{"id":19746,"date":"2025-12-13T12:06:17","date_gmt":"2025-12-13T11:06:17","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19746"},"modified":"2026-05-18T10:28:03","modified_gmt":"2026-05-18T08:28:03","slug":"diaphragm-wall-panel","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/diaphragm-wall-panel","title":{"rendered":"Diaphragm wall panel"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The diaphragm wall panel is a core element of modern excavation enclosures and cut-off walls in special foundation engineering. Each panel forms an individual wall segment of a cast-in-place diaphragm wall and takes on tasks in excavation support, water sealing, and load transfer. Over a structure\u2019s life cycle, it may become necessary to adapt, open, or deconstruct a panel &#8211; for example for openings, connections, or partial deconstruction. Quiet, low-vibration methods are then used, in which tools such as <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">Darda concrete crushers<\/a><\/strong> or <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/em> from Darda GmbH can play an important role depending on the boundary conditions. In dense urban settings and near sensitive assets, controlled hydraulic methods help maintain serviceability while enabling precise, staged interventions.<\/p>\n<h2>Definition: What is meant by a diaphragm wall panel?<\/h2>\n<p>A diaphragm wall panel is a single cast-in-place concrete panel produced in a trench stabilized with supporting fluid (usually bentonite or polymer slurry). Several panels are connected via joints in sequence to form the continuous diaphragm wall. In practice, diaphragm walls are also referred to as slurry walls when constructed under slurry support. Typical features include the sequence of primary and secondary panels, installation of reinforcement cages, the use of sealing and construction joints, and concreting via tremie pipes (tremie method). The panel resists earth pressure, water pressure, and temporary construction-stage loads; in combination with anchors, bracing, or slabs, it functions as part of the shoring. Panel lengths are selected to balance reinforcement handling, verticality control, and joint performance over the full depth.<\/p>\n<h2>Construction and design details of diaphragm wall panels<\/h2>\n<p>Execution begins with guide walls, followed by excavation of the trench using a grab or cutter under supporting fluid. Stop-end elements (e.g., joint pipes or steel sheet profiles) form end faces and joints. The reinforcement cage is then positioned and concreted via tremie pipe, displacing and recovering the supporting fluid. Decisive design aspects include geometry (wall thickness, depth), verticality, joint tightness, concrete quality, as well as the formation of the capping beam with subsequent head trimming. Depending on the project, sealing systems such as waterstops, injection hoses, or swelling elements are provided to keep panel joints permanently watertight. Continuous tremie embedment and uninterrupted flow are essential to avoid segregation and inclusions.<\/p>\n<h3>Construction sequence in steps<\/h3>\n<ol>\n<li>Construct guide walls as alignment and support for equipment.<\/li>\n<li>Excavate the trench under supporting fluid down to competent strata.<\/li>\n<li>Install stop-end elements and perform control measurements (depth, verticality).<\/li>\n<li>Lower the reinforcement cage with spacers and any embedded items.<\/li>\n<li>Concreting by the tremie method; controlled displacement of the supporting fluid.<\/li>\n<li>Curing, exposing, and subsequent head trimming for load transfer.<\/li>\n<\/ol>\n<h3>Primary and secondary panels<\/h3>\n<p>Primary panels are constructed with stop-ends on both sides; they define the geometry. Secondary panels are concreted in between and interlock with the primary panels. The joints are executed as construction and sealing joints. The composite action ensures the stability and watertightness of the entire diaphragm wall. Depending on the stop-end system, interlocks may be formed by joint pipes, steel profiles, or fresh-concrete joints with integrated waterstops to ensure continuity of sealing elements.<\/p>\n<h3>Design checks and execution tolerances<\/h3>\n<ul>\n<li><strong>Verticality<\/strong>: Typically controlled within about 1 to 2% of depth to ensure overlap and joint performance.<\/li>\n<li><strong>Concrete flow and tremie control<\/strong>: Maintain adequate embedment and rise rate for homogeneous, low-permeability concrete.<\/li>\n<li><strong>Joint geometry<\/strong>: Verify stop-end alignment, socket depth, and sealing continuity for durable watertightness.<\/li>\n<li><strong>Guide walls and alignment<\/strong>: Ensure stiffness and accurate setting out to limit trench deviation.<\/li>\n<li><strong>Capping beam formation<\/strong>: Define trimming level, bond, and load transfer to horizontal elements (struts, slabs).<\/li>\n<\/ul>\n<h2>Reinforcement, joints and watertightness<\/h2>\n<p>The reinforcement is designed according to earth and water pressure, construction-stage loads, and use. One- or two-layer mesh and bar reinforcement is frequently used, locally strengthened at openings, anchor levels, and in areas with transverse loads. Joints are formed as panel joints and are supplemented with joint profiles, waterstops, or injection hoses. For highly stressed or water-loaded structures, small crack widths (often in the range of approx. 0.2 to 0.3 mm), adequate cover, suitable exposure classes, and a robust concrete mix design are key parameters for durability.<\/p>\n<h3>Types of joints and sealing systems<\/h3>\n<ul>\n<li>Construction joints between panels with joint sheets or joint pipes.<\/li>\n<li>Sealing joints with internal waterstops or swelling profiles.<\/li>\n<li>Injection joints with subsequent injection capability for defect remediation.<\/li>\n<li>Fresh-concrete joints with integrated stop-ends to provide shear transfer and a continuous water barrier.<\/li>\n<\/ul>\n<h2>Dimensions, tolerances and quality assurance<\/h2>\n<p>Typical panel thicknesses range from about 0.6 to 1.5 m, depths often between 20 and 80 m, and significantly more depending on the project. Common requirements concern verticality, flatness, and integrity. Quality assurance includes measurements of trench depth, density\/viscosity of the supporting fluid, fresh and hardened concrete tests, as well as integrity testing. Execution and verification follow recognized engineering rules and the applicable standards and guidelines. Increasingly, digital documentation, georeferenced joint registers, and as-built models support transparent quality control and lifecycle traceability.<\/p>\n<h3>Testing and documentation<\/h3>\n<ul>\n<li>Control of supporting fluid and trench geometry.<\/li>\n<li>Concrete testing (consistency, compressive strength, temperature control).<\/li>\n<li>Integrity verification (e.g., low-impact) and joint testing.<\/li>\n<li>Documentation of concrete volumes, slurry return flow, and installation times.<\/li>\n<li>As-built surveys of panel head elevations, joint locations, and capping beam geometry.<\/li>\n<li>Environmental records for slurry recycling and disposal in accordance with permits.<\/li>\n<\/ul>\n<h2>Deconstruction, openings and adaptations to diaphragm wall panels<\/h2>\n<p>During construction or in service, panels are often worked locally: openings for utilities, temporary breakthroughs, adaptations at anchor levels, or trimming of panel heads. Controlled, low-vibration methods take priority to avoid endangering adjacent structures, joint seals, and serviceability. Depending on geometry, reinforcement ratio, and surroundings, mechanical breaking, splitting, milling, or sawing are used; in sensitive environments, portable hydraulic tools with high precision and low emissions are advantageous. Pre-cutting around opening perimeters and staged removal help maintain edge quality and protect adjacent finishes and joint systems.<\/p>\n<h3>Tools and methods in practice<\/h3>\n<ul>\n<li><strong>Concrete crushers<\/strong> from Darda GmbH enable stepwise, controlled removal of concrete in confined spaces, e.g., for edge-near openings. Low vibration protects joints and seals.<\/li>\n<li><strong>Rock and concrete splitters<\/strong> from Darda GmbH act via drilled holes and generate defined crack patterns in massive concrete members. They are suitable for gently opening or segmenting thick panels with high reinforcement ratios.<\/li>\n<li><em>Steel shears<\/em> and <em>combination shears<\/em> from Darda GmbH cut reinforcing bars, anchor heads, or embedded parts efficiently without causing unnecessary collateral damage to the concrete.<\/li>\n<li><em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a><\/em> from Darda GmbH reliably supply mobile tools, which is advantageous in tight excavations and under limited power supply.<\/li>\n<li><em>Multi Cutters<\/em> offer flexibility for mixed tasks when concrete and steel must be cut in quick succession; with complex panel openings this can consolidate work steps.<\/li>\n<\/ul>\n<p>Method selection is governed by access, required precision, reinforcement density, permissible vibration, and the need to safeguard watertight joints and neighboring panels.<\/p>\n<h2>Application areas related to diaphragm wall panels<\/h2>\n<p>Diaphragm walls are used in urban excavations, at deep stations, in cut-and-cover tunneling, and for groundwater control. Work on panels touches several application fields of Darda GmbH:<\/p>\n<ul>\n<li><strong>Concrete demolition and special deconstruction<\/strong>: Local removal of panel heads, elimination of defects, selective removal for construction stages.<\/li>\n<li><strong>Strip-out and cutting<\/strong>: Creating service openings, recesses, and penetrations; often with <em>concrete crushers<\/em> and <em>steel shears<\/em>.<\/li>\n<li><strong>Rock demolition and tunnel construction<\/strong>: In top-down construction or excavations near rock, transitions between rock support and diaphragm wall are worked; <em>rock and concrete splitters<\/em> are particularly suitable here.<\/li>\n<li><strong>Natural stone extraction<\/strong> and <strong>special applications<\/strong>: Know-how from controlled splitting can be transferred to massive concrete sections where low emissions are required.<\/li>\n<\/ul>\n<h2>Occupational safety, vibrations and environmental aspects<\/h2>\n<p>Work on diaphragm wall panels requires a coordinated safety concept. This includes stable construction stages, fall protection, load redistribution, and protection of third-party structures. Methods with low vibrations, reduced noise, and minimized dust generation are advantageous in sensitive locations. Hydraulic, portable systems support low-emission execution. Information on protective measures, permits, and disposal must always be checked on a project-specific basis and is fundamentally non-binding and general. Controls for respirable crystalline silica, noise exposure, and hand-arm vibration form part of a comprehensive site health plan.<\/p>\n<h3>Targeted reduction of emissions<\/h3>\n<ul>\n<li>Segmental removal with <strong>concrete crushers<\/strong> instead of percussive methods reduces vibrations.<\/li>\n<li>Splitting via drilled holes limits crack propagation and reduces noise.<\/li>\n<li>Mist spraying or wet cutting binds dust; retention of flushing water and slurries protects water bodies.<\/li>\n<li>Local electro-hydraulic drives and efficient power distribution reduce exhaust and noise in confined work areas.<\/li>\n<\/ul>\n<h2>Planning and interfaces<\/h2>\n<p>Before intervening in a diaphragm wall panel, structural verification, construction-stage analyses, and rebar detection are required. Coordination between structural design, geotechnical engineering, and execution defines sequences for bracing, load redistribution, and joint compatibility. Clear logistics for debris pieces, rebar remnants, and the service routing of the <em>hydraulic power packs<\/em> increases process reliability. Where adjacent assets are sensitive, instrumentation and monitoring (e.g., settlement, vibration) should be specified and action thresholds defined in advance.<\/p>\n<h3>Temporary support and construction stages<\/h3>\n<p>Opening a panel creates new load paths. Temporary bracing before the first cut, a defined cutting pattern, and a staged sequence with monitoring prevent unintended crack formation. <strong>Rock and concrete splitters<\/strong> offer high control over crack initiation, while <em>steel shears<\/em> handle exposure and trimming of reinforcement. Contingency measures for immediate stabilization and water control should be prepared before starting any removal step.<\/p>\n<h2>Typical defects and remediation strategies<\/h2>\n<p>Frequent findings include honeycombing, local voids, insufficient joint tightness, or excess concrete at the head that must be milled out. Remediation is performed using reprofiling concretes, injections, or selective removal of damaged zones. For local removal, <em>concrete crushers<\/em> and splitting methods are practical because they protect adjacent sealing joints and built-in components and preserve the integrity of neighboring panels. Additional issues such as bentonite inclusions, necking, or filter-cake contamination are addressed by targeted removal, joint sealing upgrades, and, where appropriate, re-injection with microfine cement or resin systems.<\/p>\n<h2>Practice-oriented checklist for work on diaphragm wall panels<\/h2>\n<ol>\n<li>Review existing documents, as-built data, and joint locations; perform rebar scanning.<\/li>\n<li>Verify stability, construction stages, and temporary bracing.<\/li>\n<li>Select the method: <strong>concrete crusher<\/strong> for precise removal, splitters for massive sections, <em>steel shears<\/em> for reinforcement.<\/li>\n<li>Define cutting and splitting pattern; plan the drilling pattern; protect adjacent joints.<\/li>\n<li>Organize hydraulic supply and logistics (access, load handling, disposal).<\/li>\n<li>Manage emissions: dust control, noise protection, ground vibration monitoring.<\/li>\n<li>Document execution; follow up with integrity and watertightness tests.<\/li>\n<li>Secure permits and coordinate monitoring requirements for noise, vibration, and groundwater management.<\/li>\n<li>Prepare contingency measures for stabilization and water ingress control before cutting.<\/li>\n<li>Update as-built documentation and joint registers; archive QA records for traceability.<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The diaphragm wall panel is a core element of modern excavation enclosures and cut-off walls in special foundation engineering. Each panel forms an individual wall segment of a cast-in-place diaphragm wall and takes on tasks in excavation support, water sealing, and load transfer. Over a structure\u2019s life cycle, it may <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/diaphragm-wall-panel\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19746","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Diaphragm Wall Panel - Construction &amp; Design<\/title>\n<meta name=\"description\" content=\"Guide to cast-in-place concrete diaphragm wall panel \u2713 for excavation support, watertight joints &amp; low vibration work.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/diaphragm-wall-panel\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Diaphragm Wall Panel - Construction &amp; Design\" \/>\n<meta property=\"og:description\" content=\"Guide to cast-in-place concrete diaphragm wall panel \u2713 for excavation support, watertight joints &amp; low vibration work.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/diaphragm-wall-panel\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-18T08:28:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/diaphragm-wall-panel\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/diaphragm-wall-panel\",\"name\":\"Diaphragm Wall Panel - Construction & Design\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-13T11:06:17+00:00\",\"dateModified\":\"2026-05-18T08:28:03+00:00\",\"description\":\"Guide to cast-in-place concrete diaphragm wall panel \u2713 for excavation support, watertight joints & low vibration work.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/diaphragm-wall-panel#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/diaphragm-wall-panel\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/diaphragm-wall-panel#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Diaphragm wall panel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Diaphragm Wall Panel - Construction & Design","description":"Guide to cast-in-place concrete diaphragm wall panel \u2713 for excavation support, watertight joints & low vibration work.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/diaphragm-wall-panel","og_locale":"en_US","og_type":"article","og_title":"Diaphragm Wall Panel - Construction & Design","og_description":"Guide to cast-in-place concrete diaphragm wall panel \u2713 for excavation support, watertight joints & low vibration work.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/diaphragm-wall-panel","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-18T08:28:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/diaphragm-wall-panel","url":"https:\/\/www.darda.de\/en\/knowledge\/diaphragm-wall-panel","name":"Diaphragm Wall Panel - Construction & Design","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-13T11:06:17+00:00","dateModified":"2026-05-18T08:28:03+00:00","description":"Guide to cast-in-place concrete diaphragm wall panel \u2713 for excavation support, watertight joints & low vibration work.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/diaphragm-wall-panel#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/diaphragm-wall-panel"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/diaphragm-wall-panel#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Diaphragm wall panel"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19746","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19746"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19746\/revisions"}],"predecessor-version":[{"id":27525,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19746\/revisions\/27525"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19746"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}