{"id":19799,"date":"2025-12-19T10:38:44","date_gmt":"2025-12-19T09:38:44","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19799"},"modified":"2026-05-22T14:07:02","modified_gmt":"2026-05-22T12:07:02","slug":"cable-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/cable-demolition","title":{"rendered":"Cable demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Cable demolition denotes a method of controlled deconstruction in which structures or individual components are guided into a predefined direction and deliberately brought down using cables, pulleys and winches. The method is primarily used for slender, free-standing structures such as chimneys, towers, masts or wall panels. In practice, cable demolition is rarely a stand-alone approach: it is often combined with low-vibration techniques, such as with <strong>concrete demolition shear<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong> from Darda GmbH, to create deliberate fracture initiations, weaken cross-sections, or to size-reduce components in a material-appropriate manner after laying them down. When executed with a documented plan, the method enables predictable tipping mechanisms with minimized collateral effects.<\/p>\n<h2>Definition: What is meant by cable demolition?<\/h2>\n<p>Cable demolition is understood as the controlled pulling down of structural or rock sections by tensile forces introduced via cables and winches. The goal is to move the structure into a safe fall direction after it has been prepared structurally so that a predictable tipping or crushing mechanism occurs. Cable demolition can be part of a deconstruction concept that previously includes strip-out, separation cuts and the creation of predetermined breaking points. It is low-vibration compared to impact or blasting methods but requires precise planning of load paths, anchor points and the exclusion zone. In contrast to pure lifting or cutting, cable demolition relies on deliberately induced instability combined with guided motion and verified capacity of all force-transmitting components.<\/p>\n<h2>Process and sequence in cable demolition<\/h2>\n<p>Cable demolition follows a structured procedure from analysis to execution. Central aspects are the assessment of the load-bearing structure, defining the fall direction and safely introducing the tensile forces. Environmental and operational constraints &#8211; such as wind, ground bearing capacity and the presence of utilities &#8211; are clarified up front and reflected in the method statement.<\/p>\n<h3>Typical sequence<\/h3>\n<ol>\n<li><strong>Inventory and structural assessment:<\/strong> Determination of geometry, material, reinforcement, damage and anchorage potential. Define the necessary weakenings and permissible tensile forces.<\/li>\n<li><strong>Strip-out and clearance cuts:<\/strong> Remove non-load-bearing installations, locally open the envelope and separate attachments. <em>Concrete demolition shear<\/em> are often used for selective removal of concrete cover or cantilevers.<\/li>\n<li><strong>Create predetermined breaking points:<\/strong> Local cross-section weakening, e.g., by hydraulic splitting with <em>rock and concrete splitters<\/em> from Darda GmbH or by targeted separation cuts.<\/li>\n<li><strong>Cable and winch concept:<\/strong> Selection of cable type and diameter, definition of redirects, safety lines and anchor points. Define the pulling direction and the restraining systems.<\/li>\n<li><strong>Establish the exclusion zone:<\/strong> Clear the hazard area, provide shielding and a signal chain. Define responsibilities and the communication structure.<\/li>\n<li><strong>Pulling phase:<\/strong> Steadily increase the pulling force, monitor cracks, rotations and support reactions. If necessary, follow up at the predetermined breaking points.<\/li>\n<li><strong>Post-processing:<\/strong> Size-reduce the brought-down components, separate reinforcement and concrete, and remove. Here, <em>concrete demolition shear<\/em>, <em>steel shears<\/em> or <em>Multi Cutters<\/em> from Darda GmbH are common.<\/li>\n<\/ol>\n<h3>Practical additions<\/h3>\n<ul>\n<li><strong>Test pull and calibration:<\/strong> Conduct a low-load trial to verify friction losses in redirects and to validate signal timing.<\/li>\n<li><strong>Tag lines and restrainers:<\/strong> Use auxiliary lines to control rotation and to prevent uncontrolled lateral motion.<\/li>\n<li><strong>Staged release:<\/strong> Remove temporary props and weakening caps in a defined sequence to avoid premature tipping.<\/li>\n<\/ul>\n<h2>Fields of application and limits of cable demolition<\/h2>\n<p>Cable demolition is suitable for slender, inherently stable components with a clearly definable fall direction, for example chimneys, silos, radio masts or free-standing concrete walls. In urban environments, the space required for the fall wedge and the exclusion zone is the limiting factor. For complex structures with unclear load paths, with low anchorage capacity or in the immediate vicinity of sensitive neighboring buildings, alternative or supplementary methods are preferable, such as stepwise top-down removal with <strong>concrete demolition shear<\/strong> or low-vibration splitting with <strong>rock and concrete splitters<\/strong>. Further limitations arise from wind exposure, unknown prestressing, severe corrosion at anchor zones and hidden connections that counteract the intended rotation.<\/p>\n<h3>Relation to application areas<\/h3>\n<ul>\n<li><strong>Concrete demolition and specialized deconstruction:<\/strong> Pulling down wall and frame panels; subsequent precise size reduction with hydraulic shears and splitting cylinders from Darda GmbH.<\/li>\n<li><strong>Strip-out and cutting:<\/strong> Preparation by selective removal of installations; separating reinforcement and embedded parts with <em>steel shears<\/em> or <em>Multi Cutters<\/em>.<\/li>\n<li><strong>Rock demolition and tunnel construction:<\/strong> Cable pull for controlled movement of loosened blocks; pre-widening and crack initiation using <em>rock splitting cylinders<\/em>.<\/li>\n<li><strong>Natural stone extraction:<\/strong> Releasing and tipping raw blocks via cable pull, accompanied by controlled splitting.<\/li>\n<li><strong>Special operations:<\/strong> Special structures, tanks and vessels; combined methods with <em>tank cutters<\/em> from Darda GmbH for subsequent material-appropriate cutting.<\/li>\n<\/ul>\n<p><em>In practice, hybrid approaches balance speed, precision and environmental compatibility while keeping residual risks within acceptable limits.<\/em><\/p>\n<h2>Preparatory measures: strip-out, separation cuts and predetermined breaking points<\/h2>\n<p>The quality of cable demolition depends significantly on preparation. Strip-out reduces uncontrolled load shares and minimizes unpredictable fracture patterns. Separation cuts or locally confined cross-section weakenings define the tipping lever and the desired axis of rotation. In heavily reinforced areas, <strong>rock and concrete splitters<\/strong> from Darda GmbH are helpful for creating low-crack fracture joints. <strong>Concrete demolition shear<\/strong> enable the controlled removal of ribs, upstands or protrusions that could otherwise impede the tipping process. Care is taken to avoid overcutting into sections required for stability until the pulling phase starts.<\/p>\n<h3>Quality criteria for predetermined breaking points<\/h3>\n<ul>\n<li><strong>Geometry and depth:<\/strong> Sufficient reduction of section and reinforcement to trigger rotation without premature collapse.<\/li>\n<li><strong>Continuity:<\/strong> Uniform weakening across the intended hinge line to prevent twisting.<\/li>\n<li><strong>Edge conditioning:<\/strong> Removal of stress risers that could deflect the crack path.<\/li>\n<li><strong>Verification:<\/strong> Photo documentation and sign-off before the pulling phase.<\/li>\n<\/ul>\n<h3>Division-of-work approach<\/h3>\n<ul>\n<li>Loosen and preform concrete: hydraulic splitting for crack-controlled weakening.<\/li>\n<li>Expose and separate reinforcement: use <em>concrete demolition shear<\/em> and <em>steel shears<\/em>.<\/li>\n<li>Decouple the component: release secondary structures and connections.<\/li>\n<\/ul>\n<p><em>Clear allocation of responsibilities and interfaces between disciplines reduces idle times and prevents contradictory actions on site.<\/em><\/p>\n<h2>Tools and equipment in cable demolition<\/h2>\n<p>The core inventory includes winches (hydraulic or electric), wire ropes or high-strength fiber ropes, shackles, slings, edge protectors and pulleys. Anchor points must be planned to be load-bearing and redundant. In addition, hydraulic tools from Darda GmbH are used: <em>concrete demolition shear<\/em> for selective concrete removal, <em>rock splitting cylinders<\/em> for low-vibration splitting, <em>steel shears<\/em> and <em>Multi Cutters<\/em> for metal separation, as well as <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power packs<\/a><\/em> as the energy source. Inspection states, WLL marking and compatibility of rope terminations with sheave diameters are verified before use to avoid local overloads.<\/p>\n<h3>Role of the hydraulic power packs<\/h3>\n<p>Darda GmbH&#8217;s hydraulic power packs provide the pressure supply for mobile shears and splitters. Their performance selection is based on the tool, work cycle and place of use. A well-matched hydraulic system reduces downtime, limits heat build-up and supports uniform, material-appropriate processing in sync with the cable pull. Remote operation and demand-oriented pressure control support safe spacing and consistent tool performance during critical pulling phases.<\/p>\n<h2>Cable demolition in the urban context<\/h2>\n<p>In densely built-up areas, protection zones, traffic management and emissions control are crucial. Cable demolition can only take place if fall direction, fall height and impact energy are safely controlled. Where the exclusion zone cannot be implemented, a stepwise top-down removal with <strong>concrete demolition shear<\/strong> or combined splitting is recommended to reduce component size and limit impact energy. Advance stakeholder communication with facility management and authorities, plus a documented fallback method, increase resilience against short-notice constraints.<\/p>\n<h3>Emissions<\/h3>\n<ul>\n<li><strong>Vibrations:<\/strong> Lower than impact work; peaks at impact can be reduced by pre-crushing.<\/li>\n<li><strong>Noise:<\/strong> Mainly from winch operation and material fracture; hydraulic tools generally operate at moderate levels.<\/li>\n<li><strong>Dust:<\/strong> Minimization through pre-wetting and targeted size reduction on the ground with shears and splitters.<\/li>\n<li><strong>Water management:<\/strong> Collection of slurry and protection of drains when using wet suppression.<\/li>\n<\/ul>\n<h2>Safety, structural engineering and permits<\/h2>\n<p>Cable demolition requires expert assessment of the load-bearing structure and the anchor points. The sizing of cables, slings and winches must match the expected loads including safety factors. Exclusion and safety areas must be defined and monitored. Depending on the asset and region, additional approvals, notifications or protective measures may be required; compliance with the applicable rules of technology and occupational safety is fundamental. Statements in this text are of a general nature and do not replace project-specific planning. Certified personnel, safeguarded access routes and weather thresholds are defined prior to start.<\/p>\n<h3>Monitoring and communication<\/h3>\n<p>During the pulling phase, visual inspections and measurements (e.g., crack monitoring, inclination) are advisable. A clear chain of signals between winch operation, spotters and site management minimizes errors. Emergency and abort criteria (e.g., stop in case of unexpected rotation) are defined in advance. Redundant communication channels and unambiguous hand signals help to maintain control in high-noise situations.<\/p>\n<h3>Minimum planning deliverables<\/h3>\n<ul>\n<li><strong>Method statement and risk assessment:<\/strong> Including hazard map and exclusion zone logic.<\/li>\n<li><strong>Force and stability checks:<\/strong> Rope forces, anchor verification and dynamic allowances.<\/li>\n<li><strong>Weather and stop criteria:<\/strong> Wind, visibility and ground conditions with trigger values.<\/li>\n<li><strong>Emergency plan:<\/strong> Retreat routes, first-response measures and contact chain.<\/li>\n<\/ul>\n<h2>Comparison with alternative methods<\/h2>\n<p>Compared to stepwise removal with <strong>concrete demolition shear<\/strong>, cable demolition offers speed for suitable geometries but requires the necessary space for the fall area. Hydraulic splitting with <strong>rock and concrete splitters<\/strong> is particularly suitable when vibrations and noise must be limited or when components are to be deliberately divided into smaller segments. Cutting methods such as sawing or torch cutting also have their place when precise edges or minimal environmental impact are required. In practice, methods are often combined to balance safety, quality and logistics. Selection criteria typically include geometry, surroundings, reuse goals and the achievable control over loads and trajectories.<\/p>\n<h2>Special objects: chimneys, towers, tanks and rock<\/h2>\n<p>Slender chimneys and towers can be controlled to tip by defined weakening at the base and by targeted cable routing. For steel or prestressed concrete constructions, the reinforcement layout must be considered; here, exposing with <em>concrete demolition shear<\/em> and cutting with <em>steel shears<\/em> can be useful. In tank dismantling, cables are sometimes used for stabilization and position control, while <em>tank cutters<\/em> from Darda GmbH perform the actual cutting. In rock, cable pull can control the movement of pre-loosened blocks; the initial release is achieved with low vibration using <em>rock splitting cylinders<\/em>. Additional attention is paid to internal liners, residues and coatings that may affect weight, friction and permissible cutting and splitting methods.<\/p>\n<h3>Load paths and anchor points<\/h3>\n<p>Anchor points must accommodate design loads including dynamic components. Temporary foundations, ballast or back-anchored frame structures are common solutions. Friction in redirects, cable sag and the synchronization of multiple winches influence the force flow and must be considered. Proof of capacity and inspection access are ensured for each anchor component, including intermediate pulleys and edge protections.<\/p>\n<ul>\n<li><strong>Ground anchors and ballast:<\/strong> Suitable where soil capacity is verifiable and space allows.<\/li>\n<li><strong>Structural tie-ins:<\/strong> Use existing members after capacity check and local reinforcement if required.<\/li>\n<li><strong>Free-standing frames:<\/strong> Mobile or modular frames for defined pulling geometries.<\/li>\n<\/ul>\n<h2>Planning aids for cable demolition<\/h2>\n<p>A carefully documented work plan increases execution safety. The following overview serves as guidance for planning and coordination:<\/p>\n<ul>\n<li><strong>Object analysis:<\/strong> Material, reinforcement, damage locations, attachments, connections.<\/li>\n<li><strong>Fall direction:<\/strong> Geometry, obstacles, exclusion zone, impact ground.<\/li>\n<li><strong>Weakening concept:<\/strong> Location and depth of predetermined breaking points, use of <em>concrete demolition shear<\/em> and <em>rock and concrete splitters<\/em>.<\/li>\n<li><strong>Cable and winch selection:<\/strong> Breaking load, safety factors, redundancies, redirects.<\/li>\n<li><strong>Anchor points:<\/strong> Verification of load-bearing capacity, installation, inspection.<\/li>\n<li><strong>Logistics:<\/strong> Pull path, machine locations, retreat options.<\/li>\n<li><strong>Emissions control:<\/strong> Dust and noise reduction, working times, monitoring.<\/li>\n<li><strong>Communication:<\/strong> Signals, responsibilities, abort criteria.<\/li>\n<li><strong>Post-processing:<\/strong> Size reduction on the ground with <em>concrete demolition shear<\/em>, separation with <em>steel shears<\/em>, recycling.<\/li>\n<li><strong>Weather and timing:<\/strong> Forecast checks, wind limits, light conditions and buffer times.<\/li>\n<li><strong>Interfaces:<\/strong> Utilities, traffic coordination and waste handling.<\/li>\n<\/ul>\n<h2>Documentation and quality assurance<\/h2>\n<p>Documentation includes existing records, calculations, assembly and inspection logs for cables and slings, photo documentation of the weakenings as well as recording of the pulling phase and the follow-up work. Regular tool inspections, for example of <em>hydraulic power packs<\/em>, <em>concrete demolition shear<\/em> and <em>rock splitting cylinders<\/em> from Darda GmbH, support reliable execution and contribute to traceability. Completion files typically comprise acceptance records, calibration certificates and a lessons-learned note to inform future planning.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Cable demolition denotes a method of controlled deconstruction in which structures or individual components are guided into a predefined direction and deliberately brought down using cables, pulleys and winches. The method is primarily used for slender, free-standing structures such as chimneys, towers, masts or wall panels. In practice, cable demolition <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cable-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19799","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Cable Demolition Method for Chimneys &amp; Towers<\/title>\n<meta name=\"description\" content=\"Understand cable demolition as controlled structural pull-down using cables &amp; winches \u27a4 safe direction, low vibration.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cable-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cable Demolition Method for Chimneys &amp; Towers\" \/>\n<meta property=\"og:description\" content=\"Understand cable demolition as controlled structural pull-down using cables &amp; winches \u27a4 safe direction, low vibration.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/cable-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-22T12:07:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-demolition\",\"name\":\"Cable Demolition Method for Chimneys & Towers\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-19T09:38:44+00:00\",\"dateModified\":\"2026-05-22T12:07:02+00:00\",\"description\":\"Understand cable demolition as controlled structural pull-down using cables & winches \u27a4 safe direction, low vibration.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cable-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Cable demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cable Demolition Method for Chimneys & Towers","description":"Understand cable demolition as controlled structural pull-down using cables & winches \u27a4 safe direction, low vibration.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/cable-demolition","og_locale":"en_US","og_type":"article","og_title":"Cable Demolition Method for Chimneys & Towers","og_description":"Understand cable demolition as controlled structural pull-down using cables & winches \u27a4 safe direction, low vibration.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/cable-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-22T12:07:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/cable-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/cable-demolition","name":"Cable Demolition Method for Chimneys & Towers","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-19T09:38:44+00:00","dateModified":"2026-05-22T12:07:02+00:00","description":"Understand cable demolition as controlled structural pull-down using cables & winches \u27a4 safe direction, low vibration.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/cable-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/cable-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/cable-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Cable demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19799","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19799"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19799\/revisions"}],"predecessor-version":[{"id":27703,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19799\/revisions\/27703"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19799"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}