{"id":19815,"date":"2025-12-20T10:19:13","date_gmt":"2025-12-20T09:19:13","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19815"},"modified":"2026-05-23T12:41:02","modified_gmt":"2026-05-23T10:41:02","slug":"screening-bucket","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/screening-bucket","title":{"rendered":"Screening bucket"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A <strong>screening bucket<\/strong> is a tool mounted to excavators or other carrier machines for the mechanical separation of materials by particle size directly on the construction site. In demolition, deconstruction, recycling, civil engineering, and natural stone processing, it enables pre- and post-screening of concrete, masonry, rock, excavated material, topsoil, or backfill. In combination with tools such as <em>concrete demolition shears<\/em> or <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a><\/em>, the screening bucket supports an efficient process chain: process, sort, reuse. By producing defined fractions on-site, it reduces haulage, tipping, and disposal costs while improving the quality and consistency of feed material for downstream steps.<\/p>\n<h2>Definition: What is meant by a screening bucket?<\/h2>\n<p>A screening bucket is a hydraulically driven bucket attachment whose bottom or interior functions as a screen. Using grid systems, screening basket inserts, rotating drums, or star rotors, material is separated into <em>undersize<\/em> (passing through) and <em>oversize<\/em> (remaining in the bucket). The goal is to produce defined particle size fractions, remove foreign materials, and reduce transport, landfill, and disposal costs. Unlike stationary or mobile screening plants, the screening bucket works directly at the point of material generation, shortening travel distances and allowing flexible interventions in the material flow. It is not a crusher bucket and does not perform comminution; rather, it classifies material to meet specification or prepare it for subsequent reduction.<\/p>\n<h2>Design and operation of screening buckets<\/h2>\n<p>Screening buckets typically consist of a robust main body with suspension, a <em>screening module<\/em> (e.g., grid bottom, interchangeable cassettes, drum, or rotors), a hydraulic drive with torque transmission, and wear parts (cutting edges, teeth, bushings). Separation occurs through mechanical action: when tilting, shaking, or rotating, the material moves across the screen openings; fines fall through, oversize is separated. Interchangeable inserts enable different <strong>mesh sizes<\/strong> and thus adjustable target gradations. Modern designs allow adaptation of rotational speed and, in part, the aggressiveness of material motion to moisture content, particle shape, and cohesiveness. Reverse rotation and anti-clogging features help clear blinding, while flow control on the carrier optimizes torque and speed for changing feed conditions.<\/p>\n<ul>\n<li><strong>Adjustability:<\/strong> Mesh size changes, variable speed, and configurable rotor gaps enable tuning to material and specification.<\/li>\n<li><strong>Wear concept:<\/strong> Replaceable edges, liners, and bolt-on protection extend service life and simplify servicing.<\/li>\n<li><strong>Throughput control:<\/strong> Open area, residence time, and fill level determine capacity and separation efficiency.<\/li>\n<\/ul>\n<h2>Types and screening technologies<\/h2>\n<p>Depending on the material, desired particle fraction, and carrier machine, different designs are used. The choice of technology influences performance, separation precision, and wear.<\/p>\n<h3>Drum screening buckets<\/h3>\n<p>Material rotates in a cylindrical, perforated basket. The drum provides uniform mixing and good discharge. Suitable for excavated material, soil, topsoil, and construction debris with a moderate fines content. Interchangeable drums with variable perforations allow flexible screening sizes. Extended drum length increases retention time and precision, whereas very sticky clay can blind perforations without cleaning assists.<\/p>\n<h3>Rotor screening buckets with star or shaft modules<\/h3>\n<p>Several parallel shafts with star discs or paddles convey material across adjustable gaps. This design tolerates moist, cohesive material and reduces clogging. It is suitable for pre-screening in <em>concrete demolition and special deconstruction<\/em> as well as for soil conditioning. Reversing the shafts helps remove wrapped film or roots, and modular spacers permit quick changes to gap width on-site.<\/p>\n<h3>Grid screening buckets (skeleton bucket)<\/h3>\n<p>A reinforced grid bottom enables simple classification of coarse fractions. It is robust, requires no complex drive, and is particularly resistant in harsh applications, such as <em>rock excavation and tunnel construction<\/em> or <em>natural stone extraction<\/em>. As a scalping solution, it is ideal for removing oversized pieces but provides limited control over fines or narrowly graded specifications.<\/p>\n<h3>Replaceable screening modules<\/h3>\n<p>Interchangeable frames with different mesh sizes, hole patterns, or bar spacing allow adaptation to target gradation and material properties. This facilitates combination with <strong>concrete demolition shears<\/strong> and <strong>stone and concrete splitters<\/strong>, as the appropriate fraction can be provided or reclassified in each case. Changeover times and safe handling of modules should be considered in shift planning to maintain cycle stability.<\/p>\n<h2>Typical applications and process chains<\/h2>\n<p>Screening buckets deliver particular benefits in integrated workflows. The following examples show typical process chains and their added value.<\/p>\n<ul>\n<li>Concrete demolition and special deconstruction: Pre-screening fines from construction debris, removing adhering soil, providing defined fractions for further processing with <em>concrete demolition shears<\/em>. After size reduction: post-screening for classification into recycled construction materials.<\/li>\n<li>Strip-out and cutting: After removing metallic installations with cutting tools (e.g., shears), the screening bucket separates mineral fractions, reduces mixed content, and facilitates source-segregated disposal.<\/li>\n<li>Rock excavation and tunnel construction: Sorting the muck pile into oversize and undersize, separating backfill material and lining aggregate, pre-screening to stabilize temporary site access roads.<\/li>\n<li>Natural stone extraction: Classifying rubble stone, separating overburden and fines, preparing formats after splitting with <em>stone splitting cylinders<\/em> or <em>stone and concrete splitters<\/em>.<\/li>\n<li>Special applications: Producing bedding material for utility line installation, processing contaminated material within approved procedures, pre-screening ahead of smaller crushing or splitting operations in sensitive areas.<\/li>\n<\/ul>\n<p>Where on-site criteria permit reuse, consistent fractions shorten logistics loops and enable immediate backfilling or subgrade preparation, improving program reliability and reducing export volumes.<\/p>\n<h3>Interplay with concrete demolition shears<\/h3>\n<p>In deconstruction, the screening bucket can remove fines from demolition material before <em>concrete demolition shears<\/em> size-reduce load-bearing components. This reduces wear at cutting\/crushing points, lowers dust, and improves visibility. After size reduction, the screening bucket produces uniform fractions for transport or reuse as backfill material, provided the framework conditions allow. Combining magnetic separation for ferrous removal with screening further enhances the purity of mineral fractions.<\/p>\n<h3>Interplay with stone and concrete splitters<\/h3>\n<p>When splitting massive components or natural stone blocks, a mixture of fragments and fines is produced. The screening bucket separates these into usable fractions. In this way, undersize can be provided for subgrade or bedding, and oversize for further splitting or cutting. This conserves resources and stabilizes cycle times in <em>special deconstruction<\/em> as well as in <em>natural stone extraction<\/em>. Defined gradations also improve compaction behavior and surface finish in subsequent layers.<\/p>\n<h2>Selection criteria: sizing, particle sizes, and carrier machine<\/h2>\n<p>The right configuration is crucial for performance, cost-effectiveness, and safety.<\/p>\n<ul>\n<li>Carrier machine and hydraulics: Operating weight, lifting forces, and hydraulic performance (flow, pressure) must match the screening bucket. For handheld applications, <em>hydraulic power packs<\/em> supply other tools in the same process chain; the screening bucket itself is usually powered by the excavator\u2019s on-board hydraulics. Verify flow control options and return line capacity to avoid heat build-up.<\/li>\n<li>Screen geometry: Mesh size, hole shape, and open screen area determine throughput and separation precision. Larger openings increase throughput but reduce separation precision. Round vs. square apertures influence near-size behavior and blinding tendency.<\/li>\n<li>Material properties: Moisture, cohesiveness, particle shape, and contamination influence the choice between drum, rotor, or grid designs. Consider percentage of fines, clay content, and presence of films or roots.<\/li>\n<li>Target gradation and specifications: Requirements for recycled construction materials or backfill define tolerances. On-site tests and documented grading curves can be useful. Sampling protocols and retained samples support quality assurance.<\/li>\n<li>Wear protection: Hardfacing, replaceable wear strips, and bolted edges increase service life and maintainability. Select abrasion-resistant steels where impact and sliding wear are high.<\/li>\n<li>Work environment: Space constraints, emissions (noise, dust), and material logistics influence the sensible size of the screening bucket and the pacing of the process chain. Transport route length and stockpile capacity affect achievable cycle times.<\/li>\n<li>Changeover and logistics: Time to swap cassettes or drums, availability of spare modules, and safe storage impact uptime and unit cost.<\/li>\n<li>Compliance and documentation: Project- and region-specific rules for recycled aggregates, soil classes, or contamination thresholds may require documented test results and traceability.<\/li>\n<\/ul>\n<h2>Operation, occupational safety, and environmental aspects<\/h2>\n<p>Operating screening buckets requires a working method matched to the carrier machine, clear procedures, and qualified personnel. Safety distances and a forward-looking material flow contribute to safe and efficient operations. Legal and occupational safety requirements are site- and project-specific; any statements here are general in nature. Prior to production, commission the attachment with a short test run, confirm hydraulic settings under load, and establish a loading pattern that avoids overfilling and preserves screen contact time.<\/p>\n<h3>Safety notes<\/h3>\n<ul>\n<li>Keep hazard zones around the slewing radius clear; keep personnel at a safe distance.<\/li>\n<li>Observe pinch and shear points; service the bucket only with hydraulics shut down.<\/li>\n<li>Ensure secure support when changing screening modules; use suitable lifting gear.<\/li>\n<li>Depressurize hydraulic lines; regularly check for leaks.<\/li>\n<li>Plan dust and noise mitigation; use appropriate personal protective equipment.<\/li>\n<li>Do not enter the danger area beneath suspended loads; never stand under the attachment.<\/li>\n<li>Lock out and tag out energy sources during maintenance; verify zero energy before intervention.<\/li>\n<\/ul>\n<h3>Emissions and circular economy<\/h3>\n<p>On-site screening reduces transport distances, produces fewer mixed fractions, and increases recoverable material streams. This supports <em>circular construction site logistics<\/em> and improves the environmental balance, especially in combination with precise separation tools such as <em>combination shears<\/em>, <em>multi-cutters<\/em>, <em>steel shears<\/em>, or <em>tank cutters<\/em>, which make metal content sortable. Water spray systems, enclosure where feasible, and optimized cycle times help manage dust and noise while lowering fuel consumption per ton screened.<\/p>\n<h2>Maintenance, wear, and cost-effectiveness<\/h2>\n<p>Regular maintenance increases availability and lowers overall costs. Daily visual inspections for cracks, play in bearing points, and tooth and edge wear are recommended. Rotating systems require well-maintained bearings, intact seals, and correctly tensioned drives. From an economic perspective, throughput, availability, wear part costs, and transport reduction determine overall performance. A mesh size tuned to the downstream process (e.g., <em>concrete demolition shear<\/em> or <em>stone and concrete splitter<\/em>) avoids double screening and improves cycle accuracy. Planned lubrication intervals, timely replacement of consumables, and condition-based part swaps reduce unscheduled downtime.<\/p>\n<ul>\n<li><strong>Inspection checklist:<\/strong> Screen integrity and open area, fastener torque, rotor or drum straightness, hydraulic hoses and couplings, edges and teeth.<\/li>\n<li><strong>Service intervals:<\/strong> Lubricate as specified, monitor temperature during continuous duty, and record hour-based wear trends.<\/li>\n<li><strong>Spare strategy:<\/strong> Stock critical wear parts and at least one alternate mesh module to adapt to material changes.<\/li>\n<\/ul>\n<h2>Practical examples of material flow<\/h2>\n<p>Selective deconstruction: Metallic installations are removed with cutting tools, load-bearing components are pre-crushed with <em>concrete demolition shears<\/em>, and fines and contaminants are separated with the screening bucket. Result: source-segregated fractions, reduced disposal, usable recycled aggregates.<\/p>\n<p>Rock removal and tunnel advance: After controlled splitting with <em>stone and concrete splitters<\/em>, the muck is classified into oversize and undersize with the screening bucket. Undersize serves as backfill or grading material; oversize goes on for further processing or logistics.<\/p>\n<p>Natural stone extraction: After splitting raw blocks, overburden is screened out. Reusable fractions are available as road base or bedding material, provided project-specific requirements are met.<\/p>\n<p>Across these scenarios, clearly defined acceptance criteria, documented sampling, and steady loading patterns ensure reproducible fractions and predictable cycle times.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A screening bucket is a tool mounted to excavators or other carrier machines for the mechanical separation of materials by particle size directly on the construction site. In demolition, deconstruction, recycling, civil engineering, and natural stone processing, it enables pre- and post-screening of concrete, masonry, rock, excavated material, topsoil, or <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/screening-bucket\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19815","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Screening Bucket for Excavators - Types &amp; Uses<\/title>\n<meta name=\"description\" content=\"Efficient excavator attachment screening bucket \u2713 for on-site material separation, recycling, and lower transport costs.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/screening-bucket\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Screening Bucket for Excavators - Types &amp; Uses\" \/>\n<meta property=\"og:description\" content=\"Efficient excavator attachment screening bucket \u2713 for on-site material separation, recycling, and lower transport costs.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/screening-bucket\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-23T10:41:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/screening-bucket\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/screening-bucket\",\"name\":\"Screening Bucket for Excavators - Types & Uses\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-20T09:19:13+00:00\",\"dateModified\":\"2026-05-23T10:41:02+00:00\",\"description\":\"Efficient excavator attachment screening bucket \u2713 for on-site material separation, recycling, and lower transport costs.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/screening-bucket#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/screening-bucket\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/screening-bucket#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Screening bucket\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Screening Bucket for Excavators - Types & Uses","description":"Efficient excavator attachment screening bucket \u2713 for on-site material separation, recycling, and lower transport costs.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/screening-bucket","og_locale":"en_US","og_type":"article","og_title":"Screening Bucket for Excavators - Types & Uses","og_description":"Efficient excavator attachment screening bucket \u2713 for on-site material separation, recycling, and lower transport costs.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/screening-bucket","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-23T10:41:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/screening-bucket","url":"https:\/\/www.darda.de\/en\/knowledge\/screening-bucket","name":"Screening Bucket for Excavators - Types & Uses","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-20T09:19:13+00:00","dateModified":"2026-05-23T10:41:02+00:00","description":"Efficient excavator attachment screening bucket \u2713 for on-site material separation, recycling, and lower transport costs.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/screening-bucket#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/screening-bucket"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/screening-bucket#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Screening bucket"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19815","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19815"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19815\/revisions"}],"predecessor-version":[{"id":27729,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19815\/revisions\/27729"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19815"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}