{"id":19795,"date":"2025-12-18T11:59:16","date_gmt":"2025-12-18T10:59:16","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19795"},"modified":"2026-09-12T19:53:25","modified_gmt":"2026-09-12T17:53:25","slug":"bulk-material-pulverizer","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/bulk-material-pulverizer","title":{"rendered":"Bulk material pulverizer"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Bulk material pulverizers are machines or attachments that crush solid materials such as concrete, mortar residues, brick, natural stone, or metal-free fractions into free-flowing bulk material. In demolition, deconstruction, and mineral processing, they combine mechanical disintegration with targeted particle shaping and classification. In combination with concrete demolition shears, <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a><\/strong>, and steel shears, this produces reusable aggregates for further use as secondary raw material. For the workflow in concrete demolition this means: first loosen, then separate, finally pulverize &#8211; using <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> as the energy source and tools that fit the specific construction task and the material. When configured as a coordinated tool chain, pulverization creates <em>free-flowing<\/em> fractions that are easy to transport, stockpile, and feed into screening or further processing.<\/p>\n<h2>Definition: What is meant by a bulk material pulverizer?<\/h2>\n<p>A bulk material pulverizer is a comminution system that produces a largely <em>free-flowing<\/em> gradation from hard, brittle, or even tough solid matter. Unlike primary crushers for coarse crushing, the pulverizer focuses on generating finer particle sizes that are deliberately transferred into one or more screened fractions. In practice, two types are used: stationary or mobile processing units (e.g., impact or hammer principle) and hydraulic attachment pulverizers with jaws that separate reinforcing steel and fragment concrete into bulk material. In concrete demolition, the pulverizer complements concrete demolition shears (selective loosening and cracking of components) as well as stone and concrete splitters (low-stress breaking), by transforming pre-broken material into defined bulk material with a reproducible particle size distribution. Depending on the purity target, downstream magnets and air or density separation refine the output into <strong>recycled aggregates<\/strong> suitable for defined uses.<\/p>\n<h2>Operating principle and types<\/h2>\n<p>Depending on the design, bulk material pulverizers work with compressive and tensile stresses (jaw\/jaw-ring), impact loading (impact or hammer rotor), shear loading (cutting\/tearing), or friction loading (roller\/ring). Hydraulic attachment pulverizers usually employ two profiled crushing jaws with replaceable teeth and integrated steel cutters to cut out reinforcement and granulate concrete; stationary machines rely on rotor systems that meter energy into the particles. The goal is a defined particle shape, a narrow gradation band, and a purity level that enables reuse as aggregate. Practical features include quick-change tooth systems, hardfacing for high-wear zones, and gap adjustment that stabilizes the sieve curve over the service life.<\/p>\n<h2>Process chain in concrete demolition: from loosening to bulk material<\/h2>\n<p>An efficient demolition and processing chain follows a logical sequence. First, the component is made ready to loosen, for example with <strong>stone and concrete splitters<\/strong>, in order to introduce stresses without elevated vibration and to steer cracking in a targeted way. In the next step, concrete demolition shears and combination shears selectively detach components, open cross-sections, and perform a coarse separation of reinforcement. The bulk material pulverizer then takes over the secondary comminution: the concrete is fragmented into bulk material, reinforcement is removed by steel shears or integrated cutting blades, and screening classifies the material into fractions. Hydraulic power units provide the required flow and pressure, matched to tool size and throughput requirements. Documented material streams and on-site quality checks (e.g., spot sieve analyses and contamination counts) secure repeatable results and reduce rework.<\/p>\n<h2>Typical material flows and particle sizes<\/h2>\n<p>Bulk material from concrete and masonry is not homogeneous. Economical processing benefits from clearly structured material flows and defined target gradations.<\/p>\n<h3>Pre-crushing and separation<\/h3>\n<ul>\n<li>Pre-sorting on site (rebar, wood, plastics, cables\/lines) reduces contaminants.<\/li>\n<li>Magnetic separators remove reinforcement after crushing; steel shears cut overlong bars.<\/li>\n<li>Pre-screening relieves the pulverizer by discharging fines early.<\/li>\n<li>Clear stockpiling of like materials minimizes cross-contamination and stabilizes gradation.<\/li>\n<\/ul>\n<h3>Particle size range and quality targets<\/h3>\n<ul>\n<li>Fine fraction (0\/4 or 0\/8) for backfilling or as a subbase component.<\/li>\n<li>Medium fraction (4\/16, 8\/22) as base course material; with suitable quality, as aggregate in recycled concrete.<\/li>\n<li>Coarse fraction (16\/32 and larger) for frost protection and drainage layers after additional crushing.<\/li>\n<\/ul>\n<p>For subsequent use, particle shape, gradation bandwidth, purity (e.g., low mortar and adhesion content), and a reproducible sieve curve are decisive. The pulverizer influences these parameters via impact energy, gap setting, tooth geometry, and rotor speed. Where required, additional air or density separation reduces lightweight impurities to achieve higher-value applications.<\/p>\n<h3>Quality control and documentation<\/h3>\n<ul>\n<li>Spot sieve tests on representative samples verify target gradation and detect drift early.<\/li>\n<li>Visual contamination logs (bitumen, insulation residues, gypsum) support acceptance and pricing.<\/li>\n<li>Moisture monitoring stabilizes bulk density, flowability, and screening efficiency.<\/li>\n<\/ul>\n<h2>Selection criteria: How to properly size the bulk material pulverizer<\/h2>\n<p>Selection is based on the material, operating environment, and process objectives. The following points are central:<\/p>\n<ul>\n<li>Material properties: compressive strength, abrasiveness, rebar content, moisture.<\/li>\n<li>Target gradation: desired sieve curve and particle shape, purity requirements.<\/li>\n<li>Throughput and cadence: continuous or batch feeding, peak loads.<\/li>\n<li>Energy and hydraulic data: available system pressure, flow rate, power reserve of the hydraulic power unit.<\/li>\n<li>Tool compatibility: interaction with concrete demolition shears, combination shears, steel shears, and screening technology.<\/li>\n<li>Maintenance and wear: changeover times for teeth\/blades, availability of wear parts, overload protection.<\/li>\n<li>Site logistics: space requirements, dust and noise limits, material routes between loosening, separating, and pulverizing.<\/li>\n<li>Carrier fit for attachments: operating weight class, permissible oil return backpressure, and auxiliary circuit availability.<\/li>\n<li>Feed opening and cycle time: jaw opening versus maximum feed size, closing force, and strokes per minute.<\/li>\n<li>Transport and setup: transport dimensions, permissible axle loads, and setup time on constrained sites.<\/li>\n<\/ul>\n<h2>Applications in practice<\/h2>\n<h3>Concrete demolition and specialized deconstruction<\/h3>\n<p>In selective deconstruction, components are first opened with concrete demolition shears and reinforcement is exposed. Bulk material pulverizers turn this into defined gradations for transport or mobile processing. Vibration levels and downstream pulverizing performance of stone and concrete splitters depend on the selected setup and must be assessed for the project. Coordinated staging of loosening, separating, and pulverizing shortens cycle times and limits double handling.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>Strip-out work precedes pulverization: cables, lines, and non-mineral building materials are removed. Combination shears and multi cutters help separate mixed materials; steel shears take care of cutting profiles and reinforcement so the pulverizer can run without disruptions. This preconditioning stabilizes throughput and lowers wear rates on jaws and rotors.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>In rock, volumes are often loosened with stone splitting cylinders or non-explosive methods. For backfilling and temporary access roads, free-flowing material is needed. Pulverizers refine the pre-broken rock into suitable fractions; low-dust pre-loosening with splitting devices supports emission control in underground facilities. Matching the comminution principle to the petrography improves shape and minimizes flaky particles.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>When dressing natural stone, offcuts and trimmings are generated. Pulverizing produces defined aggregates that can be used as secondary raw material. Particle shape is deliberately influenced via roller or impact principles. Careful separation of overburden and inclusions keeps fractions clean and consistent.<\/p>\n<h3>Special applications<\/h3>\n<p>In vibration-sensitive environments, densely built neighborhoods, or contaminated structures, controlled methods are required. The combination of low-stress splitting, targeted separating, and subsequent pulverization limits noise and vibration. Tank cutters are used where metallic vessels must be segmented safely; the mineral portions are then pulverized. Encapsulated work areas with negative pressure further reduce dust spread when mandates require tight controls.<\/p>\n<h2>Factors influencing quality and efficiency<\/h2>\n<p>The performance of a bulk material pulverizer depends on fine-tuning many details. A practice-oriented configuration improves quality and reduces costs.<\/p>\n<h3>Feeding and dosing<\/h3>\n<ul>\n<li>Consistent feed sizes improve particle shape and reduce oversize.<\/li>\n<li>Pre-screening relieves the crusher; fines do not need to be re-processed.<\/li>\n<li>Magnets and separators prevent tool damage from foreign objects.<\/li>\n<li>Load-sensing or automated feeders smooth spikes in throughput and stabilize energy input.<\/li>\n<\/ul>\n<h3>Tool geometry and settings<\/h3>\n<ul>\n<li>Jaw gap and tooth geometry control target gradation and degree of comminution.<\/li>\n<li>Rotor and cutting speeds balance energy input and wear.<\/li>\n<li>Replaceable teeth and blades allow rapid adaptation to material changes.<\/li>\n<li>Indexed tooth rotation and timely hardfacing keep the sieve curve stable over longer campaigns.<\/li>\n<\/ul>\n<h3>Emissions and occupational safety<\/h3>\n<ul>\n<li>Water mist or localized wetting reduces dust.<\/li>\n<li>Targeted exhaust-air management and enclosures lower noise and dust emissions.<\/li>\n<li>Splitting devices upstream reduce blows and vibration during pulverizing.<\/li>\n<li>Processes designed to minimize respirable crystalline silica and noise exposure protect personnel and comply with typical site requirements.<\/li>\n<\/ul>\n<h2>Maintenance, wear, and operation<\/h2>\n<p>Planned maintenance ensures availability. Regular inspections of jaws, teeth, bearings, and seals, adjusting gaps, and monitoring oil quality and hydraulic pressures are standard. A well-designed wear management strategy (change intervals, hardfacing, rotating the teeth) extends service life. For rotor systems, balancing, blow bar condition, and screen inserts are decisive. For attachments, matching with the hydraulic power unit (pressure, flow rate, return line) protects against thermal and mechanical overload. Predictive approaches using vibration, temperature, and pressure trend data help detect anomalies early and reduce unplanned downtime.<\/p>\n<ul>\n<li>Oil cleanliness management (filters, differential pressure checks) protects valves and actuators.<\/li>\n<li>Torque checks on structural fasteners after the first hours of operation and at defined intervals prevent looseness.<\/li>\n<li>Spare parts planning with wear kits on site shortens standstill times during peak workload.<\/li>\n<\/ul>\n<h2>Role of concrete demolition shears, stone and concrete splitters, and other tools<\/h2>\n<p>Concrete demolition shears take care of selective opening and exposing reinforcement &#8211; thus largely determining the quality of the feed for the pulverizer. <strong>Stone and concrete splitters<\/strong> deliver low-stress pre-broken pieces that granulate efficiently and generate less dust. Steel shears cut reinforcement to transportable lengths; combination shears and multi cutters support work with mixed materials. Hydraulic power units provide energy across the entire process, from loosening to fine comminution. The result is a coordinated tool chain in which the bulk material pulverizer is responsible for the final particle shape and purity level.<\/p>\n<h2>Sustainability and utilization<\/h2>\n<p>Quality-assured pulverization enables high reuse rates of mineral construction materials. The more defined the particle size distribution and the cleaner the fraction, the better bulk materials can be used as base course, backfill, or as aggregate for recycled concrete. Energy use, wear, transport, reprocessing and material recovery for the selected tool chain must be recorded for the specific process. Any carbon-footprint or broader environmental comparison requires defined system boundaries and a documented baseline.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Bulk material pulverizers are machines or attachments that crush solid materials such as concrete, mortar residues, brick, natural stone, or metal-free fractions into free-flowing bulk material. In demolition, deconstruction, and mineral processing, they combine mechanical disintegration with targeted particle shaping and classification. In combination with concrete demolition shears, stone and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/bulk-material-pulverizer\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19795","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bulk Material Pulverizer for Concrete Demolition<\/title>\n<meta name=\"description\" content=\"Turn demolition concrete into clean, reusable aggregate with a bulk material pulverizer \u27a4 precise gradation, low dust.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/bulk-material-pulverizer\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bulk Material Pulverizer for Concrete Demolition\" \/>\n<meta property=\"og:description\" content=\"Turn demolition concrete into clean, reusable aggregate with a bulk material pulverizer \u27a4 precise gradation, low dust.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/bulk-material-pulverizer\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:25+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bulk-material-pulverizer\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bulk-material-pulverizer\",\"name\":\"Bulk Material Pulverizer for Concrete Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-18T10:59:16+00:00\",\"dateModified\":\"2026-09-12T17:53:25+00:00\",\"description\":\"Turn demolition concrete into clean, reusable aggregate with a bulk material pulverizer \u27a4 precise gradation, low dust.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bulk-material-pulverizer#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bulk-material-pulverizer\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bulk-material-pulverizer#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Bulk material pulverizer\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bulk Material Pulverizer for Concrete Demolition","description":"Turn demolition concrete into clean, reusable aggregate with a bulk material pulverizer \u27a4 precise gradation, low dust.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/bulk-material-pulverizer","og_locale":"en_US","og_type":"article","og_title":"Bulk Material Pulverizer for Concrete Demolition","og_description":"Turn demolition concrete into clean, reusable aggregate with a bulk material pulverizer \u27a4 precise gradation, low dust.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/bulk-material-pulverizer","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:25+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/bulk-material-pulverizer","url":"https:\/\/www.darda.de\/en\/knowledge\/bulk-material-pulverizer","name":"Bulk Material Pulverizer for Concrete Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-18T10:59:16+00:00","dateModified":"2026-09-12T17:53:25+00:00","description":"Turn demolition concrete into clean, reusable aggregate with a bulk material pulverizer \u27a4 precise gradation, low dust.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/bulk-material-pulverizer#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/bulk-material-pulverizer"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/bulk-material-pulverizer#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Bulk material pulverizer"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19795","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19795"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19795\/revisions"}],"predecessor-version":[{"id":29130,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19795\/revisions\/29130"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19795"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}