{"id":19836,"date":"2025-12-23T15:09:09","date_gmt":"2025-12-23T14:09:09","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19836"},"modified":"2026-05-25T17:20:03","modified_gmt":"2026-05-25T15:20:03","slug":"special-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/special-demolition","title":{"rendered":"Special demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p><strong>Special demolition<\/strong> refers to the targeted, controlled deconstruction of structures, structural elements, and rock formations under complex boundary conditions. The focus is on precise, often <em>low-vibration<\/em> and <em>dust-minimized<\/em> methods that combine material separation, safety, environmental protection, and the reuse of material streams. Tools such as <strong>concrete demolition shears<\/strong> and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\"><strong>rock and concrete splitters<\/strong><\/a> from Darda GmbH are used to selectively release load-bearing and non-load-bearing structures, cut reinforcement, or split massive rock bodies in a controlled manner &#8211; within city centers, existing buildings, tunnels, industrial plants, and sensitive zones. The approach prioritizes controlled force application, measurable results, and compliance with tight emission thresholds while enabling source-segregated recovery of valuable materials.<\/p>\n<h2>Definition: What is meant by special demolition?<\/h2>\n<p>Special demolition is the technically and organizationally demanding deconstruction in which the demolition method is precisely matched to the condition of the structure, location, material mix, and the assets to be protected (people, neighboring buildings, infrastructure). It is characterized by tailor-made methods such as hydraulic splitting, cutting, and crushing of concrete, masonry, steel, and rock, often combined with selective interior demolition and separation techniques. The aim is controlled deconstruction up to source-segregated material separation, in order to obtain secondary raw materials, limit emissions, and make construction workflows safe and efficient. This includes structured method statements, risk assessments, and verifiable documentation to ensure legal compliance and reproducible quality.<\/p>\n<h2>Methods and tools in special demolition<\/h2>\n<p>Special demolition uses a graduated tool chain: <em>hydraulic splitting<\/em> with rock and concrete splitters and rock splitting cylinders for low-vibration opening of massive cross-sections; <em>cutting<\/em> or <em>shear-based<\/em> methods with concrete demolition shears, combination shears, multi cutters, and steel shears for separating concrete, reinforcement, and steel profiles; tank cutters for cold, low-spark separation tasks on vessels; and hydraulic power packs as the energy source. Depending on the structural condition, these means are used individually or in combination, for example: pre-drilling and splitting thick concrete elements, followed by breaking out with concrete demolition shears and final separation of exposed reinforcement. The result is controlled fracture patterns, reduced transfer forces into the structural system, and easily managed site logistics. Selecting the right jaw profile, blade material, and splitting wedge geometry enhances cut quality and productivity; remote-controlled carriers can increase safety in confined or high-risk areas.<\/p>\n<h2>Areas of application and typical tasks<\/h2>\n<p>Special demolition covers several fields where the interplay of methods is decisive. Permit conditions, neighbor protection concepts, and space constraints often govern the choice and sequence of techniques.<\/p>\n<h3>Concrete demolition and specialized deconstruction<\/h3>\n<p>When dismantling load-bearing elements (columns, walls, slabs), controlled load redistribution and low vibrations are essential. <strong>Concrete demolition shears<\/strong> open concrete shells, size pieces for removal, and cut reinforcement. In heavily reinforced or very thick cross-sections, <strong>rock and concrete splitters<\/strong> accelerate the process by defining cracks and predictably separating demolition pieces. Prestressed or post-tensioned components require dedicated release procedures and monitoring to maintain structural stability throughout each stage.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In selective dismantling within existing structures, combination shears, multi cutters, and steel shears are used for cutting beams, pipes, and fixtures. Concrete demolition shears minimize noise and dust in interior areas; tank cutters are used wherever sparks or heat generation would be critical. Material is prepared for efficient separation and transport, with contamination and cross-material mixing reduced through cold-cutting strategies.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>In underground works and rock areas, controlled splitting is crucial for profile-accurate excavations, niches, or cross-section enlargements. Hydraulic splitters operate with high force yet low vibration &#8211; an advantage near sensitive neighbors, heritage-protected structures, or operational facilities at the surface. Borehole diameter, depth, and spacing follow the rock mass properties to steer fracture propagation and minimize overbreak.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>For the extraction of natural stone blocks, a clean fracture pattern is central. Splitting cylinders generate defined split cracks along rows of boreholes. This allows raw blocks to be extracted resource-efficiently and with high dimensional accuracy. Reduced microcracking preserves surface integrity and increases yield in downstream processing.<\/p>\n<h3>Special operations<\/h3>\n<p>In explosion-hazard areas, hospitals, laboratories, or during ongoing operations, <em>cold-cutting<\/em>, low-vibration methods are required. Here, coordinated tool combinations from Darda GmbH enable safe deconstruction while surrounding areas remain in use. Zone classification and ignition source assessments inform tool selection, grounding, and continuous atmosphere monitoring.<\/p>\n<h2>Rock and concrete splitters compared to concrete demolition shears<\/h2>\n<p><strong>Rock and concrete splitters<\/strong> use hydraulically generated spreading forces to induce tensile stresses in the component and create controlled cracks. Advantages: low vibrations, few secondary damages, high effectiveness in massive cross-sections and rock. <strong>Concrete demolition shears<\/strong> perform shearing\/pressing cutting and crushing actions and are ideal for downsizing, shaping demolition pieces, and exposing or cutting reinforcement. In combination, split lines are set first, then components are removed to size with the shear and the reinforcement is separated. In very dense reinforcement or high-strength concrete, closer borehole grids and staged splitting may be needed; conversely, shears offer rapid piece-sizing but rely on a suitable compressive zone and carrier stability.<\/p>\n<h2>Hydraulic power packs and energy supply<\/h2>\n<p><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> supply splitting cylinders, concrete demolition shears, combination shears, and other attachments with constant flow rate and pressure. Appropriate sizing reduces energy losses, prevents overheating, and increases working performance. In emissions-sensitive areas, units with alternative drives or exhaust after-treatment are advisable to limit immissions and improve workplace quality. Load-sensing hydraulics, optimized hose routing, and correctly dimensioned quick couplers reduce pressure drops and fuel or power consumption while maintaining response speed; noise control measures improve acceptance in urban settings.<\/p>\n<h2>Planning, sequence, and documentation<\/h2>\n<p>A structured planning process is a prerequisite for safety and efficiency. In addition to surveying the existing structure, materials analysis, and structural analysis, scheduling is crucial. Trial sections and mock-ups help validate method choices, productivity, and emission control in advance.<\/p>\n<h3>Typical planning modules<\/h3>\n<ul>\n<li>Investigation: element thicknesses, reinforcement layout, material separation, embedded items<\/li>\n<li>Method selection: splitting, shearing, cutting &#8211; individually or combined<\/li>\n<li>Sequencing: load diversion, temporary shoring, staged demolition<\/li>\n<li>Logistics: piece sizes, removal, intermediate storage, recycling paths<\/li>\n<li>Emission control: dust, noise, shocks, vibrations<\/li>\n<li>Documentation: proof of separation, mass balances, quality of recovery<\/li>\n<li>Permitting and stakeholder coordination: neighbor protection, working hours, traffic and access management<\/li>\n<li>Risk assessment and method statement: hazards, controls, monitoring criteria<\/li>\n<li>Utility detection and isolation: locate, verify, and safely de-energize or bypass services<\/li>\n<\/ul>\n<h2>Safety, health, and environment<\/h2>\n<p>Protecting workers, neighbors, and the environment shapes special demolition. Low-vibration methods with <strong>rock and concrete splitters<\/strong> and <strong>concrete demolition shears<\/strong> reduce immissions. Dust suppression, extraction, encapsulation, and low-emission power packs improve air quality. Legal requirements for occupational safety and the environment must be observed; depending on the project, further measures may be necessary, to be planned individually and professionally supervised. Noise mapping, vibration baselines, and silica dust controls underpin compliance and transparent communication with stakeholders.<\/p>\n<h3>Practical focal points<\/h3>\n<ul>\n<li>Workplace organization: stable footing, fall protection, escape routes<\/li>\n<li>Media management: route hydraulic hoses safely, prevent leakage<\/li>\n<li>Monitoring: crack propagation, component deformations, measuring and warning systems<\/li>\n<li>Communication: clearly coordinate exclusion zones and lifting operations<\/li>\n<li>Utility isolation: lockout-tagout, verification of zero-energy state<\/li>\n<li>PPE and ergonomics: hearing protection, eye protection, cut-resistant gloves, anti-vibration measures<\/li>\n<\/ul>\n<h2>Material separation and urban mining<\/h2>\n<p>Special demolition promotes source-separated collection: concrete, masonry, steel, non-ferrous metals, and plastics are recorded separately. <strong>Concrete demolition shears<\/strong> facilitate exposing the reinforcement, splitters enable large, clean concrete pieces that can be processed efficiently. This creates high-quality secondary raw materials; closed-loop circulation reduces primary extraction and transport effort. Early coordination with processing facilities and digital mass balancing strengthen traceability and recycling rates.<\/p>\n<h2>Selection criteria for tools<\/h2>\n<p>The selection is based on element thickness, degree of reinforcement, accessibility, environmental constraints, and required cut quality. Hydraulic performance, tool geometry, and controllability are decisive. Carrier capabilities, remote operation needs, and on-site energy availability further refine the decision.<\/p>\n<h3>Key criteria at a glance<\/h3>\n<ul>\n<li>Component: thickness, strength class, moisture, crack pattern<\/li>\n<li>Reinforcement: diameter, position, density, lap splices<\/li>\n<li>Accessibility: interior, height, constrained positions, anchor points<\/li>\n<li>Immissions: noise and vibration limits, dust thresholds<\/li>\n<li>Performance: cutting force, spreading force, stroke speed, cycle times<\/li>\n<li>Energy: compatibility with existing hydraulic power packs<\/li>\n<li>Carrier: weight class, reach, stability, attachment interface<\/li>\n<li>Regulatory context: fire and explosion protection requirements in sensitive zones<\/li>\n<\/ul>\n<h2>Operation, maintenance, and service life<\/h2>\n<p>Regular functional checks, correct setting of pressure and flow, and care of blade and tooth segments ensure performance and service life. For splitting cylinders, clean boreholes, suitable wedges, and careful lubrication are crucial. Hydraulic power packs benefit from filter maintenance and oil care; this keeps Darda GmbH tools reliable and efficient. Torque checks on fasteners, seal inspection, calibrated pressure gauges, and documented service intervals support consistent performance and predictable lifecycle costs.<\/p>\n<h2>Performance data and metrics<\/h2>\n<p>For work planning, reference values are helpful and vary by tool and component. Realistic productivity metrics (pieces per hour, tonnage per shift) and emission indicators enable benchmarking and continual improvement of methods.<\/p>\n<h3>Typical reference values<\/h3>\n<ul>\n<li>Spreading force (splitters) and resulting crack width per stroke<\/li>\n<li>Cutting force (concrete demolition shears, steel shears) in relation to reinforcement diameter<\/li>\n<li>Opening\/closing speed and cycle times as pacemakers<\/li>\n<li>Required operating pressure and flow rate of the power pack<\/li>\n<li>Piece sizes for manageable logistics and crane\/lifting operations<\/li>\n<li>Borehole diameter, depth, and spacing in relation to cross-section and material strength<\/li>\n<li>Specific energy consumption per ton of material removed<\/li>\n<\/ul>\n<h2>Particularities in special operations<\/h2>\n<p>In explosion-hazard rooms or near hazardous substances, cold, low-spark separation methods are preferred. Tank cutters, concrete demolition shears with controlled fracture guidance, and splitting techniques minimize ignition sources. Planning includes clearance measurements, inertization, and safe disposal; execution is carried out by qualified specialists. Antistatic measures, grounding, intrinsically safe equipment where required, and continuous gas detection contribute to a robust safety concept.<\/p>\n<h2>Practice-oriented work steps<\/h2>\n<ol>\n<li>Investigation and exposure: identify lines, reinforcement, embedded parts<\/li>\n<li>Preparation: define drilling patterns for splitting cylinders, set up exclusion zones<\/li>\n<li>Pre-splitting: splitters set crack lines in massive cross-sections<\/li>\n<li>Downsizing: concrete demolition shears shape transportable pieces and cut steel<\/li>\n<li>Sorting: place steel, concrete, masonry separately and document<\/li>\n<li>Finishing: clean edges, create cut surfaces, relieve residual loads<\/li>\n<li>Quality control: verify target geometry, check emission logs, confirm load path release<\/li>\n<li>Documentation and handover: update mass balances, issue recycling evidence, record as-built status<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Special demolition refers to the targeted, controlled deconstruction of structures, structural elements, and rock formations under complex boundary conditions. The focus is on precise, often low-vibration and dust-minimized methods that combine material separation, safety, environmental protection, and the reuse of material streams. Tools such as concrete demolition shears and rock <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/special-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19836","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Special Demolition | Structural Deconstruction<\/title>\n<meta name=\"description\" content=\"Precision deconstruction for complex sites \u2713 with special demolition that cuts vibration, controls dust &amp; boosts safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/special-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Special Demolition | Structural Deconstruction\" \/>\n<meta property=\"og:description\" content=\"Precision deconstruction for complex sites \u2713 with special demolition that cuts vibration, controls dust &amp; boosts safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/special-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-25T15:20:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/special-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/special-demolition\",\"name\":\"Special Demolition | Structural Deconstruction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-23T14:09:09+00:00\",\"dateModified\":\"2026-05-25T15:20:03+00:00\",\"description\":\"Precision deconstruction for complex sites \u2713 with special demolition that cuts vibration, controls dust & boosts safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/special-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/special-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/special-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Special demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Special Demolition | Structural Deconstruction","description":"Precision deconstruction for complex sites \u2713 with special demolition that cuts vibration, controls dust & boosts safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/special-demolition","og_locale":"en_US","og_type":"article","og_title":"Special Demolition | Structural Deconstruction","og_description":"Precision deconstruction for complex sites \u2713 with special demolition that cuts vibration, controls dust & boosts safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/special-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-25T15:20:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/special-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/special-demolition","name":"Special Demolition | Structural Deconstruction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-23T14:09:09+00:00","dateModified":"2026-05-25T15:20:03+00:00","description":"Precision deconstruction for complex sites \u2713 with special demolition that cuts vibration, controls dust & boosts safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/special-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/special-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/special-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Special demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19836","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19836"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19836\/revisions"}],"predecessor-version":[{"id":27773,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19836\/revisions\/27773"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19836"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}