{"id":19832,"date":"2025-12-23T16:07:53","date_gmt":"2025-12-23T15:07:53","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19832"},"modified":"2026-05-25T11:33:03","modified_gmt":"2026-05-25T09:33:03","slug":"prestressing-system","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/prestressing-system","title":{"rendered":"Prestressing system"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Prestressing systems are central elements of prestressed-concrete technology. They bundle and transmit tensile forces via tendons into concrete or rock members to control load-bearing capacity, crack width limitation, and deformation behavior. In deconstruction, the prestressing system acts as a stored energy source that must be controlled and safely released during cutting, breaking, or splitting. Tools such as <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">Darda concrete crushers<\/a><\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> from Darda GmbH are used to remove concrete in a controlled manner, expose tendons, and execute cuts or splits with defined effects &#8211; in application areas from <em>concrete demolition and special deconstruction<\/em> through <em>building gutting and cutting<\/em> to <em>rock demolition and tunnel construction<\/em>. A professional approach considers tendon routing, anchorage zones, and residual forces to prevent uncontrolled energy release and to achieve low-vibration, low-emission results.<\/p>\n<h2>Definition: What is meant by a prestressing system?<\/h2>\n<p>A prestressing system refers to the complete system of tendons (strand, wire, cable), anchorages, stressing heads, ducts, and, where applicable, grout, used to introduce <em>prestress<\/em> into concrete or rock members. The aim is to generate defined compressive stresses in the concrete and-or introduce tensile forces into anchors in order to carry loads, control crack formation, and limit deformations. A distinction is made between pre-tensioning in a casting bed (prestressing before concreting) and post-tensioning (prestressing after hardening), each with bonded (grouted) or unbonded (external) tendons. Typical tendons are high-strength 7-wire strands or wires guided in ducts with appropriate corrosion protection. The prestressing system is therefore both a <strong>load-transfer element<\/strong> and a <strong>safety-relevant component<\/strong> &#8211; in construction and in deconstruction.<\/p>\n<h2>Structure and mode of action of prestressing systems<\/h2>\n<p>A prestressing system consists of tendons stressed in tension, which are introduced into the concrete or rock via anchorage heads. The prestressing force is applied using hydraulic stressing jacks and transferred into the member through friction and bond. In bonded systems, grout ensures the bond between tendon and concrete; in unbonded systems, force transfer occurs at anchorage and deviator points. Tendon profiles often follow parabolic or draped paths to introduce eccentricity and favorable internal moments, which can also produce camber. The force flow creates compression zones in the concrete cross-section and stabilizes the member under live and dead loads at both the serviceability and ultimate limit states. During deconstruction, these very forces &#8211; including relaxation, friction losses, and deviator forces &#8211; must be considered to plan and execute cuts, breaking operations, or splits safely and in a controlled manner.<\/p>\n<h2>Components and variants<\/h2>\n<p>Prestressing systems differ by geometry, type of bond, and installation position. Standardized components have become established from a construction perspective, which must be identified and assessed during planning, execution, and deconstruction. Identification of tendon type, anchorage generation, and corrosion protection concept is essential for reliable planning.<\/p>\n<h3>Typical components<\/h3>\n<ul>\n<li>Tendon: Single- or multi-strand tendons, wires, or cables acting in tension<\/li>\n<li>Duct-channel: Guidance of the tendon, corrosion protection, grout space<\/li>\n<li>Anchorage head-stressing head: Force transfer, wedge or screw anchorage systems<\/li>\n<li>Grout: Bonding medium for bonded post-tensioning<\/li>\n<li>Deviators-guides: Geometric guidance, change of force lines<\/li>\n<li>Corrosion protection systems: Greases, fillers, sheathing for unbonded systems<\/li>\n<li>Couplers-connectors: Continuity of tendons across construction joints or stages<\/li>\n<li>End caps-bearing plates: Protection of anchorage zones and force introduction areas<\/li>\n<\/ul>\n<h3>Prestressing procedures<\/h3>\n<ul>\n<li>Pre-tensioning in a casting bed: Tendons are stressed before concreting and released after the concrete has hardened, transferring the prestress into the concrete.<\/li>\n<li>Bonded post-tensioning: Tendons are stressed afterward and then grouted; the bond ensures permanent force transfer.<\/li>\n<li>Unbonded (external) post-tensioning: Tendons remain free to move, force transfer at anchorages-deviators; inspectable and replaceable.<\/li>\n<\/ul>\n<h2>Prestressing systems in concrete demolition and special deconstruction<\/h2>\n<p>Prestress in prestressed concrete members influences every deconstruction strategy. The stored energy can be released abruptly during cutting, breaking, or splitting. An orderly approach reduces risks and enables controlled load redistribution. Temporary propping and staged unloading of members reduce unintended rotations and secondary effects.<\/p>\n<h3>Typical risks<\/h3>\n<ul>\n<li>Snap-back of strands-wires during cutting<\/li>\n<li>Uncontrolled crack propagation and sudden member rotation<\/li>\n<li>Release of prestress energy at anchorage and deviator points<\/li>\n<li>Concealed tendon layouts with unclear force levels<\/li>\n<li>Local spalling-bursting in anchorage zones due to concentrated forces<\/li>\n<li>Unexpected residual forces from damaged or partially corroded tendons<\/li>\n<\/ul>\n<h3>Work sequence in deconstruction<\/h3>\n<ol>\n<li>Investigation: Drawings, preliminary surveys, locating tendons and anchorage zones; define cutting and de-tensioning sequences. Use non-destructive locating where feasible to reduce exploratory damage.<\/li>\n<li>Exposure: Selective concrete removal (e.g., with <strong>concrete crushers<\/strong>) to make strands and anchorages visible; observe dust and noise mitigation and arrange shielding near potential snap-back paths.<\/li>\n<li>De-tensioning-cutting: Defined cut sequence, controlled de-tensioning; cutting tendons with <em>steel shears<\/em> or <em>multi cutters<\/em>, shielding against snap-back where necessary.<\/li>\n<li>Controlled breaking-splitting: Moderate cross-section reduction and crack initiation with <strong>rock and concrete splitters<\/strong> to deliberately modify stress states.<\/li>\n<li>Stabilization and monitoring: Temporary supports, continuous measurement of deformations where required, and verification of the expected force release.<\/li>\n<li>Follow-up works: Removal of remaining reinforcement, haulage, documentation.<\/li>\n<\/ol>\n<p>Hydraulically powered tools from Darda GmbH &#8211; including compact <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> &#8211; enable low-emission work steps, particularly for <em>building gutting and cutting<\/em> indoors as well as for <em>special applications<\/em> with restricted access. Electric operation options further reduce exhaust and noise in sensitive environments.<\/p>\n<h2>Prestressing systems in building gutting and cutting<\/h2>\n<p>Selective deconstruction of prestressed slabs, hollow-core units, or girders demands precise separation. Cutting and severing operations are planned so that field moments and support reactions do not rise to unacceptable levels. Temporary propping, load redistribution checks, and defined segment sizes help maintain control over the structural response.<\/p>\n<h3>Tool selection and cut layout<\/h3>\n<ul>\n<li>Concrete crushers: Local removal of cover concrete layers, exposing tendons without large-scale loss of member material; good control near anchorage edges.<\/li>\n<li>Steel shears-multi cutters: Cutting strands, wires, and reinforcement; high cutting force for concentrated cross-sections.<\/li>\n<li>Rock and concrete splitters: Introducing a defined crack path to redistribute loads prior to cutting and to reduce residual prestress.<\/li>\n<li>Accessories and shielding: Catch devices, screens, and restraints to control strand release directions and protect adjacent areas.<\/li>\n<\/ul>\n<p>The combination of these methods enables clean progress with controlled force release &#8211; an essential factor for safety in existing structures.<\/p>\n<h2>Prestressing systems in rock demolition and tunnel construction<\/h2>\n<p>Prestressed systems are also used underground and on slopes, such as <em>rock anchors<\/em> and <em>pre-tensioned straps<\/em> for rock mass and excavation support. These prestressing systems stabilize the ground by introducing targeted tensile forces. Variable stress states in the ground require precise staging and monitoring during any modification.<\/p>\n<h3>Deconstruction and modification<\/h3>\n<ul>\n<li>Expose anchor heads and bearing plates using <strong>concrete crushers<\/strong> or point splitting of the support areas.<\/li>\n<li>Cut tension members with <em>steel shears<\/em> or <em>multi cutters<\/em>, taking into account residual prestress and possible snap-back.<\/li>\n<li>Removal or partial de-tensioning to adapt construction states, for example prior to cross-section enlargements.<\/li>\n<li>Temporary re-anchoring or staged release to maintain stability during construction sequences.<\/li>\n<\/ul>\n<p>In <em>rock demolition and tunnel construction<\/em>, low-vibration, precise methods are required. <strong>Rock and concrete splitters<\/strong> enable blast-free removal in stress-carrying areas without endangering surrounding structures.<\/p>\n<h2>Condition survey and locating of tendons<\/h2>\n<p>Before intervening in load-bearing members, the position and condition of the prestressing system must be determined. This is especially true for historic structures or where documentation is incomplete. Non-destructive testing reduces interventions and improves planning reliability.<\/p>\n<h3>Investigation methods<\/h3>\n<ul>\n<li>Localization: Indirect locating methods, visual inspections after selective removal, borescope inspections in accessible ducts.<\/li>\n<li>Condition: Assessment of corrosion indicators, grouting quality (in bonded systems), and damage in the anchorage region.<\/li>\n<li>Measurements: Indications from deformations, crack patterns, and hammer sounding or simple resistance tests; supplementary testing per recognized engineering practice where required.<\/li>\n<li>Non-destructive testing: Ground-penetrating radar, cover meters, and ultrasonic echo where applicable to map tendon paths and thicknesses.<\/li>\n<\/ul>\n<p><strong>Important<\/strong>: Results must be documented in work and cutting plans and cross-checked with the de-tensioning and cutting sequence. Changes in the structural state must be continuously monitored, with predefined stop criteria for unexpected behavior.<\/p>\n<h2>Planning certainty, occupational safety, and environmental aspects<\/h2>\n<p>Occupational safety starts with planning. Prestressing systems require a step-by-step, controlled approach with defined chains of responsibility. The statements in this article are general and do not replace project-specific planning. Clear method statements, permits where required, and coordination with structural engineering are indispensable.<\/p>\n<h3>Principles<\/h3>\n<ul>\n<li>Hazard analysis focusing on stored energy and unpredictable member behavior.<\/li>\n<li>Exclusion and protection zones against snap-back of strands; shielding at cutting points.<\/li>\n<li>Dust and noise reduction through appropriate removal and splitting techniques; water management to minimize environmental impact.<\/li>\n<li>Personal protective equipment, safe setup of hydraulic power packs, depressurized coupling.<\/li>\n<li>Defined stop criteria and an emergency plan for abnormal deformations or force releases.<\/li>\n<li>Qualification of personnel and regular inspection of tools, hoses, and connections.<\/li>\n<\/ul>\n<h2>Typical use cases<\/h2>\n<p>Prestressing systems are found in bridges, large-span slabs, hollow-core units, prestressed concrete girders, silo walls, and prestressed beams. This leads to recurring scenarios in deconstruction, often with restricted access and strict environmental constraints.<\/p>\n<h3>Examples<\/h3>\n<ul>\n<li>Bridge span separation: De-tensioned separation cuts in edge areas, exposure and sequential cutting of strands, controlled cross-section reduction with <strong>concrete crushers<\/strong>.<\/li>\n<li>Slab openings: Local de-tensioning using <strong>rock and concrete splitters<\/strong>, followed by cutting tendons with <em>steel shears<\/em> and safe removal of segments.<\/li>\n<li>Prestressed girders: Expose anchorage heads, defined cutting sequence, load redistribution, final downsizing for transport.<\/li>\n<\/ul>\n<h2>Tool technology and interfaces<\/h2>\n<p>Appropriate tool technology supports the safe control of prestressing systems. Hydraulic systems enable high forces in a compact form &#8211; an advantage indoors and in confined situations. Matching pressure stages, oil flow, and coupling systems ensures reliable interaction of all components.<\/p>\n<h3>Selection criteria<\/h3>\n<ul>\n<li>Concrete crushers: Jaw opening, crushing force, weight; suitable for exposing anchorage heads and removing cover concrete.<\/li>\n<li>Steel shears-multi cutters: Cutting force and opening width relative to strand bundles, wires, and reinforcement.<\/li>\n<li>Rock and concrete splitters: Split stroke, wedge geometry, and borehole diameter matched to member thickness and desired crack path.<\/li>\n<li>Hydraulic power packs: Oil flow, pressure, and connection interfaces matched to the tool combination; safe hose routing.<\/li>\n<li>Operational environment: Noise and vibration levels, dust control, and suitability for electric operation in enclosed spaces.<\/li>\n<li>Ergonomics and access: Tool weight, reach, and handling in overhead or confined positions.<\/li>\n<\/ul>\n<h2>Design and material aspects at a glance<\/h2>\n<p>Prestressing systems influence structural behavior over the entire life cycle. For planning and deconstruction, it helps to understand fundamental effects.<\/p>\n<ul>\n<li>Prestress losses: Immediate losses (anchorage seating, friction) and time-dependent effects (steel relaxation, concrete creep and shrinkage).<\/li>\n<li>Force deviation: Additional transverse forces at deviators; must be particularly secured during deconstruction.<\/li>\n<li>Crack patterns: Crack widths and directions provide indications of prestress direction and residual force levels.<\/li>\n<li>Bond quality: Decisive for load transfer and deconstruction behavior in bonded systems.<\/li>\n<li>Anchorage zones: Strut-and-tie action and local bursting require targeted exposure and sequencing.<\/li>\n<li>Eccentricity and camber: Second-order effects can amplify rotations during partial deconstruction.<\/li>\n<\/ul>\n<h2>Practical tips for planning and execution<\/h2>\n<ul>\n<li>First expose, then cut: A visible work area reduces surprises.<\/li>\n<li>Work from low-stress to stress-carrying areas: Plan the sequence.<\/li>\n<li>Small steps, multiple safeguards: Segmenting instead of large-scale interventions.<\/li>\n<li>Use combined methods: <strong>Concrete crushers<\/strong> for removal, <em>steel shears<\/em> for cutting, <strong>rock and concrete splitters<\/strong> for targeted de-tensioning.<\/li>\n<li>Snap-back protection: Shields, restraint systems, and defined catch directions for strands.<\/li>\n<li>Keep documentation continuously updated: Structural states, exclusion zones, and measured changes.<\/li>\n<li>Assign clear responsibilities: Define a competent person for de-tensioning steps and for releasing each work stage.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Prestressing systems are central elements of prestressed-concrete technology. They bundle and transmit tensile forces via tendons into concrete or rock members to control load-bearing capacity, crack width limitation, and deformation behavior. In deconstruction, the prestressing system acts as a stored energy source that must be controlled and safely released during <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/prestressing-system\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19832","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Prestressing System - Concrete &amp; Post-Tensioning<\/title>\n<meta name=\"description\" content=\"Expert guide to prestressing systems in concrete &amp; rock anchors \u27a4 safety, post-tensioning, demolition, load control.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/prestressing-system\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Prestressing System - Concrete &amp; Post-Tensioning\" \/>\n<meta property=\"og:description\" content=\"Expert guide to prestressing systems in concrete &amp; rock anchors \u27a4 safety, post-tensioning, demolition, load control.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/prestressing-system\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-25T09:33:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/prestressing-system\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/prestressing-system\",\"name\":\"Prestressing System - Concrete & Post-Tensioning\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-23T15:07:53+00:00\",\"dateModified\":\"2026-05-25T09:33:03+00:00\",\"description\":\"Expert guide to prestressing systems in concrete & rock anchors \u27a4 safety, post-tensioning, demolition, load control.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/prestressing-system#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/prestressing-system\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/prestressing-system#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Prestressing system\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Prestressing System - Concrete & Post-Tensioning","description":"Expert guide to prestressing systems in concrete & rock anchors \u27a4 safety, post-tensioning, demolition, load control.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/prestressing-system","og_locale":"en_US","og_type":"article","og_title":"Prestressing System - Concrete & Post-Tensioning","og_description":"Expert guide to prestressing systems in concrete & rock anchors \u27a4 safety, post-tensioning, demolition, load control.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/prestressing-system","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-25T09:33:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/prestressing-system","url":"https:\/\/www.darda.de\/en\/knowledge\/prestressing-system","name":"Prestressing System - Concrete & Post-Tensioning","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-23T15:07:53+00:00","dateModified":"2026-05-25T09:33:03+00:00","description":"Expert guide to prestressing systems in concrete & rock anchors \u27a4 safety, post-tensioning, demolition, load control.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/prestressing-system#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/prestressing-system"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/prestressing-system#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Prestressing system"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19832","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19832"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19832\/revisions"}],"predecessor-version":[{"id":27761,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19832\/revisions\/27761"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19832"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}