{"id":19783,"date":"2025-12-17T11:12:46","date_gmt":"2025-12-17T10:12:46","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19783"},"modified":"2026-09-12T19:53:24","modified_gmt":"2026-09-12T17:53:24","slug":"sleeper-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/sleeper-demolition","title":{"rendered":"Sleeper demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Sleeper demolition refers to the orderly deconstruction of railway sleepers made of concrete, wood, or steel in the context of track upgrades, track deconstruction, or rehabilitation works. The focus is on the controlled, lowest-possible-emission separation, size reduction, and extraction of components from the ballast bed or from rigid (slab) track systems. A proper approach enables short possession windows, high occupational safety, and clean, single-grade material recovery. Techniques such as hydraulic splitting and controlled crushing with <strong>concrete pulverizers<\/strong>, or the use of <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/em>, support these goals in various application scenarios &#8211; from inner-city lines and bridges to tunnels.<\/p>\n<p>In technical practice, sleeper demolition is also referred to as the dismantling of railroad ties. The discipline focuses on <strong>low-vibration, low-dust, and low-noise<\/strong> techniques that maintain track integrity in adjacent areas while ensuring <em>traceable material flows<\/em> into qualified recycling streams.<\/p>\n<h2>Definition: What is meant by sleeper demolition?<\/h2>\n<p>Sleeper demolition comprises all measures required for the dismantling and size reduction of railway sleepers &#8211; including releasing fastenings at rails and fittings, exposing sleepers from ballast or in-situ concrete, dimensioned pre-crushing, and separating reinforcement, connectors, and other attachments. The goal is controlled, safe, and environmentally compliant removal followed by material recycling or disposal. Depending on the track construction (ballasted track, slab track, turnout areas), different hydraulic tools and methods are used that are selected according to structural, time, and logistical constraints.<\/p>\n<p>Deliverables typically include <strong>complete clearance of sleeper bays<\/strong>, separation by material type, and documentation that proves compliant handling. Interfaces to rail removal and ballast processing are defined project-specifically to avoid rework and double handling.<\/p>\n<h2>Typical challenges in sleeper demolition<\/h2>\n<p>Sleepers are compact, often reinforced elements embedded in a highly stressed environment. Challenges arise from tight possession windows, limited workspaces, live overhead lines, vibration and noise limits, the separation of reinforcement and inserts, as well as safe handling of contaminated materials (e.g., creosote-impregnated old wooden sleepers). Methods that work with low vibration, precision, and low dust &#8211; such as hydraulic splitting or targeted crushing with concrete pulverizers &#8211; support controlled deconstruction and reduce risks in the track area.<\/p>\n<ul>\n<li><strong>Access and logistics:<\/strong> Constrained approaches in stations, bridges, or tunnels require compact equipment and preplanned material routes.<\/li>\n<li><strong>Variable sleeper conditions:<\/strong> Age, prestressing, and embedded components demand adaptable tooling and cutting sequences.<\/li>\n<li><strong>Third-party assets:<\/strong> Signal cables, drainage, and utilities necessitate prior locating and protective measures.<\/li>\n<li><strong>Environmental constraints:<\/strong> Strict limits for noise, dust, and vibration call for water suppression, extraction, and monitoring.<\/li>\n<\/ul>\n<h2>Locations of use and relation to deconstruction disciplines<\/h2>\n<p>Sleeper demolition occurs in various constellations and overlaps professionally with <strong>concrete demolition and special deconstruction<\/strong>, <strong>strip-out and cutting<\/strong>, and &#8211; when working in tunnels &#8211; with <strong>rock excavation and tunnel construction<\/strong>. In turnout fields, bridge areas, and stations, accessibility, load capacities, and protection of the surroundings are key criteria. Depending on the project phase (partial deconstruction, complete dismantling, conversion under operation), tools such as <em>concrete pulverizers<\/em>, <em>stone and concrete splitting devices<\/em>, <em>combination shears<\/em>, <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">multi cutters<\/a><\/em>, and <em>steel shears<\/em> are deployed in coordinated equipment combinations. <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Mobile hydraulic power units<\/a><\/em> provide reliable power for mobile on-site applications.<\/p>\n<p>On bridges and in sensitive structures, <strong>load assessments and protection concepts<\/strong> for decks and bearings are indispensable. In stations and urban corridors, phased works and night-time possessions are coordinated with operations and neighbor management to maintain service and minimize impacts.<\/p>\n<h3>Concrete sleepers, wooden sleepers, steel sleepers: deconstruction by material<\/h3>\n<ul>\n<li>Concrete sleepers: Pre-fracturing by hydraulic splitting or breaking; subsequent separation of reinforcement with <strong>concrete pulverizers<\/strong> or <em>combination shears<\/em>.<\/li>\n<li>Wooden sleepers: Releasing the fastenings, safe handling of potentially contaminated old timber; cutting and bundling for transport and disposal.<\/li>\n<li>Steel sleepers: Cutting profiles and attachments with <em>steel shears<\/em> or <em>multi cutters<\/em>; guided cuts to ensure clean separation by material type.<\/li>\n<\/ul>\n<ul>\n<li><strong>Special cases:<\/strong> Prestressed concrete sleepers in slab track require defined crack initiation and fragment control. Extended sleepers in turnout areas and cable duct crossings call for adapted cutting and lifting strategies.<\/li>\n<\/ul>\n<h2>Methods and technology in sleeper demolition<\/h2>\n<p>The choice of method depends on track form, component thickness, reinforcement content, access, and permissible emission limits. Hydraulic methods allow controlled force application, reduce secondary damage to neighboring components, and can be operated safely in confined spaces.<\/p>\n<ul>\n<li><strong>Selection criteria:<\/strong> geometry and reinforcement, distance to sensitive assets, allowable vibration and noise, dust management options, carrier availability, and <em>target fragment size<\/em> for downstream logistics.<\/li>\n<\/ul>\n<h3>Hydraulic splitting of concrete sleepers<\/h3>\n<p>Using <strong>stone and concrete splitting devices<\/strong> or <em>splitting cylinders<\/em>, controlled splitting forces are applied into predrilled core holes. The sleeper fractures along defined lines without percussive vibrations. Advantages include low noise and dust generation, precise fragment sizes, and minimal impact on adjacent track components &#8211; especially relevant in tunnels or during night work.<\/p>\n<ul>\n<li>Ideal where <strong>vibration limits are tight<\/strong> or where adjacent structures must stay intact.<\/li>\n<li>Allows <em>predictable crack paths<\/em> and repeatable outcomes, supporting high productivity in short possessions.<\/li>\n<\/ul>\n<h3>Crushing and separating with concrete pulverizers<\/h3>\n<p><strong>Concrete pulverizers<\/strong> grip and break the concrete structure, expose reinforcement, and enable its separation. In practice, they are used to reduce sleepers to transportable pieces, remove anchors and inserts, and release fastenings at turnouts and sleeper seats. Targeted force transmission supports controlled demolition with good visibility of the work area.<\/p>\n<p>Interchangeable jaws and integrated rebar shear zones accelerate <strong>selective separation<\/strong>. In combination with magnets or manual picking, clean fractions are achieved with minimal rehandling.<\/p>\n<h3>Combination shears, multi cutters, and steel shears in track deconstruction<\/h3>\n<p><em>Combination shears<\/em> combine crushing and cutting functions for mixed tasks. <em>Multi cutters<\/em> offer flexible cutting options, for example when separating cables, retaining straps, and thin-walled metal parts. <em>Steel shears<\/em> cut more massive metal components such as sleeper shoes, rail joints, or heavier inserts. These tools support clean separation by material type and accelerate loading.<\/p>\n<ul>\n<li>Carrier-neutral, compact tool designs facilitate use on small excavators or dedicated tool carriers where access is restricted.<\/li>\n<\/ul>\n<h3>Hydraulic power packs: power supply under confined conditions<\/h3>\n<p><em>Hydraulic power packs<\/em> deliver the required power for mobile tools, even where electrical supply or large carrier machines are not available. Their compact design facilitates use near tracks and in tunnels when short setup times and high availability are required.<\/p>\n<ul>\n<li>Features such as <strong>remote start-stop<\/strong>, low-noise housings, and electric-drive options support work under stringent urban and tunnel constraints.<\/li>\n<\/ul>\n<h2>Process: From removal to recycling<\/h2>\n<p>A structured process minimizes risks, shortens possession windows, and improves the recycling rate. The following framework has proven itself in practice:<\/p>\n<ol>\n<li>Survey: Material type, track form (ballasted track\/slab track), reinforcement content, fastenings, signaling and safety systems.<\/li>\n<li>Exposure: Remove ballast or work down concrete overlays; safely segregate cables and installations.<\/li>\n<li>Release connections: Selectively separate fittings, screws, clamps, inserts, and connectors.<\/li>\n<li>Pre-crushing: Hydraulic splitting or crushing with <strong>concrete pulverizers<\/strong> to produce manageable pieces.<\/li>\n<li>Metal separation: Separate reinforcement, connectors, and metal parts with <em>steel shears<\/em> or <em>combination shears<\/em>.<\/li>\n<li>Extraction and loading: Organized logistics with coordinated gripping and lifting solutions.<\/li>\n<li>Transport and recycling: Concrete rubble into the mineral stream, steel into the metal cycle; dispose of wooden sleepers according to classification.<\/li>\n<li>Documentation: Quantity recording, evidence, photo documentation, and handover protocols.<\/li>\n<\/ol>\n<p>Depending on project and authority requirements, the workflow is supplemented by <strong>permit management<\/strong>, possession planning, and digital material tracking that links <em>weigh tickets<\/em> to batch and container IDs.<\/p>\n<h3>Preparation and possession window management<\/h3>\n<p>Work windows in railway operations are tight. A robust equipment concept with clear interfaces, prepared drilling templates, spare tools, and secured power supply via <em>hydraulic power packs<\/em> reduces downtime. Briefings, escape routes, and material logistics are defined before work begins.<\/p>\n<ul>\n<li>Pre-assembled tool sets and <strong>swap-out consumables<\/strong> minimize changeover times.<\/li>\n<li>Contingency buffers for drilling and cutting tasks are built into shift plans.<\/li>\n<\/ul>\n<h3>Selective deconstruction and sorting<\/h3>\n<p>Early separation of concrete, steel, and wood prevents mixing. <strong>Concrete pulverizers<\/strong> and <em>combination shears<\/em> help to expose reinforcement cleanly. Single-grade fractions simplify recycling and reduce disposal costs.<\/p>\n<ul>\n<li>Containers and stockpiles are <strong>clearly labeled<\/strong> and protected against cross-contamination.<\/li>\n<li>Sampling and classification of timber and fines are conducted where specifications require evidence-based routing.<\/li>\n<\/ul>\n<h2>Special conditions in tunnels and urban areas<\/h2>\n<p>In tunnels and densely populated areas, vibration, noise, and dust limits are strict. Low-vibration methods such as hydraulic splitting and controlled, force-guided crushing with <strong>concrete pulverizers<\/strong> are advantageous. Coordinated extraction, water suppression, and ventilation complement the concept. Confined spaces favor compact tool units with <em>hydraulic power packs<\/em> that can be positioned flexibly.<\/p>\n<ul>\n<li>Air quality is managed with <strong>direct capture<\/strong> and verified by particulate and airflow monitoring.<\/li>\n<li>Acoustic screens and scheduling reduce nuisance during night work in residential zones.<\/li>\n<\/ul>\n<h2>Occupational safety and health protection<\/h2>\n<p>Hydraulic systems generate high forces. Safe working includes checking pressure lines, maintaining distances to hazard zones, protection from pinch points, and wearing suitable personal protective equipment. Wooden sleepers may contain impregnations that require special handling and disposal. Notes on hazardous substances and disposal routes follow applicable regulations and must be checked project-specifically. The information provided here is general and non-binding.<\/p>\n<ul>\n<li>Track protection arrangements, isolation of overhead lines where applicable, and <strong>tool lockout<\/strong> procedures are established before work starts.<\/li>\n<li>Dust control and respiratory protection address mineral dust exposure during crushing and splitting.<\/li>\n<li>Ergonomic handling and anti-vibration measures protect against hand-arm vibration and strain injuries.<\/li>\n<\/ul>\n<h2>Sustainability, recycling, and documentation<\/h2>\n<p>A key quality metric in sleeper demolition is the recycling rate. Concrete sleepers are processed into qualified aggregates, and metal portions are returned to the cycle. Cleanly separated fractions support high-value recovery routes. Complete documentation &#8211; from quantity recording and weigh tickets to recycling certificates &#8211; creates transparency for clients and authorities.<\/p>\n<ul>\n<li>Project KPIs include <strong>recycling rate<\/strong>, transport distances, and estimated CO2e from equipment and logistics.<\/li>\n<li>Designing for separation and minimizing breakage losses improve circular outcomes and reduce costs.<\/li>\n<\/ul>\n<h2>Planning and equipment combinations for efficient sleeper demolition<\/h2>\n<p>The combination of <strong>stone and concrete splitting devices<\/strong> for controlled pre-crushing and <strong>concrete pulverizers<\/strong> for exposing and separating reinforcement enables a quiet and precise approach. In addition &#8211; depending on findings &#8211; <em>combination shears<\/em>, <em>multi cutters<\/em>, and <em>steel shears<\/em> are used. <em>Hydraulic power packs<\/em> ensure the power supply, especially where only short access times and confined spaces are available. In this way, sleeper demolition becomes a plannable, low-emission work step within the overall track deconstruction project.<\/p>\n<p>Well-matched tool configurations, defined cut and split sequences, and <strong>clear acceptance criteria<\/strong> for fragment sizes and cleanliness streamline downstream transport and recycling, delivering predictable performance in possession-critical environments.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Sleeper demolition refers to the orderly deconstruction of railway sleepers made of concrete, wood, or steel in the context of track upgrades, track deconstruction, or rehabilitation works. The focus is on the controlled, lowest-possible-emission separation, size reduction, and extraction of components from the ballast bed or from rigid (slab) track <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sleeper-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19783","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Railway Sleeper Demolition - Methods &amp; Tools<\/title>\n<meta name=\"description\" content=\"Railway sleeper demolition for upgrades \u2713 hydraulic splitting, concrete crushing, dust control and material separation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sleeper-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Railway Sleeper Demolition - Methods &amp; Tools\" \/>\n<meta property=\"og:description\" content=\"Railway sleeper demolition for upgrades \u2713 hydraulic splitting, concrete crushing, dust control and material separation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/sleeper-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:24+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sleeper-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sleeper-demolition\",\"name\":\"Railway Sleeper Demolition - Methods & Tools\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-17T10:12:46+00:00\",\"dateModified\":\"2026-09-12T17:53:24+00:00\",\"description\":\"Railway sleeper demolition for upgrades \u2713 hydraulic splitting, concrete crushing, dust control and material separation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sleeper-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sleeper-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sleeper-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Sleeper demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Railway Sleeper Demolition - Methods & Tools","description":"Railway sleeper demolition for upgrades \u2713 hydraulic splitting, concrete crushing, dust control and material separation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/sleeper-demolition","og_locale":"en_US","og_type":"article","og_title":"Railway Sleeper Demolition - Methods & Tools","og_description":"Railway sleeper demolition for upgrades \u2713 hydraulic splitting, concrete crushing, dust control and material separation.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/sleeper-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:24+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/sleeper-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/sleeper-demolition","name":"Railway Sleeper Demolition - Methods & Tools","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-17T10:12:46+00:00","dateModified":"2026-09-12T17:53:24+00:00","description":"Railway sleeper demolition for upgrades \u2713 hydraulic splitting, concrete crushing, dust control and material separation.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/sleeper-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/sleeper-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/sleeper-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Sleeper demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19783","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19783"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19783\/revisions"}],"predecessor-version":[{"id":27634,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19783\/revisions\/27634"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19783"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}