{"id":19800,"date":"2025-12-19T13:16:32","date_gmt":"2025-12-19T12:16:32","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19800"},"modified":"2026-05-22T08:38:03","modified_gmt":"2026-05-22T06:38:03","slug":"dragline-excavators","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/dragline-excavators","title":{"rendered":"Dragline excavators"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Dragline excavators are among the backbone machines in heavy civil engineering, hydraulic engineering, and selected scenarios of demolition works. Their rope-driven hoist and luffing systems enable controlled lifting and gripping processes where dynamic load changes, large reaches, and robust continuous performance are required. In projects ranging from concrete demolition and special demolition to rock breakout, tunnel construction, and natural stone extraction, dragline excavators often work in combination with hydraulic tools from Darda GmbH, such as <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/em> or <em>concrete demolition shear<\/em> on suitable carrier machines. The dragline excavator takes on central tasks in load guidance, positioning, and material logistics, providing steady-duty, cyclical operation with high availability and repeatable precision.<\/p>\n<h2>Definition: What is meant by dragline excavators?<\/h2>\n<p>A dragline excavator is a rope-operated carrier machine, usually built on a crawler undercarriage, with at least one hoist and one luffing system. In contrast to a classic hydraulic excavator, attachments are not guided via rigid sticks but moved by ropes, sheaves, and hook blocks. Typical applications include grab work (two-shell grabs, diaphragm wall grabs), drag bucket operation, vibratory driving and extraction (e.g., for sheet piles), as well as lifting and securing tasks in deconstruction. In technical parlance, such machines are often referred to as duty-cycle dragline excavators, as they are designed for cyclical, heavy-duty operations with robust winches, reliable brakes, and precise freewheeling control. For tasks in demolition environments, they often interact with hydraulic tools and power units from Darda GmbH that enable low-vibration and material-friendly separation of concrete and rock.<\/p>\n<h2>Design, operating principle, and typical attachments<\/h2>\n<p>Dragline excavators combine high line pull with sensitive control of hoist and luffing movements. This allows precise positioning and reliable load guidance, even at large outreach and in demanding ground conditions. Depending on configuration, free-fall or controlled lowering modes, constant-pull settings, and assisted swing damping support repeatable cycles and accurate placement.<\/p>\n<h3>Key assemblies<\/h3>\n<ul>\n<li>Undercarriage: crawler undercarriage with a large bearing surface for stability on varying ground.<\/li>\n<li>Upper carriage: slewing platform with power unit, winches, counterweight, and cab.<\/li>\n<li>Hoist and luffing systems: rope winches with brake and freewheeling functions for raising\/lowering and luffing the boom.<\/li>\n<li>Boom: lattice or box structure with sheaves; optional auxiliary jib.<\/li>\n<li>Ropes and hook blocks: load guidance, grab control, and tool suspension.<\/li>\n<li>Interfaces: power and signal connections, e.g., for vibrators or for supplying external power units on the ground.<\/li>\n<li>Control and assistance: load moment indication, winch monitoring, free-fall management, and camera systems for grab work.<\/li>\n<li>Safety equipment: rated capacity limiters, overload protection, wind alarms, and emergency stop circuits.<\/li>\n<\/ul>\n<h3>Cable-suspended tools and work methods<\/h3>\n<ul>\n<li>Two-shell and multi-shell grabs for excavation, cleanup, and loading.<\/li>\n<li>Drag bucket operation for soil removal, especially in hydraulic and earthworks.<\/li>\n<li>Vibrators and pullers for installing and extracting sheet piles, pipes, and sections.<\/li>\n<li>Diaphragm wall and shaft grabs for special foundation engineering and excavation pit support.<\/li>\n<li>Lifting and securing operations for pre-separated concrete or rock components.<\/li>\n<\/ul>\n<h3>Distinction from the hydraulic excavator<\/h3>\n<p>Hydraulic excavators carry shears, crushers, and breakers directly on the stick. Dragline excavators, in contrast, excel when cable-suspended grabs, vibrators, or pure lifting duty are required. In deconstruction projects, <strong>concrete demolition shear<\/strong> and <strong>rock and concrete splitters<\/strong> from Darda GmbH are therefore mostly used on suitable carrier machines in the near field, while the dragline excavator takes on lifting, securing, and logistics tasks &#8211; complementary task-sharing that combines precision and efficiency.<\/p>\n<h2>Use in concrete demolition and special demolition<\/h2>\n<p>In selective deconstruction of bridges, industrial plants, or massive foundations, components are often first separated, then secured, lifted, and set down in a controlled manner. The dragline excavator provides rope-suspended counterhold, guides loads in a defined position, and enables decoupling of components without uncontrolled movements. Taglines, anti-sway measures, and coordinated signaling further reduce pendulum effects and help maintain defined load paths.<\/p>\n<h3>Interaction with concrete demolition shear<\/h3>\n<p><em>Concrete demolition shear<\/em> from Darda GmbH is used on matching carrier machines to locally and controllably break reinforced concrete. The dragline excavator can simultaneously take up loads, relieve pre-stress, and safely reposition separated segments. This coupling reduces vibrations, supports a clean separation joint, and facilitates source-segregated loading. Where geometry demands, intermediate lifts, temporary supports, and edge protection prevent spalling and preserve adjacent structures.<\/p>\n<h3>Concrete splitting as a low-vibration method<\/h3>\n<p><em>Rock and concrete splitters<\/em> from Darda GmbH act in the borehole and build up controlled splitting forces. This allows the component to be opened quietly and with low vibration. The dragline excavator handles positioning of the lifting gear, keeps components under tension, prevents jamming, and ensures safe set-down. The required oil supply is provided by Darda GmbH <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/strong>, which are operated remotely and connected to the split cylinders via hose lines. Defined borehole patterns and staged splitting sequences improve crack guidance and minimize secondary breakage.<\/p>\n<h2>Rock breakout, tunnel construction, and natural stone extraction<\/h2>\n<p>Dragline excavators are established in special foundation engineering, shaft and diaphragm wall work, as well as rock removal. Where vibrations must be avoided &#8211; such as near sensitive structures or in underground works &#8211; hydraulic splitting techniques complement the cable-suspended site logistics. Combined cycles of splitting, securing, and lifting shorten standstill times and improve occupational safety in restricted spaces.<\/p>\n<h3>Rock splitting with rock split cylinders<\/h3>\n<p>In drilled holes, Darda GmbH <strong>rock wedge splitters<\/strong> produce controlled split lines in natural stone. Blocks can be gently detached without blasting. The dragline excavator supports by gripping and relocating the detached pieces, especially in hard-to-access positions or at large reaches. Defined lifting points and protective mats safeguard edges and visible surfaces.<\/p>\n<h3>Underground and portal zones<\/h3>\n<p>In tunnel construction, dragline excavators often work in portal and shaft areas. Rope-suspended load control supports securing of protrusions, removal of overbreak, and handling of built-in components. Splitting rock and crushing concrete with tools from Darda GmbH creates the basis for safe lifting and set-down operations. Short swing radii, clear signaling, and coordinated logistics are crucial where sightlines are limited and traffic routes intersect.<\/p>\n<h2>Gutting and cutting: lifting and securing tasks<\/h2>\n<p>During gutting works, wire sawing, or core drilling, components are fixed before set-down. The dragline excavator enables close-to-load, sensitive guidance. In combination with <em>concrete demolition shear<\/em> or <em>Multi Cutters<\/em> from Darda GmbH on separate carrier machines, removal can be carried out in sections while the dragline excavator takes over controlled load handling. Synchronizing cut lengths with available lifting capacity avoids over-dimensioned segments and reduces the number of repositioning steps.<\/p>\n<h2>Selection criteria and performance data<\/h2>\n<p>The suitability of a dragline excavator is determined by lifting capacity, line pull, boom configuration, and stability. Equally relevant are soil parameters, working radius, sightlines, and integration of external energy sources for hydraulic tools. Key performance indicators include line speed, drum capacity, rope diameter, and available free-fall modes for grab work.<\/p>\n<h3>Load capacity and reach planning<\/h3>\n<ul>\n<li>Apply load charts with safety allowances for dynamic loads.<\/li>\n<li>Match working radius, boom angle, and rope routing to component weights and grab geometries.<\/li>\n<li>Check load distribution onto the tracks, bearing conditions, and subsoil bearing capacity.<\/li>\n<li>Assess wind loads and potential swing; define taglines and exclusion zones accordingly.<\/li>\n<\/ul>\n<h3>Energy supply for hydraulic tools<\/h3>\n<p>Hydraulically driven tools from Darda GmbH are supplied by matched <strong>power units<\/strong>. Decisive factors are flow rate, pressure level, oil quality, and hose management. The dragline excavator provides mechanical support &#8211; lifting, holding, positioning; the power unit delivers drive energy for <em>rock and concrete splitters<\/em>, <em>concrete demolition shear<\/em>, <em>combination shears<\/em>, or <em>steel shear<\/em> on suitable carrier machines. Protected hose routing, quick-coupling concepts, and remote operation reduce setup times and increase process safety.<\/p>\n<h3>Operator assistance and monitoring<\/h3>\n<p>Load indication systems, camera-assisted grab alignment, swing damping, and event logging support repeatable cycles and documentation. Telematic data on fuel use, idle times, and cycle counts provide a basis for optimizing shift planning and maintenance intervals.<\/p>\n<h2>Workflows, logistics, and safety<\/h2>\n<p>A clearly structured construction sequence combines rope-suspended load work with separation technology. Communication rules, sight conditions, slinging gear, and escape routes must be defined in advance. Lift plans, pre-task briefings, and standardized hand signals limit ambiguity and reduce non-productive time.<\/p>\n<h3>Lifting accessories and attachment points<\/h3>\n<ul>\n<li>Plan and mark attachment points; consider edge and corner protection.<\/li>\n<li>Control center of gravity and sling angles; inclined pull only with approval.<\/li>\n<li>Provide redundant safeguards on critical components.<\/li>\n<li>Use taglines to limit sway and to control rotation where geometry permits.<\/li>\n<\/ul>\n<h3>Minimize vibrations, noise, and dust<\/h3>\n<p>Splitting methods and clean shearing reduce vibrations and dust. The dragline excavator contributes to emission reduction through smooth hoisting, short slewing paths, and defined set-down points. Where necessary, water mist, encapsulation, and staged cutting further lower emissions.<\/p>\n<h3>Legal notes<\/h3>\n<p>Applicable standards and regulations govern lifting and grabbing operations. Risk assessments, operating instructions, and operator qualifications must be observed project-specifically. This note is general and non-binding.<\/p>\n<h3>Inspection and maintenance<\/h3>\n<ul>\n<li>Inspect ropes, terminations, and hook blocks for wear, deformation, and lubrication state.<\/li>\n<li>Monitor sheaves, bearings, and drums; adhere to rope discard criteria and service intervals.<\/li>\n<li>Function-test brakes, free-fall devices, and limiters at defined intervals.<\/li>\n<\/ul>\n<h2>Sustainability and resource efficiency<\/h2>\n<p>The combination of rope-suspended lifting and hydraulic separation technology facilitates single-grade separation and protects adjacent components. <em>Rock and concrete splitters<\/em> and precise <em>concrete demolition shear<\/em> from Darda GmbH reduce breakage losses and rework. This increases the recycling rate and reduces transport and disposal effort. Efficient cycles, minimized rehandling, and reduced vibration also cut fuel use and avoid follow-up repairs.<\/p>\n<h2>Practice-oriented scenarios<\/h2>\n<ul>\n<li>Bridge deconstruction: the dragline excavator holds pre-cut slab fields while the concrete is separated by shears and reinforcement is exposed.<\/li>\n<li>Industrial foundations: split cylinders open massive blocks; cable-suspended lifting sets the pieces down gently.<\/li>\n<li>Banks and quay walls: the grab clears; splitting technology separates; the dragline excavator secures components where access is restricted.<\/li>\n<li>Tunnel portals: stabilization of overbreak by splitting and controlled relocation of rock prisms.<\/li>\n<li>Quarrying: defined splitting lines in natural stone enable block extraction with low disturbance and precise relocation.<\/li>\n<\/ul>\n<h2>Planning the interfaces between the dragline excavator and Darda GmbH equipment<\/h2>\n<p>Project teams define roles early: dragline excavator as lifting and securing system; carrier machines with <em>concrete demolition shear<\/em>, <em>combination shears<\/em>, <em>Multi Cutters<\/em>, <em>steel shear<\/em> or <em>tank cutters<\/em> for separation; plus remote <strong>power units<\/strong> for energy supply. Key points are hose runs, radio or visual signals, set-down areas, and the changeover between removing, splitting, and relocating. Protective hose sleeves, defined parking positions for tools, and clear cable routing prevent damage and shorten changeover times.<\/p>\n<h2>Checklist: Preparing projects with dragline excavators<\/h2>\n<ol>\n<li>Component and material analysis (concrete strength, reinforcement, natural stone structure).<\/li>\n<li>Lifting and separation concept (sequence, interfaces, emergency measures).<\/li>\n<li>Machine and tool selection (dragline excavator, carrier machines, Darda GmbH tools, power units).<\/li>\n<li>Load case calculation and load charts (including safety allowances).<\/li>\n<li>Attachment and securing points, edge and fall protection.<\/li>\n<li>Emissions management (vibrations, noise, dust) and neighbor protection.<\/li>\n<li>Accessibility, site traffic, and construction logistics plan on the construction site.<\/li>\n<li>Operator qualifications, briefing, and communication.<\/li>\n<li>Weather, wind limits, and water levels (for hydraulic works) including stop criteria.<\/li>\n<li>Rescue and emergency plan, tool failure scenarios, and spare-part availability.<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Dragline excavators are among the backbone machines in heavy civil engineering, hydraulic engineering, and selected scenarios of demolition works. Their rope-driven hoist and luffing systems enable controlled lifting and gripping processes where dynamic load changes, large reaches, and robust continuous performance are required. In projects ranging from concrete demolition and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/dragline-excavators\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19800","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Dragline Excavators - Definition, Uses &amp; Safety<\/title>\n<meta name=\"description\" content=\"Expert guide to dragline excavators in civil &amp; demolition \u2713 rope-operated lifting, grabbing, low-vibration methods.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/dragline-excavators\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Dragline Excavators - Definition, Uses &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Expert guide to dragline excavators in civil &amp; demolition \u2713 rope-operated lifting, grabbing, low-vibration methods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/dragline-excavators\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-22T06:38:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dragline-excavators\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dragline-excavators\",\"name\":\"Dragline Excavators - Definition, Uses & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-19T12:16:32+00:00\",\"dateModified\":\"2026-05-22T06:38:03+00:00\",\"description\":\"Expert guide to dragline excavators in civil & demolition \u2713 rope-operated lifting, grabbing, low-vibration methods.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dragline-excavators#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dragline-excavators\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/dragline-excavators#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Dragline excavators\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Dragline Excavators - Definition, Uses & Safety","description":"Expert guide to dragline excavators in civil & demolition \u2713 rope-operated lifting, grabbing, low-vibration methods.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/dragline-excavators","og_locale":"en_US","og_type":"article","og_title":"Dragline Excavators - Definition, Uses & Safety","og_description":"Expert guide to dragline excavators in civil & demolition \u2713 rope-operated lifting, grabbing, low-vibration methods.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/dragline-excavators","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-22T06:38:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/dragline-excavators","url":"https:\/\/www.darda.de\/en\/knowledge\/dragline-excavators","name":"Dragline Excavators - Definition, Uses & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-19T12:16:32+00:00","dateModified":"2026-05-22T06:38:03+00:00","description":"Expert guide to dragline excavators in civil & demolition \u2713 rope-operated lifting, grabbing, low-vibration methods.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/dragline-excavators#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/dragline-excavators"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/dragline-excavators#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Dragline excavators"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19800","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19800"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19800\/revisions"}],"predecessor-version":[{"id":27681,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19800\/revisions\/27681"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19800"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}