{"id":19821,"date":"2025-12-22T14:53:26","date_gmt":"2025-12-22T13:53:26","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19821"},"modified":"2026-05-23T08:47:02","modified_gmt":"2026-05-23T06:47:02","slug":"silo-foundation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/silo-foundation","title":{"rendered":"Silo foundation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A silo foundation is the load-bearing base of silo installations for bulk materials such as cement, grain, or chemicals. It transfers vertical and horizontal loads safely into the ground, protects against settlements, and ensures a permanently level, tight, and low-maintenance installation point. In planning, construction, operation, refurbishment, and deconstruction, geotechnics, concrete construction, and plant engineering come together here. During conversions, retrofits, or demolition, precise, low-vibration methods are often used, for example with <strong>concrete pulverizer<\/strong> or <strong>hydraulic splitter<\/strong> from Darda GmbH-particularly in the application areas <em><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">Concrete Demolition \u2013 Deconstruction<\/a><\/em> as well as <em>building gutting and cutting<\/em>. Depending on the industry and medium, design also addresses exposure to moisture, chemicals, and hygiene requirements, while ensuring reliable interfaces to steel structures, mechanical equipment, and site logistics.<\/p>\n<h2>Definition: What is meant by a silo foundation?<\/h2>\n<p>A silo foundation is the (often reinforced) concrete structure that distributes the loads of a silo or multiple silo cells into the ground. It can be executed as a foundation slab, ring foundation, isolated footing with foundation beams, or as a pile foundation. Typical components include a foundation slab or ring, anchor bolt groups for fastening the silo legs or the silo steel structure, where applicable undergrout and grout, seals, drainage, and grounding connections. The objective is a <strong>structurally stable, permanently tight, and low-settlement<\/strong> foundation that reliably accommodates operating loads and environmental influences. In practice, this distinguishes it from simple slabs-on-grade by tighter tolerances, defined stiffness, anchorage detailing, and specific sealing and drainage concepts at the base connections.<\/p>\n<h2>Design, actions, and design criteria<\/h2>\n<p>Silo foundations are designed based on the effects from silo operation and plant operation. The combination of self-weight, imposed loads, and dynamic influences requires careful planning and execution. Verification typically covers both ultimate limit states and serviceability, including crack control, deformations, and vibration response.<\/p>\n<h3>Key loads and actions<\/h3>\n<ul>\n<li>Vertical loads from the self-weight of the silo, steel superstructure, and stored bulk material; with partial filling, <em>eccentric<\/em> load situations often occur.<\/li>\n<li>Horizontal loads due to wind, impact, thermal effects, filling and emptying operations, and, if applicable, earthquakes.<\/li>\n<li>Dynamic actions from vibrators, discharge equipment, or process vibrations.<\/li>\n<li>Support and anchoring forces from anchor bolt and silo supports, including tension, compression, shear, and torsion components.<\/li>\n<li>Fatigue effects from cyclic filling and emptying, and load reversals at anchors.<\/li>\n<li>Accidental actions such as vehicle impact, overpressure, or emergency shutdown scenarios considered in risk assessments.<\/li>\n<\/ul>\n<h3>Subsoil and foundation<\/h3>\n<ul>\n<li>Investigation of soil parameters, groundwater level, and frost penetration depth; if necessary, ground improvement or pile foundation.<\/li>\n<li>Verification against overturning, sliding, and soil failure as well as limitation of deformations (settlements, rotations).<\/li>\n<li>Drainage, capillary-breaking layers, and safe discharge of surface water.<\/li>\n<li>Assessment of buoyancy and uplift under high groundwater and during dewatering phases; liquefaction checks where relevant.<\/li>\n<\/ul>\n<h3>Concrete construction and reinforcement<\/h3>\n<ul>\n<li>Concrete compressive strength class and exposure classes suitable for environmental conditions (e.g., chemical exposure, freeze-thaw with de-icing salts).<\/li>\n<li>Crack width control, adequate concrete cover, and detailing at openings, edges, and anchor penetrations.<\/li>\n<li>High-precision <em>placement of anchors<\/em> (anchor drilling or cast-in systems) and level bearing surfaces for silo base plates.<\/li>\n<li>Integration of embedded parts, sleeves, earthing connections, and sealing systems with coordinated tolerances to avoid rework.<\/li>\n<\/ul>\n<h3>Verification and standards<\/h3>\n<ul>\n<li>Design according to applicable structural and geotechnical codes (e.g., EN 1990, EN 1992, EN 1997 or corresponding local standards), including fatigue and seismic provisions where required.<\/li>\n<li>Checks for bearing capacity, settlement, rotation limits, sliding and overturning, anchor pull-out and group effects, punching, and shear.<\/li>\n<li>Serviceability verifications for crack widths, base plate flatness, vibration limits near process equipment, and watertight detailing at interfaces.<\/li>\n<\/ul>\n<h2>Typical designs and materials<\/h2>\n<p>The choice of foundation type depends on loads, geometry, soil conditions, and operational requirements. Where layouts change over time, solutions that allow <em>adaptation and inspectability<\/em> of anchor groups and seals are advantageous.<\/p>\n<h3>Foundation slab<\/h3>\n<p>A flat, reinforced concrete slab distributes loads over a large area. It is suitable for single and multi-chamber silos and can be readily combined with drainage and cable\/utility corridors. As a raft, it can bridge weaker spots in the subsoil and simplifies later modifications at the base plate.<\/p>\n<h3>Ring foundation<\/h3>\n<p>Ring-shaped foundations support cylindrical silos with perimeter loads. The interior may be concreted solid or executed as a compacted load-bearing layer. Stiffening ribs and local thickening under support points improve rotational restraint and anchor load transfer.<\/p>\n<h3>Isolated and strip footings<\/h3>\n<p>For silo systems on columns, isolated footings are connected by foundation beams. Exact position and elevation of the anchor groups are essential. Beam design controls differential settlement and ensures compatible stiffness across support frames.<\/p>\n<h3>Piles and ground improvement<\/h3>\n<p>With low bearing-capacity subsoil or high groundwater, piles, vibro-replacement columns, or other improvement measures are common. Load transfer then occurs in combination via slab\/ring and piles. Negative skin friction, group effects, and pile head detailing must be accounted for in design and execution.<\/p>\n<h2>Planning, construction, and quality assurance<\/h2>\n<p>A systematic approach reduces construction and operational risks and increases service life. Clear role allocation between structural design, geotechnics, and plant engineering ensures consistent assumptions.<\/p>\n<h3>Planning and coordination<\/h3>\n<ul>\n<li>Define load assumptions and operating conditions (full\/partial load, temperature, vibrator operation).<\/li>\n<li>Coordinate foundation, steelwork, plant engineering, drainage, lightning protection\/grounding, and traffic areas.<\/li>\n<li>Specify tolerances for flatness, plumbness, anchor location, and bearing surfaces.<\/li>\n<li>Set the waterproofing and drainage concept, corrosion protection, and inspection accessibility at interfaces and joints.<\/li>\n<\/ul>\n<h3>Execution<\/h3>\n<ol>\n<li>Earthworks, prepare the foundation base, install frost protection and base course.<\/li>\n<li>Install formwork and reinforcement; fix anchor positions precisely.<\/li>\n<li>Place concrete with a suitable mix; compact and apply <strong>concrete curing<\/strong> to minimize cracking.<\/li>\n<li>Undergrout\/grout under base plates; form joint sealing and connection details.<\/li>\n<li>Documentation of tests (flatness, anchor pull-out test, tightness of penetrations).<\/li>\n<li>As-built surveying of anchor groups and bearing planes before release for superstructure installation.<\/li>\n<\/ol>\n<h3>Quality control and documentation<\/h3>\n<ul>\n<li>Inspection and test plan with hold points for reinforcement, embedments, and anchor templates.<\/li>\n<li>Material certificates, delivery notes, and concrete batch data including temperatures and curing records.<\/li>\n<li>Torque or tension logs for preloaded anchors, grout batch records, and watertightness test protocols.<\/li>\n<li>Geodetic surveys for elevation and settlement benchmarks to enable later monitoring.<\/li>\n<\/ul>\n<h3>Operation and inspection<\/h3>\n<ul>\n<li>Regular visual inspections for cracks, spalling, settlements, leaks, and corrosion of anchors.<\/li>\n<li>Clean drainage elements and joints; maintain seals.<\/li>\n<li>Monitoring in case of process changes (e.g., new shakers, changed bulk materials).<\/li>\n<li>Establish inspection intervals, re-torque or re-tension anchors as specified, and track settlements via fixed benchmarks.<\/li>\n<\/ul>\n<h2>Refurbishment and modification of silo foundations<\/h2>\n<p>Adaptations are common over a silo system\u2019s life cycle: new anchor layouts, additional openings, strengthening for increased loads, or repair of damaged areas. In sensitive environments-near operating plants, inside halls, or adjacent to neighboring buildings-controlled, low-vibration methods are required. Prior structural assessment, a method statement, and coordination of temporary load paths reduce risk and downtime.<\/p>\n<h3>Selective concrete removal<\/h3>\n<ul>\n<li><strong>Concrete pulverizer<\/strong> enables targeted concrete removal with low vibration and reduced dust generation, for example to expose reinforcement, open edge areas, or remove damaged concrete zones.<\/li>\n<li><strong>Hydraulic splitter<\/strong> works on the wedge principle: pre-drilling, setting wedges, controlled splitting. It is particularly suitable for massive foundation zones when vibrations must be minimized and blasting operations are to be avoided; comparable systems include <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>.<\/li>\n<li><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic Power Units<\/a> from Darda GmbH supply these tools with energy; selecting pressure and flow enables precise work.<\/li>\n<li>Manage drilling water and slurry, implement dust suppression, and protect adjacent equipment and joints.<\/li>\n<\/ul>\n<h3>Rebar and steel processing<\/h3>\n<ul>\n<li><strong>Steel shear<\/strong> and <strong>Multi Cutters<\/strong> cut exposed reinforcement, anchor bars, or small steel components during foundation modifications.<\/li>\n<li><strong>Hydraulic shear<\/strong> combines crushing and cutting functions and accelerates workflows when alternating between concrete and steel.<\/li>\n<li>Hot-work permit management and spark control where required by the process environment.<\/li>\n<\/ul>\n<h3>Typical measures<\/h3>\n<ul>\n<li>Retrofitted openings for utilities, cable trays, and inspection ducts.<\/li>\n<li>Adjustment of anchor layouts and strengthening of bearing zones.<\/li>\n<li>Crack repair, edge reprofiling, and local underfilling.<\/li>\n<li>Post-installed anchors with qualified systems including proof testing and sealing of penetrations.<\/li>\n<\/ul>\n<h2>Deconstruction of silo foundations<\/h2>\n<p>When dismantling silo installations or replacing entire silo cells, deconstruction at the foundation is often required. The goal is a safe, low-emission process with separation of recyclable materials. Adjacent structures, underground services, and groundwater conditions must be surveyed and protected.<\/p>\n<h3>Procedure in special demolition<\/h3>\n<ol>\n<li>Severance of attachments, pipelines, and superstructures; securing the anchor areas.<\/li>\n<li>Segmental concrete removal with <strong>concrete pulverizer<\/strong> and controlled splitting; transport after sorting.<\/li>\n<li>Recycling-compliant separation of reinforcement with <strong>steel shear<\/strong> or <strong>Multi Cutters<\/strong>.<\/li>\n<li>With adjacent steel tanks in combined operation, tank cutters can complement the steel scope; work must be tightly coordinated and checked for spark\/ignition sources.<\/li>\n<li>Area cleanup, backfilling, and, if applicable, ground improvement for subsequent uses.<\/li>\n<li>Final documentation including waste streams, backfill compaction control, and verification of surface drainage.<\/li>\n<\/ol>\n<h3>Special applications and confined conditions<\/h3>\n<p>In shafts, under hall roofs, or near sensitive equipment, low emissions and compact tools are crucial. <em>Handheld tools<\/em> with suitable shear or splitting cylinders enable controlled cuts and splits without large-area vibration. Remote power packs, access planning, and noise-limited work windows support safe and compliant execution.<\/p>\n<h2>Block-outs and retrofitted openings in the foundation<\/h2>\n<p>Precise block-outs are required for cable and pipe penetrations, sensors, or drains. Procedure:<\/p>\n<ul>\n<li>Marking, create core drill perimeters, and probe reinforcement layout.<\/li>\n<li>Targeted <strong>splitting<\/strong> of core areas with hydraulic splitter, gentle <strong>nibbling<\/strong> of remaining areas with concrete pulverizer.<\/li>\n<li>Produce clean cut edges, treat reinforcement bar ends with corrosion protection, seal penetrations.<\/li>\n<li>Define reinstatement details with suitable mortar or grout, select sealing systems per exposure class, and test for tightness where required.<\/li>\n<\/ul>\n<h2>Safety, environment, and documentation<\/h2>\n<p>Work on the silo foundation requires coordinated protective measures. These depend on location, structural condition, and process environment and should always be planned project-specifically.<\/p>\n<h3>Occupational safety<\/h3>\n<ul>\n<li>Plan load transfer and temporary shoring; avoid risks of overturning and sliding.<\/li>\n<li>Dust suppression and noise reduction measures, if necessary low-pressure spraying and dust extraction.<\/li>\n<li>Exclusion zones and signals for crane and lifting operations; safe routing of the hydraulic hose line.<\/li>\n<li>Method statements, permit-to-work systems, confined-space rules where applicable, and temporary works verification.<\/li>\n<\/ul>\n<h3>Environmental and emissions protection<\/h3>\n<ul>\n<li>Construction waste separation of concrete and steel for recycling.<\/li>\n<li>Avoid discharges into soil and sewer; use catch trays in the work area.<\/li>\n<li>Documentation for disposal, recycling rate, and material flow.<\/li>\n<li>Treat process water and slurry from drilling or splitting; minimize energy use and idle times of equipment.<\/li>\n<\/ul>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li><strong>Insufficient subsoil investigation:<\/strong> leads to settlements and damage. Investigate early and choose the foundation accordingly.<\/li>\n<li><strong>Incorrect anchor layout:<\/strong> impairs erection. Precisely survey and fix; acceptance before concrete placement.<\/li>\n<li><strong>Poor crack control:<\/strong> lack of concrete curing promotes cracking. Ensure appropriate concrete curing.<\/li>\n<li><strong>Unplanned interventions:<\/strong> openings without a structural concept jeopardize structural stability. Assess in advance and select suitable methods (e.g., splitting instead of breaker hammer work).<\/li>\n<li><strong>Inadequate drainage and waterproofing:<\/strong> causes moisture ingress and frost damage. Plan sealing, joints, and discharge paths comprehensively.<\/li>\n<\/ul>\n<h2>Practical tips for site and operation<\/h2>\n<ul>\n<li>Represent filling and emptying cycles as well as vibrator operation realistically in the load assumptions.<\/li>\n<li>Arrange joints and penetrations to maintain serviceability; design seals to remain accessible.<\/li>\n<li>For modifications: proceed step by step with <strong>concrete pulverizer<\/strong> and <strong>hydraulic splitter<\/strong>, selectively expose reinforcement and cut it.<\/li>\n<li>Size the hydraulic power pack appropriately; consider hose lengths and pressure losses.<\/li>\n<li>Use rigid anchor templates and geodetic control for bolt group positioning; verify before concrete placement.<\/li>\n<li>Install settlement markers and reference points during construction to enable efficient in-service monitoring.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A silo foundation is the load-bearing base of silo installations for bulk materials such as cement, grain, or chemicals. It transfers vertical and horizontal loads safely into the ground, protects against settlements, and ensures a permanently level, tight, and low-maintenance installation point. In planning, construction, operation, refurbishment, and deconstruction, geotechnics, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/silo-foundation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19821","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Silo Foundation Design, Loads &amp; Construction<\/title>\n<meta name=\"description\" content=\"Learn how to design and build a silo foundation for bulk-material storage \u2713 from loads and subsoil to concrete, safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/silo-foundation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Silo Foundation Design, Loads &amp; Construction\" \/>\n<meta property=\"og:description\" content=\"Learn how to design and build a silo foundation for bulk-material storage \u2713 from loads and subsoil to concrete, safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/silo-foundation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-23T06:47:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-foundation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-foundation\",\"name\":\"Silo Foundation Design, Loads & Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-22T13:53:26+00:00\",\"dateModified\":\"2026-05-23T06:47:02+00:00\",\"description\":\"Learn how to design and build a silo foundation for bulk-material storage \u2713 from loads and subsoil to concrete, safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-foundation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-foundation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-foundation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Silo foundation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Silo Foundation Design, Loads & Construction","description":"Learn how to design and build a silo foundation for bulk-material storage \u2713 from loads and subsoil to concrete, safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/silo-foundation","og_locale":"en_US","og_type":"article","og_title":"Silo Foundation Design, Loads & Construction","og_description":"Learn how to design and build a silo foundation for bulk-material storage \u2713 from loads and subsoil to concrete, safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/silo-foundation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-23T06:47:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/silo-foundation","url":"https:\/\/www.darda.de\/en\/knowledge\/silo-foundation","name":"Silo Foundation Design, Loads & Construction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-22T13:53:26+00:00","dateModified":"2026-05-23T06:47:02+00:00","description":"Learn how to design and build a silo foundation for bulk-material storage \u2713 from loads and subsoil to concrete, safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/silo-foundation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/silo-foundation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/silo-foundation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Silo foundation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19821","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19821"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19821\/revisions"}],"predecessor-version":[{"id":27713,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19821\/revisions\/27713"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19821"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}