{"id":19835,"date":"2025-12-23T14:59:23","date_gmt":"2025-12-23T13:59:23","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19835"},"modified":"2026-05-25T09:53:02","modified_gmt":"2026-05-25T07:53:02","slug":"spade-tool","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/spade-tool","title":{"rendered":"Spade tool"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Spade tools are among the basic hand tools on construction sites, in quarries, and in deconstruction projects. They are used to loosen, lift, and move soil, bulk materials, and loose material, and can also be used in a targeted manner to expose component edges, reinforcement, or joints. In conjunction with hydraulic demolition and splitting tools from Darda GmbH, spade tools support the <em>preparation<\/em> of work areas, the <em>finishing<\/em> of separation lines, and the <em>clean handover<\/em> to subsequent process steps-for example, when using concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>. Owing to their controlled, low-vibration mode of action, they help safeguard adjacent structures and keep interfaces tidy and accessible.<\/p>\n<h2>Definition: What is meant by a spade tool?<\/h2>\n<p>A spade tool is a hand tool with a flat blade-usually tapered\/pointed or rectangular-made of hardened steel and a shaft with a handle. It is designed for penetrating soil, gravel, or loose material, as well as for lifting and relocating smaller quantities. Unlike shovels, which primarily move volume, spades are specialized for penetrating compacted layers, setting straight edges, and selectively opening <em>narrow trenches<\/em> or joints. In construction practice and deconstruction, the spade tool is used to establish, expose, or clean work areas for mechanical and hydraulic equipment. Typical blade widths range, depending on the design, from approximately 120 to 220 mm for pointed variants and 180 to 280 mm for rectangular variants, supporting precise edge work and defined trench geometries.<\/p>\n<h2>Design and functionality of spade tools<\/h2>\n<p>A spade consists of the blade, the shaft, and the handle. The blade transfers force into the ground, the shaft transmits leverage, and the handle provides control. Foot treads allow body weight to be applied. Thanks to the narrow, sharp blade edge, material can be separated, loosened, and removed with precision.<\/p>\n<ul>\n<li><strong>Force transmission:<\/strong> rigid blade and tight blade-to-shaft connection prevent energy losses when penetrating compacted layers.<\/li>\n<li><strong>Control:<\/strong> handle geometry and shaft length determine guidance, leverage, and posture.<\/li>\n<li><strong>Durability:<\/strong> wear-resistant steels and reinforced collars reduce deformation at high loads.<\/li>\n<\/ul>\n<h3>Spade blade and edges<\/h3>\n<p>Spade blades are made of tough, wear-resistant steel. Shapes range from pointed (for cohesive soils, root systems, and compacted layers) to rectangular (for edge work, beddings, and flat surfaces). A slightly sharpened cutting edge and a well-defined blade collar increase penetration depth and stability. When working near concrete components, boreholes, or joints, a controlled sharp but not overly thinned edge is advisable to avoid spalling. Proven hardness levels in the blade zone typically lie in the mid-range for construction tools, balancing edge retention and toughness; gentle regrinding angles in the range of approximately 25 to 35 degrees support clean guidance without chipping.<\/p>\n<h3>Shaft, handle, and ergonomics<\/h3>\n<p>Typical shafts are made of ash wood, fiberglass-reinforced plastic, or steel tube. D- or T-handles improve guidance during leverage movements. Shaft length influences reach and lever arm: shorter shafts for confined spaces, longer ones for excavation with an upright posture. Ergonomic handle shapes and a non-slip design reduce stress on the back and wrists. For sensitive environments, variants with electrically insulating properties or vibration-damping grips can reduce risk and fatigue.<\/p>\n<h2>Typical designs and application range<\/h2>\n<ul>\n<li>Pointed spade: for compacted, cohesive soils and precise penetration along joints, cracks, and separation cuts.<\/li>\n<li>Garden spade\/universal spade: rectangular blade for beddings, layer removal, leveling small areas.<\/li>\n<li>Narrow spade\/cable spade: slim blade for narrow trenches, exposing utilities, and working between reinforcement.<\/li>\n<li>Root spade: reinforced tip, suitable for cutting organic structures in excavations.<\/li>\n<li>Flat spade\/tile spade: broad, flat cutting edge for scraping, lifting thin layers, and trimming bedding planes.<\/li>\n<li>Drainage spade: narrow, elongated blade for slim trenches with reduced soil displacement.<\/li>\n<\/ul>\n<h2>Role in concrete demolition and specialized deconstruction<\/h2>\n<p>In deconstruction, spade tools bridge heavy hydraulic tools and manual fine work. After opening components with <strong>concrete demolition shears<\/strong> or creating controlled fracture lines with <strong>rock and concrete splitters<\/strong>, spades are used to remove drilling dust, splinters, loose concrete pieces, and aggregates, as well as to expose edges. This improves visual inspection, prevents unintended spalling, and facilitates accurate positioning of subsequent tools. Clean edge preparation also reduces collateral damage and helps maintain specified tolerances along separation lines.<\/p>\n<h3>Work sequence in the deconstruction environment<\/h3>\n<ol>\n<li>Preparation: Mark separation lines, remove coverings, soil, or bedding layers with the spade.<\/li>\n<li>Exposure: Open narrow routes for drilling, clean the borehole surroundings and joints.<\/li>\n<li>Mechanical separation: Use concrete demolition shears or rock and concrete splitters from Darda GmbH.<\/li>\n<li>Finishing: Remove loose rims, lift out small concrete remnants, and cleanly shape the cut edge.<\/li>\n<li>Material flow: Relocate aggregate, sand beddings, and fines; visual inspection and documentation.<\/li>\n<li>Quality assurance: Check geometry, edge integrity, and cleanliness before proceeding with subsequent steps.<\/li>\n<\/ol>\n<h2>Rock demolition and tunnel construction<\/h2>\n<p>In rock removal and tunnel heading, <strong>rock splitting cylinders<\/strong> and rock and concrete splitters are used to break up massive rock bodies in a controlled manner. Spade tools complement this work by clearing splitting joints of rock dust, cleaning wedge slots, and removing loosened fine material from the work zone. In drilling templates, a narrow spade helps keep borehole mouths clear and set splitting sequences quickly without damaging the borehole edges. Where water is used for dust suppression or flushing, spades assist in drawing small runoff channels so that work areas remain accessible and slip-resistant.<\/p>\n<h2>Natural stone extraction<\/h2>\n<p>In quarries, the spade aids in separating natural layer joints. After applying the splitting technique, loose material is carefully removed to reveal fracture surfaces and assess the quality of the natural stone. Precise hand work with a suitable spade prevents uncontrolled breakouts at value-defining edges. Seasonal moisture conditions can influence adhesion and chipping behavior; careful, incremental removal improves result consistency.<\/p>\n<h2>Strip-out and cutting<\/h2>\n<p>During strip-out in existing structures, spade tools are helpful for loosening and lifting out fills, screed residues, insulation, and loam infills from openings. Before using <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a><\/strong>, <strong>combination shears<\/strong>, or <strong>steel shears<\/strong>, areas are often cleared manually. Spades make it easier to expose lines or embedded components in an equipment-friendly manner before cutting selectively. When cutting openings, a spade can also push away loose edges and remove fine debris. For adhesive-bound layers, a flat, sharpened edge and shallow attack angles reduce substrate damage.<\/p>\n<h2>Special use: sensitive areas and confined spaces<\/h2>\n<p>In areas with surfaces requiring protection, in existing buildings with heritage conservation requirements, or in ATEX zones, controlled hand work is important. Spade tools enable low-vibration material removal, for example when exposing tank enclosures before working with <strong>tank cutters<\/strong> or when removing beddings near sensitive utility lines. This allows subsequent work to be prepared more safely and gently on materials. Where ignition hazards exist, non-sparking tool concepts and avoidance of steel-to-steel impacts must be taken into account.<\/p>\n<h2>Selection criteria for the right spade tool<\/h2>\n<ul>\n<li>Blade shape and width: pointed for cohesive soils and precision, rectangular for edges and flats, narrow for routes.<\/li>\n<li>Material and hardness: wear-resistant blade quality for gravel and mineral construction materials, sufficiently tough for leverage.<\/li>\n<li>Shaft length and handle: adapt to the work environment; shorter shafts, longer for a back-friendly posture.<\/li>\n<li>Foot treads: for safe penetration with foot force, especially in compacted layers.<\/li>\n<li>Weight and balance: as heavy as necessary, as light as possible; good guidance reduces fatigue.<\/li>\n<li>Insulation and sparking aspects: choose suitable materials depending on the environment; always check local requirements.<\/li>\n<li>Socket and collar design: robust connections between blade and shaft prevent wobble and misalignment under load.<\/li>\n<li>Surface protection: coatings or plating against corrosion reduce maintenance effort in damp, mineral-rich environments.<\/li>\n<li>Conformity and documentation: select tools with clear specifications and applicable conformity information for professional use.<\/li>\n<\/ul>\n<h2>Work techniques, ergonomics, and safety<\/h2>\n<p>Efficient and safe work with the spade relies on technique, body posture, and appropriate equipment. Calm, controlled guidance is more productive than force peaks.<\/p>\n<h3>Leverage technique and edge guidance<\/h3>\n<p>The blade is guided with a straight edge along joints, separation cuts, or layers. Short, repeated leverage movements loosen material without damaging adjacent components. When working near boreholes or splitting lines, a <em>shallow penetration depth<\/em> is advisable to protect edges. If resistance rises noticeably, withdraw, reorient the blade, and re-enter at a reduced angle to avoid prying damage.<\/p>\n<h3>Body posture and energy management<\/h3>\n<p>Upright posture, alternating hand positions, and using body weight via the foot treads reduce strain. The shaft is kept close to the body, and wide swings are avoided. On inclined surfaces, work from stable footing and step back progressively to prevent undercutting.<\/p>\n<h3>Personal protective equipment<\/h3>\n<ul>\n<li>Safety footwear with puncture-resistant soles and appropriate toe protection.<\/li>\n<li>Hand protection with good grip feel, safety glasses against splinters.<\/li>\n<li>Depending on the environment, hearing and dust protection; probe cautiously when utilities are unknown.<\/li>\n<li>High-visibility clothing and site-appropriate protective clothing where required by regulations.<\/li>\n<\/ul>\n<h3>Common errors and damage patterns<\/h3>\n<ul>\n<li>Over-thinning the cutting edge during grinding, leading to rapid chipping in mineral materials.<\/li>\n<li>Levering against sharp concrete edges at large angles, causing spalling or blade deformation.<\/li>\n<li>Using excessive force in frozen or highly compacted layers instead of pre-loosening or adapting the blade geometry.<\/li>\n<\/ul>\n<h2>Care, maintenance, and service life<\/h2>\n<p>The service life of a spade tool largely depends on care and storage. Clean, dry tools corrode less, retain their edges, and remain reliable.<\/p>\n<ul>\n<li>Cleaning: after mineral material, remove coarse adhesions, dry the blade.<\/li>\n<li>Edge: re-sharpen gently if necessary; avoid overheating when grinding.<\/li>\n<li>Shaft inspection: check for cracks, keep connections tight; replace damaged shafts in good time.<\/li>\n<li>Storage: dry, hung up or with blade protection; avoid contact corrosion with other metals.<\/li>\n<li>Corrosion protection: apply a light oil film to uncoated steel; keep foot treads clean to preserve grip.<\/li>\n<li>Documentation: note repairs and replacements to ensure traceability in professional fleets.<\/li>\n<\/ul>\n<h2>Interfaces to hydraulic demolition tools<\/h2>\n<p>In practical workflows, the spade supports the efficient use of hydraulic systems. Before operating <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power packs<\/a><\/strong> with concrete demolition shears, <strong>rock splitting cylinders<\/strong>, or rock and concrete splitters, the spade creates access, removes loose material from borehole areas, keeps work surfaces free of fine debris, and facilitates the safe setup of power packs. After cutting or splitting, edges are finished and samples taken without adding extra load peaks to the component. Clear hose routes and free-standing areas for the power supply reduce trip hazards and simplify repositioning cycles.<\/p>\n<h2>Material flow and construction logistics<\/h2>\n<p>Clean work areas accelerate deconstruction. Spade tools help separate fines from coarse pieces, draw provisional channels for water runoff, or create small ramps for equipment access. Manual control of material flow supports working with <strong>concrete demolition shears<\/strong> and splitters because visibility and accessibility remain consistently ensured. Thoughtful micro-logistics at the workface reduces rehandling and shortens cycle times between splitting, cutting, and removal.<\/p>\n<h2>Practical examples from the application areas<\/h2>\n<h3>Concrete demolition at foundation edges<\/h3>\n<p>After applying the concrete demolition shear, the exposed foundation edge is cleaned of loose aggregates with the spade. Boreholes can then be drilled and a rock and concrete splitter positioned. The result is defined edges that are easier to separate and load.<\/p>\n<h3>Rock removal in tunnel heading<\/h3>\n<p>Boreholes are kept clear at the mouth with the spade. After the splitting sequence, rock dust is removed from splitting joints so that subsequent cycles run without jamming. The work area remains tidy, and the devices from Darda GmbH can be repositioned quickly.<\/p>\n<h3>Selective strip-out in building rehabilitation<\/h3>\n<p>Before cutting embedded steel or cables with combination or steel shears, a narrow spade exposes infill layers in a controlled manner. Utilities and edge zones remain intact, and subsequent cuts can be placed precisely with minimal rework.<\/p>\n<h2>Legal and organizational notes<\/h2>\n<p>Work with spade tools is part of an overall concept of hazard analysis, instruction, and suitable work organization. Before exposing areas, utility and service plans must be considered; in unknown zones, proceed with probing, cautious hand movements. Compliance with applicable regulations on occupational safety, noise, dust, and disposal is essential. Information on load-bearing capacity, application limits, and combination with hydraulic equipment must be adapted to the specific construction site situation.<\/p>\n<ul>\n<li>Carry out a documented risk assessment and provide task-specific instruction.<\/li>\n<li>Observe applicable national standards and rules for hand tools, PPE, and safe working distances near utilities.<\/li>\n<li>Define responsibilities for area closure, access control, and waste segregation.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Spade tools are among the basic hand tools on construction sites, in quarries, and in deconstruction projects. They are used to loosen, lift, and move soil, bulk materials, and loose material, and can also be used in a targeted manner to expose component edges, reinforcement, or joints. In conjunction with <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/spade-tool\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19835","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Spade Tool for Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Guide to the spade tool as a construction hand tool for excavation and concrete demolition \u2713 tips on use, safety &amp; care.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/spade-tool\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Spade Tool for Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Guide to the spade tool as a construction hand tool for excavation and concrete demolition \u2713 tips on use, safety &amp; care.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/spade-tool\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-25T07:53:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/spade-tool\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/spade-tool\",\"name\":\"Spade Tool for Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-23T13:59:23+00:00\",\"dateModified\":\"2026-05-25T07:53:02+00:00\",\"description\":\"Guide to the spade tool as a construction hand tool for excavation and concrete demolition \u2713 tips on use, safety & care.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/spade-tool#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/spade-tool\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/spade-tool#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Spade tool\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Spade Tool for Construction & Demolition","description":"Guide to the spade tool as a construction hand tool for excavation and concrete demolition \u2713 tips on use, safety & care.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/spade-tool","og_locale":"en_US","og_type":"article","og_title":"Spade Tool for Construction & Demolition","og_description":"Guide to the spade tool as a construction hand tool for excavation and concrete demolition \u2713 tips on use, safety & care.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/spade-tool","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-25T07:53:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/spade-tool","url":"https:\/\/www.darda.de\/en\/knowledge\/spade-tool","name":"Spade Tool for Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-23T13:59:23+00:00","dateModified":"2026-05-25T07:53:02+00:00","description":"Guide to the spade tool as a construction hand tool for excavation and concrete demolition \u2713 tips on use, safety & care.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/spade-tool#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/spade-tool"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/spade-tool#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Spade tool"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19835","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19835"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19835\/revisions"}],"predecessor-version":[{"id":27755,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19835\/revisions\/27755"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}