{"id":19773,"date":"2025-12-16T08:19:03","date_gmt":"2025-12-16T07:19:03","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19773"},"modified":"2026-05-20T09:52:03","modified_gmt":"2026-05-20T07:52:03","slug":"push-rod","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/push-rod","title":{"rendered":"Push rod"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The push rod is a central machine element for linear force transmission in hydraulic and mechanical tools for demolition, deconstruction, and rock cutting or processing. In tools from Darda GmbH such as concrete demolition shears, hydraulic wedge splitters for stone and concrete, combination shears, or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears for deconstruction tasks<\/a>, it transfers the force generated by the drive straight to jaws, wedges, or lever mechanisms. Its design affects the function, precision, and service life of the tools in concrete demolition, building gutting, rock excavation, tunnel construction, natural stone extraction, and special demolition.<\/p>\n<ul>\n<li><strong>Linear force path<\/strong>: Direct transmission from actuator to tool minimizes losses and enables precise, repeatable motion.<\/li>\n<li><strong>Guidance and stiffness<\/strong>: Geometric stiffness and accurate guidance suppress lateral loads that would otherwise degrade seals and bearings.<\/li>\n<li><strong>Interface functions<\/strong>: The push rod connects hydraulic or mechanical drives with levers, wedges, or jaws and harmonizes stroke, speed, and force in the kinematic chain.<\/li>\n<\/ul>\n<h2>Definition: What is meant by a push rod?<\/h2>\n<p>A <strong>push rod<\/strong> is a rod-shaped component that, as a <em>compression member<\/em>, transmits compressive-and often also tensile-forces linearly. It links the drive and the working member, for example the piston of a hydraulic cylinder with a lever kinematic chain or directly with a tool such as a shear or a wedge system. In hydraulic tools, the force-transmitting rod on the cylinder is often called the piston rod; depending on the design, this piston rod takes on the function of the push rod or acts on the tool via an additional actuating rod. Common to all variants: The push rod guides the motion and carries the loads without permanently deforming, buckling, or wearing excessively.<\/p>\n<p><em>Depending on application, synonyms such as actuating rod or link rod are used when the rod primarily connects elements within a lever train.<\/em><\/p>\n<h2>Design and operating principle of the push rod in hydraulic tools<\/h2>\n<p>The push rod forms the linear link between the drive and the working organ. It absorbs compressive and-if designed accordingly-tensile forces, is mounted on clevises, pins, or spherical bearings, and guides motion precisely along one axis. In hydraulic applications, hydraulic pressure drives the piston, which transfers its motion via the piston rod and, if applicable, subsequent push rods and levers directly to wedges, shear arms, or cutting heads. Decisive factors include a suitable diameter to prevent buckling, appropriate materials and surface finishes to resist wear, and play-free yet movable bearing points.<\/p>\n<p><strong>Key design levers:<\/strong><\/p>\n<ul>\n<li>Geometry and free length to achieve sufficient buckling safety in all lever positions.<\/li>\n<li>Material strength and heat treatment for static and cyclic loads with adequate safety.<\/li>\n<li>Surface finish and coating for low friction, seal compatibility, and corrosion protection.<\/li>\n<li>Bearing concept with controlled clearance, lubrication, and misalignment tolerance.<\/li>\n<\/ul>\n<h3>Push rod in the hydraulic cylinder<\/h3>\n<p>In many tools, the piston rod assumes the role of the push rod. It travels under hydraulic pressure, must be protected against lateral loads, and requires a high-quality surface so that seals and guides operate reliably. Where additional kinematic stages are needed, a separate actuating or push rod follows the piston rod to transfer the motion into the tool.<\/p>\n<p>For cylinder-integrated push rods, fine grinding or polishing with low roughness values supports seal life and reduces stick-slip. Coatings selected for the medium and environment minimize corrosion, while sufficient rigidity prevents micro-bending that would accelerate wear in guides and wipers.<\/p>\n<h3>Push rod in toggle and lever kinematics<\/h3>\n<p>Toggle mechanisms are common in concrete demolition shears and combination shears. Here, the push rod converts cylinder stroke into a rotational movement of the shear arms. The advantage: high end force in a compact design. The rod is designed primarily for compression, while the kinematics distribute forces to pins and bearings. Small angular errors are compensated via rod ends.<\/p>\n<p>The force-stroke characteristic in toggles is nonlinear: mechanical advantage rises markedly near the dead-center region. Design and verification therefore consider peak compressive stresses and the reduced effective free length at each lever angle to ensure stable operation across the full stroke.<\/p>\n<h2>Use in concrete demolition shears, hydraulic wedge splitters, and other tools<\/h2>\n<p>The role of the push rod varies by tool type but is always linked to reliable force transmission required for controlled demolition and precise splitting-from <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> to steel shears.<\/p>\n<ul>\n<li><strong>Concrete demolition shears<\/strong>: The push rod transfers the cylinder stroke to the shear arms. Through a toggle, the closing force rises sharply at the end position-critical for cutting concrete webs and downsizing reinforced members in concrete demolition and specialized deconstruction.<\/li>\n<li><strong>Hydraulic wedge splitters for stone and concrete<\/strong>: Depending on design, the push rod drives a wedge or pressure plate that introduces splitting forces into a borehole or defined groove. This initiates controlled cracks-for example in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>, or natural stone extraction.<\/li>\n<li><strong>Combination shears and multi cutters<\/strong>: The push rod works with levers and joints to provide cutting and pressing forces. Uniform force transmission improves cut quality and tool control during gutting and cutting operations.<\/li>\n<li><strong>Steel shears and tank cutters<\/strong>: High compressive forces act on tough materials. The push rod must safely absorb bending effects from off-center loading and provide high fatigue strength.<\/li>\n<\/ul>\n<p>Across all tool families, backlash-free kinematics, adequate reserve against peak loads, and robust surface protection are decisive for consistent field performance.<\/p>\n<h2>Design: forces, buckling, and service life<\/h2>\n<p>The sizing of the push rod determines safety and efficiency. In addition to the maximum operating pressure and the resulting piston force, geometry, bearing spacing, and service conditions are decisive.<\/p>\n<ul>\n<li><strong>Buckling<\/strong>: The slenderness ratio determines the critical compressive load. Shorter free lengths, larger diameters, and suitable boundary conditions (e.g., pin-pin) increase buckling safety. Edge regions such as holes or threads are buckling-critical and require careful detailing.<\/li>\n<li><strong>Strength<\/strong>: Fatigue-resistant cross-sections reduce damage under variable loads, vibrations, and shock loads-typical in demolition, deconstruction, and special demolition.<\/li>\n<li><strong>Straightness and guidance<\/strong>: Precisely manufactured rods with tight tolerances ensure smooth motion, avoid lateral loads on seals, and keep the kinematic chain free of play.<\/li>\n<li><strong>Temperature and media<\/strong>: Ambient temperature, moisture, dust, and corrosive agents influence material selection and corrosion protection-relevant on construction sites, in tunnels, and in stone quarries.<\/li>\n<\/ul>\n<p>Dynamic amplification from impacts, valve switching, or tool contact must be considered with appropriate safety factors. Transitional radii, gentle undercuts, and optimized thread runouts reduce stress concentrations and extend fatigue life.<\/p>\n<h3>Calculation notes<\/h3>\n<p>For preliminary design, piston forces are derived from the maximum operating pressure and transferred to the push rod. Safety factors account for load peaks, unfavorable lever positions, and tolerance stack-ups. The free buckling length results from the kinematics and bearing conditions; from this the required diameter follows. In detailed design, transitions to holes and clevises should have generous radii to avoid stress concentrations.<\/p>\n<ol>\n<li>Determine load cases: closing, opening, impact, and transient phases with the most adverse lever angle.<\/li>\n<li>Evaluate buckling for relevant end conditions and include geometric imperfections and expected wear-induced play.<\/li>\n<li>Verify fatigue using representative duty cycles and shock spectra; consider surface condition and residual stresses.<\/li>\n<li>Check bearing pressures at pins and bushings and confirm lubrication concept over the service interval.<\/li>\n<li>Validate manufacturability and inspection feasibility for straightness, concentricity, and critical surface zones.<\/li>\n<\/ol>\n<h2>Materials, surfaces, and manufacturing<\/h2>\n<p>Proven materials are quenched and tempered steels with high toughness and good surface hardness. Surfaces are finely ground or polished, often further enhanced (e.g., corrosion- and wear-resistant). Low roughness improves seal compatibility and reduces abrasion. Induction-hardened bearing points and hard-chromed or equivalently coated sliding areas increase tool life-especially in dusty environments in concrete demolition and natural stone extraction.<\/p>\n<h3>Surface finish and coatings<\/h3>\n<p>Depending on the environment, coating systems such as hard chrome, thermal spray, or duplex processes improve corrosion and wear resistance while maintaining seal-friendly roughness. Controlled Ra and Rz values, along with proper edge rounding at seal runouts, are essential for long-term tightness. Manufacturing routes prioritize straightness, concentricity, and defect-free surfaces in load-bearing and sealing zones.<\/p>\n<h2>Bearing points and connecting elements<\/h2>\n<p>Rod ends, clevises, and pins transfer forces from the push rod to shear arms, wedges, or cutting heads. For a play-free yet smooth-running kinematic chain, fits, envelope dimensions, and lubrication are crucial. Axial retainers and wear-resistant bushings limit play, facilitate maintenance, and protect the rod against notches and scoring. Under off-center loading, spherical bearings help accommodate angular misalignment.<\/p>\n<p>To stabilize interfaces over life, carefully matched hardness pairs, protected grease reservoirs, and dirt-excluding seals or wipers are recommended. Retaining elements require positive locking and inspection access for reliable condition checks.<\/p>\n<h2>Assembly, maintenance, and servicing<\/h2>\n<p>Proper handling preserves the functional reliability of push rods in tools from Darda GmbH and minimizes downtime on the construction site.<\/p>\n<ul>\n<li>Clean mounting surfaces and correct alignment prevent lateral loads and point loading.<\/li>\n<li>Observe specified tightening torques and bolt retention; lightly grease bearing points where specified.<\/li>\n<li>Regular visual inspection for scoring, corrosion, paint flaking, and incipient bending; replace worn bushings early.<\/li>\n<li>Check the condition of cylinder seals and guides to avoid consequential damage to the push rod due to particles and misalignment.<\/li>\n<li>Use transport and storage aids to prevent surface damage.<\/li>\n<\/ul>\n<ol>\n<li>Define inspection intervals based on duty cycle, media exposure, and shock intensity.<\/li>\n<li>Document measured clearances at joints and compare with acceptance thresholds to plan timely refurbishment.<\/li>\n<li>After repairs or coating work, verify straightness, surface finish, and dimensional conformity before recommissioning.<\/li>\n<\/ol>\n<h2>Typical damage patterns and troubleshooting<\/h2>\n<p>In harsh service during gutting, rock excavation, and special demolition, impacts, dust, and variable loads act on the kinematics. Common findings can be addressed with clear measures.<\/p>\n<ul>\n<li><strong>Scratches and scoring<\/strong> caused by particles: Check seals, keep protective caps and wipers clean, repair or replace damaged rod surfaces.<\/li>\n<li><strong>Bending or warp<\/strong> due to lateral loads: Check guidance, correct alignment of bearing points, reduce free buckling length through design.<\/li>\n<li><strong>Play in joints<\/strong>: Replace pins and bushings, restore fits, adjust lubrication condition.<\/li>\n<li><strong>Corrosion<\/strong>: Improve surface protection, limit moisture ingress, choose suitable coatings.<\/li>\n<li><strong>Leakage<\/strong> at the cylinder: Replace seals and inspect guides to prevent consequential damage to the push rod.<\/li>\n<li><strong>Fretting at pin interfaces<\/strong>: Inspect contact pressures and micro-motions, implement harder bushing materials or surface treatments, and optimize lubrication.<\/li>\n<li><strong>Coating delamination<\/strong> after improper handling: Review pretreatment and edge radii, rework coating with correct process parameters, and protect surfaces during assembly.<\/li>\n<\/ul>\n<h2>Safety and operation<\/h2>\n<p>Safe handling of push rods includes working within the specified pressure and load limits, protection against pinch and shear points, and control of fastening elements. Follow the instructions in the technical documentation and operating manual. Interventions on pressurized components may only be carried out when depressurized. Inspection intervals should match the duty cycle, especially with frequent load reversals and shock loads.<\/p>\n<ul>\n<li>Secure against unintended movement and residual energy before any intervention.<\/li>\n<li>Use appropriate lifting and protection equipment to avoid damage to surfaces and threads.<\/li>\n<li>After service, perform functional checks across the full stroke and verify leak-tightness of all interfaces.<\/li>\n<\/ul>\n<h2>Environmental conditions and operating environments<\/h2>\n<p>Construction sites in concrete demolition, tunnel construction, and stone quarries place high demands on push rods: dust, slurry, splash water, and temperature fluctuations act on bearings and surfaces. Protective boots, effective wipers, corrosion-resistant coatings, and suitable lubricants increase operational safety. In natural stone extraction and special demolition, irregular load paths and sharp-edged contact surfaces must also be considered.<\/p>\n<p>Micro-abrasive dust requires robust wiper designs and compatible lubricants. Where aggressive media are present, materials and coatings are selected to balance corrosion resistance with seal friendliness and impact resilience.<\/p>\n<h2>Selection criteria for push rods in hydraulic tools<\/h2>\n<p>Key criteria include the required end force at the tool, available stroke, kinematics (direct vs. toggle), free buckling length, environmental conditions, and maintenance strategy. In concrete demolition shears, a force-amplifying lever kinematic favors a robust, short-guided push rod, while in hydraulic wedge splitters a controlled, straight wedge actuation and a very smooth surface are prioritized.<\/p>\n<ul>\n<li>Define the worst-case lever position and associated compressive load including shock allowances.<\/li>\n<li>Set target surface parameters for sealing zones and select coatings to match environment and lubricant.<\/li>\n<li>Choose bearing concepts that maintain alignment and limit play over the intended service interval.<\/li>\n<li>Consider total cost of ownership: wear reserve, ease of inspection, and refurbishability.<\/li>\n<\/ul>\n<h2>Distinction from piston rod and tie rod<\/h2>\n<p>The piston rod is the integral connecting element in the hydraulic cylinder; it leads the piston to the outside and transmits forces. A push rod can be this piston rod or a downstream component in the kinematic chain. A tie rod, by contrast, is optimized primarily for tensile loads. In many tools from Darda GmbH, push rods must safely handle both compressive and tensile loads, for example when opening and closing shears or during the return stroke of wedge systems.<\/p>\n<p>Clear terminology supports unambiguous specification and maintenance planning, particularly where cylinder-integrated and external actuating rods coexist within one kinematic chain.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The push rod is a central machine element for linear force transmission in hydraulic and mechanical tools for demolition, deconstruction, and rock cutting or processing. In tools from Darda GmbH such as concrete demolition shears, hydraulic wedge splitters for stone and concrete, combination shears, or steel shears for deconstruction tasks, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/push-rod\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19773","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Push Rod in Hydraulic Demolition Tools<\/title>\n<meta name=\"description\" content=\"Guide to push rod design for hydraulic demolition tools \u27a4 linear force transmission, buckling safety, materials &amp; care.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/push-rod\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Push Rod in Hydraulic Demolition Tools\" \/>\n<meta property=\"og:description\" content=\"Guide to push rod design for hydraulic demolition tools \u27a4 linear force transmission, buckling safety, materials &amp; care.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/push-rod\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-20T07:52:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/push-rod\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/push-rod\",\"name\":\"Push Rod in Hydraulic Demolition Tools\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-16T07:19:03+00:00\",\"dateModified\":\"2026-05-20T07:52:03+00:00\",\"description\":\"Guide to push rod design for hydraulic demolition tools \u27a4 linear force transmission, buckling safety, materials & care.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/push-rod#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/push-rod\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/push-rod#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Push rod\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Push Rod in Hydraulic Demolition Tools","description":"Guide to push rod design for hydraulic demolition tools \u27a4 linear force transmission, buckling safety, materials & care.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/push-rod","og_locale":"en_US","og_type":"article","og_title":"Push Rod in Hydraulic Demolition Tools","og_description":"Guide to push rod design for hydraulic demolition tools \u27a4 linear force transmission, buckling safety, materials & care.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/push-rod","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-20T07:52:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/push-rod","url":"https:\/\/www.darda.de\/en\/knowledge\/push-rod","name":"Push Rod in Hydraulic Demolition Tools","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-16T07:19:03+00:00","dateModified":"2026-05-20T07:52:03+00:00","description":"Guide to push rod design for hydraulic demolition tools \u27a4 linear force transmission, buckling safety, materials & care.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/push-rod#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/push-rod"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/push-rod#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Push rod"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19773","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19773"}],"version-history":[{"count":3,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19773\/revisions"}],"predecessor-version":[{"id":27606,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19773\/revisions\/27606"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19773"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}