{"id":19834,"date":"2025-12-23T13:21:28","date_gmt":"2025-12-23T12:21:28","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19834"},"modified":"2026-05-25T10:27:02","modified_gmt":"2026-05-25T08:27:02","slug":"groundbreaking-ceremony","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/groundbreaking-ceremony","title":{"rendered":"Groundbreaking ceremony"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The groundbreaking ceremony is the visible kickoff and the technical start of a construction project. It marks the transition from planning and permits to site setup, initial excavation, and earthworks. In practice, the start is often accompanied by preparatory activities: selective deconstruction, <em>exposure of utilities<\/em>, removal of foundation remnants, or rock outcrops. Where concrete, reinforced concrete, or rock are in the way, controlled methods are used, such as <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> for low-vibration breaking or <strong>concrete pulverizers<\/strong> for precise removal and downsizing, with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">concrete crushers<\/a> used where sizing efficiency is required. This clears the way for the <em>excavation pit<\/em>, foundation, and utility trenches. Early coordination with geotechnics, surveying, and environmental protection ensures predictable progress and minimizes impacts on adjacent properties.<\/p>\n<h2>Definition: What is meant by the groundbreaking ceremony?<\/h2>\n<p>The groundbreaking ceremony refers to the symbolic and organizational start of the works. It marks the moment when, after surveying, site setup, and securing the working areas, the first bite into the ground occurs. Unlike the laying of the foundation stone, which often takes place later, the groundbreaking ceremony concerns the actual start of construction with excavation, site grading, and the first interventions into the subsoil. Typical preparatory measures include <em>topsoil removal<\/em>, establishing temporary site roads, and removing obstacles such as old foundations, foundation slabs, well shafts, or rock projections. The groundbreaking ceremony generally presupposes existing permits, a <em>hazard analysis<\/em>, a surveying concept, and coordination with utility providers.<\/p>\n<ul>\n<li><strong>Core prerequisites at a glance<\/strong>: permit-to-dig, current utility maps and locates, geotechnical report, <em>method statement<\/em> with sequencing, <em>traffic management plan<\/em>, environmental management plan, and pre-condition survey of adjoining structures.<\/li>\n<\/ul>\n<h2>Process of the groundbreaking ceremony: From planning to the first excavation<\/h2>\n<p>The path to the first excavation is structured and follows defined steps. The goal is a safe, low-emission, and schedule-stable start to earthworks and foundation construction, coordinated with deconstruction tasks and material logistics. <em>Clean separation cuts<\/em>, <em>low-vibration methods<\/em>, and reliable surveying are essential to avoid rework and protect the neighborhood.<\/p>\n<ol>\n<li>Clarify prerequisites: permits, subsoil investigation, utility locates, unexploded ordnance screening, construction schedule and traffic management plan.<\/li>\n<li>Site setup: access routes, temporary site roads, storage areas, utility supply, safety zones, and environmental measures (dust, noise, seepage water).<\/li>\n<li>Surveying and staking-out: control points, <em>excavation pit<\/em> edges, axes, elevation levels; digital documentation for as-planned vs. as-built comparison.<\/li>\n<li>Deconstruction and clearance: <em>gutting works<\/em>, selective separation, remove concrete and masonry remnants; for reinforced concrete, deploy <em>concrete pulverizers<\/em>, for massive blocks <em>hydraulic wedge splitters<\/em>.<\/li>\n<li>Expose and probe: locate utilities, trial pits, check groundwater levels, install temporary protections.<\/li>\n<li>First bite into the ground: <em>topsoil removal<\/em>, start excavation, secure approach edges, steer material flows (intermediate storage, recycling, disposal).<\/li>\n<li>Ongoing control: geotechnics, settlements, slope stabilization, dewatering; continuous adjustment of the construction phases.<\/li>\n<li>Handover to foundation works: verify formation level, bearing capacity, and tolerances; document release for subsequent trades.<\/li>\n<\/ol>\n<p>Integrating digital schedules linked to material flows and machine availability stabilizes cycle times and reduces idle movements during the critical start phase.<\/p>\n<h2>Preparatory works and deconstruction prior to the groundbreaking ceremony<\/h2>\n<p>Before the first excavation, the area is technically cleared. This includes removing asphalt, removing foundations, opening slabs, and separating attachments and installations. In dense urban environments, methods that generate little vibration and dust are preferred. <strong>Concrete pulverizers<\/strong> enable controlled removal of reinforced concrete components with integrated rebar separation. For compact foundation bodies, plinths, or rock projections, <strong>hydraulic wedge splitters<\/strong> using boreholes allow controlled cracking of the material. This keeps adjacent fabric undamaged and <em>noise emission<\/em> low.<\/p>\n<ul>\n<li><strong>Emission control measures<\/strong>: water mist and point extraction for dust, low-vibration techniques, acoustic screens, negative-pressure tents for sensitive interiors, and real-time monitoring of noise and particle loads.<\/li>\n<li><strong>Selective dismantling<\/strong>: pre-cutting of components, protection of edges and facades, and staged removal for clean sorting of concrete, steel, and mixed debris.<\/li>\n<\/ul>\n<h2>Subsoil, rock, and foundation remnants: controlled breaking instead of blasting<\/h2>\n<p>If the groundbreaking ceremony encounters competent rock, boulders, or heavily reinforced concrete, a symbolic act quickly becomes a technical task. Blasting is often impermissible or undesirable. <strong>Hydraulic wedge splitters<\/strong> with suitable splitting cylinders generate splitting forces in the borehole and break the material with low vibration. Advantages include minimal edge spalling, predictable fracture lines, and a reduced risk of vibration damage to existing structures. In combination with <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">properly sized hydraulic power units<\/a><\/em>, splitting parameters can be adapted to the material and subsoil. The loosened blocks are then made manageable with <em>grapples<\/em> or <em>shears<\/em> and hauled away.<\/p>\n<p>Efficient sequences rely on correct drilling patterns, hole diameters, and spacing matched to compressive strength and reinforcement density. Groundwater conditions, access for equipment, and removal paths for broken material determine whether splitting is combined with nibbling, sawing, or cutting.<\/p>\n<ul>\n<li><strong>Planning tips<\/strong>: map reinforcement first, choose cylinder geometry accordingly, design splitting direction to protect edges, and coordinate lifting points for safe block handling.<\/li>\n<\/ul>\n<h2>Tools and methods in the early construction sequence<\/h2>\n<p>Tool selection depends on material, geometry, accessibility, and environmental constraints. Combining low-vibration splitting with targeted crushing and cutting often yields the cleanest interfaces and the fastest downstream excavation.<\/p>\n<h3>Concrete pulverizers<\/h3>\n<p>Concrete pulverizers cut and crush reinforced concrete, create openings, and reduce components to transportable sizes. Around the groundbreaking ceremony, they are useful for removing foundation heads, edges, or protrusions and exposing reinforcement. Their targeted bite prevents uncontrolled <em>crack formation<\/em> in adjacent areas.<\/p>\n<h3>Hydraulic wedge splitters<\/h3>\n<p>These devices split massive concrete or natural stone via boreholes. They are <em>low in dust and vibration<\/em> and are suitable for inner-city excavation pits, utility trenches, or the deconstruction of foundation blocks when vibration must be minimized.<\/p>\n<h3>Hydraulic power packs<\/h3>\n<p>Hydraulic power packs supply grapples, shears, and splitting cylinders. Proper sizing to flow rate and <em>operating pressure<\/em> is decisive for performance, cycle times, and energy efficiency. Short hose runs, suitable set-up points, and protection from contamination ensure trouble-free operation.<\/p>\n<h3>Combination shears and multi cutters<\/h3>\n<p>Combination shears combine cutting and crushing, which is advantageous for mixed construction types. Multi cutters cut profiles, reinforcing steel, and pipes that are in the way during exposure, installation, or deconstruction. They reduce manual cutting work and increase safety on the component.<\/p>\n<h3>Steel shears and tank cutters<\/h3>\n<p>Steel shears are used for steel structures, beams, or sheet pile walls that must be shortened before excavation. Tank cutters are required when old tank systems must be professionally dismantled before the ground can be opened. Special safety and environmental protection requirements apply here.<\/p>\n<ul>\n<li><strong>Selection criteria<\/strong>: required cut forces, reach and machine class, material thickness, target fragment size, noise and vibration limits, and available hydraulic power.<\/li>\n<\/ul>\n<h2>Application areas related to the groundbreaking ceremony<\/h2>\n<ul>\n<li><strong>Concrete demolition and special demolition<\/strong>: Clearing construction fields, removing foundations, plinths, and massive concrete components.<\/li>\n<li><strong>Building gutting and cutting<\/strong>: Selective removal of interior components, severing of utilities and connections prior to excavation.<\/li>\n<li><strong>Rock excavation and tunnel construction<\/strong>: Opening rock caps, creating excavation pits in hard ground, building utility trenches in rock.<\/li>\n<li><strong>Natural stone extraction<\/strong>: The principle of controlled splitting provides know-how for precise rock breaking on construction sites.<\/li>\n<li><strong>Special operations<\/strong>: Work in sensitive zones with requirements for noise, vibration, and dust, for example next to existing buildings or infrastructure.<\/li>\n<li><strong>Infrastructure tie-ins<\/strong>: Creating access pits and launch shafts for utilities where settlement control and low-emission methods are mandatory.<\/li>\n<\/ul>\n<h2>Occupational safety, environment, and legal framework<\/h2>\n<p>The groundbreaking ceremony requires clear safety procedures: hazard analysis, onboarding, barriers, and communication paths. Dust and noise mitigation as well as a dewatering concept protect the environment and the neighborhood. Special precautions must be taken when dealing with <em>contaminated sites<\/em>, tanks, or contaminated soils. Legal requirements vary by region and project; the notes given here are general in nature and do not replace binding, case-specific advice.<\/p>\n<ul>\n<li><strong>Key documents<\/strong>: method statement and risk assessment, permit-to-dig, utility clearance certificates, vibration and noise management plan, spill response and sediment control, and monitoring plan with trigger levels.<\/li>\n<\/ul>\n<h2>Surveying, tolerances, and documentation<\/h2>\n<p>Precise staking defines <em>excavation pit<\/em> edges, foundation levels, and axes. Ongoing as-planned vs. as-built comparisons prevent deviations and ensure dimensional accuracy. For later evidence, continuous documentation of excavation volumes, <em>material flow<\/em>, splitting and cutting logs, as well as readings for <em>ground vibration monitoring<\/em> and noise emission levels is recommended.<\/p>\n<p>Modern workflows integrate survey control into machine guidance, GNSS and total stations, and federated models for clash checks. Georeferenced photo and video logs, daily reports, and condition surveys create a verifiable record for quality and claims management.<\/p>\n<ul>\n<li><strong>Typical checkpoints<\/strong>: control of reference benchmarks, verification of formation level and gradients, slope angles, support positions, and positional tolerances of trenches and foundation edges.<\/li>\n<\/ul>\n<h2>Typical challenges and practical solutions<\/h2>\n<ul>\n<li><strong>Unexpected foundation remnants<\/strong>: Probe, take core samples (core drilling), then break in a controlled manner with hydraulic wedge splitters.<\/li>\n<li><strong>High reinforcement ratios<\/strong>: Pre-open with concrete pulverizers, separate reinforcing steel with multi cutters, and stage it for clean sorting.<\/li>\n<li><strong>Tight conditions<\/strong>: Use compact, hydraulically driven <em>excavator attachments<\/em>; schedule inbound and outbound <em>haulage logistics<\/em>.<\/li>\n<li><strong>Emission control<\/strong>: Dust suppression with water mist, low-vibration methods, time-window control for noise-intensive tasks.<\/li>\n<li><strong>Schedule pressure<\/strong>: Parallel preparation of deconstruction and excavation, short setup times via an appropriate <em>hydraulic power pack<\/em>, clear interfaces.<\/li>\n<li><strong>Groundwater ingress<\/strong>: Early dewatering concept, observation wells, and adaptive excavation stages to maintain dry and stable faces.<\/li>\n<li><strong>Unexpected finds<\/strong>: Procedures for archaeological or hazardous material discoveries with immediate stop rules and responsible contacts.<\/li>\n<\/ul>\n<h2>Scheduling and logistics planning in the context of the groundbreaking ceremony<\/h2>\n<p>For a smooth start, deliveries, intermediate storage, and disposal chains should be fixed early. Hydraulic power packs and attachments are provided ready for operation, with hose lengths and couplings coordinated. Short distances between work area, intermediate storage, and outbound transport reduce downtime. For inner-city projects, a time-window and route plan helps to ease traffic and the neighborhood.<\/p>\n<ul>\n<li><strong>Stabilizers for the start phase<\/strong>: digital slot booking for trucks, backhauling to reduce empty runs, separate stockpiles for clean recycling streams, and reserved laydown areas close to the work front.<\/li>\n<\/ul>\n<h2>Quality characteristics of a professional groundbreaking ceremony<\/h2>\n<ul>\n<li>Complete clearing of the area without damage to adjacent buildings.<\/li>\n<li>Dimensional accuracy in staking and cleanly defined <em>excavation pit<\/em> edges.<\/li>\n<li>Controlled breaking of concrete and rock with minimal vibration.<\/li>\n<li>Orderly <em>construction waste separation<\/em> for recycling and disposal.<\/li>\n<li>Documented safety, environmental, and emission values.<\/li>\n<li>Traceable documentation set: permits, monitoring logs, as-built data, and release protocols for subsequent trades.<\/li>\n<li>Validated execution parameters: recorded pressures and flow rates for splitting and cutting, tool inspections, and maintenance records.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The groundbreaking ceremony is the visible kickoff and the technical start of a construction project. It marks the transition from planning and permits to site setup, initial excavation, and earthworks. In practice, the start is often accompanied by preparatory activities: selective deconstruction, exposure of utilities, removal of foundation remnants, or <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/groundbreaking-ceremony\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19834","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Groundbreaking Ceremony in Construction - Process<\/title>\n<meta name=\"description\" content=\"Discover \u2713 how a construction groundbreaking ceremony kicks off site setup, safe excavation &amp; low-vibration methods.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/groundbreaking-ceremony\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Groundbreaking Ceremony in Construction - Process\" \/>\n<meta property=\"og:description\" content=\"Discover \u2713 how a construction groundbreaking ceremony kicks off site setup, safe excavation &amp; low-vibration methods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/groundbreaking-ceremony\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-25T08:27:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/groundbreaking-ceremony\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/groundbreaking-ceremony\",\"name\":\"Groundbreaking Ceremony in Construction - Process\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-23T12:21:28+00:00\",\"dateModified\":\"2026-05-25T08:27:02+00:00\",\"description\":\"Discover \u2713 how a construction groundbreaking ceremony kicks off site setup, safe excavation & low-vibration methods.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/groundbreaking-ceremony#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/groundbreaking-ceremony\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/groundbreaking-ceremony#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Groundbreaking ceremony\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Groundbreaking Ceremony in Construction - Process","description":"Discover \u2713 how a construction groundbreaking ceremony kicks off site setup, safe excavation & low-vibration methods.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/groundbreaking-ceremony","og_locale":"en_US","og_type":"article","og_title":"Groundbreaking Ceremony in Construction - Process","og_description":"Discover \u2713 how a construction groundbreaking ceremony kicks off site setup, safe excavation & low-vibration methods.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/groundbreaking-ceremony","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-25T08:27:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/groundbreaking-ceremony","url":"https:\/\/www.darda.de\/en\/knowledge\/groundbreaking-ceremony","name":"Groundbreaking Ceremony in Construction - Process","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-23T12:21:28+00:00","dateModified":"2026-05-25T08:27:02+00:00","description":"Discover \u2713 how a construction groundbreaking ceremony kicks off site setup, safe excavation & low-vibration methods.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/groundbreaking-ceremony#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/groundbreaking-ceremony"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/groundbreaking-ceremony#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Groundbreaking ceremony"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19834","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19834"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19834\/revisions"}],"predecessor-version":[{"id":27757,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19834\/revisions\/27757"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19834"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}