{"id":19824,"date":"2025-12-22T13:48:49","date_gmt":"2025-12-22T12:48:49","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19824"},"modified":"2026-05-23T09:28:03","modified_gmt":"2026-05-23T07:28:03","slug":"silo-cell","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/silo-cell","title":{"rendered":"Silo cell"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A silo cell is a central building block of silo systems in cement plants, gravel plants, lime and gypsum production, agricultural logistics, or in the chemical industry. Wherever bulk materials are stored, handled, and metered, planners, operators, and specialist contractors encounter the silo cell in new construction, maintenance, modification, and deconstruction. Interventions in silo cells are technically demanding: concrete and steel structures meet confined spaces, dust and explosion protection, complex load paths, and ongoing operations. Especially here, low-vibration, low-impact methods have become established, such as controlled splitting of concrete or selective concrete removal. Depending on the task at hand, tools such as <strong>concrete pulverizer<\/strong> or <strong>hydraulic splitter<\/strong> as well as suitable hydraulics from Darda GmbH are used in connection with work in silo cells &#8211; typically in the application areas <em>concrete demolition and special demolition<\/em>, <em>gutting works and cutting<\/em>, and <em>special deployment<\/em>.<\/p>\n<p>Compared with percussive techniques, such approaches reduce vibration, microcracking, and collateral damage to sensitive linings. They support clean interfaces for retrofits, permit work in confined geometries, and help keep adjacent operations running with predictable emissions and schedules.<\/p>\n<h2>Definition: What is meant by a silo cell?<\/h2>\n<p>A <strong>silo cell<\/strong> is understood to be the individual chamber of a multi-cell silo system (silo battery) or the standalone, usually vertical container of a silo system. Silo cells are constructed as cylindrical, polygonal, or rectangular shaft structures made of reinforced concrete or steel. They typically consist of the shell wall (shaft), the conical or pyramidal hopper (discharge), the roof with inlet and maintenance openings, and the connections to discharge units (e.g., screws, rotary valves). They serve to store and dose bulk materials such as cement, lime, gypsum, fly ash, aggregates, ore, grain, or pellets. Design takes into account filling and emptying pressures, wall friction, temperature and humidity changes, as well as dynamic effects from operation.<\/p>\n<p>Depending on the bulk material and operating concept, <em>auxiliary equipment<\/em> is common for reliable flow and safety:<\/p>\n<ul>\n<li>Aeration pads, fluidization nozzles, or vibrators for flow aid<\/li>\n<li>Level measurement, pressure monitoring, and temperature sensors<\/li>\n<li>Explosion vents, isolation devices, and grounding connections<\/li>\n<li>Internal wear liners, coatings, and impact plates in the hopper area<\/li>\n<li>Manholes, inspection doors, and sampling points for maintenance access<\/li>\n<\/ul>\n<h2>Structure and design features<\/h2>\n<p>Silo cells combine load-bearing function and proximity to conveying. For planning, repair, or deconstruction, the structural setup is crucial because it determines the choice of methods and dictates work access.<\/p>\n<ul>\n<li><strong>Concrete silo cell<\/strong>: Reinforced concrete walls with reinforcement, often with wear-resistant internal lining in the hopper area. Wall thicknesses vary depending on height, diameter, and load assumptions. Attachments such as fixed ladders, platforms, dust extraction lines, or knockers are common.<\/li>\n<li><strong>Steel silo cell<\/strong>: Shell made of steel plate with rings, beads, or profile rings for stiffening. Hopper from conically bent plates. Often with wear linings or coatings. Attachments include conveying equipment, impact plates, and measuring sensors.<\/li>\n<li><strong>Silo batteries<\/strong>: Several silo cells are combined in a common structure. Partition walls share loads, so local interventions (openings, reinforcements) must be coordinated structurally.<\/li>\n<li><strong>Hybrid and lined variants<\/strong>: Concrete or steel cells with replaceable liners or composite solutions to balance wear resistance, hygiene, and structural performance.<\/li>\n<li><strong>Internal fittings and interfaces<\/strong>: Chutes, inserts, or flow-correction cones influence load paths and access. Their presence must be reflected in temporary shoring and method selection.<\/li>\n<\/ul>\n<p>Dimensional tolerances, reinforcement layout, and the position of inlets and outlets govern drilling patterns and feasible tool clearances. Early verification of manhole sizes and internal obstructions prevents access conflicts during execution.<\/p>\n<h2>Typical tasks on existing silo cells<\/h2>\n<p>Throughout the life cycle of a silo cell, a wide range of tasks arise that must be executed precisely and in a material-appropriate manner. These include work in <em>concrete demolition and special demolition<\/em>, in <em>gutting works and cutting<\/em>, and in <em>special deployment<\/em>.<\/p>\n<ul>\n<li>Creating openings for inspection, conveying, dust extraction, or modifications<\/li>\n<li>Selective removal of concrete on shell walls or hoppers, e.g., for wall thickness reduction or to fit new attachments<\/li>\n<li>Removing crusts and build-ups, breaking bridges<\/li>\n<li>Deconstruction of decommissioned silo cells or partial deconstruction of hoppers and roof areas<\/li>\n<li>Repair: exposing corroded reinforcement, removing defective concrete or steel plates<\/li>\n<li>Retrofitting outlets and discharge equipment, enlarging or relocating inlets<\/li>\n<li>Installing or replacing instrumentation such as level switches, pressure taps, or temperature probes<\/li>\n<li>Sealing and corrosion protection works on penetrations, roofs, and hopper connections<\/li>\n<li>Geometry adaptations to mitigate ratholing or arching, including local hopper re-profiling<\/li>\n<\/ul>\n<h2>Methods and tools for work on silo cells<\/h2>\n<p>The choice of method depends on material, component thickness, installations, surroundings, and safety requirements. In practice, hydraulic, low-impact methods that are controllable and usable in confined spaces have proven themselves. Zoning for potentially explosive atmospheres and ignition source control inform the selection and sequencing of each operation.<\/p>\n<h3>Controlled splitting of concrete components<\/h3>\n<p>With controlled splitting, splitting cylinders are inserted into a defined drilling pattern. <strong>hydraulic splitters<\/strong> and stone splitting cylinders generate high, locally confined splitting forces in the borehole, causing the concrete to crack along the calculated lines of weakness. The method is precise, low-vibration, and suitable for openings in shell walls, deconstruction of hopper tips, or detaching concrete noses. Power is supplied by <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/strong> from Darda GmbH; the arrangement allows work in areas with restricted accessibility. Typical application areas are <em>concrete demolition and special demolition<\/em> as well as <em>gutting works and cutting<\/em>.<\/p>\n<h3>Selective concrete removal and edge finishing<\/h3>\n<p><strong>concrete pulverizer<\/strong> enables \u201cnibbling\u201d concrete with high shape accuracy, for example when exposing reinforcement, cleanly notching edges, or tying into existing installations. The device can be guided section by section, allowing opening contours or bevels to be produced precisely on silo walls. In combination with splitting technology, rough separation can be performed first and then contoured. Tools such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">concrete crushers for precise removal<\/a> support this method. The low shock input protects adjacent components, coatings, and embedded parts.<\/p>\n<h3>Cutting reinforcement and steel components<\/h3>\n<p>Where reinforcing steels, profile rings, impact plates, or steel hoppers must be cut, <strong>steel shear<\/strong> and <strong>hydraulic shear<\/strong> are used. They cut reinforcement and plates in a controlled manner, including in elevated areas or inside the cell. <strong>Multi Cutters<\/strong> are helpful when different material thicknesses and mixed construction are encountered. Working in small cutting windows and with low spark generation is an advantage in dust-sensitive areas.<\/p>\n<h3>Cutting tanks and steel silos<\/h3>\n<p>For metallic silo cells or tank-like vessels, segmental deconstruction can be carried out with a <strong>cutting torch<\/strong>. Before such work, clearance measurements, inerting, and suitable extraction are usually prepared. These tasks often fall under <em>special deployment<\/em> when special geometries or media are present.<\/p>\n<h2>Planning, structural analysis, and safety<\/h2>\n<p>Interventions in silo cells affect load-bearing capacity, operational safety, and explosion protection. Careful planning is essential and should assess the individual case with expert knowledge. The following points provide general guidance but do not replace project-specific planning or approvals:<\/p>\n<ul>\n<li>Check existing documentation: structural analysis, reinforcement drawings, material specifications, linings, attachments<\/li>\n<li>Clarify filling state and residual material, exclude bridging; if necessary, empty in a controlled manner<\/li>\n<li>Risk assessment incl. dust explosion protection, clearance measurements, and ventilation; define personal protective equipment<\/li>\n<li>Access and rescue: work in confined spaces only with a coordinated rescue plan and communication means<\/li>\n<li>Plan temporary <strong>shoring<\/strong> and load relief, especially for openings in load-bearing areas or hopper modifications<\/li>\n<li>Emission reduction: <strong>dust suppression<\/strong> (e.g., mist), <strong>dust extraction<\/strong>, enclosures<\/li>\n<li>Organize work permits, briefings, and cordoned-off areas<\/li>\n<li>Define ATEX zoning, ignition source control, and monitoring of hot surfaces and sparks<\/li>\n<li>Set up structural and environmental monitoring (crack gauges, vibration, dust, and noise meters) for critical phases<\/li>\n<li>Coordinate interfaces with process control and lockout-tagout to avoid inadvertent filling or flow<\/li>\n<li>Establish waste segregation, temporary storage, and transport logistics compliant with the <strong>waste management chain<\/strong><\/li>\n<\/ul>\n<h3>Monitoring and quality control<\/h3>\n<ul>\n<li>Verification drilling and rebar scanning to calibrate drilling patterns and avoid clashes<\/li>\n<li>Test splits or test cuts to validate tool parameters and achieve target line accuracy<\/li>\n<li>Documentation: photo logs, as-built sketches, and measurement records for openings and edge qualities<\/li>\n<li>Acceptance criteria for edges, residual wall thickness, and surface roughness defined before execution<\/li>\n<\/ul>\n<h2>Workflow: From concept to a clean opening<\/h2>\n<ol>\n<li>Survey and define the intervention goal (opening, deconstruction, repair)<\/li>\n<li>Isolate, clean, and if applicable inert; document measurements and releases<\/li>\n<li>Access and logistics concept (suspension, platforms, lifting gear, material removal)<\/li>\n<li>Method selection: splitting, pulverizer work, shears or cutting technology; selection of suitable <strong>hydraulic power pack<\/strong><\/li>\n<li>Trial split or trial cut in a non-critical area to verify parameters<\/li>\n<li>Execution in sections with ongoing monitoring of component behavior and emissions<\/li>\n<li>Finishing: refine edges, treat <strong>reinforcement<\/strong>, add protective layers; acceptance and documentation<\/li>\n<li>Waste handling and recycling routing by fraction with clean separation of concrete and metals<\/li>\n<li>Final inspection with dimensional check, rebar cover verification, and updated as-built documentation<\/li>\n<\/ol>\n<p>In practice, <strong>hydraulic splitters<\/strong> are often used for structured separation, e.g., <a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-splitters\">Rock splitters<\/a>, and then contours are finished with <strong>concrete pulverizer<\/strong>. Metallic components are cut with <strong>steel shear<\/strong>, <strong>hydraulic shear<\/strong>, or <strong>Multi Cutters<\/strong>. Clear acceptance criteria for geometry, residual thickness, and surface quality reduce rework and interface risks.<\/p>\n<h2>Specifics for cement, lime, and grain silos<\/h2>\n<h3>Cement and lime silos<\/h3>\n<p>Build-ups and crusts are typical. Mechanical loosening requires a controlled approach to avoid abrupt changes in wall pressures. For structural adjustments, openings can be created with splitting technology; edge areas are defined with <strong>concrete pulverizer<\/strong>. Dust binding and grounding of conductive components contribute to explosion protection. Flow aids such as aeration pads and pressure relief paths must remain functional after intervention.<\/p>\n<h3>Grain and feed silos<\/h3>\n<p>Often built as steel silos, with special requirements for explosion protection and hygiene. For cutting plates and stiffeners, methods with low sparks and ignition sources are advantageous. <strong>steel shear<\/strong> and, where appropriate, <strong>cutting torch<\/strong> enable segmental dismantling. Residues of fumigants or organic dust layers call for verified air exchange and continuous atmosphere monitoring.<\/p>\n<h3>Ore, gravel, and aggregate silos<\/h3>\n<p>High abrasion can lead to worn hopper tips or local damage. For replacement, damaged areas are often removed via a drilling pattern and <strong>hydraulic splitter<\/strong> to protect the adjacent structure. Edge finishing is then performed with <strong>concrete pulverizer<\/strong>. Wear liners, impact plates, and transitions to chutes require careful reinstallation to restore flow profiles.<\/p>\n<h2>Emissions and environmental aspects<\/h2>\n<p>Work on silo cells requires an emissions concept. Hydraulic splitting and pulverizer work are generally low-vibration and support a controlled emissions level. Dust is reduced by extraction and wetting, noise is minimized by enclosed work areas and adjusted working hours. Arising materials are separated by fractions (concrete, reinforcing steel, plates, linings) and properly disposed of or routed to <strong>recycling<\/strong>.<\/p>\n<ul>\n<li>Use local capture at source with suitable filtration stages and discharge monitoring<\/li>\n<li>Plan negative-pressure enclosures where feasible to avoid cross-contamination<\/li>\n<li>Select fluids and lubricants with leak protection and spill kits for sensitive areas<\/li>\n<li>Schedule noisy or dust-intensive steps in low-impact time windows<\/li>\n<\/ul>\n<h2>Practice-oriented application scenarios<\/h2>\n<ul>\n<li>Opening in a concrete silo cell for a new discharge: drilling pattern, splitting with <strong>hydraulic splitter<\/strong>, exposing the reinforcement, contoured finishing with <strong>concrete pulverizer<\/strong>.<\/li>\n<li>Segmental deconstruction of a decommissioned steel silo: removing attachments, cutting shell plates with <strong>steel shear<\/strong>, trimming larger sections with <strong>cutting torch<\/strong> and controlled lowering.<\/li>\n<li>Refurbishment of a hopper with replacement of the tip: local exposure using splitting technology, removing corroded reinforcement with <strong>Multi Cutters<\/strong>, fitting new components.<\/li>\n<li>Retrofitting level and pressure instrumentation: small-format openings via splitting and precise edge creation with a <strong>concrete pulverizer<\/strong>, followed by sealed penetrations.<\/li>\n<\/ul>\n<h2>Checklist for preparing work on silo cells<\/h2>\n<ul>\n<li>Define objectives and delineate the work area<\/li>\n<li>Documentation status: drawings, structural analysis, material data, linings<\/li>\n<li>Risk assessment incl. dust and explosion protection; measurement and release concept<\/li>\n<li>Clear, empty, clean; <strong>waste management chain<\/strong> for residual materials<\/li>\n<li>Access, <strong>fall protection<\/strong>, rescue, and communication<\/li>\n<li>Method and tool selection (e.g., <strong>concrete pulverizer<\/strong>, <strong>hydraulic splitter<\/strong>, <strong>steel shear<\/strong>, <strong>hydraulic shear<\/strong>)<\/li>\n<li>Plan hydraulic supply (<strong>hydraulic power pack<\/strong>, hose routes, leak protection)<\/li>\n<li>Emission and noise control measures<\/li>\n<li>Sectional planning, trial areas, documentation<\/li>\n<li>Quality control and final inspection<\/li>\n<li>Hot-work and confined-space permits, fire watch, and ATEX zoning confirmation<\/li>\n<li>Interface coordination with process operations, lockout-tagout, and exclusion zones<\/li>\n<\/ul>\n<h2>Terminology distinction<\/h2>\n<p>Silo cells are containers designed for bulk materials with specific flow properties. They are to be distinguished from bunkers (usually open and with short drop heights) as well as liquid containers and tanks. For tank-like steel vessels, interventions resemble those on steel silos; <strong>steel shear<\/strong> and <strong>cutting torch<\/strong> are frequently used here. For massive concrete structures with bulk material contact, <strong>hydraulic splitter<\/strong> and <strong>concrete pulverizer<\/strong> have proven effective &#8211; typically in the application areas <em>concrete demolition and special demolition<\/em> as well as <em>gutting works and cutting<\/em>.<\/p>\n<p>Clear terminology supports appropriate method selection, risk assessment, and definition of acceptance criteria for structural and operational performance.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A silo cell is a central building block of silo systems in cement plants, gravel plants, lime and gypsum production, agricultural logistics, or in the chemical industry. Wherever bulk materials are stored, handled, and metered, planners, operators, and specialist contractors encounter the silo cell in new construction, maintenance, modification, and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/silo-cell\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19824","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Silo Cell in Bulk Material Storage &amp; Handling<\/title>\n<meta name=\"description\" content=\"Industrial bulk storage guide - silo cell design, planning, safety &amp; low-impact methods \u2713 for cement &amp; grain.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/silo-cell\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Silo Cell in Bulk Material Storage &amp; Handling\" \/>\n<meta property=\"og:description\" content=\"Industrial bulk storage guide - silo cell design, planning, safety &amp; low-impact methods \u2713 for cement &amp; grain.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/silo-cell\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-23T07:28:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-cell\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-cell\",\"name\":\"Silo Cell in Bulk Material Storage & Handling\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-22T12:48:49+00:00\",\"dateModified\":\"2026-05-23T07:28:03+00:00\",\"description\":\"Industrial bulk storage guide - silo cell design, planning, safety & low-impact methods \u2713 for cement & grain.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-cell#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-cell\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-cell#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Silo cell\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Silo Cell in Bulk Material Storage & Handling","description":"Industrial bulk storage guide - silo cell design, planning, safety & low-impact methods \u2713 for cement & grain.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/silo-cell","og_locale":"en_US","og_type":"article","og_title":"Silo Cell in Bulk Material Storage & Handling","og_description":"Industrial bulk storage guide - silo cell design, planning, safety & low-impact methods \u2713 for cement & grain.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/silo-cell","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-23T07:28:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/silo-cell","url":"https:\/\/www.darda.de\/en\/knowledge\/silo-cell","name":"Silo Cell in Bulk Material Storage & Handling","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-22T12:48:49+00:00","dateModified":"2026-05-23T07:28:03+00:00","description":"Industrial bulk storage guide - silo cell design, planning, safety & low-impact methods \u2713 for cement & grain.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/silo-cell#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/silo-cell"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/silo-cell#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Silo cell"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19824","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19824"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19824\/revisions"}],"predecessor-version":[{"id":27717,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19824\/revisions\/27717"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19824"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}