{"id":19802,"date":"2025-12-19T16:47:39","date_gmt":"2025-12-19T15:47:39","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19802"},"modified":"2026-05-22T13:57:02","modified_gmt":"2026-05-22T11:57:02","slug":"cable-pulley","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/cable-pulley","title":{"rendered":"Cable pulley"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The cable pulley is a fundamental machine element in lifting and pulling operations. In demolition, deconstruction, and rock and tunnel works, it enables the safe deflection of wire ropes and the creation of mechanical advantage. In combination with equipment from Darda GmbH such as concrete demolition shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, and other hydraulic tools, the cable pulley supports the controlled moving, securing, and lowering of structural components and rock blocks-without generating force itself, but by purposefully guiding and distributing forces. In practice it contributes to reproducible workflows, reduced exposure in hazard zones, and efficient handling of heavy parts.<\/p>\n<h2>Definition: What is meant by a cable pulley?<\/h2>\n<p>A cable pulley is a rotatably mounted sheave with a rope-friendly groove that guides a rope, reduces friction, and changes the pulling direction. In combination with multiple cable pulleys, block-and-tackle systems arise that provide <em>mechanical advantage<\/em>. Cable pulleys are built as fixed or movable deflection pulleys, sized for wire ropes or fiber ropes, and attached with hooks, eyes, or shackle points. Common industry terms include <em>sheave block<\/em> and, for side-opening designs, <em>snatch block<\/em>. Key parameters include load capacity <em>(working load limit, WLL)<\/em>, rope diameter, and the ratio of sheave diameter to rope diameter <em>(D\/d)<\/em>. For wire ropes, minimum D\/d values specified by the rope manufacturer must be observed to limit bending fatigue, often significantly higher for compacted or high-strength constructions.<\/p>\n<h2>Design and operating principle<\/h2>\n<p>A cable pulley consists of the sheave with groove, a bearing (plain, roller, or ball), side plates\/cheeks, a housing, and an attachment point (eye, swivel hook, shackle mount). With side-opening designs (snap- or swing-open cheeks), a rope that is already in service can be inserted. The groove is shaped to support the rope cover and minimize point pressures. The <strong>D\/d ratio<\/strong> affects rope preservation: the larger the sheave diameter relative to the rope, the lower the bending and the wire rope fatigue. Its operating principle is purely passive: the pulley does not sense or create load; it merely redirects it-however, the resulting reaction forces at attachment points must be carefully considered. Durable operation depends on adequate bearing selection and sealing against dust and moisture as well as on correct groove geometry that matches the rope construction.<\/p>\n<h3>Mechanical advantage and efficiency<\/h3>\n<p>With fixed pulleys the direction is changed (1:1), while movable pulleys can reduce the required pulling force (e.g., 2:1, 3:1). Each additional pulley increases losses due to bearing and bending friction; efficiency in practice is below 100%. Therefore, friction losses and dynamic additional forces (start-up, shock, vibration) must be included in planning.<\/p>\n<ul>\n<li>Rule of thumb: assume efficiency losses per sheave and per bend; overall system efficiency decreases with each additional deflection.<\/li>\n<li>Roller or ball bearings typically offer higher efficiency than plain bearings, provided lubrication and sealing are appropriate.<\/li>\n<li>Rope stiffness, contamination, and small D\/d ratios increase internal rope losses and reduce the effective mechanical advantage.<\/li>\n<\/ul>\n<h2>Types and designs<\/h2>\n<ul>\n<li>Fixed deflection cable pulley: Direction change without force gain, e.g., for lateral guying or rerouting a winch line.<\/li>\n<li>Movable pulley: Attached to the component to be moved; serves load distribution and force reduction.<\/li>\n<li>Cable pulley with side-opening cheek: Allows insertion of an already tensioned rope, helpful on confined sites.<\/li>\n<li>Swivel hook or shackle mount: Reduces rope twist and facilitates aligned attachment.<\/li>\n<li>Special grooves for wire ropes or fiber ropes: Profile and flank angle adapted to rope type.<\/li>\n<li>Heavy-duty cable pulleys: Reinforced cheeks, large-dimensioned bearings, for high loads and frequent deflections.<\/li>\n<li>Low-headroom variants: Compact construction for restricted spaces where clearance is limited.<\/li>\n<li>Sheaves with rope guards: Minimize unintentional rope exit under vibration or slack conditions.<\/li>\n<\/ul>\n<h3>Selection criteria in practice<\/h3>\n<ul>\n<li>Load capacity and safety margins relative to the expected load, including dynamic factors.<\/li>\n<li>Matching rope diameter and sufficient D\/d ratio for wire ropes.<\/li>\n<li>Groove profile and bearing type according to continuous operation, dust exposure, and temperature.<\/li>\n<li>Environmental conditions: moisture, concrete dust, corrosion, chemical influences.<\/li>\n<li>Compatibility with rigging gear (shackle width, hook mouth, swivel).<\/li>\n<li>Documentation, marking, and regular inspection according to state-of-the-art rules.<\/li>\n<li>Traceability and markings: WLL and identification must remain legible for documentation and inspection.<\/li>\n<li>Temperature range and sealing concept appropriate to ambient conditions and cleaning methods.<\/li>\n<li>Space for correct reeving and for safe handling, including access for inspection and lubrication.<\/li>\n<\/ul>\n<h2>Use in concrete demolition and specialist deconstruction<\/h2>\n<p>In concrete structures and in <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a>, cable pulleys are used to optimize pulling directions, pretension components, or lower them in a controlled manner. During targeted separation of components, rope guidance supports safe load control while hydraulic tools from Darda GmbH cut or split the material. Thus, control units and hydraulic power packs remain away from the danger zone while the load is secured via rope guidance. Coordinated use reduces uncontrolled component movement, exposure to dust and vibration, and the need for manual intervention near the hazard area.<\/p>\n<h3>Working with concrete demolition shears<\/h3>\n<p>When separating concrete beams or wall segments with concrete demolition shears, a rope can be routed over a fixed deflection cable pulley so that a component is pretensioned before the final cut. This reduces uncontrolled movement when cutting through reinforcement. An additional movable pulley on the component can lower the required pulling force and position the pulling machine at a safe distance. Adequate edge distance and edge protection at bearing points are important to avoid rope damage. Tag lines and controlled release procedures help to manage swing and prevent snap-back effects when residual stresses are released.<\/p>\n<h3>Use with rock and concrete splitters<\/h3>\n<p>Splitting processes create crack fronts whose progression can be influenced by front and back safety. Cable pulleys deflect securing lines so that loosened blocks are held in a controlled manner or guided in a defined direction. In rock demolition and tunnel construction, heavy fragments are often repositioned or lowered step by step after splitting; the combination of splitting force and targeted rope guidance enables precise, low-shock work. Secondary retention lines and staged lowering plans further reduce the risk of sudden movement.<\/p>\n<h2>Workflow and positioning on the construction site<\/h2>\n<ol>\n<li>Clarify the load case: mass, center of gravity location, possible tipping and sliding directions, component geometry.<\/li>\n<li>Select attachment and deflection points: load-bearing structures, favorable load angles, sufficient edge distance.<\/li>\n<li>Define the cable pulley configuration: fixed or movable pulley, required ratio, pulling path.<\/li>\n<li>Check rope path: clear runs, no sharp edges, provide edge protection.<\/li>\n<li>Test load and communication: start slowly, clear hand signals\/radio discipline, establish exclusion zones.<\/li>\n<li>Controlled cutting\/splitting: operate hydraulic tools, observe the load, actively follow the load path.<\/li>\n<li>Safe setting down: release load, detach rigging, recheck pulley condition.<\/li>\n<li>Documentation and debrief: record loads, configurations, and findings to improve subsequent operations.<\/li>\n<\/ol>\n<h2>Planning, sizing, and load paths<\/h2>\n<p>With a 180\u00b0 deflection, forces at the anchor point are typically on the order of twice the line pull, plus friction and dynamic components. With oblique guidance (fleet angle), lateral forces increase; the pulley must be adequately dimensioned axially and radially. For wire ropes, the D\/d ratio and the number of bending cycles are decisive to limit fatigue. The required pulling force results from load, friction, and the desired ratio; selection of the cable pulley must always include sufficient reserves. The specifications of the rigging and lifting equipment used as well as generally accepted technical rules must be observed.<\/p>\n<p><em>Example:<\/em> For a 2:1 reeving with a target load of 20 kN and an assumed per-sheave efficiency of 95%, the theoretical line pull would be slightly above 10 kN; accounting for two bends and additional system friction, a planning value of approximately 11 to 12 kN is prudent, with suitable reserve on WLL for all involved components.<\/p>\n<h2>Safety, operation, and inspection<\/h2>\n<ul>\n<li>Visual inspection before use: groove free of nicks\/burrs, cheeks without deformation, hook latch intact, bearings free-running.<\/li>\n<li>Compatibility: rope diameter matches groove, rigging correctly sized, no impermissible side loading.<\/li>\n<li>Setup: mark exclusion zones, never stand in the rope line of fire, avoid pendulum and snap-back effects.<\/li>\n<li>Operation: uniform pulling motion, avoid jerks, continuously monitor the load, maintain clear team communication.<\/li>\n<li>Maintenance: remove concrete dust, lubricate bearings properly according to the cable pulley manufacturer\u2019s specifications.<\/li>\n<li>Inspection: regular checks and documented inspection intervals per applicable requirements; if in doubt, take the cable pulley out of service.<\/li>\n<li>Secondary retention where appropriate: use additional securing lines when working above personnel or traffic routes.<\/li>\n<li>Temperature and contamination: observe permissible temperature range, avoid embedding abrasive dust in grooves and bearings.<\/li>\n<li>Post-incident rule: after overload, impact, or unknown events, quarantine the pulley and have it inspected by a competent person.<\/li>\n<\/ul>\n<h3>Common failure modes and causes<\/h3>\n<ul>\n<li>Excessive rope wear: D\/d ratio too small, incorrect groove profile, sharp edges on the component.<\/li>\n<li>Stiff running\/overheating: contaminated or damaged bearings, missing lubrication.<\/li>\n<li>Cheek deformation: overload, side loading, incorrect attachment.<\/li>\n<li>Groove breakouts\/burrs: shock loading, foreign objects, improper use.<\/li>\n<li>Bearing seizure due to fine dust ingress: insufficient sealing or inadequate maintenance.<\/li>\n<li>Attachment damage: hooks or shackles stressed by lateral load or misalignment.<\/li>\n<\/ul>\n<h2>Materials and durability<\/h2>\n<p>Cable pulleys are manufactured from steel, cast materials, aluminum, or high-strength plastics. For corrosive environments, coated components or stainless steel are used. In dusty environments such as concrete demolition, a robust bearing design with suitable sealing is recommended. After work involving concrete and rock dust, thorough cleaning is advisable to prevent abrasion and corrosion. Galvanized or coated steel increases corrosion resistance, while polymer sheaves can be advantageous for fiber ropes due to low abrasion and noise; UV stability and temperature limits must nevertheless be considered.<\/p>\n<h2>Accessories and interfaces<\/h2>\n<ul>\n<li>Shackles, swivel hooks, connecting elements: for rotation-free attachment points and aligned pull lines.<\/li>\n<li>Rigging: wire ropes, chains, textile slings-selected to suit the pulley and the component.<\/li>\n<li>Edge protectors and rerouting aids: reduce rope abrasion at component edges.<\/li>\n<li>Winches and pulling devices: provide the pulling force; the cable pulley guides and distributes the forces.<\/li>\n<li><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> and tools: while Darda GmbH hydraulic devices cut or split, rope guidance provides safe load control.<\/li>\n<li>Rope terminations and connectors: thimbles, sockets, and clamps must match rope class and comply with applicable rules.<\/li>\n<\/ul>\n<h2>Practical examples from the application fields<\/h2>\n<p>During gutting and cutting of slab fields, a segment is pretensioned via rope guidance before the final cut and then lowered in a controlled manner after separation. In concrete demolition and specialist deconstruction, cable pulleys deflect the pulling direction of a ground winch so that operators and hydraulic power packs from Darda GmbH work outside the danger area. In natural stone extraction, split blocks are lifted out of the quarry bed or repositioned onto sliding tracks via movable pulleys. In tunnel construction, cable pulleys secure loosened breakout pieces after the use of rock splitting cylinders and guide them into the transport area. When separating pipe or vessel sections-e.g., in combination with tank cutters or steel shears-cable pulleys also stabilize the work area through defined pull lines. Across these examples, the consistent goal is predictable force paths, minimized uncontrolled movement, and efficient sequencing of cutting and handling.<\/p>\n<h2>Terminology and classification within systems<\/h2>\n<p>Cable pulleys are guiding elements in rigging and lifting technology. They do not generate pulling force themselves but work together with winches, cranes, or manual pulling devices. Compared to simple guide brackets or edge rollers, they offer defined, low-friction deflection and rope-friendly geometry. In workflows with concrete demolition shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, multi cutters, or steel shears from Darda GmbH, cable pulleys provide the link between cutting\/splitting operations and safe load control. Decisions on selection, use, and inspection should follow generally accepted technical rules and be tailored to the specific load case. Terminology such as WLL and minimum breaking load must be clearly distinguished and consistently documented to ensure traceable planning and inspection.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The cable pulley is a fundamental machine element in lifting and pulling operations. In demolition, deconstruction, and rock and tunnel works, it enables the safe deflection of wire ropes and the creation of mechanical advantage. In combination with equipment from Darda GmbH such as concrete demolition shears, rock and concrete <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cable-pulley\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19802","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Cable Pulley - Lifting, Rigging &amp; Demolition Guide<\/title>\n<meta name=\"description\" content=\"Safe rope guidance with a cable pulley for lifting, rigging, and demolition \u2713 achieve control and mechanical advantage.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cable-pulley\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cable Pulley - Lifting, Rigging &amp; Demolition Guide\" \/>\n<meta property=\"og:description\" content=\"Safe rope guidance with a cable pulley for lifting, rigging, and demolition \u2713 achieve control and mechanical advantage.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/cable-pulley\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-22T11:57:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-pulley\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-pulley\",\"name\":\"Cable Pulley - Lifting, Rigging & Demolition Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-19T15:47:39+00:00\",\"dateModified\":\"2026-05-22T11:57:02+00:00\",\"description\":\"Safe rope guidance with a cable pulley for lifting, rigging, and demolition \u2713 achieve control and mechanical advantage.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-pulley#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-pulley\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-pulley#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Cable pulley\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cable Pulley - Lifting, Rigging & Demolition Guide","description":"Safe rope guidance with a cable pulley for lifting, rigging, and demolition \u2713 achieve control and mechanical advantage.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/cable-pulley","og_locale":"en_US","og_type":"article","og_title":"Cable Pulley - Lifting, Rigging & Demolition Guide","og_description":"Safe rope guidance with a cable pulley for lifting, rigging, and demolition \u2713 achieve control and mechanical advantage.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/cable-pulley","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-22T11:57:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/cable-pulley","url":"https:\/\/www.darda.de\/en\/knowledge\/cable-pulley","name":"Cable Pulley - Lifting, Rigging & Demolition Guide","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-19T15:47:39+00:00","dateModified":"2026-05-22T11:57:02+00:00","description":"Safe rope guidance with a cable pulley for lifting, rigging, and demolition \u2713 achieve control and mechanical advantage.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/cable-pulley#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/cable-pulley"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/cable-pulley#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Cable pulley"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19802","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19802"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19802\/revisions"}],"predecessor-version":[{"id":27701,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19802\/revisions\/27701"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19802"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}