{"id":19752,"date":"2025-12-13T11:43:08","date_gmt":"2025-12-13T10:43:08","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19752"},"modified":"2026-05-19T17:00:04","modified_gmt":"2026-05-19T15:00:04","slug":"wastewater-pipe","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/wastewater-pipe","title":{"rendered":"Wastewater pipe"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Wastewater pipes safely convey domestic, commercial, and industrial wastewater away &#8211; from buildings, through building drains and collection networks, to the public sewer. They are a central element of drainage engineering and must be hydraulically efficient, permanently watertight, and mechanically protected. In practice, wastewater pipes often intersect with construction activities such as <em>concrete demolition and special demolition<\/em>, <em>building gutting and cutting<\/em>, as well as work on existing structures. Especially there, the choice of suitable, low-vibration methods is crucial, for example the use of <strong>concrete pulverizers<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong> to avoid endangering pipes and connection shafts in the ground. The following sections combine fundamental knowledge with practical guidance for planning, execution, operation, and work in the vicinity of pipelines. In addition, they emphasize low-vibration techniques to limit settlement risks and safeguard watertightness and hydraulic performance over the service life.<\/p>\n<h2>Definition: What is meant by a wastewater pipe?<\/h2>\n<p>A wastewater pipe is a pipeline section for the discharge of contaminated wastewater (e.g., from toilets, kitchens, bathrooms, commercial processes) without stormwater. Inside buildings, it includes stacks and collector lines; in the ground, building drains and house connection lines up to the connection to the public sewer. Wastewater pipes are also referred to as <em>building sewers<\/em>, <em>house connections<\/em>, or the <em>sewer lateral<\/em> within property boundaries. Wastewater pipes predominantly operate as gravity lines in the <em>separate system<\/em> (separate routing of stormwater and wastewater) or the <em>combined system<\/em> (joint discharge). The design takes into account hydraulic requirements (slope, degrees of filling, self-cleaning), materials, tightness, structural stability, and protection against backwater. Normative requirements and technical rules (e.g., for drainage systems, installation in the ground, testing) are country- or region-specific; they serve as a recognized basis but do not replace project-specific planning. Responsibility and maintenance obligations may differ between private property and public space and should be clarified before construction measures commence.<\/p>\n<h2>Structure and mode of operation<\/h2>\n<p>Wastewater pipes generally operate with gravity flow. With adequate slope, wastewater drains under gravity; in topographically unfavorable situations, lifting stations or pressure drainage are used. Venting ensures pressure compensation, protects trap seals, and supports stable flow patterns.<\/p>\n<h3>Pipeline elements<\/h3>\n<ul>\n<li>Stacks (building): vertical discharge from sanitary rooms with venting<\/li>\n<li>Collector and connection lines (building): horizontal lines to building drains<\/li>\n<li>Building drains (buried): lead to the house connection chamber or property boundary<\/li>\n<li>House connection line: connection to the public sewer<\/li>\n<li>Inspection and access openings, shafts: for inspection, cleaning, and changes in direction<\/li>\n<\/ul>\n<h3>Hydraulic principles<\/h3>\n<ul>\n<li>Recommended slope in house lines often approx. 1-3%, depending on nominal diameter and use<\/li>\n<li>Self-cleaning: target flow velocities from about 0.7 m\/s<\/li>\n<li>Degrees of filling: sized so that air entrainment and venting work properly<\/li>\n<li>Backwater level: installations below it require backwater protection or lifting stations<\/li>\n<li>Avoid oversteep slopes that may cause phase separation of water and solids<\/li>\n<\/ul>\n<h3>Materials<\/h3>\n<ul>\n<li>Plastics (PVC-U, PP, PE-HD): smooth, corrosion-resistant, installation-friendly<\/li>\n<li>Vitrified clay: high abrasion and chemical resistance<\/li>\n<li>Concrete or reinforced concrete pipes: for large diameters, robust against external loads<\/li>\n<li>Ductile cast iron: high mechanical load capacity, often in traffic areas<\/li>\n<\/ul>\n<p>Joints are typically made via push-fit sockets with elastomer seals. A <strong>watertight<\/strong> and <strong>correctly aligned<\/strong> installation prevents in- and exfiltration, settlement-related damage, and odor issues. Depending on the technical rules, tightness is verified by air or water tests and documented as part of quality assurance.<\/p>\n<h2>Planning and sizing in new builds and existing structures<\/h2>\n<p>Design considers connected loads, simultaneity, pipeline lengths, changes in direction, venting concept, and local boundary conditions. In existing buildings, a condition survey and CCTV inspection are often the first step before conversions, gutting, or deconstruction begin. Coordination with structural engineering, building services, and fire and acoustic protection prevents conflicts and rework.<\/p>\n<h3>Key planning aspects<\/h3>\n<ol>\n<li>Nominal diameter and slope: ensure hydraulic capacity and self-cleaning<\/li>\n<li>Venting concept: avoid pressure fluctuations, protect traps<\/li>\n<li>Backwater protection: specifically secure drainage located below the backwater level<\/li>\n<li>External loads and cover: traffic load classes, frost penetration depth, bearing capacity of bedding<\/li>\n<li>Accessibility: sensibly arrange inspection openings, shafts, and cleaning points<\/li>\n<li>Material selection: consider medium, temperature, chemicals, abrasion, and service life<\/li>\n<li>Construction sequencing and temporary bypass: maintain drainage service during interventions<\/li>\n<li>Digital coordination and clash detection: integrate routing in coordinated models where applicable<\/li>\n<\/ol>\n<p>For repurposing or vertical extension, additional wastewater volumes, new shaft locations, and altered flow paths must be checked. In sensitive areas, for example above existing lines, a low-vibration construction method is recommended. In demolition and during openings, <strong>concrete pulverizers<\/strong> or <strong>rock and concrete splitters<\/strong> are frequently used to protect the existing wastewater pipe. Early involvement of specialists helps define tolerances for settlements and vibration to protect pipeline integrity.<\/p>\n<h2>Installation in the ground: excavation pit, bedding, and protection<\/h2>\n<p>The quality of pipe bedding and compaction determines durability. Settlements lead to slope disturbances, deposits, and leaks. Proper gradation and moisture conditioning of backfill, combined with layer-by-layer compaction, reduce differential settlement and ovalization.<\/p>\n<h3>Execution steps<\/h3>\n<ul>\n<li>Pit shoring, dewatering, and pipeline setting-out<\/li>\n<li>Formation level and pipe bedding (well-graded materials, layer-by-layer compaction)<\/li>\n<li>Pipe laying with socket alignment, dimensional accuracy, and tightness<\/li>\n<li>Side backfill and cover with controlled compaction<\/li>\n<li>Protective measures: route warning tapes, marking mesh, and protective conduits if necessary<\/li>\n<li>As-built documentation with coordinates and invert levels for future maintenance<\/li>\n<\/ul>\n<p>During work on existing assets &#8211; such as exposing house connections &#8211; the surrounding structure is often removed in sections. Low-vibration methods support protection of the pipeline: gently breaking concrete using <em>rock splitting cylinders<\/em> and targeted grasping of components with <em>concrete pulverizers<\/em> minimizes impact energy. <em>Hydraulic power packs<\/em> supply the attachments with the required drive power. Where soils are fine-grained or groundwater is present, supplementary measures (e.g., geotextile separation layers or temporary drainage) stabilize the trench and maintain bedding quality.<\/p>\n<h2>Operation, cleaning, and inspection<\/h2>\n<p>Reliable operation requires preventive maintenance. Fat, sludge, foreign objects, and root intrusion are typical causes of malfunctions. Documented maintenance plans with defined intervals improve availability and reduce unplanned outages.<\/p>\n<h3>Recommendations for operation<\/h3>\n<ul>\n<li>Regular visual checks of inspection openings and shafts<\/li>\n<li>Needs-based cleaning (e.g., flushing), adapted to material and slope<\/li>\n<li>Inspection by CCTV, documentation of damage<\/li>\n<li>Maintenance of backwater devices and lifting stations, functional tests<\/li>\n<li>Root management and selective cutting where permitted to prevent re-intrusion<\/li>\n<\/ul>\n<p>Pretreatment systems (e.g., grease separators) are key in commercial operations. Improper chemical discharges promote corrosion (e.g., H<sub>2<\/sub>S formation) and damage seals. Follow the guidance of local sewer utilities. Where odor problems occur, review ventilation, trap seals, and hydraulic load patterns before escalating to chemical dosing.<\/p>\n<h2>Typical damage patterns and rehabilitation methods<\/h2>\n<p>Damage often results from settlements, inadequate compaction, over- or underloading, or mechanical impacts during deconstruction. Additional triggers include corrosion due to aggressive media and cyclical surcharge loads in traffic areas.<\/p>\n<h3>Damage patterns<\/h3>\n<ul>\n<li>Cracks, longitudinal breaks, deformed pipes<\/li>\n<li>Leaks, infiltration\/exfiltration, root intrusion<\/li>\n<li>Joint offsets, insufficient slope, deposits<\/li>\n<li>Corrosion (chemical\/biogenic), abrasion from solids<\/li>\n<\/ul>\n<h3>Rehabilitation options<\/h3>\n<ul>\n<li>Open cut: excavation, replacement\/partial section renewal<\/li>\n<li>Trenchless: short liners, liners, cured-in-place lining, partial sleeves<\/li>\n<li>Localized repairs on shafts and connections<\/li>\n<\/ul>\n<p>With open cut in built-up areas, controlled demolition methods are important. <strong>Concrete pulverizers<\/strong> enable selective deconstruction of foundations above pipelines. Combination shears and <em>multi cutters<\/em> can selectively cut reinforcing steel, brackets, or steel beams around the pipeline without unnecessary vibrations. <em>Steel shears<\/em> are used in plant areas with steel pipelines or support systems. After completion, tightness testing and updated documentation confirm functional restoration.<\/p>\n<h2>Interfaces with concrete demolition, building gutting, and special demolition<\/h2>\n<p>In construction practice, wastewater pipes often run beneath floor slabs, in shafts, or in close proximity to load-bearing structural elements. During <em>building gutting and cutting<\/em> as well as in <em>concrete demolition and special demolition<\/em>, safeguarding the drainage system is a critical factor for the construction schedule, occupational safety, and the environment. Monitoring of vibration and settlements helps maintain agreed threshold values and protects joints and connections.<\/p>\n<h3>Practical guide for working near pipelines<\/h3>\n<ol>\n<li>Utility locating and exposure: review plans, locate, conduct trial pits, and carefully expose<\/li>\n<li>Protective measures: shoring, covering, temporary diversion or bypass<\/li>\n<li>Select the demolition method: prioritize low-vibration methods (e.g., <strong>rock and concrete splitters<\/strong>, <strong>concrete pulverizers<\/strong>)<\/li>\n<li>Severing rebar and embedded parts: use <em>combination shears<\/em>, <em>multi cutters<\/em>, <em>steel shears<\/em> as needed<\/li>\n<li>Hydraulic supply: size suitable <em>hydraulic power packs<\/em> and operate them safely<\/li>\n<li>Control and documentation: record the condition of the pipeline before\/after the intervention<\/li>\n<li>Monitoring: track vibrations and level changes during works, implement stop criteria<\/li>\n<\/ol>\n<p>In technically demanding situations &#8211; such as deconstruction above active house connections &#8211; step-by-step removal, small jaw bite sizes, and controlled splitting are advantageous. This reduces the risk of settlements that could lead to joint offsets or cracks. Clear contingency plans for bypassing, spill control, and immediate repair reduce environmental risks and downtime.<\/p>\n<h2>Rock excavation, tunnel construction, and special cases<\/h2>\n<p>In infrastructure projects, wastewater pipes intersect with <em>rock excavation and tunnel construction<\/em>. Underpasses, construction of utility corridors, and connection to trunk sewers require careful coordination. In rocky ground, controlled splitting of rock facilitates the construction of pipe trenches with defined bedding without excessive vibrations. Selective concrete removal (e.g., with <em>concrete pulverizers<\/em>) is also helpful when installing large shaft structures.<\/p>\n<p>In <em>special deployment<\/em> scenarios &#8211; such as deconstructing tanks or enclosures near wastewater pipes &#8211; safely opening and dismantling tanks and housings may be necessary. Appropriately configured cutting and separation equipment (e.g., <em>cutting torch<\/em>) and precise removal of foundations are suitable to avoid affecting underground pipelines. Permit-to-work procedures for hot work and gas detection complement protective measures in confined areas.<\/p>\n<h2>Occupational safety and legal notes<\/h2>\n<p>Work on and near wastewater pipes is subject to hazardous substance and occupational safety requirements. These include protection against biological agents, gas detection in shafts, fall protection, traffic safety, and safe routing of media. Permits, coordination with network operators, and compliance with technical rules are essential. The notes provided are general and do not replace project-specific planning or official requirements. Confined space entry, rescue concepts, and qualification of personnel must be planned and documented before starting work.<\/p>\n<h2>Material selection and service life: decision criteria<\/h2>\n<p>The choice of pipe material depends on chemical exposure, temperature, mechanical loading, installation conditions, and life-cycle costs. Sustainability aspects, such as recyclability and environmental product data where available, increasingly influence selection.<\/p>\n<ul>\n<li>Plastic pipes: lightweight, good hydraulics, sensitive to point loads &#8211; clean bedding is important<\/li>\n<li>Vitrified clay: very durable, higher self-weight, careful installation required<\/li>\n<li>Concrete\/reinforced concrete: insensitive to external loads, check chemical resistance<\/li>\n<li>Ductile cast iron: mechanically robust, suitable for low cover\/high loads<\/li>\n<\/ul>\n<p>In existing buildings with impending deconstruction work, a condition assessment is advisable before load redistributions occur. Selective deconstruction with <strong>concrete pulverizers<\/strong> or controlled splitting helps avoid negatively affecting the planned service life of the remaining drainage system. Where feasible, life-cycle costing compares initial investment with maintenance, rehabilitation effort, and residual value.<\/p>\n<h2>Practical tips for site management and crews<\/h2>\n<ul>\n<li>Before starting demolition or cutting: clear pipeline routes, define backwater level and bypass<\/li>\n<li>Minimize vibrations: targeted use of <strong>rock and concrete splitters<\/strong>, small removal steps with <strong>concrete pulverizers<\/strong><\/li>\n<li>Cleanly cut steel components: appropriately use <em>combination shears<\/em>, <em>multi cutters<\/em>, <em>steel shears<\/em><\/li>\n<li>Check hydraulics: properly size <em>hydraulic power packs<\/em>, protect hose routing<\/li>\n<li>Completion: cleaning, CCTV check, documentation for quality assurance<\/li>\n<li>Establish emergency procedures for leakage events and ensure rapid access to repair materials<\/li>\n<\/ul>\n<p>The proper combination of drainage expertise and controlled demolition techniques supports safe, sustainable handling of wastewater pipes &#8211; from new construction and operation to deconstruction in existing structures. In this context, Darda GmbH stands for precise, low-vibration working methods that have proven themselves near sensitive pipeline infrastructure.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Wastewater pipes safely convey domestic, commercial, and industrial wastewater away &#8211; from buildings, through building drains and collection networks, to the public sewer. They are a central element of drainage engineering and must be hydraulically efficient, permanently watertight, and mechanically protected. In practice, wastewater pipes often intersect with construction activities <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wastewater-pipe\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19752","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Wastewater Pipe - Design, Installation &amp; Safety<\/title>\n<meta name=\"description\" content=\"Expert guide to wastewater pipe systems for sewer drainage \u2713 planning, installation, safety &amp; low vibration demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wastewater-pipe\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wastewater Pipe - Design, Installation &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Expert guide to wastewater pipe systems for sewer drainage \u2713 planning, installation, safety &amp; low vibration demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/wastewater-pipe\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-19T15:00:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wastewater-pipe\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wastewater-pipe\",\"name\":\"Wastewater Pipe - Design, Installation & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-13T10:43:08+00:00\",\"dateModified\":\"2026-05-19T15:00:04+00:00\",\"description\":\"Expert guide to wastewater pipe systems for sewer drainage \u2713 planning, installation, safety & low vibration demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wastewater-pipe#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wastewater-pipe\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wastewater-pipe#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Wastewater pipe\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wastewater Pipe - Design, Installation & Safety","description":"Expert guide to wastewater pipe systems for sewer drainage \u2713 planning, installation, safety & low vibration demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/wastewater-pipe","og_locale":"en_US","og_type":"article","og_title":"Wastewater Pipe - Design, Installation & Safety","og_description":"Expert guide to wastewater pipe systems for sewer drainage \u2713 planning, installation, safety & low vibration demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/wastewater-pipe","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-19T15:00:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/wastewater-pipe","url":"https:\/\/www.darda.de\/en\/knowledge\/wastewater-pipe","name":"Wastewater Pipe - Design, Installation & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-13T10:43:08+00:00","dateModified":"2026-05-19T15:00:04+00:00","description":"Expert guide to wastewater pipe systems for sewer drainage \u2713 planning, installation, safety & low vibration demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/wastewater-pipe#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/wastewater-pipe"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/wastewater-pipe#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Wastewater pipe"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19752","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19752"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19752\/revisions"}],"predecessor-version":[{"id":27593,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19752\/revisions\/27593"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19752"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}