{"id":19754,"date":"2025-12-13T16:38:23","date_gmt":"2025-12-13T15:38:23","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19754"},"modified":"2026-05-19T09:15:05","modified_gmt":"2026-05-19T07:15:05","slug":"cutting-torch","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/cutting-torch","title":{"rendered":"Cutting torch"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Cutting torches are central tools in metal cutting, in the deconstruction of plants, and in the demolition of steel-reinforced components. In many projects involving concrete demolition and special deconstruction, strip-out and cutting, as well as special operations, they are deliberately combined with hydraulic equipment. For example, concrete cross-sections can be opened with concrete pulverizers, while the cutting torch separates exposed reinforcement. In combination with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a>, steel shears, or tank cutters, this creates a predictable, safe approach for dismantling tasks with steel components. Additional benefits include coordinated sequencing, reduced rework, and cleaner material separation for efficient downstream logistics.<\/p>\n<h2>Definition: What is a cutting torch?<\/h2>\n<p>A cutting torch is a hand-held or machine-guided tool for thermally separating carbon and low-alloy steels using oxygen and fuel gas. The process is referred to as oxy-fuel cutting. A preheating flame brings the material along the cut line to ignition temperature. Afterwards, a concentrated jet of pure cutting oxygen oxidatively severs the steel. Typical fuel gases are acetylene, propane, or natural gas; the choice influences heating behavior, cutting speed, and surface quality. Cutting torches are used in the dismantling of steel structures, in the disassembly of tanks and vessels, and in freeing reinforcing steel during deconstruction. In practice, oxy-acetylene offers fast preheating, whereas propane is valued for robust operation and availability.<\/p>\n<h2>Operating principle and oxy-fuel cutting process<\/h2>\n<p>During oxy-fuel cutting, the preheating flame creates temperatures well above the steel\u2019s ignition temperature. The entering cutting oxygen oxidizes the heated steel to iron oxide, which is blown out of the kerf as slag. Depending on torch guidance, the cut edge shows a characteristic striation pattern and a heat-affected zone. Quality depends on nozzle setup, oxygen purity, gas pressures, torch guidance, and the condition of the nozzle.<\/p>\n<ul>\n<li><strong>Preheat and pierce control<\/strong> &#8211; adequate soak at the start significantly reduces burrs and slag adhesion.<\/li>\n<li><strong>Nozzle match<\/strong> &#8211; the nozzle size and seating must correspond to thickness to maintain a stable oxygen jet.<\/li>\n<li><strong>Gas cleanliness<\/strong> &#8211; dry, oil-free oxygen and consistent pressure stabilize the reaction front and cut face.<\/li>\n<li><strong>Travel discipline<\/strong> &#8211; constant stand-off and angle keep striations fine and parallel.<\/li>\n<\/ul>\n<h2>Applications in deconstruction: interaction with hydraulic tools<\/h2>\n<p>In deconstruction projects, cutting torches are rarely used in isolation. The efficient approach is to combine them with hydraulic tools powered by hydraulic power packs. Concrete pulverizers open and crush concrete members so that reinforcement becomes accessible. These steel components can then be separated with the cutting torch or, alternatively, with steel shears. Stone and concrete splitters generate defined crack patterns in massive cross-sections, reducing vibration and noise and creating access points where subsequent cuts can be made on inserts, anchors, or rails. In strip-out and when cutting plant components, cutting torches are used on beams, lines, and supports; for tanks and pipelines, in sensitive situations, tank cutters or hydraulic cutting tools without an open flame are an option.<\/p>\n<ul>\n<li><strong>Typical sequences<\/strong> &#8211; expose reinforcement with concrete pulverizers, relieve cross-sections with splitters, separate steel thermally or mechanically.<\/li>\n<li><strong>Advantages<\/strong> &#8211; reduced collateral damage, targeted heat input, improved access, and controlled pacing.<\/li>\n<li><strong>Contingencies<\/strong> &#8211; where ignition sources are restricted, preplanned switch-over to cold cutting keeps schedules intact.<\/li>\n<\/ul>\n<h2>Differentiation and alternatives: cold cutting instead of flame<\/h2>\n<p>Thermal cutting is powerful but introduces heat, sparks, and gases. Where fire or explosion hazards exist, cold alternatives are appropriate. Steel shears and combination shears separate sections, rebar, and sheet without a flame. Multi cutters cover a wide range of materials when different cross-sections must be processed in short time. In concrete demolition, concrete pulverizers perform the bulk of the fragmentation so the material flow can be cleanly separated: mineral to mineral, metal to metal. Tank cutters are designed for the safe cutting of vessels and boilers, especially when residues or coatings must be considered. The selection depends on the material mix, the location of the component, the safety requirements, and the permissible emissions profile.<\/p>\n<p><em>Decision drivers<\/em> include ignition risk, permissible noise and fume exposure, dimensional tolerances, and access constraints. Where coatings generate hazardous fumes, pre-cleaning or a switch to shearing is often more effective than adding extraction alone.<\/p>\n<h2>Material and process limits<\/h2>\n<p>Cutting torches are suitable primarily for unalloyed and low-alloy steels. High-alloy steels, aluminum, or copper alloys cannot be cut, or only inadequately, with classical oxy-fuel cutting because the oxide layer cannot be removed in a molten state. Alternative processes are used here. For galvanized or coated components, pay attention to fume generation and decomposition products. Near concrete, heating can cause spalling; therefore, concrete surfaces are opened in a controlled way with concrete pulverizers before reinforcement is cut deliberately.<\/p>\n<p>In addition, <strong>section thickness<\/strong> and <strong>edge condition<\/strong> influence feasibility and speed. Very thin sheet is prone to warping, while very thick sections require staged piercing and higher gas throughput. Wind and drafts can destabilize the preheat zone and should be mitigated with shields where feasible.<\/p>\n<h2>Selection criteria for cutting torches and gases<\/h2>\n<p>The selection is based on material thickness, required cut quality, mobility, and environmental conditions. Acetylene enables very rapid heating; propane offers economical operation with a stable flame. Nozzle geometry must match plate or section thickness. High oxygen purity and stable pressures improve piercing behavior and cut cleanliness. For deconstruction work in hard-to-reach areas, compact hand torches and safe hose routing are advantageous. For continuous cutting, ergonomic torch handling is important to keep guidance stable and limit heat input.<\/p>\n<ul>\n<li><strong>Task profile<\/strong> &#8211; sporadic access cuts versus continuous sectioning with high duty cycles.<\/li>\n<li><strong>Site conditions<\/strong> &#8211; ventilation, wind, altitude, and temperature affect flame behavior and gas delivery.<\/li>\n<li><strong>Consumables<\/strong> &#8211; availability of gases and spare nozzles, regulator compatibility, and interchangeability.<\/li>\n<li><strong>Ergonomics<\/strong> &#8211; handle geometry, weight distribution, and valve layout support steady motion.<\/li>\n<\/ul>\n<h2>Occupational safety and health protection<\/h2>\n<p>Using cutting torches requires a systematic hazard analysis. Open flame, sparks and slag, oxygen enrichment, hot parts, and gases are key risks. Personal protective equipment includes heat-resistant clothing, eye protection with an appropriate shade, gloves, and hearing protection. Extraction or ventilation is important when working on coated or oily components. In sensitive areas where ignition sources are not permitted, <em>cold<\/em> methods such as steel shears, combination shears, or tank cutters are preferable. Safety distances, firefighting equipment, controlled ignition and shutdown procedures, and regular leakage tests of hoses and fittings are essential. Compliance with relevant rules of practice and general requirements is necessary; specific requirements must always be checked on a project-by-project basis.<\/p>\n<ol>\n<li><strong>Before work<\/strong> &#8211; verify permits, check regulators and hoses for leaks, clear combustibles, and define fire watch.<\/li>\n<li><strong>During work<\/strong> &#8211; maintain shielding, manage sparks and molten slag, and avoid oxygen-rich atmospheres.<\/li>\n<li><strong>After work<\/strong> &#8211; close valves in correct order, vent lines, and monitor the area for delayed ignition.<\/li>\n<\/ol>\n<h2>Process chain in deconstruction: from opening to separation<\/h2>\n<p>In practice, a sequential approach has proven effective: first, components are relieved and secured. Concrete pulverizers open the concrete cross-section until reinforcement is sufficiently exposed. Stone and concrete splitters introduce defined cracks to relieve stresses. The cutting torch then separates the accessible steel along marked lines. Where sparks would be critical, steel shears or combination shears take over the separation. Finally, cut interfaces are cooled or shielded in a controlled manner before components are transported away and sorted by material fractions.<\/p>\n<ol>\n<li><strong>Secure and expose<\/strong> &#8211; stabilize components, reveal steel, and create access windows.<\/li>\n<li><strong>Separate<\/strong> &#8211; apply thermal or cold cutting as defined in the plan, switch methods where conditions demand.<\/li>\n<li><strong>Clear and sort<\/strong> &#8211; verify cool-down, remove sections, and segregate by fraction for recycling.<\/li>\n<\/ol>\n<h2>Cut quality, tolerances, and rework<\/h2>\n<p>A good cut edge shows fine striations, minimal burr formation, and uniform heat input. Parameters such as torch angle, cutting speed, stand-off distance, and oxygen pressure directly influence quality. For thicker sections, multi-stage pierce starts and steady guidance are crucial. Rework includes removing heat tint for weld preparation, removing remaining burrs, and checking for heat-related defects on load-bearing components. In deconstruction, separability takes precedence over appearance as long as safety-relevant edges and heat effects are taken into account.<\/p>\n<ul>\n<li><strong>Indicators of stability<\/strong> &#8211; continuous sparks on the underside and straight striation lines along the cut.<\/li>\n<li><strong>Corrective actions<\/strong> &#8211; slow travel slightly for drag lines that lean back, increase oxygen pressure for unblown slag.<\/li>\n<li><strong>Rework focus<\/strong> &#8211; deburr sharp edges in handling zones and verify absence of microcracks in critical interfaces.<\/li>\n<\/ul>\n<h2>Maintenance and operating supplies<\/h2>\n<p>Regularly cleaned nozzles, tightly closing valves, and intact hose bundles are basic prerequisites. Pressure regulators should be checked and protected against damage. Safe work organization also includes clear separation of gas cylinders, protection against tipping, and shutting off media after work ends. Hydraulic power packs that simultaneously supply steel shears, combination shears, or concrete pulverizers should be positioned in the work area so that hose routing does not cross or become thermally stressed.<\/p>\n<ul>\n<li><strong>Routine<\/strong> &#8211; clean seats and nozzles, replace damaged O-rings, and inspect flashback arrestors.<\/li>\n<li><strong>Intervals<\/strong> &#8211; function checks before each shift, leak tests at cylinder change, documented inspections at defined service periods.<\/li>\n<li><strong>Storage<\/strong> &#8211; upright cylinders, caps fitted, separated by gas type, and shielded from heat sources.<\/li>\n<\/ul>\n<h2>Environmental and resource aspects<\/h2>\n<p>Thermal cutting generates slag, scale, and gases. Organized collection facilitates recycling. By combining concrete pulverizers for the mineral fraction and cutting torches or steel shears for the metals, clean material streams are created. This reduces disposal costs and improves the recycling rate. Where possible, spark and heat shields should be used to protect adjacent components.<\/p>\n<p>Project planning should consider local emission rules for fumes and noise, specify extraction or shielding where required, and document fraction purity to support high-value recycling.<\/p>\n<h2>Limits of use in rock excavation, tunnel construction, and natural stone extraction<\/h2>\n<p>In rock excavation and tunnel construction, the cutting torch is not a primary tool for the rock itself. It is used there to cut steel components such as support profiles, rails, anchors, or formwork parts. Actual rock breaking and shaping is performed mechanically, for example with stone and concrete splitters. In natural stone extraction, the cutting torch plays only a minor role for metallic inserts; stone processing is performed by pressure or splitting techniques.<\/p>\n<p>Typical use cases are the controlled removal of deformed steel sets, the shortening of rails, or the release of embedded steel fixtures for replacement.<\/p>\n<h2>Planning and documentation<\/h2>\n<p>Robust planning includes cutting sequences, supports, load transfer, protective measures, and the interaction between thermal and hydraulic techniques. Cut lines, access points, and emergency measures should be documented and coordinated with the team. In complex deconstruction projects, a clear assignment of when concrete pulverizers, stone and concrete splitters, steel shears, or tank cutters replace the cutting torch is central to safety and pacing.<\/p>\n<ul>\n<li><strong>Documents<\/strong> &#8211; method statement, risk assessment, gas management plan, and fire watch protocol.<\/li>\n<li><strong>Marking<\/strong> &#8211; clearly visible cut lines, removal directions, and handling points for lifting.<\/li>\n<li><strong>Coordination<\/strong> &#8211; defined handovers between teams and time windows for hot and cold work.<\/li>\n<\/ul>\n<h2>Avoiding common mistakes<\/h2>\n<p>Typical problems arise from oxygen pressure that is too high or too low, worn nozzles, excessive stand-off, or overly fast travel. This leads to burr formation, angled cut faces, and unnecessarily large heat input. Poorly prepared cut lines on reinforced concrete extend cutting time and increase the risk of spalling. Better is coordinated preparatory work with concrete pulverizers that clearly expose the reinforcement before cutting. Where fire protection cannot be ensured, switch to cold methods.<\/p>\n<ul>\n<li><strong>Quick diagnostics<\/strong> &#8211; heavy slag tails indicate low oxygen flow, erratic sparks point to poor preheat or drafts.<\/li>\n<li><strong>Setup first<\/strong> &#8211; verify nozzle size and seating before changing technique parameters.<\/li>\n<li><strong>Access matters<\/strong> &#8211; remove loose concrete and rust scale to keep the oxygen jet unobstructed.<\/li>\n<\/ul>\n<h2>Quality assurance and qualification<\/h2>\n<p>Clean results require trained personnel, suitable equipment, and ongoing process control. Short test cuts on the original material help to fine-tune parameters. A <strong>calm, repeatable guidance<\/strong> and well-maintained torches are crucial, especially on load-bearing components that must be released in a controlled manner. Integrating hydraulic alternatives such as steel shears, combination shears, and concrete pulverizers improves process safety and pacing consistency.<\/p>\n<p>Quality assurance can include checklists for setup, documented parameter windows for typical thickness ranges, and recorded acceptance of critical cuts on structural elements.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Cutting torches are central tools in metal cutting, in the deconstruction of plants, and in the demolition of steel-reinforced components. In many projects involving concrete demolition and special deconstruction, strip-out and cutting, as well as special operations, they are deliberately combined with hydraulic equipment. For example, concrete cross-sections can be <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cutting-torch\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19754","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Cutting Torch | Oxy-Fuel Steel Cutting &amp; Safety<\/title>\n<meta name=\"description\" content=\"Learn oxy-fuel steel cutting with a cutting torch \u2713 safety, process, and cold-cutting alternatives.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/cutting-torch\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cutting Torch | Oxy-Fuel Steel Cutting &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Learn oxy-fuel steel cutting with a cutting torch \u2713 safety, process, and cold-cutting alternatives.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/cutting-torch\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-19T07:15:05+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cutting-torch\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cutting-torch\",\"name\":\"Cutting Torch | Oxy-Fuel Steel Cutting & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-13T15:38:23+00:00\",\"dateModified\":\"2026-05-19T07:15:05+00:00\",\"description\":\"Learn oxy-fuel steel cutting with a cutting torch \u2713 safety, process, and cold-cutting alternatives.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cutting-torch#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cutting-torch\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/cutting-torch#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Cutting torch\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cutting Torch | Oxy-Fuel Steel Cutting & Safety","description":"Learn oxy-fuel steel cutting with a cutting torch \u2713 safety, process, and cold-cutting alternatives.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/cutting-torch","og_locale":"en_US","og_type":"article","og_title":"Cutting Torch | Oxy-Fuel Steel Cutting & Safety","og_description":"Learn oxy-fuel steel cutting with a cutting torch \u2713 safety, process, and cold-cutting alternatives.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/cutting-torch","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-19T07:15:05+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/cutting-torch","url":"https:\/\/www.darda.de\/en\/knowledge\/cutting-torch","name":"Cutting Torch | Oxy-Fuel Steel Cutting & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-13T15:38:23+00:00","dateModified":"2026-05-19T07:15:05+00:00","description":"Learn oxy-fuel steel cutting with a cutting torch \u2713 safety, process, and cold-cutting alternatives.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/cutting-torch#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/cutting-torch"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/cutting-torch#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Cutting torch"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19754","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19754"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19754\/revisions"}],"predecessor-version":[{"id":27567,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19754\/revisions\/27567"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19754"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}