{"id":19839,"date":"2025-12-24T08:19:47","date_gmt":"2025-12-24T07:19:47","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19839"},"modified":"2026-05-25T17:27:03","modified_gmt":"2026-05-25T15:27:03","slug":"special-equipment","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/special-equipment","title":{"rendered":"Special equipment"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Special equipment comprises technical solutions designed for demanding tasks in demolition, deconstruction, rock cutting\/processing, and natural stone extraction. They are deployed when standard tools reach physical, spatial, or safety limits. Typical examples include <strong>concrete pulverizers<\/strong>, <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/em>, hydraulic splitting cylinders, combination shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a>, steel shears, tank cutters, and the associated hydraulic power packs. Combined with precise working methods, they enable controlled separating, splitting, crushing, and dismantling of concrete, masonry, natural stone, steel, and composite structures &#8211; with low vibration, low emissions, and high repeatability. Compact geometries and high power density favor use in confined, load-sensitive, or indoor environments where precision and controllability are essential.<\/p>\n<h2>Definition: What is meant by special equipment?<\/h2>\n<p>Special equipment refers to machines, attachments, and hand-held hydraulic systems designed for specific tasks in structural and geotechnical practice. Characteristic features include application-specific kinematics and force transmission (e.g., shears, jaws, splitting wedges), high power density via hydraulics, compact construction for confined workspaces, and a precise, controllable effect. Special equipment provides support in particular for concrete demolition and special deconstruction, for strip-out and cutting, for rock excavation and tunnel construction, for natural stone extraction, and for special operations with stringent safety or environmental protection requirements.<\/p>\n<ul>\n<li><strong>Application-specific kinematics<\/strong> with optimized shearing, splitting, or cutting geometry for the target material.<\/li>\n<li><strong>High power density<\/strong> through hydraulics for reliable force delivery under constrained access conditions.<\/li>\n<li><strong>Compact, ergonomic construction<\/strong> for reduced set-up space and safe handling in confined areas.<\/li>\n<li><strong>Fine controllability<\/strong> to achieve reproducible results and minimize secondary damage.<\/li>\n<\/ul>\n<h2>Hydraulic operating principles and designs<\/h2>\n<p>The majority of special equipment is hydraulically operated. A hydraulic power pack provides the required pressure and flow rate, which is routed through hydraulic hose lines to cylinders, motors, or valves. This yields three core operating principles: splitting (force acts radially via wedges or splitting cylinders into a drilled or natural structure), shearing\/jaw action (two opposing blades or jaws generate concentrated shear and crushing force), and cutting\/separating (continuous cut via blade geometry, rotating tools, or specialized cutting heads. The choice of principle depends on the material, component geometry, accessibility, and the required cut or fracture quality.<\/p>\n<ul>\n<li><strong>Splitting<\/strong>: Induces tensile stress along boreholes or natural joints to open defined crack planes; typical tools include splitting cylinders and <em>rock and concrete splitters<\/em>.<\/li>\n<li><strong>Shearing &#8211; jaw action<\/strong>: Concentrates force at jaws or blades to crush concrete and separate reinforcement; common with concrete pulverizers and combination shears.<\/li>\n<li><strong>Cutting &#8211; separating<\/strong>: Produces continuous, clean cuts in metals and profiles using blade geometry or rotary heads; typical tools include steel shears and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a>.<\/li>\n<\/ul>\n<h2>Typical special equipment and their tasks<\/h2>\n<p>Concrete pulverizers are used for the controlled size reduction of reinforced concrete and heavily reinforced components. They combine high shear force with effective crushing to selectively separate the matrix and reinforcement. <em>Rock and concrete splitters<\/em> &#8211; often built as compact splitting cylinders &#8211; use the splitting principle for low-noise, explosive-free separations in foundations, walls, slabs, or natural stone blocks. Combination shears combine the breaking of concrete and cutting of reinforcing steel in one tool and are suitable for selective deconstruction. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a> extend the application range to different materials and profile geometries. Steel shears focus on the efficient cutting of beams, sections, plates, and rebar. Tank cutters are designed for the safe opening and segmenting of vessels, silos, and tanks where sparks, vapors, or residual media require particular caution. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> complete the system and deliver application-optimized pressure\/flow values, often with fine control for precise, repeatable workflows.<\/p>\n<ul>\n<li><strong>Concrete pulverizers<\/strong>: Size reduction, exposure and separation of rebar, preparatory dismantling.<\/li>\n<li><strong>Rock and concrete splitters<\/strong>: Quiet, low-vibration crack initiation and block separation.<\/li>\n<li><strong>Combination shears<\/strong>: Selective deconstruction where concrete and steel appear in one section.<\/li>\n<li><strong>Multi Cutters<\/strong>: Flexible cutting of profiles, sheet metal, cable trays, and light steel structures.<\/li>\n<li><strong>Steel shears<\/strong>: Productive cutting of beams, sections, plates, and rebar bundles.<\/li>\n<li><strong>Tank cutters<\/strong>: Safe openings in vessels and tanks with attention to fumes and ignition sources.<\/li>\n<li><strong>Hydraulic power units<\/strong>: Provide matched pressure and flow for consistent tool performance.<\/li>\n<\/ul>\n<h2>Fields of application: From deconstruction to natural stone extraction<\/h2>\n<p>In <strong>concrete demolition and special deconstruction<\/strong>, concrete pulverizers enable a structured removal of slabs, walls, columns, and foundations. For massive cross-sections, the removal concept can be supplemented with splitting cylinders to induce stresses and exploit controlled cracking. For <strong>strip-out and cutting<\/strong> of fixtures, lines, routes, and light steel structures, Multi Cutters, steel shears, and tank cutters are used &#8211; with a focus on clean cut edges and minimized secondary damage. In <strong>rock excavation and tunnel construction<\/strong>, rock and concrete splitters offer a low-vibration alternative to produce breakouts, cross-section corrections, or niches without affecting the surroundings. In <strong>natural stone extraction<\/strong>, splitting cylinders and stone splitters support the gentle release and sizing of blocks along natural joints or targeted rows of boreholes. For <strong>special operations<\/strong> &#8211; for example in sensitive areas with stringent limits on vibration, noise, or emissions &#8211; the operating principles and tools can be combined as required.<\/p>\n<ul>\n<li><strong>Sensitive structures<\/strong>: Work near historic fabric, utilities, or vibration-critical equipment.<\/li>\n<li><strong>Confined sites<\/strong>: Basement works, shafts, galleries, and narrow access conditions.<\/li>\n<li><strong>Occupied environments<\/strong>: Low-noise, low-dust measures to maintain adjacent operations.<\/li>\n<li><strong>Selective dismantling<\/strong>: Targeted separation for high recycling purity and minimal collateral damage.<\/li>\n<\/ul>\n<h2>Selection criteria and sizing<\/h2>\n<p>The selection of special equipment depends on material, component thickness, reinforcement ratio, accessibility, and quality requirements for the result (cut appearance, fracture path, reusability). Important parameters include splitting force or cutting\/shearing force, jaw opening and depth, blade or wedge geometry, operating pressure and flow rate of the hydraulic system, and self-weight relative to hand-held use or carrier machine. For concrete pulverizers, force progression, blade position, and rebar clearance are decisive; for <em>rock and concrete splitters<\/em>, borehole diameter, wedge angle, and body length influence the splitting effect. A matched hydraulic power pack ensures the tool continuously achieves its rated performance and remains finely controllable.<\/p>\n<ul>\n<li><strong>Material and geometry<\/strong>: Concrete strength class, aggregate type, steel grade, section thickness, and edge distances.<\/li>\n<li><strong>Performance window<\/strong>: Required splitting or cutting force, stroke speed, and duty cycle.<\/li>\n<li><strong>Interface fit<\/strong>: Hose size, coupling type, permissible back pressure, and carrier compatibility.<\/li>\n<li><strong>Result quality<\/strong>: Targeted crack path, cut straightness, and surface finish for downstream processing.<\/li>\n<li><strong>Ergonomics and mass<\/strong>: Tool weight and balance relative to hand-held operation or carrier payload.<\/li>\n<\/ul>\n<h2>Working methods: Splitting, shearing, cutting<\/h2>\n<p><strong>Splitting<\/strong> starts with borehole planning (diameter, depth, pattern). Splitting cylinders are inserted; the wedges extend, generate radial pressure, and produce defined crack patterns. This allows massive elements to be subdivided into transportable, manageable segments. In <strong>shearing<\/strong>, concrete pulverizers or combination shears act with high forces on a small contact area; the concrete matrix is crushed, reinforcement is cut or exposed, which facilitates material-segregated separation. <strong>Cutting<\/strong> of steel components is performed with steel shears or Multi Cutters; tank cutters enable safe openings of vessels, often with organizational measures to minimize sparks, dust, and fumes. The methods can be combined on a project basis, for example splitting to pre-widen cracks followed by size reduction with concrete pulverizers.<\/p>\n<ol>\n<li><strong>Plan the intervention<\/strong>: Define target geometry, borehole grid, and sequence to control crack propagation.<\/li>\n<li><strong>Prepare interfaces<\/strong>: Verify hydraulic pressure\/flow, hose integrity, and tool function before load is applied.<\/li>\n<li><strong>Execute in stages<\/strong>: Apply force incrementally, monitor response, and adapt spacing or orientation as needed.<\/li>\n<li><strong>Sectionalize<\/strong>: Reduce subdivided segments to handling size with appropriate shearing or cutting tools.<\/li>\n<li><strong>Verify quality<\/strong>: Check cut edges, crack path, and rebar exposure against the plan before proceeding.<\/li>\n<\/ol>\n<h2>Safety, emissions, and environmental protection<\/h2>\n<p>Work with special equipment requires a careful hazard analysis, coordinated work instructions, and suitable personal protective equipment. Hydraulic methods are generally low in vibration and noise; nevertheless, vibrations, noise emission, and dust emission should be monitored and minimized through appropriate measures (e.g., wet cutting, dust extraction, shielding). During tank cutting and when separating coated components, be mindful of possible vapors or coating residues. Safety and environmental protection requirements must always be reviewed on a project-specific basis; binding assessments can only be made case by case by authorized bodies.<\/p>\n<ul>\n<li><strong>Risk control<\/strong>: Define exclusion zones, lifting points, and load paths; prevent pinch and ejection hazards.<\/li>\n<li><strong>PPE and monitoring<\/strong>: Use eye, hand, hearing, and respiratory protection; log vibration and noise exposure where applicable.<\/li>\n<li><strong>Atmosphere management<\/strong>: For tanks and coated parts, assess explosive and toxic atmospheres and implement gas monitoring and purging.<\/li>\n<li><strong>Dust and slurry<\/strong>: Apply wet methods, local extraction, and contain runoff; dispose of residues in compliance with regulations.<\/li>\n<li><strong>Hydraulic integrity<\/strong>: Inspect hoses and couplings, guard against hose whip, and manage spill prevention and cleanup.<\/li>\n<\/ul>\n<h2>Operation, care, and service life<\/h2>\n<p>Reliable operation depends on clean hydraulic connections, intact hydraulic hose lines, and correctly set pressure\/flow values. Wedges, blades, and jaws are wear parts and should be inspected regularly and adjusted or replaced as needed. Proper storage, lubrication, and cleaning increase service life; seals and bolted joints should be checked at regular intervals. Hydraulic power packs require maintenance intervals based on operating hours, including filter replacement and hydraulic oil analysis. Documented personnel training supports reproducible quality and reduces downtime.<\/p>\n<ul>\n<li><strong>Daily checks<\/strong>: Visual inspection of blades, wedges, jaws, pins, and protective guards before operation.<\/li>\n<li><strong>Scheduled service<\/strong>: Replace filters, check relief valves, and sample hydraulic oil at defined intervals.<\/li>\n<li><strong>Wear management<\/strong>: Track jaw clearance, blade sharpness, and wedge expansion to maintain performance.<\/li>\n<li><strong>Fasteners and seals<\/strong>: Retorque bolted joints and renew seals to prevent leaks and loss of force.<\/li>\n<li><strong>Documentation<\/strong>: Record operating hours, maintenance tasks, and component replacements to predict service needs.<\/li>\n<\/ul>\n<h2>Planning and logistics on the construction site<\/h2>\n<p>Deployment planning includes access routes, set-up areas, load transfer, utilities supply, and handling of separated segments. For concrete pulverizers, crane or carrier machine operations must be coordinated; for <em>rock and concrete splitters<\/em>, the drilling concept (pattern, depth, sequence) must be aligned with the desired fracture path. Disposal concepts benefit from <strong>demolition sorting<\/strong> already during demolition: steel, concrete, and natural stone are collected separately, which simplifies transport, recycling, and post-processing. Forward-looking segmentation reduces lifting loads and improves occupational safety.<\/p>\n<ul>\n<li><strong>Access and staging<\/strong>: Confirm bearing capacity, headroom, ventilation, and lighting for safe tool operation.<\/li>\n<li><strong>Energy and consumables<\/strong>: Plan hydraulic power, fuel or electricity, cooling water, and drilling supplies.<\/li>\n<li><strong>Lifting and handling<\/strong>: Define lifting gear, anchor points, and segment weights to avoid overloads.<\/li>\n<li><strong>Material flow<\/strong>: Establish routes and containers for segregated streams (concrete, steel, natural stone).<\/li>\n<li><strong>Coordination<\/strong>: Synchronize drilling, splitting, and removal cycles to minimize idle times.<\/li>\n<\/ul>\n<h2>Distinction from alternative methods<\/h2>\n<p>Compared with breaker hammers or blasting methods, hydraulic special equipment is often quieter, low-vibration, and more precisely controllable. This is especially relevant in sensitive environments, historic structures, ongoing operations, or densely built-up areas. Mechanical methods such as pneumatic hammers\/jackhammers are justified for coarse removal but can cause higher secondary damage and dust exposure. The decision on a method should consider boundary conditions, permitting, and the desired outcome.<\/p>\n<ul>\n<li><strong>Advantages<\/strong>: Controlled force application, low vibration and noise, selective separation, and high repeatability.<\/li>\n<li><strong>Limitations<\/strong>: Requires hydraulic infrastructure and, for splitting, drilling effort and planning of crack propagation.<\/li>\n<li><strong>Method choice<\/strong>: Balance productivity, precision, environmental constraints, and reuse or recycling goals.<\/li>\n<\/ul>\n<h2>Quality characteristics and documentation<\/h2>\n<p>Quality is evidenced by reproducible cut and fracture patterns, adherence to dimensional tolerances, low secondary damage, and predictable cycle times. Simple, robust operation and fine controllability support consistent results. Project-accompanying documentation &#8211; such as drilling and splitting grids, cutting sequences, machine parameters, and photo logs &#8211; facilitates verification and the optimization of future deployments.<\/p>\n<ul>\n<li><strong>Result indicators<\/strong>: Target-conforming crack path, clean cut edges, and limited spalling.<\/li>\n<li><strong>Process records<\/strong>: Tool IDs, hydraulic settings, operating pressures\/flows, and sequence timing.<\/li>\n<li><strong>Evidence<\/strong>: Borehole logs, segment weights, waste separation records, and georeferenced photo documentation.<\/li>\n<li><strong>Lessons learned<\/strong>: Deviations, countermeasures, and parameter adjustments to refine subsequent operations.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Special equipment comprises technical solutions designed for demanding tasks in demolition, deconstruction, rock cutting\/processing, and natural stone extraction. They are deployed when standard tools reach physical, spatial, or safety limits. Typical examples include concrete pulverizers, rock and concrete splitters, hydraulic splitting cylinders, combination shears, Multi Cutters, steel shears, tank cutters, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/special-equipment\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19839","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Special Equipment for Demolition &amp; Rock Cutting<\/title>\n<meta name=\"description\" content=\"Discover hydraulic special equipment for demolition, rock splitting and stone extraction \u2713 precise, low vibration, safe.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/special-equipment\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Special Equipment for Demolition &amp; Rock Cutting\" \/>\n<meta property=\"og:description\" content=\"Discover hydraulic special equipment for demolition, rock splitting and stone extraction \u2713 precise, low vibration, safe.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/special-equipment\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-25T15:27:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/special-equipment\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/special-equipment\",\"name\":\"Special Equipment for Demolition & Rock Cutting\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-24T07:19:47+00:00\",\"dateModified\":\"2026-05-25T15:27:03+00:00\",\"description\":\"Discover hydraulic special equipment for demolition, rock splitting and stone extraction \u2713 precise, low vibration, safe.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/special-equipment#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/special-equipment\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/special-equipment#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Special equipment\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Special Equipment for Demolition & Rock Cutting","description":"Discover hydraulic special equipment for demolition, rock splitting and stone extraction \u2713 precise, low vibration, safe.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/special-equipment","og_locale":"en_US","og_type":"article","og_title":"Special Equipment for Demolition & Rock Cutting","og_description":"Discover hydraulic special equipment for demolition, rock splitting and stone extraction \u2713 precise, low vibration, safe.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/special-equipment","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-25T15:27:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/special-equipment","url":"https:\/\/www.darda.de\/en\/knowledge\/special-equipment","name":"Special Equipment for Demolition & Rock Cutting","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-24T07:19:47+00:00","dateModified":"2026-05-25T15:27:03+00:00","description":"Discover hydraulic special equipment for demolition, rock splitting and stone extraction \u2713 precise, low vibration, safe.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/special-equipment#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/special-equipment"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/special-equipment#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Special equipment"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19839","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19839"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19839\/revisions"}],"predecessor-version":[{"id":27775,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19839\/revisions\/27775"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19839"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}