{"id":19822,"date":"2025-12-22T08:37:33","date_gmt":"2025-12-22T07:37:33","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19822"},"modified":"2026-09-12T19:53:27","modified_gmt":"2026-09-12T17:53:27","slug":"silo-shaft","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/silo-shaft","title":{"rendered":"Silo shaft"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A silo shaft is the vertical heart of many silo installations for storing and discharging bulk materials such as cement, fly ash, lime, ore, or grain. In industry, infrastructure, and raw material extraction, this shaft connects storage cells with hoppers, conveying equipment, and dust extraction systems. For planning, maintenance, refurbishment, or deconstruction, knowledge of the structure, loads, and safe working methods is crucial. Due to the massive construction in reinforced concrete or steel and the confined, often dust-laden working environment, work on the silo shaft relies on controlled, low-vibration and low-dust methods &#8211; especially the targeted use of <strong>concrete pulverizers<\/strong> as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-splitters\">rock splitters<\/a>, powered by <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">appropriate hydraulic power units<\/a>. In the context of bulk solids engineering, such approaches minimize collateral damage, shorten shutdowns, and support reproducible, documented results.<\/p>\n<h2>Definition: What is meant by a silo shaft?<\/h2>\n<p>A silo shaft is generally understood to be the cylindrical or polygonal, vertical shaft of a silo system that connects storage areas, discharge hoppers, conveying technology, and operating levels. It can be configured as a standalone cell (tower silo), as a central storage shaft in multi-chamber systems, or as a bunker shaft in process plants. Characteristic features are tall, slender geometries, high surface loads from bulk materials, and dynamic effects from filling, consolidation, sliding processes, and discharge. Structurally, reinforced concrete or steel shells dominate, sometimes with internal linings, wear protection, and de-dusting; statically, hoop tension and buckling are governing, as are local notch stresses at openings, temperature and moisture gradients, and eccentricities due to non-uniform bulk material flow. Typical shaft heights range from a few meters to several tens of meters, with inner diameters often between 2 and over 10 meters, resulting in pronounced slenderness. Depending on the application, integrated <em>aeration<\/em> and <em>flow aids<\/em>, inspection access, and instrumentation are part of the functional design.<\/p>\n<h2>Structure and mode of operation of the silo shaft<\/h2>\n<p>The silo shaft consists of the shell (shaft), the transition into the hopper, discharge organs, and connections to the conveying technology. The shell takes up hoop tension forces and wind loads, the hopper consolidates material flows, and discharge is via chutes, rotary feeder valves, slides, screws, or pneumatic systems. Operationally, a distinction is made between <strong>mass flow<\/strong> and <strong>core flow<\/strong>: while mass flow promotes uniform wall loading and predictable flow properties, core flow more frequently leads to buildups, bridging, and eccentric load paths. Maintenance openings, inspection platforms, and measuring points (level, pressure, temperature) complete the setup. For interventions in the structure &#8211; such as openings, strengthening, or deconstruction &#8211; structural system, concrete strength, reinforcement layout, and any prestressing must be considered; in steel silos, plate thicknesses, beads, and ring stiffeners. Low-vibration cutting and splitting methods preserve the integrity of adjacent components and reduce dust and noise emissions. Where required, flow aids (vibrators, air pads), <em>anti-bridging<\/em> measures, and continuous level monitoring (e.g., radar or acoustic) stabilize operations and inform maintenance windows.<\/p>\n<h2>Construction methods and materials<\/h2>\n<p>Silo shafts are built in cast-in-place concrete (often using slipform or climbing formwork), as precast construction, or from steel plate with ring stiffeners. Reinforced concrete silos have wall thicknesses from a few centimeters (small diameters) to over 30 centimeters (large facilities); internally, hard-material linings, wear plates, or polymer-based coatings can be installed against abrasion and buildup. Steel silos frequently use high-strength fine-grain steels; corrosion protection, crack monitoring, and vibration isolation are key here. Transition zones from shell to hopper are structurally sensitive and must be handled carefully during modifications. For selective deconstruction, <em>concrete pulverizers<\/em> are suitable for concrete structures and <em>steel shears<\/em> or tank cutters for steel silos; for massive wall thicknesses, <strong>hydraulic wedge splitters<\/strong> with wedge cylinders enable precise, controlled separation. In practice, attention to <em>thermal cycling<\/em>, shrinkage and creep (concrete), as well as weld quality and stiffener continuity (steel), reduces the risk of local overstress during interventions.<\/p>\n<h2>Use, loads, and typical damage patterns<\/h2>\n<p>Operation governs the loads: dead weight of the bulk material, friction and lateral pressures, dynamic effects from filling\/emptying, temperature variations, and moisture. Typical phenomena are buildup, bridging, and shaft blockages that lead to non-uniform stresses. Damage patterns include cracks at openings and joints, spalling due to abrasion, local deformations in steel silos, corrosion damage, and fatigue. In maintenance and refurbishment, wear zones are upgraded, openings optimized, or the shaft is partially deconstructed. Low-shock procedures with hydraulic concrete pulverizers and splitting technology minimize consequential damage to adjacent structures and plant components. Flow-induced vibrations and transient events (silo quaking or honking) may occur during discharge, causing cyclic stresses; early indicators are fine ring cracks, local buckles, or abnormal noise, which should trigger structured inspection and monitoring.<\/p>\n<h2>Safety and occupational safety in the silo shaft<\/h2>\n<p>Work in the silo shaft involves activities in confined spaces with potentially elevated hazards. These include dust generation, oxygen deficiency, bulk material slippage, fall risks, and mechanical hazards from conveying equipment. Added to this are potential ignition sources and potentially explosive dust atmospheres. In principle, appropriate permits, hazard analysis, measurements, rescue plans, and suitable dust and ignition source controls are required. The choice of demolition and separation technology has a direct impact on the safety level: low-vibration, low-spark, and low-dust approaches with splitting and shear methods are advantageous in sensitive environments. Essential elements typically include <strong>confined space entry<\/strong> procedures, isolation and <strong>lockout-tagout<\/strong> of all drives, continuous gas monitoring (oxygen, combustible dust concentration), verified rescue access, and consideration of explosive atmospheres classification (e.g., zones for combustible dust), including avoidance of hot work where possible.<\/p>\n<h2>Planning, structural analysis, and building assessment<\/h2>\n<p>Before intervening in the silo shaft, construction documents, material properties, reinforcement layout, and load cases must be reviewed. Incomplete documentation can be supplemented by low-destructive testing (rebar scanning, rebound hammer, core drilling) and monitoring. Openings in highly stressed zones must be assessed structurally; temporary shoring, relief boreholes, or props may be required. In steel silos, welds, stiffeners, and shell buckling must be considered. The choice between cutting, breaking, splitting, or sawing depends on component thickness, boundary conditions, and emission targets. Hydraulic power packs must be sized so that tools operate with constant operating pressure and flow rate to achieve controlled cutting and splitting results. Added value comes from <em>as-built<\/em> capture via 3D scanning, model-based checks against applicable design standards, and a coordinated method statement that defines sequencing, hold points, and quality metrics (e.g., permitted crack width, edge tolerances, and maximum vibration levels).<\/p>\n<h2>Refurbishment, modification, and deconstruction of silo shafts<\/h2>\n<p>Depending on the objective, measures range from creating openings and breakthroughs through local strengthening to complete demolition. In plants with ongoing production, selective, low-vibration work is essential. Typical tools are <strong>concrete pulverizers<\/strong> for concrete and reinforced concrete, <em>combination shears<\/em> for mixed tasks (concrete\/steel), <em>Multi Cutters<\/em> and <em>steel shears<\/em> for steel components, and <em>tank cutters<\/em> for plate shells. For thick-walled components, <strong>hydraulic wedge splitters<\/strong> with wedge cylinders enable controlled crack initiation and clean separation joints &#8211; useful, for example, when gradually reducing shaft height or creating openings in load-bearing zones. Hydraulic power packs supply the tools stationarily or mobile, depending on accessibility and deployment logistics. Where required, temporary ring clamps, external bracing, or internal propping keep deformations within limits; remote-controlled attachments increase worker distance to the hazardous zone.<\/p>\n<h3>Openings and breakthroughs in the silo shaft<\/h3>\n<p>For new discharge, inspection, or maintenance openings, position, geometry, and load redistribution must be planned in advance. Practical procedure:<\/p>\n<ul>\n<li>Expose, mark, rebar scanning, and derivation of load paths with attention to shear and ring tension<\/li>\n<li>Preparation via core drilling and relief cuts to predefine crack paths and reduce breakout forces<\/li>\n<li>Low-vibration material removal with concrete pulverizers; for massive construction, splitting with hydraulic wedge splitters to protect adjacent components<\/li>\n<li>Simultaneous dust suppression, shoring, and edge reinforcement with corrosion-protected anchors<\/li>\n<li>Installation of strengthening frames, edge protection, and liners with verified clearances and wear allowances<\/li>\n<\/ul>\n<h3>Selective deconstruction of concrete and steel<\/h3>\n<p>In concrete silos, deconstruction often starts top-down with segmental removal. Concrete pulverizers nibble the shell and crown in a controlled manner; reinforcement is cut with Multi Cutters. In steel silos, shell sections are separated with steel shears or tank cutters and lowered under control. Combination shears make sense on hybrid components (concrete with dense reinforcement and embedded parts). Splitting technology reduces lifting forces and minimizes effects on adjacent installations. Lift plans, cutting patterns, fall protection, and exclusion zones are coordinated in advance to control segment size, weight, and drop risk; interfaces to dust extraction and waste logistics are integrated into the sequence.<\/p>\n<h2>The silo shaft in cement, power, and chemical plants<\/h2>\n<p>Specific requirements arise in cement plants (clinker, cement, and raw meal silos), power plants (fly ash, gypsum, or lime silos), and chemical facilities (powders, granulates). Abrasive media and elevated temperatures put heavy demand on the inner surfaces, requiring local linings, impact plates, and geometry adjustments. When changing material flow (e.g., from core to mass flow), hopper angles, linings, and opening geometries must be reviewed. For modifications and deconstruction, low-dust and low-spark methods are preferred; <strong>hydraulic wedge splitters<\/strong> and <strong>concrete pulverizers<\/strong> are established in <em><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a><\/em>. Sticky or cohesive fines, thermal gradients, and chemical exposure (e.g., alkaline dusts) additionally influence wear zones and dictate inspection intervals and lining selection.<\/p>\n<h2>The silo shaft in raw material extraction and tunnel construction<\/h2>\n<p>In natural stone extraction and underground construction, silo shafts are used as buffer and storage shafts for muck or granulates. Geometry adjustments, connections to conveying systems, and wear protection play a major role here. When enlarging or breaking out openings in rock or concrete sections, controlled splitting with hydraulic wedge splitters is a low-vibration method that protects adjacent rock. For load-bearing steel elements, steel shears are used; hybrid components are processed with combination shears. The tight integration into the workflow of <em>rock breakout and tunnel construction<\/em> requires compact, powerful hydraulic power packs. Additional boundary conditions include ventilation, water ingress management, and protection against impact loads from skips or loaders at transfer points.<\/p>\n<h2>Logistics, hydraulic power supply, and workflow<\/h2>\n<p>Narrow accesses, elevated locations, and limited load-bearing capacities define deployment logistics. Hydraulic power packs must be selected according to required pressure and flow rate; hose lengths and back pressure must be considered. A typical workflow:<\/p>\n<ol>\n<li>Work and rescue plan, isolation, and measurements<\/li>\n<li>Scaffolding, access equipment, and dust protection<\/li>\n<li>Preparatory separation cuts\/core drilling, shoring<\/li>\n<li>Low-vibration removal with concrete pulverizers or splitting with hydraulic wedge splitters<\/li>\n<li>Separate handling of reinforcing steel and embedded items with Multi Cutters, steel shears, or tank cutters<\/li>\n<li>Source-separated sorting and removal<\/li>\n<\/ol>\n<p>Practicalities such as hose management, pressure-drop calculation, power supply constraints, and noise windows should be aligned with site logistics; cooling air supply and return flow restrictions of the power packs must be verified for the installed length and elevation.<\/p>\n<h2>Emissions, environment, and recycling<\/h2>\n<p>Dust, noise, and vibration reduction are central aims when working on the silo shaft. Water mist, local extraction, and adapted tool selection reduce emissions. Low-vibration splitting and shear methods favor the protection of sensitive environments and installations. Removed concrete is crushed and sent to construction waste recycling; steel fractions are separated by type. Measures must be coordinated with the applicable regulations; information is provided without legal binding. In addition, silica dust control, water management for misting systems, and real-time monitoring of particle and noise levels help document compliance and optimize parameters during execution.<\/p>\n<h2>Terminology and practical differentiation<\/h2>\n<p>In common usage, silo shaft, silo cell, silo chamber, and bunker shaft are sometimes used interchangeably. Technically, the silo shaft describes the vertical component that connects storage and conveying areas, while the cell denotes the actual storage chamber and the bunker often has a short-term buffer function. For planning, maintenance, and deconstruction, precise functional assignment is crucial to correctly define load assumptions, opening details, and the choice of suitable methods &#8211; such as <strong>concrete pulverizers<\/strong> or <strong>hydraulic wedge splitters<\/strong>. Clear differentiation from the <em>hopper<\/em> (transition geometry), <em>chute\/spout<\/em> (discharge path), and <em>bin<\/em> (general storage term) prevents misinterpretation in specifications and method statements.<\/p>\n<h2>Practice-oriented notes for silo shaft projects<\/h2>\n<p>Successful projects combine robust pre-investigation with suitable equipment technology and a coherent execution plan. The following have proven effective:<\/p>\n<ul>\n<li>Early involvement of structural analysis, occupational safety, and execution teams with clearly defined roles and interfaces<\/li>\n<li>Field trials\/tests to verify concrete strength, reinforcement density, and separation behavior, including test splits or pilot cuts<\/li>\n<li>Modular approach: pre-cutting &#8211; controlled splitting\/nibbling &#8211; rebar separation &#8211; removal<\/li>\n<li>Use of hydraulic power packs with sufficient capacity reserve for constant tool performance and thermal stability<\/li>\n<li>Documentation of crack formation, settlements, and emission values for quality assurance with traceable acceptance criteria<\/li>\n<\/ul>\n<p>In this context, Darda GmbH bundles expertise in hydraulic tools for <em>concrete demolition and special deconstruction<\/em>, <em>gutting and cutting<\/em>, <em>rock breakout and tunnel construction<\/em>, <em>natural stone extraction<\/em>, and <em>special deployments<\/em> &#8211; with a focus on controlled, precise work and source-separated material handling in the silo shaft.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A silo shaft is the vertical heart of many silo installations for storing and discharging bulk materials such as cement, fly ash, lime, ore, or grain. In industry, infrastructure, and raw material extraction, this shaft connects storage cells with hoppers, conveying equipment, and dust extraction systems. For planning, maintenance, refurbishment, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/silo-shaft\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19822","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Silo Shaft - Industrial Design, Loads &amp; Safety<\/title>\n<meta name=\"description\" content=\"Explore the silo shaft as the vertical core of bulk material silos \u2713 design, safety &amp; low-dust deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/silo-shaft\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Silo Shaft - Industrial Design, Loads &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Explore the silo shaft as the vertical core of bulk material silos \u2713 design, safety &amp; low-dust deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/silo-shaft\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:27+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-shaft\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-shaft\",\"name\":\"Silo Shaft - Industrial Design, Loads & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-22T07:37:33+00:00\",\"dateModified\":\"2026-09-12T17:53:27+00:00\",\"description\":\"Explore the silo shaft as the vertical core of bulk material silos \u2713 design, safety & low-dust deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-shaft#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-shaft\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-shaft#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Silo shaft\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Silo Shaft - Industrial Design, Loads & Safety","description":"Explore the silo shaft as the vertical core of bulk material silos \u2713 design, safety & low-dust deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/silo-shaft","og_locale":"en_US","og_type":"article","og_title":"Silo Shaft - Industrial Design, Loads & Safety","og_description":"Explore the silo shaft as the vertical core of bulk material silos \u2713 design, safety & low-dust deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/silo-shaft","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:27+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/silo-shaft","url":"https:\/\/www.darda.de\/en\/knowledge\/silo-shaft","name":"Silo Shaft - Industrial Design, Loads & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-22T07:37:33+00:00","dateModified":"2026-09-12T17:53:27+00:00","description":"Explore the silo shaft as the vertical core of bulk material silos \u2713 design, safety & low-dust deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/silo-shaft#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/silo-shaft"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/silo-shaft#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Silo shaft"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19822","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19822"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19822\/revisions"}],"predecessor-version":[{"id":29133,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19822\/revisions\/29133"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19822"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}