{"id":19842,"date":"2025-12-24T09:16:52","date_gmt":"2025-12-24T08:16:52","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19842"},"modified":"2026-05-25T10:42:03","modified_gmt":"2026-05-25T08:42:03","slug":"blasting-works","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/blasting-works","title":{"rendered":"Blasting works"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Blasting works are a central method in construction and the raw materials sector whenever rock or massive concrete structures must be efficiently loosened, crushed, or removed. In urban environments, in tunnel construction, and in special demolition, however, <em>low-vibration<\/em> and <em>low-noise<\/em> alternatives now stand alongside blasting technology on equal footing. These include above all <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong>, <strong>concrete demolition shears<\/strong>, combination shears, as well as other hydraulic tools that are often planned in combination with blasting works in order to balance precision, safety, and environmental compatibility. When combined thoughtfully, <strong>blasting works<\/strong> provide bulk efficiency, while hydraulic tools deliver selective accuracy and controlled sequencing across sensitive interfaces.<\/p>\n<h2>Definition: What is meant by blasting works?<\/h2>\n<p><strong>Blasting works<\/strong> refer to the controlled application of explosives to selectively loosen or fragment rock, concrete, or other mineral materials. The goal is predictable fragmentation while simultaneously protecting people, the environment, and adjacent infrastructure. Blasting works require special expertise, a careful hazard analysis, and official permits. In practice, blasting is often coordinated with mechanical methods, for example through subsequent removal with <em>concrete demolition shears<\/em> or low-vibration pre-loosening with <em>hydraulic splitters<\/em> when sensitive areas are nearby.<\/p>\n<ul>\n<li><strong>Typical process steps<\/strong>: site survey and risk assessment, blast design and charge calculation, drilling and <em>stemming<\/em>, charging and initiation planning, exclusion and signaling, detonation and clearance, monitoring of <em>PPV<\/em> and air overpressure, scaling and mucking, documentation.<\/li>\n<li><strong>Design parameters<\/strong>: burden and spacing, timing and delay patterns, decked charges, pre-splitting or smooth blasting for contour control, misfire prevention and post-blast checks.<\/li>\n<\/ul>\n<h2>Basic principles, objectives, and distinctions<\/h2>\n<p>The basic principle of blasting technology is the short-term release of energy that separates and displaces the material matrix. Typical objectives include loosening rock in tunnel and road construction, removing massive foundations, and controlled toppling of components in special demolition. Where vibrations, noise, dust, or flyrock must be limited, <strong>hydraulic alternatives<\/strong> are used in addition to or instead of blasting. <em>Hydraulic splitters<\/em> and <em>concrete demolition shears<\/em> enable precise, step-by-step work with reduced emissions and are often combined in sequences: first loosen, then selectively dismantle and separate by material.<\/p>\n<ul>\n<li><strong>Output vs. control<\/strong>: high advance rates with blasting vs. fine geometry, selective dismantling, and material purity with hydraulic tools.<\/li>\n<li><strong>Emission profile<\/strong>: PPV and air overpressure from blasting vs. lower noise and vibration from splitting, cutting, and shearing.<\/li>\n<li><strong>Quality of the break<\/strong>: controlled contours via pre-splitting or smooth blasting vs. crack guidance by hydraulic splitting in sensitive zones.<\/li>\n<\/ul>\n<h2>Historical development and current practice<\/h2>\n<p>From its beginnings in mining to modern, monitored blasting, the focus has shifted from pure performance gains to precision, predictability, and neighborhood protection. Today, blasting works are closely linked with metrology, monitoring, and coordinated construction logistics. Mechanical tools such as <em>concrete demolition shears<\/em>, <em>Multi Cutters<\/em>, and <em>combination shears<\/em> form the bridge between the blasting solution and material-appropriate downstream processing, for example for exposing reinforcement or for final geometry finishing on components.<\/p>\n<p>Digital blast design, remote initiation systems, and continuous data logging have improved reproducibility and compliance verification. In parallel, hydraulic equipment has become more powerful and finely controllable, enabling hybrid approaches that reduce residual risks and optimize the sequence from loosening to sizing and sorting.<\/p>\n<h2>Typical applications in construction and deconstruction<\/h2>\n<p>Blasting works are anchored across several sectors. The choice of method depends on geology, structural behavior, environmental conditions, and the site\u2019s objectives. Mechanical technology complements blasting where control, selectivity, and material separation take priority.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In rock, blasting is used to advance excavation or to stabilize slopes. Near structures, utilities, or transportation routes, <strong>rock wedge splitters<\/strong> can serve as a low-vibration option to pre-weaken rock and guide crack propagation. <em>Hydraulic power packs<\/em> supply these devices with constant power. Dedicated <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic Power Units<\/a> ensure consistent performance. In this way, safety distances and monitoring requirements can be better maintained, while the subsequent <em>debris clearance<\/em> with mechanical tools can proceed in a structured manner.<\/p>\n<ul>\n<li><strong>Method variants<\/strong>: production blasting for advance, pre-splitting for slope stability, smooth blasting for perimeter control, secondary breaking for oversize lumps.<\/li>\n<li><strong>Interface to mechanics<\/strong>: post-blast scaling, mucking and sorting, trimming with <em>hydraulic splitters<\/em> where contour quality is critical.<\/li>\n<\/ul>\n<h3>Natural stone extraction<\/h3>\n<p>In natural stone extraction, block quality is paramount. Where large-format, low-crack pieces are required, <em>hydraulic splitters<\/em> support gentle release of the material. Blasting works may precede or follow, but is often scaled back in sensitive deposits to preserve edges. The interplay of controlled loosening and mechanical separation determines the yield.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>Massive reinforced-concrete bodies, bridges, or industrial facilities require a combination of methods. Blasting can loosen components or create drop heights; precise downsizing then often uses <strong>concrete demolition shears<\/strong>, which selectively separate concrete and reinforcement. <em>Steel shears<\/em> handle larger steel sections, while <em>Multi Cutters<\/em> and <em>combination shears<\/em> flexibly adapt to varying material thicknesses. This reduces emissions and prepares recycling streams.<\/p>\n<ul>\n<li><strong>Selective dismantling<\/strong>: staged removal to protect adjacent assets, reduction of unplanned fracture surfaces, and improved handling safety.<\/li>\n<li><strong>Reinforcement exposure<\/strong>: targeted cracking followed by rebar cutting supports material separation and recycling.<\/li>\n<\/ul>\n<h3>Strip-out and cutting<\/h3>\n<p>In buildings with close neighbors or during ongoing operations, selective methods that reduce dust and noise dominate. Blasting works play at most a subordinate role here. Instead, components are controlled with <em>concrete demolition shears<\/em> and lowered, or prepared with complementary cutting methods. The result is clean cut edges, better reusability of materials, and fewer disruptions.<\/p>\n<h3>Special applications<\/h3>\n<p>For special tasks, for example in sensitive industrial areas or with problematic materials, customized solutions are required. <em>Cutting torches<\/em> are used, for instance, when vessels must be properly opened or cut into segments. Whether blasting is suitable depends on the inventory of substances, protective measures, and boundary conditions and is evaluated on a project-specific basis.<\/p>\n<h2>Safety and environmental aspects<\/h2>\n<p>Protecting people and the environment has top priority. The hazard analysis considers vibrations, noise, dust, flyrock, and pressure waves. Exclusion zones, warning signals, and coordinated communication are fundamental building blocks. Where requirements are particularly high, <strong>low-vibration<\/strong> methods such as <em>hydraulic splitters<\/em> or <em>concrete demolition shears<\/em> can offer advantages, for example at hospitals, historic structures, or highly serviced industrial installations.<\/p>\n<h3>Vibrations and structural monitoring<\/h3>\n<p>Vibrations are monitored in the vicinity of vulnerable structures, with the aim of preserving the integrity of neighboring structures and complying with limits. In many projects, the blasting concept is interlocked with mechanical methods so that critical steps take place with low vibration levels, while high-output sections are planned at greater distance from the surroundings. <em>Ground vibration monitoring<\/em> supports compliance verification.<\/p>\n<ul>\n<li><strong>Key indicators<\/strong>: peak particle velocity, frequency content, air overpressure, and crack mapping on sensitive elements.<\/li>\n<li><strong>Control measures<\/strong>: charge confinement and delay optimization, decked charges, increased burden or additional pre-splitting, substitution with <em>hydraulic splitting<\/em> where thresholds would be exceeded.<\/li>\n<\/ul>\n<h3>Dust, noise, and emissions<\/h3>\n<p>Dust and noise reduction are part of work preparation. Mechanical alternatives are often quieter but require appropriately organized material logistics. In enclosed or semi-enclosed spaces, low-emission steps are preferred, which is why <em>concrete demolition shears<\/em> and similar tools are often the first choice, while blasting works are limited to suitable areas. Measures can include <em>dust suppression<\/em> and <em>noise control<\/em>.<\/p>\n<ul>\n<li><strong>Typical measures<\/strong>: water mist, local extraction at the tool, enclosure concepts, time-window management, and transport routes with minimal crossing of occupied areas.<\/li>\n<\/ul>\n<h2>Planning, approvals, and expertise<\/h2>\n<p>Blasting works are subject to special permits and qualification requirements in many countries. Responsibilities, notification and documentation obligations, as well as safety requirements are defined on a project-specific basis. Statements here are always general and not binding. In practice, blasting concepts are coordinated early with structural analysis, surveying, monitoring, and the selection of mechanical equipment. <em>Hydraulic power packs<\/em> ensure the energy supply for <em>rock wedge splitters<\/em>, <em>concrete demolition shears<\/em>, and other devices to enable seamless workflows.<\/p>\n<ul>\n<li><strong>Planning checklist<\/strong>: site constraints and receptors, allowable PPV and noise criteria, access and egress, emergency procedures, monitoring plan, and interfaces to downstream logistics.<\/li>\n<\/ul>\n<h2>Process alternatives and complementary technology<\/h2>\n<p>Combining blasting works with hydraulic tools increases controllability and supports material separation. Common complements include:<\/p>\n<ul>\n<li><strong>hydraulic splitters<\/strong>: low-vibration pre-loosening and controlled separation in sensitive environments.<\/li>\n<li><strong>concrete demolition shears<\/strong>: selective demolition of reinforced concrete, exposing and separating reinforcement.<\/li>\n<li><em>combination shears<\/em> and <em>Multi Cutters<\/em>: flexible adaptation to varying material thicknesses and mixed matrices.<\/li>\n<li><em>steel shears<\/em>: cutting massive steel sections, beams, and rebar bundles.<\/li>\n<li><em>cutting torches<\/em>: segmented opening of vessels in special applications.<\/li>\n<li><em>hydraulic power packs<\/em>: constant power for mobile and stationary tools.<\/li>\n<li><em>diamond drilling and wire or wall sawing<\/em>: precise openings, trims, and separations where geometry and surface quality are critical.<\/li>\n<li><em>dust suppression and extraction systems<\/em>: emission control for enclosed or sensitive areas.<\/li>\n<\/ul>\n<p>With this combination, work steps can be decoupled: coarse loosening where possible and precise processing where necessary.<\/p>\n<h2>Work preparation and interface management<\/h2>\n<p>Good work preparation defines interfaces between blasting technology, mechanical removal, transport, and recycling. Clear responsibilities, coordinated time windows, and secured traffic routes ensure smooth operations. Mechanical tools such as <em>concrete demolition shears<\/em> reduce uncontrolled breakage and facilitate dimensionally accurate processing of components prior to transport.<\/p>\n<ul>\n<li><strong>Interfaces<\/strong>: drilling and charging teams, monitoring unit, mechanical dismantling crews, logistics and traffic control, waste management and documentation.<\/li>\n<\/ul>\n<h3>Material flow and recycling<\/h3>\n<p>After loosening, fractions are separated: concrete, reinforcing steel, and other materials. <em>Steel shears<\/em> create manageable lengths, while <em>concrete demolition shears<\/em> size concrete pieces for later processing or reuse. In industrial facilities, material inventories must also be considered; <em>cutting torches<\/em> support safe segmentation. Notes on legal requirements are always general and not case-specific.<\/p>\n<p>Pre-separation on site increases downstream efficiency: clean aggregates, free rebar, and targeted segregation of contaminants reduce disposal volumes and improve recycling quality in the sense of a circular approach.<\/p>\n<h2>Risks, residual risks, and decision-making<\/h2>\n<p>The choice between blasting works and mechanical methods is a trade-off between time, risk, emissions, and material quality. In dense environments or at protected structures, <strong>low-vibration<\/strong> solutions often offer advantages. Where output and reach dominate, blasting technology may be advantageous. Hybrid concepts leverage the strengths of both approaches.<\/p>\n<ul>\n<li><strong>Decision criteria<\/strong>: schedule constraints, allowable PPV and noise, access limitations, geometry and required tolerances, environmental and neighborhood sensitivity, recycling objectives.<\/li>\n<li><strong>Residual risks<\/strong>: misfires, flyrock, unforeseen crack propagation, dust peaks, and interface delays mitigated by phased execution and monitoring.<\/li>\n<\/ul>\n<h2>Terminological distinctions<\/h2>\n<p>Blasting works differ from <em>hydraulic splitting<\/em> and from <em>cutting<\/em> primarily in the type of energy input and the resulting emissions. In <em>controlled demolition<\/em>, the focus is on controlled toppling or loosening; in <em>special demolition<\/em>, selective, mechanical methods with <em>concrete demolition shears<\/em> and complementary shears often dominate. In the <em>blasting advance<\/em> of tunnel and rock construction, space gain is organized in precise rounds and interlinked with subsequent mechanical work steps.<\/p>\n<h2>Technical trends and development<\/h2>\n<p>Development is moving toward precise, data-driven methods with comprehensive monitoring. At the same time, sustainability and the circular economy are coming into focus. Mechanical tools such as <em>hydraulic splitters<\/em>, <em>concrete demolition shears<\/em>, <em>Multi Cutters<\/em>, and <em>combination shears<\/em> are becoming more powerful and more finely controllable. The result is hybrid concepts that intelligently combine blasting technology and hydraulics to unite quality, safety, and environmental aspects.<\/p>\n<p>Advances include sensor-supported blast design, automated data capture for compliance, remote activation concepts, and integration with low-emission carriers. In practice, this leads to higher predictability, fewer disturbances, and improved downstream material management with consistent documentation across all phases.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Blasting works are a central method in construction and the raw materials sector whenever rock or massive concrete structures must be efficiently loosened, crushed, or removed. In urban environments, in tunnel construction, and in special demolition, however, low-vibration and low-noise alternatives now stand alongside blasting technology on equal footing. These <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/blasting-works\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19842","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Blasting Works in Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Guide to blasting works in construction and demolition \u2713 safety, low vibration options, and hybrid hydraulic methods.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/blasting-works\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Blasting Works in Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Guide to blasting works in construction and demolition \u2713 safety, low vibration options, and hybrid hydraulic methods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/blasting-works\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-25T08:42:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-works\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-works\",\"name\":\"Blasting Works in Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-24T08:16:52+00:00\",\"dateModified\":\"2026-05-25T08:42:03+00:00\",\"description\":\"Guide to blasting works in construction and demolition \u2713 safety, low vibration options, and hybrid hydraulic methods.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-works#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-works\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/blasting-works#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Blasting works\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Blasting Works in Construction & Demolition","description":"Guide to blasting works in construction and demolition \u2713 safety, low vibration options, and hybrid hydraulic methods.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/blasting-works","og_locale":"en_US","og_type":"article","og_title":"Blasting Works in Construction & Demolition","og_description":"Guide to blasting works in construction and demolition \u2713 safety, low vibration options, and hybrid hydraulic methods.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/blasting-works","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-25T08:42:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/blasting-works","url":"https:\/\/www.darda.de\/en\/knowledge\/blasting-works","name":"Blasting Works in Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-24T08:16:52+00:00","dateModified":"2026-05-25T08:42:03+00:00","description":"Guide to blasting works in construction and demolition \u2713 safety, low vibration options, and hybrid hydraulic methods.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/blasting-works#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/blasting-works"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/blasting-works#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Blasting works"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19842","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19842"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19842\/revisions"}],"predecessor-version":[{"id":27759,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19842\/revisions\/27759"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}