{"id":19753,"date":"2025-12-13T13:42:18","date_gmt":"2025-12-13T12:42:18","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19753"},"modified":"2026-05-19T17:29:02","modified_gmt":"2026-05-19T15:29:02","slug":"auger-drive-unit","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/auger-drive-unit","title":{"rendered":"Auger drive unit"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>An auger drive unit is a hydraulically powered drilling system that transfers torque into an earth or rock auger. In practice, it combines the advantages of low-vibration, controlled drilling with methods of concrete demolition, rock excavation, and natural stone extraction. In combination with methods from Darda GmbH &#8211; such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\"><em>rock and concrete splitters<\/em><\/a>, <em>rock splitting cylinders<\/em> or <em>concrete crushers<\/em> &#8211; the drill drive enables targeted drilling for splitting techniques, anchors, dewatering, or probing. This allows components to be prepared, separation joints to be defined, and load paths to be broken in a controlled manner &#8211; without percussive action, with high dimensional accuracy, and with good dust and noise control.<\/p>\n<p>In technical terms, the auger drive works as a <strong>hydraulic motor plus reduction gearbox<\/strong> that provides <strong>high torque at low speed<\/strong> to rotate a matched auger. Compared with percussive drilling, the purely rotational process produces <em>cleaner, more dimensionally stable<\/em> boreholes and reduces secondary damage to adjacent structures. This makes it suitable wherever <strong>low emissions<\/strong> and <strong>predictable break behavior<\/strong> are required.<\/p>\n<h2>Definition: What is meant by an auger drive unit?<\/h2>\n<p>An auger drive unit is understood to be a compact assembly consisting of a hydraulic motor and a reduction gearbox (usually a planetary gearbox) that drives an auger with high torque and low rotational speed. The drive is typically operated on a carrier machine (e.g., mini excavator, excavator, loader) as an attachment or supplied via a separate <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\"><strong>hydraulic power pack<\/strong><\/a>. It differs from percussive drilling systems in that it operates purely by rotation: material is transported out of the borehole by the cutting of the teeth and the conveying action of the auger flights. With suitable tools (earth auger, rock drill, mixing or core-drilling inserts), soil, weakly cemented rocks, and concrete-like materials can be processed. For high-strength reinforced concrete, combined approaches are feasible in which the auger drive unit produces boreholes for subsequent <em>splitting techniques<\/em> or for selective intervention with <em>concrete crushers<\/em>.<\/p>\n<p>Depending on size class, usable torque ranges from a few kNm to well above 50 kNm, with typical working speeds between roughly 10 and 120 rpm. Common output couplings (e.g., hex or square) allow quick changes between augers and accessories while maintaining concentricity and minimal runout for accurate hole geometry.<\/p>\n<h2>Design and operating principle of an auger drive unit<\/h2>\n<p>A typical auger drive unit consists of a hydraulic axial-piston or gerotor motor, a robust planetary gearbox for torque reduction, an output coupling (e.g., hex or square) for the auger, and a suspension\/slewing mount for aligning the drill. Using forward and reverse, the auger can be rotated and the cuttings removed. Sizing follows the interplay of flow rate (speed), pressure (torque), and gearbox reduction. Higher pressures and larger displacement mean more torque; a greater flow rate increases rotational speed.<\/p>\n<p>Practical design details include shock-reduced starting behavior, sturdy bearings to absorb axial and radial loads, and a floating or cardanic mount to keep the auger aligned. Anti-cavitation measures and suitable relief valves help avoid pressure peaks and protect the drivetrain.<\/p>\n<h3>Hydraulic interfaces<\/h3>\n<p>The drive is powered via the hydraulics of the carrier machine or via <strong>hydraulic power packs<\/strong>. Important points are: sufficient <strong>flow rate<\/strong> for the desired speed, a system-compliant maximum <strong>pressure<\/strong> for the target torque, a pressureless <em>case-drain<\/em> return for the relevant motor type, and sensitive controllability via proportional valves. In deconstruction environments, stable oil temperature and effective filtration are crucial to ensure the service life of the power packs and the drill drive. As guiding values, modern systems often operate at 30 to 180 l\/min and up to approximately 210 to 250 bar; case-drain pressure should remain very low, and oil cleanliness as per established standards markedly increases component life.<\/p>\n<h3>Torque, speed, and reduction<\/h3>\n<p>The working envelope is defined by the auger: larger diameters, harder material, and longer drill strings require <em>more torque<\/em> and tolerate lower speed. In cohesive soils, moderately higher speeds are possible; in dense concrete or hard rock, slow, controlled rotation is advisable. A practical rule of thumb has proven itself: <strong>torque before speed<\/strong> &#8211; especially when the goal is to produce clean, dimensionally accurate boreholes for <em>rock splitting cylinders<\/em> or to establish separation lines for <em>concrete crushers<\/em>. Efficient cutting also depends on tooth geometry, auger pitch, and the sharpness and stand-off of the cutters.<\/p>\n<h3>Tools and auger types<\/h3>\n<p>The choice of auger influences quality and speed:<\/p>\n<ul>\n<li>Earth auger with replaceable teeth for soft to medium-hard soils.<\/li>\n<li>Rock drill with carbide teeth or chisel-like tips for gravelly, strongly bound, or concrete-like materials.<\/li>\n<li>Hollow auger\/core barrel (mechanical rather than diamond-impregnated) for obtaining cores in more weakly bound materials.<\/li>\n<li>Pilot bit and cleaners for guidance and safe discharge of cuttings.<\/li>\n<li>Extension rods and adapters matched to the output coupling to reach target depths without compromising guidance.<\/li>\n<li>Flight thickness, pitch, and wear protection adapted to material abrasiveness to stabilize conveying performance.<\/li>\n<\/ul>\n<h2>Applications in concrete demolition, rock excavation, and tunnel construction<\/h2>\n<p>Auger drive units are used to create boreholes for the further processing of concrete, masonry, and rock. In combination with the methods of Darda GmbH, <strong>low-vibration<\/strong> and <strong>controlled<\/strong> sequences can be implemented:<\/p>\n<ul>\n<li><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">Concrete demolition and special deconstruction<\/a>: rows of holes to weaken components, preparation of intended break lines, boreholes for <em>rock and concrete splitters<\/em> and <em>rock splitting cylinders<\/em>; subsequent separation with <em>concrete crushers<\/em> or <em>combination shears<\/em>, rebar finishing with <em>Multi Cutters<\/em> or <em>steel shears<\/em>.<\/li>\n<li>Strip-out and cutting: local cores and penetrations for installations, recesses for decoupling components, targeted openings as starting points for <em>concrete crushers<\/em> and <em>tank cutters<\/em> in special operations.<\/li>\n<li>Rock excavation and tunnel construction: pilot holes for drainage, relief boreholes in overstressed zones, hole patterns for splitting techniques in hard rock; controlled loosening of blocks without blasting.<\/li>\n<li>Natural stone extraction: setting rows of boreholes along natural joints; subsequent splitting with <em>rock splitting cylinders<\/em> or <em>rock and concrete splitters<\/em> to obtain dimensionally accurate rough blocks.<\/li>\n<li>Special application: exploratory drilling, monitoring of subsoil layers, degassing or dewatering boreholes when particularly low-vibration procedures are required.<\/li>\n<li>Foundations and anchoring: boreholes for anchors, soil nails, or dowels where minimal vibration and accurate spacing are critical.<\/li>\n<\/ul>\n<h3>Concrete crushers and splitting techniques: a sequential approach<\/h3>\n<p>A practice-oriented sequence for controlled concrete demolition can be as follows:<\/p>\n<ol>\n<li>Surveying, structural and utility checks, definition of the separation geometry.<\/li>\n<li>Setting dimensionally accurate boreholes with the auger drive unit (diameter and spacing matched to the splitting technique).<\/li>\n<li>Inserting the <em>rock splitting cylinders<\/em> or <em>rock and concrete splitters<\/em>, controlled widening of cracks along the row of holes.<\/li>\n<li>Separating released segments with <em>concrete crushers<\/em>; trimming reinforcement with <em>Multi Cutters<\/em> or <em>steel shears<\/em>.<\/li>\n<li>If applicable, cutting tanks and hollow bodies in <em>special operations<\/em> with <em>tank cutters<\/em>, if part of the project scope.<\/li>\n<li>Final quality check: verify target dimensions and residual bearing capacity at interfaces, remove loose fragments, and document results.<\/li>\n<\/ol>\n<h2>Selection criteria and sizing<\/h2>\n<p>The following criteria are decisive for sizing an auger drive unit:<\/p>\n<ul>\n<li>Material and strength: soil class, aggregates, reinforcement content, rock type.<\/li>\n<li>Bore diameter and depth: larger diameters and depths require higher torque and stable guidance.<\/li>\n<li>Hydraulic power: available flow rate and pressure of the carrier machine or the <strong>hydraulic power pack<\/strong>; temperature management and filtration.<\/li>\n<li>Tool choice: auger type, tooth design, pilot bit, enlarger.<\/li>\n<li>Precision requirements: dimensional accuracy for splitting hole patterns (typically in the range of approx. 30-50 mm), straightness, axial alignment.<\/li>\n<li>Site boundary conditions: space constraints, emission requirements (dust, noise), accessibility, disposal of drill cuttings.<\/li>\n<li>Carrier and interface: machine tonnage, permissible reaction torque at the coupler, and the availability of auxiliary hydraulics including case-drain.<\/li>\n<li>Guidance and positioning: use of drill jigs, spirit levels, or frames to keep bore axes aligned where tolerances are tight.<\/li>\n<\/ul>\n<h3>Recommendations for drilling strategy<\/h3>\n<ul>\n<li>Work with moderate speed and high feed pressure; if blocked, briefly reverse and clear the cuttings.<\/li>\n<li>Deepen boreholes step by step; regularly check that the auger is discharging freely.<\/li>\n<li>For splitting hole patterns, use smaller diameters and tighter spacing to promote uniform crack propagation.<\/li>\n<li>Set boreholes perpendicular to the future separation plane; correct deviations early.<\/li>\n<li>In reinforced concrete, plan pilot holes so that reinforcement can subsequently be loosened with <em>concrete crushers<\/em> and cut with <em>steel shears<\/em>.<\/li>\n<li>Where possible, employ a guide frame or template to stabilize the first centimeters of drilling and reduce entry wander.<\/li>\n<li>Record key parameters (pressure, flow proxy via engine speed, advance rate) to reproduce successful settings.<\/li>\n<\/ul>\n<h2>Operation, maintenance, and troubleshooting<\/h2>\n<p>Reliable operation is based on regular checks of the hydraulics and the tooling. These include visual inspections, leak checks, functional checks of direction of rotation and speed, and inspection of the teeth and auger flights. A properly functioning case-drain line, suitable couplings, and low-shock switching increase service life. The entire system &#8211; including the <strong>hydraulic power packs<\/strong> &#8211; benefits from good oil quality and temperature control.<\/p>\n<ul>\n<li>Wear patterns: rounded teeth, worn receptacles, play at the output shaft.<\/li>\n<li>Performance drop: often due to clogged filters, insufficient flow rate, air in the system, or insufficient feed pressure.<\/li>\n<li>Overtemperature: an indication of excessive continuous load, unsuitable viscosity, or contaminated coolers.<\/li>\n<li>Skewed boreholes: the result of insufficient guidance, excessive speed, or changing layer boundaries; counteract with alignment aids and reduced speed.<\/li>\n<li>Case-drain issues: elevated case pressure leads to seal wear and motor damage; check return restrictions and dedicated filters.<\/li>\n<li>Vibration or chatter: indicates tooth damage, incorrect pitch for the material, or intermittent choking of the flights; reduce rpm and clear cuttings.<\/li>\n<\/ul>\n<h2>Safety, health, and environment<\/h2>\n<p>For auger drilling, the general rules of occupational safety and environmental protection apply. Dust generation (especially with quartz-containing materials) should be reduced by suitable measures. Securely fixing the work area, keeping the slewing area clear, and avoiding pinch points at rotating parts are essential. The information is general in nature and does not replace project-specific requirements; the applicable regulations and operating instructions are always authoritative.<\/p>\n<ol>\n<li>Cordon off the work area, locate utilities, check the component condition.<\/li>\n<li>Use PPE, keep loose clothing and jewelry away from rotating parts.<\/li>\n<li>Reduce speed before engaging, accelerate only under guidance.<\/li>\n<li>Regularly remove cuttings; in case of dust exposure, use extraction or wetting.<\/li>\n<li>Release hydraulic pressure without load before changing tools.<\/li>\n<li>Monitor noise exposure and silica dust; use hearing protection and dust control per the risk assessment.<\/li>\n<\/ol>\n<h2>Typical interfaces to Darda GmbH equipment<\/h2>\n<p>The auger drive unit often serves as a preparatory tool. Boreholes define weakening zones into which <em>rock splitting cylinders<\/em> and <em>rock and concrete splitters<\/em> are inserted. After splitting, components can be selectively gripped and separated with <em>concrete crushers<\/em>. In deconstruction-intensive environments, the reinforcement is then cut with <em>Multi Cutters<\/em> or <em>steel shears<\/em>. Where an independent energy supply is required, <strong>hydraulic power packs<\/strong> are considered to feed the drill drive and downstream tools. For special applications &#8211; for example, opening tanks in <em>special operations<\/em> &#8211; drilling defined starting points and relief openings creates a controlled baseline for <em>tank cutters<\/em>.<\/p>\n<h3>Fields of application at a glance<\/h3>\n<ul>\n<li>Concrete demolition and special deconstruction: hole patterns for splitting techniques, intended break lines for <em>concrete crushers<\/em>.<\/li>\n<li>Strip-out and cutting: penetrations, recesses, and guide points for separating attachments.<\/li>\n<li>Rock excavation and tunnel construction: drainage, relief, and splitting hole rows in hard rock.<\/li>\n<li>Natural stone extraction: boreholes along joints, subsequent splitting into rough blocks.<\/li>\n<li>Special application: probing, degassing, targeted openings with minimal vibration.<\/li>\n<li>Foundations and anchoring: holes for dowels, soil nails, and anchors with strict tolerance requirements.<\/li>\n<\/ul>\n<h2>Practical notes on quality assurance<\/h2>\n<p>Dimensionally accurate boreholes are the basis for reproducible results in splitting techniques and selective deconstruction. Test boreholes at the beginning, continuous monitoring of diameter, straightness, and depth, as well as documentation of hydraulic operating values are recommended. For natural stone, hole rows should be aligned so that the splitting planes follow the natural joints. For reinforced concrete, the drilling strategy should be matched to the rebar layout so that <em>concrete crushers<\/em> and subsequent cutting tools can engage efficiently.<\/p>\n<ul>\n<li>Measure with calibrated gauges or internal calipers; record diameter and depth after each tool change.<\/li>\n<li>Check axial deviation with plumb or laser reference; correct setup if drift exceeds specified tolerance.<\/li>\n<li>Log oil temperature and estimated flow to correlate process stability with tool wear and output quality.<\/li>\n<li>Document hole patterns and spacing to facilitate repeatability across similar components and projects.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>An auger drive unit is a hydraulically powered drilling system that transfers torque into an earth or rock auger. In practice, it combines the advantages of low-vibration, controlled drilling with methods of concrete demolition, rock excavation, and natural stone extraction. In combination with methods from Darda GmbH &#8211; such as <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/auger-drive-unit\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19753","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Auger Drive Unit - Hydraulic Earth &amp; Rock Drilling<\/title>\n<meta name=\"description\" content=\"Hydraulic drilling attachment - an auger drive unit for precise, low vibration boring in rock &amp; concrete \u2713 high torque.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/auger-drive-unit\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Auger Drive Unit - Hydraulic Earth &amp; Rock Drilling\" \/>\n<meta property=\"og:description\" content=\"Hydraulic drilling attachment - an auger drive unit for precise, low vibration boring in rock &amp; concrete \u2713 high torque.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/auger-drive-unit\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-19T15:29:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/auger-drive-unit\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/auger-drive-unit\",\"name\":\"Auger Drive Unit - Hydraulic Earth & Rock Drilling\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-13T12:42:18+00:00\",\"dateModified\":\"2026-05-19T15:29:02+00:00\",\"description\":\"Hydraulic drilling attachment - an auger drive unit for precise, low vibration boring in rock & concrete \u2713 high torque.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/auger-drive-unit#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/auger-drive-unit\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/auger-drive-unit#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Auger drive unit\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Auger Drive Unit - Hydraulic Earth & Rock Drilling","description":"Hydraulic drilling attachment - an auger drive unit for precise, low vibration boring in rock & concrete \u2713 high torque.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/auger-drive-unit","og_locale":"en_US","og_type":"article","og_title":"Auger Drive Unit - Hydraulic Earth & Rock Drilling","og_description":"Hydraulic drilling attachment - an auger drive unit for precise, low vibration boring in rock & concrete \u2713 high torque.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/auger-drive-unit","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-19T15:29:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/auger-drive-unit","url":"https:\/\/www.darda.de\/en\/knowledge\/auger-drive-unit","name":"Auger Drive Unit - Hydraulic Earth & Rock Drilling","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-13T12:42:18+00:00","dateModified":"2026-05-19T15:29:02+00:00","description":"Hydraulic drilling attachment - an auger drive unit for precise, low vibration boring in rock & concrete \u2713 high torque.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/auger-drive-unit#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/auger-drive-unit"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/auger-drive-unit#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Auger drive unit"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19753","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19753"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19753\/revisions"}],"predecessor-version":[{"id":27595,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19753\/revisions\/27595"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19753"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}