{"id":19806,"date":"2025-12-20T10:48:54","date_gmt":"2025-12-20T09:48:54","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19806"},"modified":"2026-09-12T19:53:26","modified_gmt":"2026-09-12T17:53:26","slug":"secondary-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/secondary-demolition","title":{"rendered":"Secondary demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p><strong>Secondary demolition<\/strong> is the phase of deconstruction in which previously detached structural elements, blocks, or bulk materials are re-broken in a controlled manner, separated, and reduced to transportable or processable sizes. It ties selective deconstruction to high-quality <strong>demolition separation<\/strong> and dovetails seamlessly with <strong>primary demolition<\/strong>. In practice, it plays a central role across all relevant fields of application &#8211; from <strong>concrete demolition and special demolition<\/strong> through <strong>gutting works and cutting<\/strong> to <strong>rock excavation and tunnel construction<\/strong>, <strong>natural stone extraction<\/strong>, and <strong>special demolition<\/strong>. Tools such as <strong>concrete demolition shears<\/strong> and <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong> can be used for defined processing tasks; emissions and material quality must be assessed for the selected setup. Proper sequencing minimizes rehandling, shortens cycle times, and supports predictable site logistics.<\/p>\n<h2>Definition: What is meant by secondary demolition?<\/h2>\n<p>Secondary demolition refers to the targeted size reduction, exposure, and sorting of already detached components after the primary demolition. This includes breaking concrete, cutting and bundling <strong>reinforcing steel<\/strong>, splitting massive blocks, and producing defined piece sizes for haulage, reuse, or processing. Secondary demolition is usually carried out at ground level or on securely positioned <strong>work platforms<\/strong>. Typical methods are <strong>crushing with concrete demolition shears<\/strong>, <strong>splitting with rock and concrete splitters<\/strong>, and <strong>cutting with steel shears<\/strong> or Multi Cutters. Objectives include high separation purity with <strong>low vibration levels<\/strong>, low <strong>noise emission<\/strong>, and reduced dust exposure, as well as safe, predictable <strong>transport logistics<\/strong>.<\/p>\n<ul>\n<li>Size reduction to defined piece sizes for efficient removal or processing<\/li>\n<li>Targeted exposure and separation of reinforcement and embedded parts<\/li>\n<li>Source-pure sorting of fractions to enable high-quality recycling or disposal<\/li>\n<\/ul>\n<h2>Tasks and objectives in secondary demolition<\/h2>\n<p>The focus is on reduction to defined grain sizes, clean exposure of reinforcement, source-pure separation of fractions, and preparation for recycling, reuse, or disposal. This requires suitable tool selection, matched to element thickness, material composites, reinforcement content, accessibility, and emission requirements. Hydraulically driven systems, for example via a <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power pack<\/a><\/strong>, provide the necessary energy for handheld <strong>hydraulic splitters<\/strong> or mobile <strong>excavator attachment<\/strong> tools. In combination with <strong>hydraulic demolition shears<\/strong>, <strong>steel shears<\/strong>, and &#8211; depending on the task &#8211; Multi Cutters or tank cutters, an efficient, safe workflow with high material quality is achieved.<\/p>\n<ul>\n<li>Minimize fines while achieving target dimensions<\/li>\n<li>Maximize recovery of clean concrete and scrap steel<\/li>\n<li>Maintain low emissions and safeguard adjoining structures and utilities<\/li>\n<li>Coordinate removal paths with container sizes, crane capacities, and on-site processing<\/li>\n<\/ul>\n<h2>Fields of application: From concrete elements to natural stone blocks<\/h2>\n<p>Secondary demolition is relevant in various scenarios. In <strong>concrete demolition and special demolition<\/strong>, slabs, walls, or <strong>foundation<\/strong> elements are broken to size after detachment using concrete demolition shears, and the reinforcement is exposed. In <strong>gutting works and cutting<\/strong>, the removal of non-load-bearing components is often followed by re-breaking of residual bodies, separating embedded parts, and sizing <strong>anchor<\/strong> bars or <strong>structural steel section<\/strong>. In <strong>rock excavation and tunnel construction<\/strong> as well as <strong>natural stone extraction<\/strong>, <strong>splitting<\/strong> with rock and concrete splitters serves the dimensional reduction of large blocks without blast-induced vibrations. In <strong>special demolition<\/strong>, for example on vessels and tanks, special cutting processes are used, while concrete-adjacent embedments are secondarily crushed or split.<\/p>\n<h2>Demarcation: Primary demolition, secondary demolition, and post-sorting<\/h2>\n<p>Primary demolition detaches components from the structure, separates load-bearing systems, and creates safety and logistics zones. Secondary demolition follows on and further processes the detached elements: <em>breaking, splitting, cutting, separating<\/em>. This is followed by post-sorting, in which fractions are finally sorted by material type, purity, and piece size. In well-planned projects, these three stages are closely interlinked so that carrier machines and tools are used efficiently and <strong>transport routes<\/strong> are minimized.<\/p>\n<h2>Methods and tools in secondary demolition<\/h2>\n<h3>Concrete demolition shears: size reduction and exposing reinforcement<\/h3>\n<p><strong>Concrete demolition shears<\/strong> generate high crushing forces, release aggregates from the cement matrix, and enable controlled reduction of components. Their design favors exposing and severing reinforcement: concrete is broken, and steel can then be shortened and bundled with a <strong>steel shear<\/strong> or <strong>hydraulic demolition shear<\/strong>. Advantages include <strong>low vibration levels<\/strong> and highly targeted intervention &#8211; especially important in sensitive environments, on adjoining structures, or near utility lines.<\/p>\n<ul>\n<li>Preferred for heavily reinforced components and localized interventions<\/li>\n<li>Good control at edges, openings, and interfaces to preserved structures<\/li>\n<li>Supports downstream sorting by delivering clean, exposed rebar<\/li>\n<\/ul>\n<h3>Rock and concrete splitters: splitting instead of hammering<\/h3>\n<p><strong>Rock and concrete splitters<\/strong> work via borehole splitting. The wedge builds controlled pressure, and components crack along defined stress zones. This method is quiet, low in vibration, and predictable. It is suitable for massive <strong>foundations<\/strong>, thick walls, thick <strong>concrete slabs<\/strong>, or natural stone blocks &#8211; wherever <em>dimensional<\/em> separation and low emissions are required.<\/p>\n<ul>\n<li>Minimizes structure-borne noise and protects sensitive surroundings<\/li>\n<li>Produces large, regular pieces with low fines content<\/li>\n<li>Effective where impact tools are restricted or prohibited<\/li>\n<\/ul>\n<h3>Steel shears, combination shears, and Multi Cutters: separating metals and composites<\/h3>\n<p><strong>Steel shears<\/strong> cut reinforcement, sections, and pipes efficiently. <strong>Hydraulic demolition shears<\/strong> with combination jaws merge breaking and cutting functions and are thus universally deployable in secondary demolition, for example when alternating between concrete remnants and steel. Multi Cutters expand the spectrum for mixed materials, such as cables, thin-walled metal parts, or embedded components.<\/p>\n<ul>\n<li>Clean separation of ferrous and non-ferrous fractions<\/li>\n<li>Rapid length adjustment of bars, sections, and pipes to transport size<\/li>\n<li>Versatile handling of composite assemblies with minimal tool changes<\/li>\n<\/ul>\n<h3>Hydraulic power packs and handheld systems<\/h3>\n<p><strong>Hydraulic power packs<\/strong> deliver energy to handheld <strong>hydraulic splitters<\/strong> and other compact tools. This is particularly helpful in confined spaces, during <strong>gutting works<\/strong>, or in constrained positions where a <strong>carrier machine<\/strong> cannot be used. The combination of mobile hydraulics with the right tool increases flexibility in secondary demolition.<\/p>\n<ul>\n<li>Ideal for low headroom, narrow shafts, and indoor work<\/li>\n<li>Enables selective interventions without moving heavy carriers<\/li>\n<li>Facilitates phased work where access changes over time<\/li>\n<\/ul>\n<h3>Tank cutters for special applications<\/h3>\n<p><strong>Tank cutters<\/strong> are designed for dismantling vessels, tanks, or thick pipelines. In secondary demolition, after opening, large segments are further reduced and component edges are reworked. For combined concrete-steel structures, a <strong>concrete demolition shear<\/strong> or a splitter complements the process.<\/p>\n<h2>Planning and selection criteria for secondary demolition<\/h2>\n<h3>Component and material analysis<\/h3>\n<p>Essential parameters include compressive strength, reinforcement ratio, element thickness, potential prestressing, inserts, and composite materials. These factors govern the choice between demolition shear, splitter, shear, or combinations.<\/p>\n<ul>\n<li>Identify weak zones, interfaces, and potential stress concentrators<\/li>\n<li>Assess contamination or coatings that may affect processing and recycling<\/li>\n<li>Verify stability of laydown areas and intermediate storage<\/li>\n<\/ul>\n<h3>Emission requirements and environmental conditions<\/h3>\n<p>Requirements on <em>noise<\/em>, <em>vibrations<\/em>, and <em>dust<\/em> influence the methods. Splitting and shears often have advantages in sensitive areas, such as dense urban quarters, hospital environments, or live operations, due to lower <strong>noise emission<\/strong>, <strong>low vibration levels<\/strong>, and reduced dust exposure.<\/p>\n<ul>\n<li>Plan dust control via misting, water feed, or local extraction<\/li>\n<li>Define time windows for noisy work and vibration monitoring points<\/li>\n<li>Protect adjacent assets with shielding, mats, or temporary supports<\/li>\n<\/ul>\n<h3>Accessibility, carriers, and logistics<\/h3>\n<p>Access, bearing capacity of traffic routes, slab loads, and working heights determine whether handheld systems with a <strong>hydraulic power pack<\/strong>, compact <strong>carrier machine<\/strong>s, or larger machinery are appropriate. The target piece size is aligned with removal paths, load-assist devices, and the processing technology.<\/p>\n<ul>\n<li>Match piece sizes to container dimensions and lifting gear<\/li>\n<li>Define one-way material flows to avoid crossings and rehandling<\/li>\n<li>Provide buffer areas for interim sorting and quality checks<\/li>\n<\/ul>\n<h3>Separation purity and recovery objectives<\/h3>\n<p>Recycling quality requires clean separation: concrete portions are broken or split to target size, reinforcement is separated and bundled as scrap. Mechanical separation processes with shears, splitters, and cutters support high purities.<\/p>\n<ul>\n<li>Use magnetic and manual post-picks to reach target purity classes<\/li>\n<li>Bundle reinforcement by diameter and length for efficient recycling<\/li>\n<li>Document contamination removal where applicable<\/li>\n<\/ul>\n<h2>Workflow in secondary demolition<\/h2>\n<h3>Securing, positioning, preparing<\/h3>\n<p>After the primary demolition, components are secured in position, work areas are cordoned off, and load paths are defined. Tool selection, configuration of the hydraulic system, and a visual inspection of the components follow.<\/p>\n<h3>Pre-dimensioning and notch effect<\/h3>\n<p>Defined break lines are set with the demolition shear, or slab-edge sections are nibbled off. Alternatively, boreholes are drilled for splitting to create defined crack paths.<\/p>\n<h3>Breaking or splitting to target size<\/h3>\n<p>The main processing reduces the material to the planned size. Splitting produces large, dimensional pieces with low fines generation; with shear-crushing, rebar exposure is particularly efficient.<\/p>\n<h3>Separating and bundling reinforcement<\/h3>\n<p>Exposed steels are cut to length with a steel shear or hydraulic demolition shear. Bundles facilitate removal, weighing, and recycling.<\/p>\n<h3>Final inspection and handover<\/h3>\n<p>Piece sizes, separation purity, and surfaces are checked. Material fractions are handed over to transport or on-site processing.<\/p>\n<ul>\n<li>Record as-built dimensions of pieces and mass flows per fraction<\/li>\n<li>Photo documentation of interfaces and exposed reinforcements<\/li>\n<li>Handover protocol including destination, container IDs, and times<\/li>\n<\/ul>\n<h2>Safety and health protection<\/h2>\n<h3>General notes<\/h3>\n<p>Safe work areas, stable laydown locations, and defined retreat zones are essential. Personal <strong>safety equipment<\/strong>, protection from falling objects, and control of <strong>crushing hazard<\/strong> and shear points are mandatory.<\/p>\n<ul>\n<li>PPE: helmet, eye and hearing protection, cut-resistant gloves, safety footwear<\/li>\n<li>Secure components against uncontrolled movement or rolling<\/li>\n<li>Establish exclusion zones and signalers during lifts and cuts<\/li>\n<\/ul>\n<h3>Hydraulic safety and tool handling<\/h3>\n<p><strong>Hydraulic hose line<\/strong>s must be installed pressure-free, sealing surfaces kept clean, and pressure zones shielded. Tools must be inspected and operated in accordance with manufacturer instructions. Legal requirements may vary by project; compliance with applicable regulations and permits must be ensured.<\/p>\n<ul>\n<li>Verify system pressure and relief settings before operation<\/li>\n<li>Check for leaks, abrasion, and proper fittings on hoses and couplings<\/li>\n<li>Depressurize circuits before maintenance or tool changes<\/li>\n<\/ul>\n<h2>Quality assurance and documentation<\/h2>\n<h3>Process and result quality<\/h3>\n<p>Target and actual piece sizes, separation purities, and mass flows are documented. Ongoing adjustment of tool settings &#8211; such as <strong>pressing force<\/strong> on shears, splitting sequence, or cutting sequence &#8211; improves efficiency and outcome quality.<\/p>\n<ul>\n<li>KPIs: throughput per hour, purity per fraction, rework rate<\/li>\n<li>Calibration of measuring and weighing devices at defined intervals<\/li>\n<li>Regular toolbox talks to refine sequences and mitigate deviations<\/li>\n<\/ul>\n<h2>Sustainability and resource efficiency<\/h2>\n<p>Low-vibration methods such as splitting and targeted shear-crushing reduce damage to adjacent structures and lower emissions. Clean material separation increases the <strong>recycling<\/strong> rate, reduces transports, and supports the circular use of concrete and steel. In natural stone, controlled splitting improves block reusability.<\/p>\n<ul>\n<li>Short transport routes via on-site sizing and interim processing<\/li>\n<li>Optimized container utilization through consistent piece sizing<\/li>\n<li>Prioritize reuse of large elements before crushing<\/li>\n<\/ul>\n<h2>Practice-oriented application scenarios<\/h2>\n<h3>Foundation demolition in existing structures<\/h3>\n<p>Massive foundations are split into transportable blocks via borehole splitting. Remaining concrete is then re-broken with the demolition shear, and inserts are cut with the steel shear. Advantage: low vibrations with high dimensional accuracy.<\/p>\n<h3>Slab fields and beams<\/h3>\n<p>After lowering a slab field, the demolition shear reduces the <strong>concrete slabs<\/strong>, exposes the reinforcement, and prepares the material for the <strong>crushing plant<\/strong>. Hydraulic demolition shears take care of quickly shortening bars and sections.<\/p>\n<h3>Rock and block management in tunnel heading<\/h3>\n<p>Oversized blocks that impede the material flow are reduced with hydraulic splitters to suit the <strong>conveyor belt<\/strong> or the <strong>wheel loader<\/strong>. The low vibrations protect the surroundings and the existing lining system.<\/p>\n<h3>Gutting works with mixed materials<\/h3>\n<p>After removing non-load-bearing components, remaining concrete parts are crushed with the demolition shear, while <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a> separate cables, thin-walled metals, or composite parts. The result is source-pure fractions for further recovery.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Secondary demolition is the phase of deconstruction in which previously detached structural elements, blocks, or bulk materials are re-broken in a controlled manner, separated, and reduced to transportable or processable sizes. It ties selective deconstruction to high-quality demolition separation and dovetails seamlessly with primary demolition. In practice, it plays a <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/secondary-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19806","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Secondary Demolition - Definition, Methods &amp; Tools<\/title>\n<meta name=\"description\" content=\"Discover secondary demolition in deconstruction \u2713 precise crushing and splitting, dust control and clean material separation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/secondary-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Secondary Demolition - Definition, Methods &amp; Tools\" \/>\n<meta property=\"og:description\" content=\"Discover secondary demolition in deconstruction \u2713 precise crushing and splitting, dust control and clean material separation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/secondary-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:26+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/secondary-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/secondary-demolition\",\"name\":\"Secondary Demolition - Definition, Methods & Tools\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-20T09:48:54+00:00\",\"dateModified\":\"2026-09-12T17:53:26+00:00\",\"description\":\"Discover secondary demolition in deconstruction \u2713 precise crushing and splitting, dust control and clean material separation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/secondary-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/secondary-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/secondary-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Secondary demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Secondary Demolition - Definition, Methods & Tools","description":"Discover secondary demolition in deconstruction \u2713 precise crushing and splitting, dust control and clean material separation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/secondary-demolition","og_locale":"en_US","og_type":"article","og_title":"Secondary Demolition - Definition, Methods & Tools","og_description":"Discover secondary demolition in deconstruction \u2713 precise crushing and splitting, dust control and clean material separation.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/secondary-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:26+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/secondary-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/secondary-demolition","name":"Secondary Demolition - Definition, Methods & Tools","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-20T09:48:54+00:00","dateModified":"2026-09-12T17:53:26+00:00","description":"Discover secondary demolition in deconstruction \u2713 precise crushing and splitting, dust control and clean material separation.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/secondary-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/secondary-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/secondary-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Secondary demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19806","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19806"}],"version-history":[{"count":3,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19806\/revisions"}],"predecessor-version":[{"id":29131,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19806\/revisions\/29131"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19806"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}