{"id":19776,"date":"2025-12-16T09:04:44","date_gmt":"2025-12-16T08:04:44","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19776"},"modified":"2026-05-20T11:46:02","modified_gmt":"2026-05-20T09:46:02","slug":"safety-net","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/safety-net","title":{"rendered":"Safety net"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A safety net is a technical protective measure used in demolition, deconstruction, natural stone extraction, and rock and tunnel construction to reliably retain falling parts, fragments, and debris. In conjunction with work equipment such as concrete demolition shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, multi cutters, or steel shears, a properly planned safety net creates a controlled working environment and reduces risks for people, machines, and surrounding areas. Correctly selected, installed, and inspected, it helps effectively limit emissions from falling components, uncontrolled ejection of fragments, and secondary damage. In practice, this contributes to <strong>process reliability<\/strong>, cleaner interfaces with adjacent trades, and fewer unplanned stoppages.<\/p>\n<h2>Definition: What is meant by a safety net?<\/h2>\n<p>A safety net is a planar, tensile net system for the <em>retention<\/em> of persons or objects. Depending on the application and energy input, it serves as a catch net, debris catch net, fragment protection net, scaffold safety net, rockfall net, or dust protection net. In practice, net-like fabrics made of textile fibers or wire rope with load-bearing border ropes, connection and guying points are used. The goal is the <strong>controlled absorption and dissipation<\/strong> of kinetic energy and limiting flight distances. Safety nets function through elastic deformation, defined slip at knots or clamps, and force distribution into reinforced border ropes and anchorages. Safety nets are not a standalone solution but part of an overall concept comprising hazard analysis, construction logistics, barriers, personnel-related protective measures, and suitable working methods.<\/p>\n<h2>Application areas and net types in the construction and deconstruction context<\/h2>\n<p>Different net types are used depending on the task. In deconstruction with concrete demolition shears or hydraulic splitters for stone and concrete, debris catch and fragment protection nets are paramount, while in rock excavation and tunnel construction, rockfall and slope stabilization nets dominate. In building gutting, scaffold and dust protection nets help encapsulate work areas and protect the surroundings. Selection criteria include, among others, the mass and shape of expected fragments, drop heights, working distances, energy absorption capacity, mesh size, fire and weather resistance, as well as fastening and substructure.<\/p>\n<ul>\n<li><strong>Catch and debris nets<\/strong> for vertical drops and controlled chutes.<\/li>\n<li><strong>Fragment protection nets<\/strong> with tight mesh for spalls and fine debris.<\/li>\n<li><strong>Rockfall and wire rope nets<\/strong> with high energy absorption for geology-driven hazards.<\/li>\n<li><strong>Scaffold and dust protection nets<\/strong> for enclosure, shielding, and emission control.<\/li>\n<\/ul>\n<h2>Safety nets in combination with concrete demolition shears and stone and concrete splitters<\/h2>\n<p>Mechanical separation of concrete or natural stone produces fracture edges, cone breakouts, and small to medium-sized spalls. Despite controlled working methods, <strong>impact and fling motions<\/strong> can occur, especially when biting in with concrete demolition shears or when controlled splitting of a borehole crack with hydraulic splitters is performed. Safety nets act here as a spatial barrier and define safe zones. They are positioned to cover the main flight directions (generally tangential to the work site and in the fall direction). In confined environments, such as during building gutting, nets are additionally used as room dividers to separate traffic routes and sensitive areas.<\/p>\n<ul>\n<li>Provide sufficient <strong>standoff distance<\/strong> to allow elastic deformation without contact with hazards.<\/li>\n<li>Close <strong>edge gaps<\/strong> at floors, walls, and penetrations with overlaps and secondary lashing.<\/li>\n<li>Coordinate <em>tool approach angles<\/em> and cut sequences with the net concept to minimize ejection vectors.<\/li>\n<\/ul>\n<h2>Planning, sizing, and selection criteria<\/h2>\n<p>The performance of a safety net results from the interplay of fabric, border ropes, anchorage points, and substructure. The basis is a hazard analysis that considers material, component geometry, working method, potential fragment sizes and velocities, as well as environmental conditions. Dimensioning is verified through type testing, manufacturer data, and project-specific checks with defined safety factors.<\/p>\n<h3>Mesh size and energy absorption<\/h3>\n<p>Mesh size is determined by the smallest critical item to be retained. For fragment protection, tighter meshes and textile fabrics are chosen; for debris and rockfall retention, high-strength wire or combination nets are used. The energy absorption capacity must match the potential kinetic energy; for greater drop heights or larger masses, multi-layer systems or pre-tensioning are advisable. Aging, UV exposure, and corrosion reduce residual capacity and must be factored into selection and inspection intervals.<\/p>\n<h3>Fastening, border ropes, and load paths<\/h3>\n<p>The <strong>load paths<\/strong> from the net into the structure are decisive. Border ropes, knot connections, and anchorage points must match one another. Fastening is carried out on load-bearing structural elements (e.g., load-bearing columns, temporary steel frames, or rock anchors). Overlaps and lap joints avoid openings. Where nets are mounted on scaffolds, permissible additional loads must be observed.<\/p>\n<ul>\n<li>Ensure <em>edge distances<\/em> and embedment depths for anchors according to the substrate.<\/li>\n<li>Use <strong>anti-chafe measures<\/strong> at sharp edges and contact points to prevent cutting.<\/li>\n<li>Provide redundancy where feasible (secondary lashings, backup connectors) for critical edges.<\/li>\n<\/ul>\n<h3>Weather, chemical, and fire protection aspects<\/h3>\n<p>UV radiation, moisture, temperature, and chemical exposure influence service life. Textile nets require UV-stabilized fibers, wire nets require corrosion protection. In areas with sparks or thermal work, flame-retardant grades or coverings must be provided. Regular visual and functional inspection is mandatory. Proper storage in dry, shaded conditions and the use of identifiable tags support lifecycle management.<\/p>\n<h3>Visibility, dust, and acoustics<\/h3>\n<p>Safety nets can combine visual screening and dust reduction, for example through additional fabric inserts. Air permeability should be selected so that dust is slowed while ventilation is not unnecessarily restricted. In noise-sensitive areas, sound-absorbing net-tarp combinations can contribute. High-contrast colors improve visibility at access points and along walkways.<\/p>\n<h2>Installation, inspection, and maintenance<\/h2>\n<p>Before installation, nets and connectors are inspected and damaged components sorted out. Erection follows an installation plan with details on net type, dimensions, overlaps, anchorage points, retaining means, and rescue or recovery routes. After installation, acceptance with documentation takes place. During use, visual inspections are provided before work begins, after load events, and with weather changes. Net areas with cuts, widened meshes, loosened knots, or corrosion are repaired or replaced.<\/p>\n<ul>\n<li><strong>Acceptance checklist<\/strong>: correct type and size, identification and marking, tensioning and sag, overlaps, anchors and torque, rescue concept availability.<\/li>\n<li><strong>In-service checks<\/strong>: connector integrity, abrasion points, contamination that adds weight, and any geometric changes due to shifting.<\/li>\n<\/ul>\n<h2>Legal and organizational framework<\/h2>\n<p>Safety nets are planned, installed, and operated according to recognized rules of technology. A careful hazard analysis, selection of appropriate protection levels, and qualified personnel for installation and inspection are decisive. Requirements for load-bearing capacity, energy absorption, marking, inspection intervals, and documentation obligations must be observed. Information in operating manuals of the work equipment used (e.g., concrete demolition shears or hydraulic splitters for stone and concrete) must be taken into account, particularly regarding working distances, jaw pressure, splitting force, and permissible workpiece sizes. Legal notes are always to be understood as general and do not replace a case-by-case assessment. Responsibilities for planning, execution, inspection, and approval must be assigned and recorded.<\/p>\n<h2>Application areas: from building gutting to tunnel construction<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>In selective demolition, debris catch nets help define controlled drop zones. When reducing the size of concrete elements with concrete demolition shears, net curtains are used to limit the flight distances of fragments and provide path protection. In vertical demolitions, horizontal catch nets protect lower levels. For overhead work, progressive dismantling with temporary net repositioning maintains consistent protection.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>In interior demolition, nets act as room closures to secure stairwells, corridors, and access points against debris and fragments. When cutting concrete and steel components with Multi Cutters or steel shears, nets prevent cut pieces from sliding off or swinging uncontrollably. Coordinated enclosure concepts reduce dust migration and protect building fabric earmarked for reuse.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Rockfall nets and wire rope systems retain breakouts that can occur when rock is loosened or during tunnel heading. In work areas with hydraulic splitters for stone and concrete, they stabilize edge zones and catch unforeseen spalling. Temporary meshing immediately after advance limits exposure time before permanent lining or support is installed.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>During the extraction and benching of natural stone blocks, nets serve edge and base stabilization. They prevent smaller wedges or scales from being pushed out of the face when setting splitting cylinders and entering traffic areas. Adapted mesh sizes and robust border ropes enable repeated repositioning across benches.<\/p>\n<h3>Special use<\/h3>\n<p>In sensitive environments, such as industrial plants or city centers, nets limit protected areas for logistics, create clear separation between working and occupancy zones, and complement barriers, padding, and coverings. Signaling and access control are integrated to maintain route safety during ongoing operations.<\/p>\n<h2>Practical planning steps<\/h2>\n<ol>\n<li>Hazard analysis: material, component geometry, load assumptions, drop heights, movement directions.<\/li>\n<li>Net concept: net type, mesh size, energy absorption, multi-layering, overlaps.<\/li>\n<li>Load-bearing structure: define anchorage points, verify load paths, clarify permissible additional loads.<\/li>\n<li>Installation planning: sequence, access, temporary scaffolds, rescue and recovery concept.<\/li>\n<li>Acceptance and marking: documentation, visual inspection, release of work areas.<\/li>\n<li>Operation: regular inspections, adjustments for changed working methods, weather management.<\/li>\n<li>Deconstruction: gentle disassembly, inspection for reusability, proper storage.<\/li>\n<\/ol>\n<p><strong>Tip<\/strong>: Include mock-up trials for critical interfaces and define criteria for temporary removal and immediate reinstatement during sequential works.<\/p>\n<h2>Avoid common mistakes<\/h2>\n<ul>\n<li>Insufficient overlaps or open joints between net panels.<\/li>\n<li>Fastening to non-load-bearing components or unsuitable scaffold bays.<\/li>\n<li>Incorrect mesh size for fragment protection, allowing small fragments to pass through.<\/li>\n<li>Underestimated energy inputs during work with high splitting force or large components.<\/li>\n<li>Lack of net adjustment to changing working directions when using concrete demolition shears.<\/li>\n<li>Neglected inspection and maintenance intervals, especially after load events and storms.<\/li>\n<li>Unprotected contact with sharp edges leading to localized cutting or tearing.<\/li>\n<li>Anchorage verification limited to single-point checks without considering system load paths.<\/li>\n<li>Excessive slack causing rebound into hazard zones or contact with rotating parts.<\/li>\n<\/ul>\n<h2>Materials and constructions<\/h2>\n<p>Textile safety nets (e.g., polyamide) are flexible, lightweight, and suitable for fragment and personnel protection with low to medium energy absorption. Wire rope and steel wire nets offer high energy absorption for rockfall and debris retention. Combination solutions pair fine retention by textiles with wire-rope-based primary security. Border ropes, thimbles, shackles, and connectors must be coordinated appropriately by material and system. Knotless textile constructions reduce snagging risk, while defined elongation characteristics support predictable energy management and clearance requirements.<\/p>\n<h2>Interfaces with other protective measures<\/h2>\n<p>Safety nets are part of a <strong>multi-layered safety concept<\/strong>. In combination with barriers, protective scaffolds, coverings, support blocks, padding, and water mist systems (dust suppression), a coordinated system is created. For work with concrete demolition shears and hydraulic splitters for stone and concrete, defined drop zones, restricted areas, signaling, and clear team communication rules are also required. Overly closed enclosures should be avoided where ventilation and visibility are safety-relevant.<\/p>\n<h2>Documentation and evidence<\/h2>\n<p>To ensure traceability, installation plans, inspection certificates, manufacturer information, approvals, and inspection results are kept. Events such as load events, damage, and repairs are documented. In connection with the working methods of Darda GmbH (e.g., use of concrete demolition shears or hydraulic splitters for stone and concrete), a coordinated work instruction is recommended that brings together the net concept, working distances, tool guidance, and retreat lines. Photographic documentation of set-up and acceptance points, unique ID tagging of nets and connectors, and recorded handovers improve auditability and fleet management.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A safety net is a technical protective measure used in demolition, deconstruction, natural stone extraction, and rock and tunnel construction to reliably retain falling parts, fragments, and debris. In conjunction with work equipment such as concrete demolition shears, hydraulic rock and concrete splitters, multi cutters, or steel shears, a properly <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/safety-net\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19776","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Safety Net for Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Practical guide to safety nets for construction and demolition \u2713 contain debris, protect crews, plan and inspect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/safety-net\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Safety Net for Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Practical guide to safety nets for construction and demolition \u2713 contain debris, protect crews, plan and inspect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/safety-net\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-20T09:46:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/safety-net\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/safety-net\",\"name\":\"Safety Net for Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-16T08:04:44+00:00\",\"dateModified\":\"2026-05-20T09:46:02+00:00\",\"description\":\"Practical guide to safety nets for construction and demolition \u2713 contain debris, protect crews, plan and inspect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/safety-net#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/safety-net\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/safety-net#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Safety net\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Safety Net for Construction & Demolition","description":"Practical guide to safety nets for construction and demolition \u2713 contain debris, protect crews, plan and inspect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/safety-net","og_locale":"en_US","og_type":"article","og_title":"Safety Net for Construction & Demolition","og_description":"Practical guide to safety nets for construction and demolition \u2713 contain debris, protect crews, plan and inspect.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/safety-net","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-20T09:46:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/safety-net","url":"https:\/\/www.darda.de\/en\/knowledge\/safety-net","name":"Safety Net for Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-16T08:04:44+00:00","dateModified":"2026-05-20T09:46:02+00:00","description":"Practical guide to safety nets for construction and demolition \u2713 contain debris, protect crews, plan and inspect.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/safety-net#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/safety-net"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/safety-net#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Safety net"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19776","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19776"}],"version-history":[{"count":3,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19776\/revisions"}],"predecessor-version":[{"id":27618,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19776\/revisions\/27618"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19776"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}