{"id":19820,"date":"2025-12-22T11:03:38","date_gmt":"2025-12-22T10:03:38","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19820"},"modified":"2026-05-23T17:57:02","modified_gmt":"2026-05-23T15:57:02","slug":"silo-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/silo-demolition","title":{"rendered":"Silo demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Silo demolition refers to the controlled deconstruction of cylindrical storage vessels made of reinforced concrete or steel. It combines engineering planning with practical deconstruction expertise: from emptying and <em>building gutting<\/em> through segmental separation to source-separated recycling. Depending on the construction type, mechanical, hydraulic, and saw- or splitter-assisted methods are used. In practice, <strong>concrete pulverizers<\/strong> as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> are often used, supported by <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a> and steel cutting technology. Silo demolition is a classic part of <em>concrete demolition and special demolition<\/em> and adjoins the application fields of <em>building gutting and concrete cutting<\/em> and &#8211; where massive foundations are involved &#8211; techniques from <em>rock excavation<\/em>. Well-structured project planning enables low-risk execution with minimized downtime for surrounding operations.<\/p>\n<h2>Definition: What is meant by silo demolition?<\/h2>\n<p>Silo demolition means the planned, safety- and environment-oriented deconstruction of silo installations. This includes reinforced concrete and steel silos, single and battery silos, including built-in components, conveying equipment, attachments, foundations, and connections. The goal is selective, low-vibration and low-emission removal, the separation of construction materials (concrete, reinforcing steel, steel sheet) and orderly disposal or recycling. The term covers both complete demolition and dismantling of partial areas (e.g., superstructures, roof cones, discharge hoppers) as well as preparation by <em>building gutting and concrete cutting<\/em>.<\/p>\n<ul>\n<li><strong>Scope:<\/strong> shell, roof and cone areas, ring beams, internal fittings, discharge equipment, foundations, and media connections.<\/li>\n<li><strong>Objectives:<\/strong> structural safety, controlled load paths, traceable material flows, and documentation suitable for permitting and later site use.<\/li>\n<li><strong>Outcome:<\/strong> source-separated fractions for high-quality recycling and a site prepared for subsequent construction or reinstatement.<\/li>\n<\/ul>\n<h2>Challenges and methods in silo demolition<\/h2>\n<p>The choice of method depends on material, wall thickness, structural behavior, surroundings, accessibility, and protected assets. Typical challenges include dust and noise, possible explosion hazards due to residual dusts, handling reinforcing steel and sheets, working at height, and limiting vibrations in sensitive environments. Proven approaches include mechanical biting with <strong>concrete pulverizers<\/strong>, controlled splitting with <strong>hydraulic wedge splitters<\/strong>, cutting of steel with <em>steel shear<\/em>, <em>multi cutters<\/em> or <em>tank cutters<\/em>, as well as saw- and wire-based segmental deconstruction. Hydraulic power packs provide the energy supply &#8211; stationary or mobile.<\/p>\n<ul>\n<li><strong>Method selection criteria:<\/strong> wall thickness and reinforcement density, buckling risk, stand-by stability, access for carriers and cranes, emission limits, and hot work restrictions.<\/li>\n<li><strong>Risk controls:<\/strong> fall protection and edge protection, remote-controlled tools where feasible, dust suppression, fire watch, and exclusion zones with defined load and impact areas.<\/li>\n<li><strong>Verification:<\/strong> temporary supports or tie-ins where required, staged cuts and controlled lowering procedures with redundant attachment points.<\/li>\n<\/ul>\n<h2>Planning, preliminary investigation, and occupational safety<\/h2>\n<p>Existing-condition analysis and planning always come before deconstruction. This includes review of documents, site walkdown, material identification, and the consideration of load paths, ring beams, prestressing, foundations, and connections. In facilities with potentially explosive dusts or residual media, additional hazard analyses, cleaning, and, where applicable, inertization measures must be taken into account. Safety requirements, access protection, personal protective equipment, dust suppression, and low-emission working methods have high priority. Statements regarding legal obligations are always to be understood in general terms and do not replace an individual assessment.<\/p>\n<ul>\n<li><strong>Core planning deliverables:<\/strong> deconstruction concept and method statement, structural check of interim states, risk assessment with rescue plan, monitoring concept for dust, noise, and vibrations, and a waste and recycling management plan.<\/li>\n<li><strong>Permits and coordination:<\/strong> hot work permits where applicable, traffic and crane plans, utility isolation and lockout-tagout, and communication with stakeholders in sensitive surroundings.<\/li>\n<li><strong>Verification records:<\/strong> material surveys including hazardous substances if suspected, cleanliness certificates after cleaning or inertization, and instrumented pre-measurements to define baseline emissions.<\/li>\n<\/ul>\n<h2>Typical construction types and suitable deconstruction principles<\/h2>\n<h3>Reinforced concrete silos<\/h3>\n<p>Reinforced concrete shafts are often selectively deconstructed from top to bottom. <strong>Concrete pulverizers<\/strong> crush the shell, ring beam, and roof cone; the reinforcing steel is cut or taken along and separated later. For thick walls, <strong>hydraulic wedge splitters<\/strong> offer advantages: By creating controlled crack lines, vibrations are reduced and removal remains predictable &#8211; useful in <em>special demolition<\/em> near sensitive installations. Hydraulic power packs supply the tools; where access is tight, compact units are used. Pre-drilling patterns and defined bite sequences help maintain stability and improve fragment size for handling.<\/p>\n<h3>Steel silos<\/h3>\n<p>Steel silos are dismantled in segments. <em>Steel shear<\/em> or <em>multi cutters<\/em> cut shell plates, stiffening rings, and <em>gusset plates<\/em>; <em>tank cutters<\/em> handle thicker sections and attachments. Structural behavior and buckling risk require a well-planned cutting sequence and <em>load transfer<\/em>. The cutting technique can be combined with wire- and saw-based measures, for example when setting down roof domes. Where hot work is restricted, cold cutting and water-cooled saws reduce ignition sources and thermal distortion.<\/p>\n<h3>Hybrid and composite constructions<\/h3>\n<p>With mixed construction &#8211; such as a steel sheet shell on a concrete foundation or steel elements filled with concrete &#8211; methods are combined. Splitting techniques open massive pedestals and foundations, followed by separation of steel parts with shears. This keeps material separation source-separated, which facilitates recycling. Interfaces between materials are assessed for dowels, anchors, or grouted sleeves to avoid unplanned load transfer.<\/p>\n<h2>Deconstruction strategies and sequence at a glance<\/h2>\n<p>Deconstruction strategies depend on structural analysis, surroundings, and logistics. Common are segmental deconstruction from top to bottom, saw- and wire-supported dismantling of larger components, as well as splitter- and shear-based removal for controlled, low-vibration results.<\/p>\n<ul>\n<li><strong>Selective removal with concrete pulverizers:<\/strong> controlled biting of concrete elements while simultaneously exposing the reinforcing steel; suitable for <em>concrete demolition<\/em> in sensitive neighborhoods.<\/li>\n<li><strong>Splitting technique for massive walls:<\/strong> <em>hydraulic wedge splitters<\/em> create defined cracks and reduce force input and vibrations &#8211; advantageous in <em>special demolition<\/em> scenarios.<\/li>\n<li><strong>Cutting technology on steel components:<\/strong> <em>steel shear<\/em>, <em>multi cutters<\/em> and <em>tank cutters<\/em> separate sheets, profiles and built-ins; suitable for <em>building gutting and concrete cutting<\/em> and the dismantling of steel silos.<\/li>\n<li><strong>Saw and wire methods:<\/strong> for precise, straight separation cuts when components are to be set down or moved as a whole.<\/li>\n<\/ul>\n<ol>\n<li>Isolate and clean the silo, verify gas-free conditions, and establish exclusion zones.<\/li>\n<li>Install access systems, anchors, and temporary protections; verify load paths.<\/li>\n<li>Open roof and upper shell segments first, then proceed ring by ring or in defined panels.<\/li>\n<li>Lower segments in a controlled manner or reduce in place using pulverizers or splitters.<\/li>\n<li>Process reinforcement and steel components separately to maintain sorting quality.<\/li>\n<li>Remove foundations and substructures, typically after superstructure clearance.<\/li>\n<li>Finalize area cleaning, verification measurements, and documentation handover.<\/li>\n<\/ol>\n<h2>Emissions, vibrations, and environmental protection<\/h2>\n<p>Dust and noise reduction, vibration control, and careful water management are key quality criteria. Where technically possible, dust suppression, shielded cutting areas, and low-emission methods are preferred. <strong>Hydraulic wedge splitters<\/strong> and <strong>concrete pulverizers<\/strong> support low-vibration and quieter work, which is particularly relevant in <em>special demolition<\/em> within existing facilities.<\/p>\n<ul>\n<li><strong>Dust:<\/strong> misting or spray bars with water run-off control and, if needed, pH monitoring and sediment filtration.<\/li>\n<li><strong>Noise:<\/strong> shielding, time windows, and tool selection with lower sound power levels.<\/li>\n<li><strong>Vibrations:<\/strong> pre-set trigger values, accelerometer monitoring at assets, and switch to splitting or sawing when limits approach.<\/li>\n<li><strong>Water and waste:<\/strong> controlled collection of slurry, proper disposal of fines, and prevention of drainage contamination.<\/li>\n<\/ul>\n<h3>Explosion and fire protection<\/h3>\n<p>Special precautions apply to residual dusts and media. Potential hazards are assessed during planning; cleaning, inertization, and ignition source control measures are aligned with local conditions. Cutting operations are shielded and monitored; spark generation is limited. Gas detection with LEL monitoring, hot work permits, intrinsically safe equipment, and grounding or bonding strategies reduce ignition risks in classified areas.<\/p>\n<h3>Sustainability and recycling<\/h3>\n<p>Silo demolition aims for high recycling rates. With <strong>concrete pulverizers<\/strong>, concrete can be crushed so that reinforcing steel is largely exposed. Steel fractions are separated with shears and cutters. Source-separated fractions simplify transport and recycling, reduce disposal costs, and conserve resources. Targets such as a recycling rate above 90 percent and minimized transport distances support circular economy goals and verifiable CO\u2082 savings.<\/p>\n<h2>Logistics, accessibility, and equipment selection<\/h2>\n<p>Equipment selection and access planning are closely interlinked. Criteria include the load-bearing capacity of the surroundings, drop heights, crane and lifting installation, and the required <em>drive power<\/em> of the hydraulics. <em>Hydraulic power packs<\/em> supply attachments and handheld tools; compact solutions are advantageous indoors or where load-bearing capacity is limited.<\/p>\n<ul>\n<li><strong>Carrier and tool pairing:<\/strong> reach and working radius, tool weight and hydraulic flow, and quick-change options for efficient sequences.<\/li>\n<li><strong>Power supply:<\/strong> electric or hybrid drives for low emissions indoors; mobile units for flexibility with limited infrastructure.<\/li>\n<li><strong>Site logistics:<\/strong> crane positions, laydown and stockpiling areas, one-way material flow, and short, segregated transport routes.<\/li>\n<\/ul>\n<h3>Confined sites and interior demolition<\/h3>\n<p>In production facilities or densely built environments, deconstruction must be especially compact, quiet, and controlled. Here, splitter- and shear-based methods with small <em>carrier machines<\/em> and suitable power supply have proven themselves &#8211; an application of <em>building gutting and concrete cutting<\/em> in combination with <em>special demolition<\/em>. Electric drives and remote operation further reduce emissions and improve safety where access is constrained.<\/p>\n<h3>Foundations, shafts, and attachments<\/h3>\n<p>Foundations, discharge hoppers, and impact walls often have high reinforcement ratios. <strong>Hydraulic wedge splitters<\/strong> open massive cross-sections, followed by separation of the reinforcing steel. Techniques known from <em>rock excavation<\/em> can be adapted to direct forces and release components in a controlled manner. Pre-drilling grids, sequencing to relieve restraints, and attention to dowels or prestressed elements prevent uncontrolled cracking.<\/p>\n<h2>Material separation and circular economy<\/h2>\n<p>Sorting follows removal: mineral fractions, reinforcing steel, clean steel sheet, and possibly residual equipment. <strong>Concrete pulverizers<\/strong> and shears facilitate separation already during the process. The aim is reuse or high-quality recycling, for example as recycled aggregate or secondary raw material. Storage and transport are kept separate, and routes short, to minimize emissions.<\/p>\n<ul>\n<li><strong>Documentation:<\/strong> weighbridge tickets, delivery notes for recyclers, and material balance sheets by fraction.<\/li>\n<li><strong>Quality:<\/strong> separation by contamination class and grain size for consistent downstream processing.<\/li>\n<li><strong>Traceability:<\/strong> batch-wise recording enables verification against project targets and regulatory requirements.<\/li>\n<\/ul>\n<h2>Quality assurance and monitoring<\/h2>\n<p>Documentation, progress checks and &#8211; where necessary &#8211; measurements of dust, noise, and vibrations are standard. Complete documentation supports evidence, disposal, and later site use. Statements on measurement and limit values must be verified on a project-specific basis.<\/p>\n<ul>\n<li><strong>Monitoring tools:<\/strong> calibrated sensors for particulates, noise dosimeters, vibration sensors at sensitive assets, and photographic progress logs.<\/li>\n<li><strong>Control points:<\/strong> hold points for stability checks before critical cuts, tool inspections, and daily briefings with task risk reviews.<\/li>\n<li><strong>Acceptance:<\/strong> sign-off of cleanliness, recycling quotas, and reinstatement quality with as-built records.<\/li>\n<\/ul>\n<h2>Practice-oriented scenarios<\/h2>\n<ul>\n<li><strong>Agricultural silo on a farmstead:<\/strong> small clearances, sensitive neighboring buildings. Splitting and shear techniques reduce vibrations and dust; hydraulic power packs enable the use of compact tools.<\/li>\n<li><strong>Cement silo at a plant:<\/strong> heavy reinforcement, massive ring beams. A combination of <strong>concrete pulverizers<\/strong> and <strong>hydraulic wedge splitters<\/strong>, plus shears for reinforcing steel, ensures controlled removal.<\/li>\n<li><strong>Steel silo in a chemical environment:<\/strong> increased requirements for spark control. Cutting technology with <em>steel shear<\/em>, <em>multi cutters<\/em> or <em>tank cutters<\/em> in shielded areas; segment-by-segment lowering.<\/li>\n<li><strong>Battery silos within an operating facility:<\/strong> parallel structures with shared platforms and conveyors. Staged deconstruction with temporary bracing and coordinated logistics maintains stability and shortens out-of-service periods.<\/li>\n<\/ul>\n<h2>Links to application areas and product categories<\/h2>\n<p>Silo demolition lies at the intersection of <em>concrete demolition and special demolition<\/em> as well as <em>building gutting and concrete cutting<\/em>. Depending on the task, product categories such as <strong>concrete pulverizers<\/strong>, <strong>hydraulic wedge splitters<\/strong>, <em>hydraulic power packs<\/em>, <em>combination shears<\/em>, <em>multi cutters<\/em>, <em>steel shear<\/em> and <em>tank cutters<\/em> are used. Transferable techniques from <em>rock excavation and tunnel construction<\/em> are particularly helpful when opening massive components or foundations. Darda GmbH stands for these working methods as a technological reference point in planning and execution, without the choice of method replacing the necessary project-specific verification. Competent execution relies on qualified personnel, clear responsibilities, and verifiable procedure control from planning through completion.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Silo demolition refers to the controlled deconstruction of cylindrical storage vessels made of reinforced concrete or steel. It combines engineering planning with practical deconstruction expertise: from emptying and building gutting through segmental separation to source-separated recycling. Depending on the construction type, mechanical, hydraulic, and saw- or splitter-assisted methods are used. <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/silo-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19820","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Silo Demolition | Concrete &amp; Steel Structures<\/title>\n<meta name=\"description\" content=\"Expert guide to silo demolition \u2713 safe deconstruction of concrete &amp; steel silos with low dust, vibration &amp; precise cuts.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/silo-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Silo Demolition | Concrete &amp; Steel Structures\" \/>\n<meta property=\"og:description\" content=\"Expert guide to silo demolition \u2713 safe deconstruction of concrete &amp; steel silos with low dust, vibration &amp; precise cuts.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/silo-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-23T15:57:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-demolition\",\"name\":\"Silo Demolition | Concrete & Steel Structures\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-22T10:03:38+00:00\",\"dateModified\":\"2026-05-23T15:57:02+00:00\",\"description\":\"Expert guide to silo demolition \u2713 safe deconstruction of concrete & steel silos with low dust, vibration & precise cuts.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/silo-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Silo demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Silo Demolition | Concrete & Steel Structures","description":"Expert guide to silo demolition \u2713 safe deconstruction of concrete & steel silos with low dust, vibration & precise cuts.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/silo-demolition","og_locale":"en_US","og_type":"article","og_title":"Silo Demolition | Concrete & Steel Structures","og_description":"Expert guide to silo demolition \u2713 safe deconstruction of concrete & steel silos with low dust, vibration & precise cuts.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/silo-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-23T15:57:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/silo-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/silo-demolition","name":"Silo Demolition | Concrete & Steel Structures","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-22T10:03:38+00:00","dateModified":"2026-05-23T15:57:02+00:00","description":"Expert guide to silo demolition \u2713 safe deconstruction of concrete & steel silos with low dust, vibration & precise cuts.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/silo-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/silo-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/silo-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Silo demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19820","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19820"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19820\/revisions"}],"predecessor-version":[{"id":27743,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19820\/revisions\/27743"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19820"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}