{"id":19774,"date":"2025-12-16T15:29:59","date_gmt":"2025-12-16T14:29:59","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19774"},"modified":"2026-05-20T08:15:04","modified_gmt":"2026-05-20T06:15:04","slug":"hard-hat","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/hard-hat","title":{"rendered":"Hard hat"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A hard hat is indispensable in professional demolition, rock and tunnel construction, and natural stone extraction. Where concrete demolition shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a>, steel shears, combination shears, tank cutters, and Multi Cutters are used, high energies, flying debris, vibrations, and moving loads converge. The <strong>head protection<\/strong> reduces the risk of severe head injuries from falling objects, flying fragments, and bumping into edges &#8211; such as during building gutting, concrete demolition and special demolition, or special operations. For the safe use of products from <strong>Darda GmbH<\/strong>, a suitable, correctly adjusted hard hat is therefore a central component of personal protective equipment and part of a coherent risk control strategy at the worksite.<\/p>\n<h2>Definition: What is meant by a hard hat?<\/h2>\n<p>A hard hat (also safety helmet, construction helmet, or industrial helmet) is personal protective equipment designed to protect the head from mechanical impacts such as blows, penetration, falling objects, and lateral loads. It consists of a load-bearing shell, an internal suspension with damping elements, and an optional chin strap and accessories such as visors or hearing protection. In the context of <em>concrete demolition and special demolition<\/em>, <em>building gutting and cutting<\/em>, <em>rock excavation and tunnel construction<\/em>, <em>natural stone extraction<\/em>, and <em>special operations<\/em> &#8211; that is, wherever products from <strong>Darda GmbH<\/strong> are used &#8211; the hard hat serves as the primary system against head injuries. Depending on task and environment, industrial designs with energy-absorbing harnesses or mountaineering-style helmets with fixed chin straps may be appropriate if permitted by the applicable rules. Legal requirements may vary by country; the applicable regulations and the findings of the hazard assessment are decisive.<\/p>\n<h2>Standards, markings, and performance requirements<\/h2>\n<p>Industrial hard hats in Europe are typically tested in accordance with EN 397. The standard specifies requirements for impact absorption, penetration resistance, flame resistance, and chin-strap behavior, among others. Optionally tested properties may include extended temperature ranges (e.g., -30 \u00b0C or +150 \u00b0C), lateral deformation (LD), or protection against molten metal splash (MM). For tasks with possible electrical hazards, special requirements apply (e.g., electrically insulating helmets per the relevant standards and national rules). For work with fall hazards, helmets with fixed chin straps are often preferred; attention must be paid to the intended use and the respective interpretation of the standard, as requirements may differ between industrial and mountaineering concepts.<\/p>\n<p><strong>Markings<\/strong> inside the hard hat provide information about the standard, manufacturer details, date of manufacture, and, where applicable, temperature or insulation ratings. Typical codes and a date wheel facilitate traceability. This information forms the basis for selection, use, and replacement &#8211; the manufacturer\u2019s instructions are always binding within the applicable regulations.<\/p>\n<h2>Hazards and typical application scenarios<\/h2>\n<p>When using concrete demolition shears, rock and concrete splitters, rock splitting cylinders, Multi Cutters, steel shears, and tank cutters, different hazards arise that necessitate the use of suitable hard hats:<\/p>\n<ul>\n<li>Falling concrete pieces or natural stone blocks during advancing or deconstruction processes<\/li>\n<li>Flying debris and spalling when cutting, crushing, splitting, and severing concrete and steel<\/li>\n<li>Rebound and uncontrolled component movements when releasing locked-in stresses<\/li>\n<li>Bumping into beams, formwork, pipelines, and edges in tight areas during building gutting<\/li>\n<li>Hydraulic hazards from bursting hoses, escaping fluid, or pressure spikes at power units<\/li>\n<li>Weather exposure, poor lighting, and noise, for example in tunnel tubes and caverns<\/li>\n<li>Secondary impacts from slips, trips, and falls with head contact on structural elements<\/li>\n<li>Sparks, radiant heat, and fumes during tank cutting and thermal separation processes<\/li>\n<\/ul>\n<h3>Relation to concrete demolition shears and rock and concrete splitters<\/h3>\n<p>When working with concrete demolition shears, brittle spalling and sharp-edged fragments can occur due to crushing and shearing processes. <strong>Rock and concrete splitters<\/strong> generate controlled crack formation and splitting, which can lead to the sudden release of stresses. In both cases, a correctly adjusted hard hat with reliable impact absorption and &#8211; when working with fall potential &#8211; a secure chin strap reduces risks from unpredictable fragment or component movements. Where face protection is required, certified visor systems that do not interfere with the suspension help maintain stability and a clear field of view.<\/p>\n<h2>Selection criteria: Which hard hat for which work?<\/h2>\n<p>Selection is based on the hazard assessment and the conditions at the place of use. The following criteria have proven themselves for applications with products from <strong>Darda GmbH<\/strong>:<\/p>\n<ul>\n<li>Work environment: concrete demolition\/building gutting (confined spaces, bump hazard), rock excavation\/tunnel construction (rockfall, moisture), natural stone extraction (weather, UV, temperature), special operations (special methods, limited escape routes)<\/li>\n<li>Mechanical protection: impact absorption, penetration resistance, and, if applicable, lateral deformation<\/li>\n<li>Temperature range: resistance to cold or heat for winter operations, tunnel atmospheres, or hot processes such as tank cutting<\/li>\n<li>Electrical influences: selection of suitable models where electrical hazards may be present<\/li>\n<li>Chin strap: secure hold when working at height, on scaffolds, in shafts, and in tunnels<\/li>\n<li>Compatibility: interfaces to hearing protection, visor, or respiratory protection; mounts for a headlamp<\/li>\n<li>Visibility: high-visibility colors or reflective elements for poor visibility conditions<\/li>\n<li>Material and comfort: weight, ventilation, sweatband, dial adjuster for fine tuning<\/li>\n<li>Sizing and adjustability: appropriate shell size and harness range to accommodate seasonal liners without compromising fit<\/li>\n<li>Labeling and documentation: clear markings for standards, options (e.g., LD, MM), and a legible date of manufacture for fleet management<\/li>\n<\/ul>\n<h2>Use, adjustment, and wearing comfort<\/h2>\n<p>A hard hat only protects reliably when it fits correctly. Adjust the interior so the shell sits evenly all around without pressure points. The dial adjuster secures the circumference; tighten the chin strap so that two fingers fit between the strap and chin. Accessories such as earmuffs, visor, or headlamp must engage securely and preserve the hard hat\u2019s balance. Liners should be thin so as not to impair the fit. In dust-intensive work &#8211; such as breaking concrete elements with concrete demolition shears &#8211; combining hard hat, eye, and respiratory protection is advisable; compatibility should be checked in advance. Bulky caps, thick hoods, or non-approved add-ons reduce protective performance and must be avoided.<\/p>\n<h3>Compatibility with hydraulic work equipment<\/h3>\n<p>Hydraulic power units and cutting tools generate noise, vibration, and sometimes oil mist. The hard hat should be compatible with earmuff hearing protection and, if necessary, a visor against flying debris. In constricted access &#8211; typical for building gutting &#8211; compact shells with good weight distribution help prevent snagging and reduce fatigue. Where team communication is essential, ensure that helmet-mounted hearing protection with communication functions integrates securely without compromising the suspension or chin strap.<\/p>\n<h2>Maintenance, inspection, and replacement<\/h2>\n<p>Regular checks extend service life and preserve protective performance. Principles include:<\/p>\n<ol>\n<li>Daily visual check: shell for cracks, dents, discoloration; suspension for brittle straps and broken links<\/li>\n<li>Function check: secure hold of the dial adjuster, chin strap, and mounts for accessories<\/li>\n<li>Cleaning: mild agents, lukewarm water; no solvents that could damage plastics<\/li>\n<li>Storage: dry, protected from UV and heat; do not store permanently in the vehicle interior<\/li>\n<li>Replacement: after severe impact, if damage is visible, or upon expiry of the recommended service life per the manufacturer<\/li>\n<li>Documentation: record inspections, incidents, and replacements for traceability and auditing<\/li>\n<li>Environmental effects: consider UV indicators and known exposures to oils, fuels, or chemicals when deciding on early replacement<\/li>\n<\/ol>\n<p>Stickers, drilled holes, or unauthorized modifications can impair protective function and must be avoided. For identification and documentation, use designated areas or neutral markings that do not attack the material. Service life depends on material, use intensity, and storage conditions; the date of manufacture is not automatically the expiry date &#8211; the manufacturer\u2019s guidance and the site\u2019s risk assessment apply.<\/p>\n<h2>Organizational aspects and instruction<\/h2>\n<p>The hard hat is part of a coordinated PPE concept. Responsibilities for selection, issuance, instruction, and oversight should be clearly defined. Training covers correct fit, combination with other PPE, and rules of conduct in hazardous areas &#8211; such as when working under suspended loads or when releasing prestressed concrete. Pictograms and clear on-site signals increase acceptance and reduce misuse. Regular toolbox talks and supervisory spot checks help maintain compliance and quickly address improper adjustments or damaged components.<\/p>\n<h2>Application examples from the Darda GmbH practice fields<\/h2>\n<p>In the application areas of <strong>Darda GmbH<\/strong>, typical requirements for the hard hat arise from the working methods and environmental conditions.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>When removing slabs or walls with concrete demolition shears and Multi Cutters, there is a risk from falling edges and spalling. A hard hat with reliable impact absorption, a secure chin strap, and compatible face protection reduces risk, especially during overhead work and when cutting rebar. Where crane support or suspended loads are involved, high-visibility colors and reflective elements improve detectability by machine operators.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>In existing structures, access routes are narrow, pipelines protrude, and lighting is often makeshift. The hard hat must be slim, absorb bump energy, and be capable of holding a headlamp. In combination with tank cutters, protective properties against heat and sparks must be considered via accessories (visors, drapes). In partially energized environments, only models permitted for electrical influence areas and compatible visor solutions may be used according to the hazard assessment.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>When widening, splitting, or loosening rock with rock and concrete splitters and rock splitting cylinders, rockfall and flying debris occur. A fixed chin strap, good visibility, and the ability to attach lamps are crucial. Moisture and cold argue for suitable materials and headbands that remain elastic at low temperatures. In low ceilings and narrow galleries, low-profile shells reduce snagging and improve freedom of movement.<\/p>\n<h2>Natural stone extraction<\/h2>\n<p>In quarries, UV exposure, wind, and temperature fluctuations prevail. A UV-resistant, well-ventilated hard hat with optional reflective elements increases safety and comfort. During cutting and splitting, a visor and hearing protection are useful additions to mitigate combined loads from noise and flying debris. In strong winds or on uneven terrain, a correctly tensioned chin strap helps maintain a secure fit.<\/p>\n<h2>Misapplications and common misconceptions<\/h2>\n<p>Bump caps are not a substitute for a hard hat. Wearing the hard hat backwards, drilling holes to mount accessories, or using thick caps under the shell reduces protective performance. After any strong impact, impairment must be assumed; the hard hat should be replaced. Even an apparently intact shell can age due to UV or chemicals &#8211; regular inspections are essential. Painting and uncontrolled use of solvents can embrittle plastics and are therefore not permitted unless explicitly allowed by the manufacturer.<\/p>\n<h2>Complementary PPE and interfaces<\/h2>\n<p>The hard hat works in conjunction with eye and face protection, hearing protection, and respiratory protection. When working on concrete with concrete demolition shears, safety glasses or a visor against fragments are advisable; when cutting metal, hearing protection and, where appropriate, a spark visor are sensible. With heavy dust &#8211; such as respirable quartz fine dust &#8211; suitable respiratory protection solutions must be combined without impairing the hard hat\u2019s fit. Interfaces such as helmet mounts, adapters for earmuffs, and lamp holders facilitate safe integration. Balanced setups &#8211; with even weight distribution front to back &#8211; reduce neck fatigue and help maintain the field of view.<\/p>\n<h2>Sustainability and disposal<\/h2>\n<p>Proper care extends service life. At the end of the life cycle, components can be separated and, where possible, recycled by material type. Proper disposal follows local requirements. Careful selection, storage, and cleaning not only ensure safety but also reduce resource consumption. Wherever feasible, choose replaceable suspensions and sweatbands to extend the useful life of the shell within the manufacturer\u2019s specified limits and the site\u2019s quality policy.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A hard hat is indispensable in professional demolition, rock and tunnel construction, and natural stone extraction. Where concrete demolition shears, rock and concrete splitters, hydraulic power units, steel shears, combination shears, tank cutters, and Multi Cutters are used, high energies, flying debris, vibrations, and moving loads converge. The head protection <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/hard-hat\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19774","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hard Hat Safety Helmet for Demolition &amp; Tunneling<\/title>\n<meta name=\"description\" content=\"Essential hard hat guide for construction, demolition, tunneling &amp; quarrying \u2713 Selection, fit, standards, and safe use.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/hard-hat\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hard Hat Safety Helmet for Demolition &amp; Tunneling\" \/>\n<meta property=\"og:description\" content=\"Essential hard hat guide for construction, demolition, tunneling &amp; quarrying \u2713 Selection, fit, standards, and safe use.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/hard-hat\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-20T06:15:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hard-hat\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hard-hat\",\"name\":\"Hard Hat Safety Helmet for Demolition & Tunneling\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-16T14:29:59+00:00\",\"dateModified\":\"2026-05-20T06:15:04+00:00\",\"description\":\"Essential hard hat guide for construction, demolition, tunneling & quarrying \u2713 Selection, fit, standards, and safe use.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hard-hat#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hard-hat\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hard-hat#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Hard hat\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hard Hat Safety Helmet for Demolition & Tunneling","description":"Essential hard hat guide for construction, demolition, tunneling & quarrying \u2713 Selection, fit, standards, and safe use.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/hard-hat","og_locale":"en_US","og_type":"article","og_title":"Hard Hat Safety Helmet for Demolition & Tunneling","og_description":"Essential hard hat guide for construction, demolition, tunneling & quarrying \u2713 Selection, fit, standards, and safe use.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/hard-hat","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-20T06:15:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/hard-hat","url":"https:\/\/www.darda.de\/en\/knowledge\/hard-hat","name":"Hard Hat Safety Helmet for Demolition & Tunneling","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-16T14:29:59+00:00","dateModified":"2026-05-20T06:15:04+00:00","description":"Essential hard hat guide for construction, demolition, tunneling & quarrying \u2713 Selection, fit, standards, and safe use.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/hard-hat#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/hard-hat"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/hard-hat#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Hard hat"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19774","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19774"}],"version-history":[{"count":3,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19774\/revisions"}],"predecessor-version":[{"id":27601,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19774\/revisions\/27601"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19774"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}