{"id":19766,"date":"2025-12-15T16:37:13","date_gmt":"2025-12-15T15:37:13","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19766"},"modified":"2026-05-20T14:51:03","modified_gmt":"2026-05-20T12:51:03","slug":"screw-coupling","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/screw-coupling","title":{"rendered":"Screw coupling"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The screw coupling is a fundamental element in hydraulics for creating permanently leak-tight, vibration-resistant connections between hose lines and components. On jobsites from concrete demolition to rock excavation, a connection must remain reliable even when dust, vibration, and changing temperatures act on the system. In the Darda GmbH environment, screw couplings are used in particular on <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Darda hydraulic power units<\/a>, hose assemblies, and tool connections- such as with <strong>concrete demolition shears<\/strong>, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, rock-splitting cylinders, combination shears, multi cutters, steel shears, and tank cutters.<\/p>\n<p>In professional hydraulics, screw couplings are also known as threaded couplings or threaded hydraulic connectors. They are selected wherever durability under shock loads and reliable sealing performance are more important than ultra-fast tool changes.<\/p>\n<h2>Definition: What is meant by a screw coupling?<\/h2>\n<p>A screw coupling is a detachable, pressure-tight connection between two hydraulic lines or between a line and a hydraulic component that is screwed together via threads. Sealing surfaces such as a cone, O-ring, or flat seal provide tightness; the threaded connection transmits the mechanical forces. Compared with quick couplings, screw couplings offer especially high resistance to vibration, pressure surges, and tensile loads-properties required in concrete demolition, special demolition, natural stone extraction, and tunnel construction.<\/p>\n<p>They are designed for repeatable assembly and disassembly with minimal wear, provided that thread form, sealing concept, and materials are correctly matched to the application and the hydraulic medium.<\/p>\n<h2>Design and operating principle<\/h2>\n<p>A screw coupling typically consists of a nut and a nipple (or female and male thread), a defined sealing geometry, and support for the line. When tightened, the sealing surface is compressed in a controlled manner, creating a <em>form- and force-fit<\/em> connection. Correct alignment of the sealing faces and the specified tightening torque are crucial to avoid both over-stretching and under-compression. In practice, the thread is first positioned hand-tight and then tightened to specification with suitable tools.<\/p>\n<p>Good practice includes light lubrication of O-rings with a compatible medium, avoiding grease on frictional metal-to-metal cones unless specified, and never using additional tape or paste on sealing geometries that are designed to seal without it. Where permitted by the standard, thread lubricant can reduce scatter in tightening torque and improve reproducibility.<\/p>\n<h3>Thread and sealing systems<\/h3>\n<p>In hydraulics, metric and imperial thread profiles are used alongside different sealing principles. Common are conical seals (e.g., 24\u00b0 cone), flat-sealing systems with an O-ring at a face-side sealing edge, or tapered threads with metal-to-metal sealing. The selection influences ease of assembly, reusability, and sealing reliability. <strong>Important<\/strong>: Thread standards must not be mixed-even small deviations lead to leakage or thread damage.<\/p>\n<ul>\n<li>Metric 24\u00b0 cone and light or heavy series for compact, high-pressure lines.<\/li>\n<li>37\u00b0 flare systems for robust, repeatedly disconnectable hose and tube terminations.<\/li>\n<li>Flat-face O-ring systems (ORFS type) for very low leakage risk and high vibration resistance.<\/li>\n<li>Parallel threads with bonded seals for simple face sealing in manifold or adapter interfaces.<\/li>\n<li>Tapered threads for metal-to-metal sealing where permitted, with attention to permissible sealants.<\/li>\n<\/ul>\n<p>Identification in practice relies on measuring outer diameter and thread pitch, recognizing flank angles, and inspecting the sealing face geometry. Gauges and thread templates increase accuracy and prevent misassembly.<\/p>\n<h3>Nominal size and flow<\/h3>\n<p>The nominal size of the screw coupling determines the free cross-section. Too small a nominal size causes pressure losses, heating of the fluid, and sluggish movements of attachments, whereas oversized cross-sections consume unnecessary weight and installation space. For tools such as concrete demolition shears and rock and concrete splitters, select the nominal size so that the required flow rate is transmitted with minimal pressure loss.<\/p>\n<p>As a rule of thumb, keep oil velocities moderate in pressure lines and lower in return lines to limit losses and heat generation; short, flow-optimized couplings with smooth internal contours help maintain efficiency.<\/p>\n<h3>Pressure ratings and temperature resistance<\/h3>\n<p>Screw couplings in high-pressure hydraulics must safely absorb pressure spikes from switching events. The temperature resistance of the body and sealing elements influences service life-especially in outdoor use for strip-out, cutting applications, and rock excavation. Seal materials are selected to match the hydraulic oil and the temperature window.<\/p>\n<p>High-cycle impulse loads demand designs verified by impulse testing; typical elastomers include NBR for standard oils and temperatures, HNBR for improved heat and abrasion resistance, and FKM for elevated temperatures or specific media compatibility.<\/p>\n<h2>Use in concrete demolition, special demolition, and rock excavation<\/h2>\n<h3>Concrete demolition shears<\/h3>\n<p>With concrete demolition shears, cyclic load reversals and pressure surges occur, for example when closing\/opening the jaws or crushing reinforced concrete. Screw couplings with vibration-proof threading and robust sealing systems reduce leaks and downtime. Dust caps prevent contamination during tool changes. In combination with Darda hydraulic power packs, appropriate coupling sizing enables low-loss oil supply and precise control of the tool.<\/p>\n<h3>Rock and concrete splitters<\/h3>\n<p>During splitting, high pressure acts hydraulically on the splitting wedge or rock splitting cylinder. Here an <em>absolutely leak-tight<\/em>, torsionally stable connection is critical so that the pressure remains constant under rough conditions. Screw couplings with suitable pressure rating, corrosion-resistant material, and good contamination protection increase process reliability in natural stone extraction and special operations in tunnel construction.<\/p>\n<h3>Other attachments<\/h3>\n<p>Combination shears, multi cutters, steel shears, and tank cutters benefit from compact, flow-optimized couplings. A short overall length facilitates handling in confined spaces, for example during strip-out and cutting in existing buildings. Double shut-off systems (shut off on both sides) minimize oil discharge when disconnecting lines.<\/p>\n<h2>Selection criteria for practice<\/h2>\n<ul>\n<li>Pressure and safety reserve: Design for the maximum system pressure including expected pressure spikes, with an adequate safety margin.<\/li>\n<li>Flow and cross-section: Nominal size according to flow rate; short, flow-optimized geometry to reduce pressure losses.<\/li>\n<li>Sealing system: Select O-ring, cone, or flat seal to suit the medium, temperature, and assembly specifications.<\/li>\n<li>Material and corrosion protection: Surface coating or corrosion-resistant materials for outdoor use and humid, dusty environments.<\/li>\n<li>Vibration and anti-rotation security: Nuts with locking features or defined counter-hold surfaces.<\/li>\n<li>Compatibility: Uniform thread standards and coupling profiles within Darda GmbH equipment to avoid chains of adapters.<\/li>\n<li>Serviceability: Well-accessible hex flats, clear marking, available replacement seals.<\/li>\n<li>Environmental protection: Double shut-off, low-drip design and clean coupling processes to minimize oil loss.<\/li>\n<li>Standards and approvals: Use components that comply with recognized hydraulic connection standards and relevant safety requirements.<\/li>\n<li>Traceability and marking: Durable identification of nominal size, pressure class, and thread type supports maintenance and correct replacement.<\/li>\n<\/ul>\n<p>In demanding field operations, minimizing the number of adapters and transitions reduces pressure loss, potential leak points, and assembly errors while improving serviceability.<\/p>\n<h2>Installation and commissioning<\/h2>\n<h3>Recommended procedure<\/h3>\n<ol>\n<li>Depressurize the system and release residual pressure.<\/li>\n<li>Clean sealing faces and threads; remove protective caps only immediately before connection.<\/li>\n<li>Align the coupling axially, start the thread hand-tight, strictly avoid cross-threading.<\/li>\n<li>Tighten with suitable tools to the specified tightening torque; use a counter-hold to prevent hose twisting.<\/li>\n<li>Leak test under operating conditions; in case of seepage, relieve the connections, eliminate the cause, and test again.<\/li>\n<li>Document tightening torque, date, and any replaced seals for traceability.<\/li>\n<\/ol>\n<p>Only use lubricants or thread sealants that are explicitly permitted for the selected thread and sealing concept. After the first thermal cycle, a torque check can stabilize preload if specified by the standard.<\/p>\n<h3>Common failure modes<\/h3>\n<ul>\n<li>Leakage after temperature changes: sealing material unsuitable or settling effects-replace the seal, check tightening torque.<\/li>\n<li>Damaged O-rings due to dirt particles: improve cleaning, consistently use dust caps.<\/li>\n<li>High pressure loss: nominal size too small or coupling restricted-match cross-section to flow rate.<\/li>\n<li>Cracking at threads: excessive tightening torque or wrong tool-adjust assembly procedure.<\/li>\n<li>Fretting corrosion from micro-movements: insufficient anti-rotation or missing support-implement locking features and relieve hose strain.<\/li>\n<\/ul>\n<h2>Maintenance, cleaning, and service life<\/h2>\n<p>Regular visual inspection, careful cleaning of coupling faces, and the use of intact protective caps extend service life. When changing tools-for example when switching between concrete demolition shears and rock and concrete splitters-seals should be kept in stock as wear parts. Lightly wetting the O-rings with a compatible medium eases tightening and protects the sealing edge. <strong>Important<\/strong> is depressurized disconnection to avoid damaging sealing lips and uncontrolled oil losses.<\/p>\n<ul>\n<li>Replace seals showing flattening, cuts, or hardening; never reuse damaged O-rings.<\/li>\n<li>Inspect hex flats and threads for rounding or galling; replace affected parts promptly.<\/li>\n<li>Record coupling maintenance to correlate leaks or pressure losses with operating hours and conditions.<\/li>\n<\/ul>\n<h2>Hydraulic power packs, hose lines, and interfaces<\/h2>\n<p>The coupling interface between hydraulic power pack, hose bundle, and tool determines energy efficiency and precision. A <em>systematic<\/em> interplay of suitable nominal size, short line lengths, and flow-optimized screw couplings reduces heating and increases actuator response speed. For Darda tools, consistent standardization of connections is recommended so that switching between different attachments does not require chains of adapters.<\/p>\n<p>Careful routing with adequate bend radii, protection against abrasion, and strain relief on hoses reduces loads on the coupling. Each additional interface adds restriction and a potential leak path-keeping the connection architecture simple enhances performance and reliability.<\/p>\n<h2>Special requirements in tunnel construction and special operations<\/h2>\n<p>Confined spaces, long hose runs, and high dust loads place special demands on screw couplings. Flat-sealing, compact designs and corrosion-resistant surfaces make work easier. In underground environments, low-drip coupling and clean handling are important to avoid contaminating the surroundings. Couplings with smooth outer contours reduce the risk of snagging on reinforcement or rock protrusions.<\/p>\n<p>Where hoses and couplings are frequently dragged over rough substrates, protective sleeves and impact-resistant outer geometries help prevent mechanical damage and preserve sealing integrity.<\/p>\n<h2>Cleaning and contamination control<\/h2>\n<p>Dirt particles act like abrasives and promote seal wear, valve blockages, and premature failures. Therefore: use protective caps, clean coupling faces with a lint-free cloth before each connection, do not place couplings in dust, and cap hoses during transport. Especially with concrete demolition shears and rock and concrete splitters, fine dust is generated that could enter the system without consistent cleanliness.<\/p>\n<p>Targeting an appropriate oil cleanliness level for the system class and maintaining clean handling at every interface significantly reduces wear and extends service intervals.<\/p>\n<h2>Practical tips for long service life<\/h2>\n<ul>\n<li>Uniform labeling of lines and couplings to avoid mix-ups.<\/li>\n<li>Carry replacement seals and protective caps in the tool case.<\/li>\n<li>Avoid hose twisting by counter-holding; consider rotary unions for frequent changes.<\/li>\n<li>Regular leak checks in both warm and cold operating conditions.<\/li>\n<li>Monitor hysteresis and sluggishness in operation-often indications of undersized nominal sizes or restricted couplings.<\/li>\n<li>Protect couplings from the elements; moisture and de-icing salt accelerate corrosion.<\/li>\n<li>Use torque tools calibrated at defined intervals to maintain assembly quality.<\/li>\n<li>Standardize a small set of thread types and seal materials across the fleet to simplify logistics and reduce error risk.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The screw coupling is a fundamental element in hydraulics for creating permanently leak-tight, vibration-resistant connections between hose lines and components. On jobsites from concrete demolition to rock excavation, a connection must remain reliable even when dust, vibration, and changing temperatures act on the system. In the Darda GmbH environment, screw <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/screw-coupling\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19766","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Screw Coupling in Hydraulics - Design &amp; Selection<\/title>\n<meta name=\"description\" content=\"Hydraulic guide to screw coupling \u2713 for leak-tight, vibration-resistant hose connections in harsh conditions.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/screw-coupling\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Screw Coupling in Hydraulics - Design &amp; Selection\" \/>\n<meta property=\"og:description\" content=\"Hydraulic guide to screw coupling \u2713 for leak-tight, vibration-resistant hose connections in harsh conditions.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/screw-coupling\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-20T12:51:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/screw-coupling\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/screw-coupling\",\"name\":\"Screw Coupling in Hydraulics - Design & Selection\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-15T15:37:13+00:00\",\"dateModified\":\"2026-05-20T12:51:03+00:00\",\"description\":\"Hydraulic guide to screw coupling \u2713 for leak-tight, vibration-resistant hose connections in harsh conditions.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/screw-coupling#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/screw-coupling\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/screw-coupling#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Screw coupling\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Screw Coupling in Hydraulics - Design & Selection","description":"Hydraulic guide to screw coupling \u2713 for leak-tight, vibration-resistant hose connections in harsh conditions.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/screw-coupling","og_locale":"en_US","og_type":"article","og_title":"Screw Coupling in Hydraulics - Design & Selection","og_description":"Hydraulic guide to screw coupling \u2713 for leak-tight, vibration-resistant hose connections in harsh conditions.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/screw-coupling","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-20T12:51:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/screw-coupling","url":"https:\/\/www.darda.de\/en\/knowledge\/screw-coupling","name":"Screw Coupling in Hydraulics - Design & Selection","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-15T15:37:13+00:00","dateModified":"2026-05-20T12:51:03+00:00","description":"Hydraulic guide to screw coupling \u2713 for leak-tight, vibration-resistant hose connections in harsh conditions.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/screw-coupling#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/screw-coupling"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/screw-coupling#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Screw coupling"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19766","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19766"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19766\/revisions"}],"predecessor-version":[{"id":27628,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19766\/revisions\/27628"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19766"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}