatives: hydraulics instead of explosives<\/h2>\n<p>Mechanical and hydraulic methods provide a <strong>low-vibration and finely controllable<\/strong> alternative to explosives. <strong>Stone and concrete splitters<\/strong> generate controlled cracks via spreading forces, <em>rock wedge splitters<\/em> act deep in the borehole, and <em>concrete demolition shears<\/em> act on the exposed component. <em>Hydraulic power packs<\/em> deliver the necessary output; <em>combi shears<\/em>, <em>steel shears<\/em>, and <em>multi cutters<\/em> take over the separation of reinforcement, sections, and attachments. These methods are predestined for inner-city locations, sensitive infrastructure, work near utilities, and selective deconstruction.<\/p>\n<ul>\n<li><strong>Advantages:<\/strong> Reduced emissions, precise crack control, repeatable results, and simplified neighborhood protection.<\/li>\n<li><strong>Considerations:<\/strong> Access for tool setup, reaction forces on supports, and integration with cutting or drilling steps.<\/li>\n<\/ul>\n<h2>Safety, occupational safety, and permits<\/h2>\n<p>Explosives are subject to strict regulations on acquisition, storage, transport, and application. Suitable qualifications, approvals, and a documented workflow with hazard analysis are required. This includes cordoning and warning concepts, protective measures against flyrock, vibration and airborne sound monitoring, as well as rules for handling misfires. The information in operating manuals of the means used, in relevant regulations, and the agreements with authorities must be observed. These notes are general in nature and do not replace a project-specific review. A structured blast plan, competence management, and clear communication chains are central pillars of risk control.<\/p>\n<h2>Environmental impacts, emissions, and neighborhood protection<\/h2>\n<p>Relevant impacts include vibrations, airborne sound, dust, and flyrock. Coordinated delay sequences, shielding, and suitable working hours can limit emissions. In inner-city deconstruction or near sensitive objects, <strong>stone and concrete splitters<\/strong> and <em>concrete demolition shears<\/em> are often used because these methods are <em>low-vibration<\/em> and <em>noise-reducing<\/em>. Continuous monitoring (e.g., vibration measurement) helps ensure compliance with guideline values and creates transparency for local residents. Pre-condition surveys and complaint management processes strengthen acceptance and provide a factual basis for evaluation.<\/p>\n<ul>\n<li><strong>Mitigation:<\/strong> Water spray or vacuum extraction for dust, mats for flyrock, acoustic barriers for air overpressure, and PPV monitoring.<\/li>\n<li><strong>Documentation:<\/strong> Measuring points, trigger thresholds, and event logs for traceability and reporting.<\/li>\n<\/ul>\n<h2>Planning, quality assurance, and documentation<\/h2>\n<p>Professional work planning defines objectives (fragmentation, contour, protected assets), boundary conditions (geology, component build-up), logistical processes, and interfaces to downstream activities such as sorting and haulage. Test areas, measurement-based evaluation, and traceable documentation ensure reproducible results. In combined methods, planning already determines which areas are separated with explosives and which are processed with hydraulic tools such as <strong>concrete demolition shears<\/strong>, <em>combi shears<\/em>, or <em>rock wedge splitters<\/em>. Defined key figures such as fragment size distribution, PPV, overbreak, and cycle time support continuous improvement.<\/p>\n<h2>Material logistics, storage, and transport of explosives<\/h2>\n<p>Explosives and initiation devices are stored separately and securely, safeguarded against unauthorized access and protected from moisture and high temperatures. Transport is carried out in accordance with the applicable dangerous goods regulations. Batch and shelf-life control, proper incoming inspection, and clear inventory management are part of quality assurance. Hydraulic alternatives are likewise subject to requirements for maintenance, leak-tightness, and performance of the <em>hydraulic power packs<\/em> as well as functional tests on site. Clearly assigned responsibilities and redundancy in supply reduce schedule risks.<\/p>\n<h2>Product relevance in practice: combined methods in deconstruction<\/h2>\n<p>In practice, explosives are often used for coarse separation, while fine processing is carried out mechanically. A typical sequence can look like this: large concrete cross-sections are released; subsequently, <strong>concrete demolition shears<\/strong> break components to the required size, <em>steel shears<\/em> cut reinforcement, <em>combi shears<\/em> process transition areas, and <em>multi cutters<\/em> separate attachments. Where blasting is not permitted, <strong>stone and concrete splitters<\/strong> or <em>rock wedge splitters<\/em> take over the primary separation. This interplay increases process reliability and the quality of the final result. Clear interfaces, synchronized timing, and suitable pre-weakening reduce rework and handling effort.<\/p>\n<h2>Limits of the use of explosives<\/h2>\n<p>Explosives reach their limits when the protection of sensitive structures is paramount, when accessibility is restricted, or when legal and organizational efforts outweigh the benefits. In <em>special operations<\/em> &#8211; for example, in facilities with hazardous residues, for critical infrastructure, or in listed structures &#8211; <strong>stone and concrete splitters<\/strong>, <em>concrete demolition shears<\/em>, and precise <em>tank cutters<\/em> are often the first choice. The decision is always made after a comprehensive assessment of risks and boundary conditions. Ventilation restrictions, continuous operations, and complex evacuation concepts can further tip the balance toward hydraulic approaches.<\/p>\n<h2>Linguistic classification and practical usage<\/h2>\n<p>In everyday language, \u201cblasting\u201d is often used as an umbrella term for any type of rapid material fracture. Technically, it is important to distinguish between explosive substances, initiation devices, and accessories. Equally important is the distinction from <em>hydraulic splitting and cutting methods<\/em>, which do not use explosive substances and play a central role in concrete demolition, special deconstruction, rock excavation, and tunneling. For planning, tendering, and execution, clear terminology is helpful so that objectives, risks, and responsibilities are unambiguous. Consistent terminology improves comparability in bids and reduces misinterpretations during execution.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Explosives are among the most important tools of blasting technology in construction, mining and tunneling, as well as in natural stone extraction. They enable the targeted loosening, fragmentation, and removal of rock and concrete when mechanical methods alone are insufficient or uneconomical. At the same time, numerous situations exist in <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/explosives\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19848","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Explosives in Construction, Mining &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Guide to explosives for construction, mining and tunneling \u2713 types, initiation, safety and low vibration alternatives.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/explosives\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Explosives in Construction, Mining &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Guide to explosives for construction, mining and tunneling \u2713 types, initiation, safety and low vibration alternatives.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/explosives\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-25T05:20:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/explosives\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/explosives\",\"name\":\"Explosives in Construction, Mining & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-25T14:46:19+00:00\",\"dateModified\":\"2026-05-25T05:20:03+00:00\",\"description\":\"Guide to explosives for construction, mining and tunneling \u2713 types, initiation, safety and low vibration alternatives.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/explosives#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/explosives\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/explosives#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Explosives\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Explosives in Construction, Mining & Demolition","description":"Guide to explosives for construction, mining and tunneling \u2713 types, initiation, safety and low vibration alternatives.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/explosives","og_locale":"en_US","og_type":"article","og_title":"Explosives in Construction, Mining & Demolition","og_description":"Guide to explosives for construction, mining and tunneling \u2713 types, initiation, safety and low vibration alternatives.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/explosives","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-25T05:20:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/explosives","url":"https:\/\/www.darda.de\/en\/knowledge\/explosives","name":"Explosives in Construction, Mining & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-25T14:46:19+00:00","dateModified":"2026-05-25T05:20:03+00:00","description":"Guide to explosives for construction, mining and tunneling \u2713 types, initiation, safety and low vibration alternatives.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/explosives#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/explosives"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/explosives#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Explosives"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19848","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19848"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19848\/revisions"}],"predecessor-version":[{"id":27745,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19848\/revisions\/27745"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19848"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}