{"id":19739,"date":"2025-12-12T14:41:16","date_gmt":"2025-12-12T13:41:16","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19739"},"modified":"2026-05-18T08:59:03","modified_gmt":"2026-05-18T06:59:03","slug":"sludge-silo","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/sludge-silo","title":{"rendered":"Sludge silo"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A sludge silo is a central component of construction logistics and plant logistics whenever mineral slurry is generated during concrete demolition, interior demolition, drilling, sawing, or natural stone extraction. It stores, separates, and conditions fine-grained water-solid mixtures from concrete and stone processing so that clarified water can be recovered for the process cycle and solids can be discharged in an orderly manner. In conjunction with tools such as <strong>concrete demolition shear<\/strong> as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH, the sludge silo helps separate material flows, bind dust via wet processes, and make disposal plannable &#8211; without promotional intent, but as part of a technically sound process chain. In practice, sludge silos underpin <strong>closed-loop water management<\/strong>, stabilize site logistics under variable loads, and support compliance with discharge limits and documentation duties.<\/p>\n<h2>Definition: What is meant by a sludge silo?<\/h2>\n<p>A sludge silo is generally understood to be a cylindrical-conical vessel for interim storage and preliminary clarification of mineral slurries (e.g., concrete, drilling, or sawing slurry). Through gravity sedimentation &#8211; optionally supported by internal calming zones, baffle plates, or flocculation &#8211; solids are separated from the process water. At the cone, the dewatered sludge is withdrawn via discharge aids, while clarified water is taken off at the top and returned to the loop or led to downstream treatment (e.g., filter press, decanter). Sludge silos are used stationary in plants and mobile on construction sites for concrete demolition, special demolition, rock excavation, tunnel construction, and natural stone extraction. Depending on scale, units are realized as compact, skid-mounted modules or as permanently installed systems with integrated peripherals.<\/p>\n<ul>\n<li><strong>Typical working volumes<\/strong>: from a few cubic meters for mobile use to clearly larger stationary units.<\/li>\n<li><strong>Residence time<\/strong>: minutes to hours, depending on inflow, fines proportion, and target clarity.<\/li>\n<li><strong>Purpose<\/strong>: buffering peak loads, separating solids, returning clarified water, and enabling orderly discharge.<\/li>\n<\/ul>\n<h2>Technical design and mode of operation<\/h2>\n<p>A sludge silo typically consists of a cylindrical upper section to calm the inflow and a conical lower section to collect the sludge. Inlet lines discharge tangentially or centrally below the water surface to reduce turbulence. Internal impact and baffle plates create <em>calming zones<\/em> that promote settling. At the cone, steep angles ensure a safe sliding angle of the solids; discharge slide valves, rotary lobe pumps, or discharge screws transfer the sludge into containers. Level measurement (hydrostatic, radar), sampling nozzles, and vents are part of the equipment. Optionally, agitators prevent \u201cbridging\u201d of very fine or thixotropic slurries. Clarified water withdrawal takes place via height-adjustable weirs or floating skimmers to account for different sedimentation layers.<\/p>\n<p>Materials and protection are selected for abrasion, alkalinity, and outdoor exposure. Common are coated carbon steel or stainless steel, optionally with <em>wear linings<\/em> in the cone and inlet area. Overflow edges are designed with tranquilizing weirs; emergency overflows and backflow protection safeguard against uncontrolled discharge. Flanged connections and quick couplers facilitate assembly and cleaning, while access hatches enable safe internal inspection after isolation.<\/p>\n<ul>\n<li><strong>Typical equipment options<\/strong>: turbidity indication at the draw-off, flushing nozzles at the cone, heating or insulation for cold conditions, and removable scum boards at the weir.<\/li>\n<li><strong>Interface points<\/strong>: defined inlet stub with splash protection, clarified water outlet with valve or pump, sludge discharge port sized for container changeover.<\/li>\n<\/ul>\n<h2>Types of sludge from demolition, cutting, and extraction<\/h2>\n<p>The type and behavior of the sludge determine the silo design:<\/p>\n<ul>\n<li><strong>Concrete slurry<\/strong>: arises during wet drilling, wet sawing, and wet breaking with dust suppression; contains cement fines, aggregates, and admixtures. Elevated pH values and ultra-fine fractions are typical, which settle more slowly.<\/li>\n<li><strong>Drilling slurry<\/strong> from rock excavation and tunnel construction: mineral, grain size distribution depending on the rock (granite, limestone, gneiss), sometimes with drilling fluids; often settles faster but can tend to consolidate.<\/li>\n<li><strong>Sawing slurry<\/strong> from interior demolition and cutting: very fine fractions down to silt\/clay size, high water content, tends to stratify.<\/li>\n<\/ul>\n<p>Additives, surface-active agents, and the ionic composition of the water influence floc formation and separation efficiency. Highly alkaline concrete fines can require targeted pH control and matching flocculants to improve clarification and reduce carryover of fines.<\/p>\n<p>With mechanical methods such as splitting using <strong>rock wedge splitter and concrete splitter<\/strong> or crushing with <strong>concrete demolition shear<\/strong>, primarily coarse material is produced; where water is used for dust suppression, fine-grained wet spoil is generated that can be buffered and separated in the sludge silo. In <em>natural stone extraction<\/em> and in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>, sludge silos complement material logistics by separating drilling and sawing slurries from clarified water, which can be reused for cooling\/lubrication and dust suppression.<\/p>\n<h2>Process chain: From demolition to water and solids separation<\/h2>\n<ol>\n<li>Primary dismantling of components, e.g., with <strong>concrete demolition shear<\/strong> in <em>concrete demolition and special demolition<\/em> or <strong>rock wedge splitter and concrete splitter<\/strong> in <em>rock excavation<\/em>.<\/li>\n<li>Wet operation\/dust suppression during interior demolition and cutting; generation of concrete or sawing slurry.<\/li>\n<li>Conveyance of the slurry-water mixture via chute, hose, or pump into the sludge silo.<\/li>\n<li>Calming and sedimentation in the silo; formation of a clarified water zone.<\/li>\n<li>Withdrawal of clarified water back into the cycle; additional treatment if required.<\/li>\n<li>Discharge of thickened sludge into containers or downstream dewatering.<\/li>\n<li>Documentation, interim storage, and recovery\/disposal of the sludge depending on material quality.<\/li>\n<li>Optional pH adjustment and fines conditioning prior to discharge or reuse of process water.<\/li>\n<li>Logging of volumes and quality metrics to underpin mass balances and compliance documentation.<\/li>\n<\/ol>\n<p>Hydraulically driven tools from Darda GmbH are operated via <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a>. Their throughput and cycling indirectly influence the sludge load (e.g., during wet cutting steps), which should be considered in the silo design alongside the available <strong>drive power<\/strong>. Intermittent peak flows require adequate buffer volume, resilient pump sizing, and control logic that prioritizes clarified water quality under load.<\/p>\n<h2>Design and dimensioning<\/h2>\n<p>Dimensioning is based on the expected volumetric flows, solids loads, and sedimentation properties:<\/p>\n<h3>Key design parameters<\/h3>\n<ul>\n<li><strong>Inflow rate<\/strong> [m\u00b3\/h] and <strong>solids content<\/strong> [%]: define the required residence time.<\/li>\n<li><strong>Grain size distribution<\/strong> and <strong>density<\/strong>: determine settling velocity and cone angle.<\/li>\n<li><strong>Viscosity<\/strong> and <strong>thixotropy<\/strong>: influence the need for agitators.<\/li>\n<li><strong>Clarified water recovery rate<\/strong>: guides the design of weirs or floating skimmers.<\/li>\n<li><strong>Construction logistics<\/strong>: container size, crane\/<strong>forklift<\/strong> accessibility, footprint.<\/li>\n<li><strong>Regulatory constraints<\/strong>: discharge thresholds and waste codes frame target qualities and documentation.<\/li>\n<\/ul>\n<h3>Orders of magnitude and allowances<\/h3>\n<p>For varying site loads, safety allowances are common, around 20-30% volume reserve. For very fine sawing slurries, a greater cylinder height extends calming time. A sufficiently steep cone and defined discharge prevent bridging. For abrasive slurries, transport velocities in feed and discharge lines should balance suspension reliability and wear.<\/p>\n<h3>Design options and accessories<\/h3>\n<ul>\n<li><strong>Clarified water take-off<\/strong>: scum board plus sharp-crested weir, floating skimmer for variable interface heights, or telescopic draw-off.<\/li>\n<li><strong>Discharge aids<\/strong>: cone vibrator, air pads, discharge screw, or pump sump with anti-vortex plate.<\/li>\n<li><strong>Peripherals<\/strong>: coarse particle trap at the inlet, strainers to protect pumps, and sampling spigots at defined elevations.<\/li>\n<li><strong>Seasonal equipment<\/strong>: insulation, trace heating, and weather covers for reliable winter operation.<\/li>\n<\/ul>\n<h2>Operation, monitoring, and safety<\/h2>\n<p>Safe operation includes regular visual checks of clarified water quality, level monitoring, and verification of discharge. Sensor-based level measurement and overflow weirs reduce the risk of overflows. If required, a <em>bypass<\/em> to a standby unit or buffer tank can be provided. The installation site should be load-bearing and protected against vehicle impact. Work on the silo is carried out with due attention to <em>fall protection<\/em> and <em>hazard analysis<\/em>; operation with alkaline concrete slurry requires suitable protective equipment.<\/p>\n<ul>\n<li><strong>Operational indicators<\/strong>: stable interface position, low turbidity in clarified water, and constant discharge rate without pulsation.<\/li>\n<li><strong>Quality checks<\/strong>: pH tracking, periodic solids content measurements, and documentation of draw-off times and volumes.<\/li>\n<li><strong>Safety practice<\/strong>: isolation and lockout for internal work, gas-freeing and ventilation before entry, and secure access platforms.<\/li>\n<\/ul>\n<h2>Environmental aspects and water recycling<\/h2>\n<p>Sludge silos enable the return of process water and controlled release of solids. Depending on composition, pH adjustment and dosing of flocculants may be advisable. Legal requirements for water discharges and waste classification may apply and must be examined on a project-specific basis. A low-emission construction site benefits from short pipe runs, covered silos, and low-dust discharges.<\/p>\n<ul>\n<li><strong>Practical measures<\/strong>: covers against aerosol formation, splash guards at inlets, and drip trays under connections.<\/li>\n<li><strong>Closed loops<\/strong>: maximize reuse of clarified water for cooling and dust suppression to conserve freshwater.<\/li>\n<li><strong>Evidence of conformity<\/strong>: maintain sampling records and calibration logs for sensors that inform discharge decisions.<\/li>\n<\/ul>\n<h2>Maintenance and typical disturbances<\/h2>\n<ul>\n<li><strong>Bridging and ratholing<\/strong>: avoid through steep cones, discharge aids, and optional agitators.<\/li>\n<li><strong>Consolidation of sediment<\/strong>: plan regular discharge, flushing nozzles, and cleaning intervals.<\/li>\n<li><strong>Foam formation<\/strong>: calm the inflow, use defoamers only after assessment.<\/li>\n<li><strong>Sensor fouling<\/strong>: arrange measuring points to be accessible and flushable.<\/li>\n<\/ul>\n<p>A simple maintenance plan with visual inspection, functional testing of valves\/pumps, and periodic internal cleaning preserves availability. For cold spells and standby periods, drain or protect pipework and instruments, and verify heating or insulation performance to prevent ice formation and instrumentation drift.<\/p>\n<h2>Integration into Darda GmbH application areas<\/h2>\n<p>In <strong>interior demolition and cutting<\/strong>, fine slurries arise from wet drilling and sawing; the sludge silo reduces volume peaks and returns clarified water. In <strong>concrete demolition and special demolition<\/strong>, <strong>concrete demolition shear<\/strong> primarily generates coarse fractions; where water is used for dust suppression, the silo takes up the fine portion. In <strong>rock excavation and tunnel construction<\/strong> as well as <strong>natural stone extraction<\/strong>, drilling slurry is thickened in the silo and prepared for further treatment. In <strong>special demolition<\/strong> &#8211; for example, in sensitive areas &#8211; the silo supports separation of mineral constituents and mixed fractions. Across these fields, the sludge silo links wet process steps with downstream material and water management.<\/p>\n<h2>Tools and interfaces<\/h2>\n<p>The choice of cutting and crushing tool influences the quantity and character of the sludge. <strong>rock wedge splitter and concrete splitter<\/strong> as well as <strong>rock wedge splitter<\/strong> operate by fracture mechanics and generate little fine slurry; they can reduce the need for wet cutting. <strong>concrete demolition shear<\/strong>, <strong>hydraulic shear<\/strong>, <strong>Multi Cutters<\/strong>, <strong>steel shear<\/strong>, and <strong>tank cutter<\/strong> are used depending on the material; where cooling or flushing water is used with metallic materials, the sludge silo separates the mineral fine fraction from the loop water. <strong>hydraulic power packs<\/strong> provide the necessary <strong>drive power<\/strong> for the tools and thus shape the cycling and feed logic of the downstream sludge treatment.<\/p>\n<ul>\n<li><strong>Upstream protection<\/strong>: coarse particle traps and strainers at the inlet prevent blockages and reduce wear.<\/li>\n<li><strong>Downstream readiness<\/strong>: standardized discharge heights and container interfaces shorten changeover and transport.<\/li>\n<\/ul>\n<h2>Best practices for clarified water quality<\/h2>\n<ul>\n<li><strong>Calm feed<\/strong>: avoids resuspension and improves separation.<\/li>\n<li><strong>Variable clarified water withdrawal<\/strong>: adjust the height to the current interface.<\/li>\n<li><strong>Sampling and documentation<\/strong>: regularly check separation performance and pH values.<\/li>\n<li><strong>Scalable buffers<\/strong>: provide mobile auxiliary silos or tanks for peak loads.<\/li>\n<li><strong>pH control<\/strong>: keep the operating window suitable for the materials and downstream processes to stabilize flocculation.<\/li>\n<li><strong>Seasonal tuning<\/strong>: adapt residence times and withdrawal settings to temperature-dependent settling behavior.<\/li>\n<\/ul>\n<h2>Planning in confined situations<\/h2>\n<p>On inner-city construction sites with limited space, compact, tall silo geometries and modular components help. Short hose runs reduce sedimentation losses in the inflow. For <em>interior demolition<\/em>, mobile units are suitable that can be relocated as the project progresses. A clear material flow &#8211; from the workface via the silo to the container &#8211; minimizes downtime of tools such as <strong>concrete demolition shear<\/strong>.<\/p>\n<ul>\n<li><strong>Modularity<\/strong>: split vessels or skid frames ease internal transport and crane handling.<\/li>\n<li><strong>Stackable peripherals<\/strong>: integrate pumps, hoses, and controls within the footprint.<\/li>\n<li><strong>Traffic safety<\/strong>: barriers and marked routes prevent vehicle impacts and maintain access.<\/li>\n<\/ul>\n<h2>Avoiding typical planning errors<\/h2>\n<ul>\n<li><strong>Underestimated fines<\/strong>: ultra-fine fractions extend required residence time; plan reserve volume.<\/li>\n<li><strong>Lack of discharge aids<\/strong>: viscous slurries require suitable discharge systems.<\/li>\n<li><strong>Unclear interfaces<\/strong>: define responsibilities for water routing, sampling, and disposal early.<\/li>\n<li><strong>Insufficient subbase<\/strong>: ensure load-bearing capacity and low-settlement installation.<\/li>\n<li><strong>Missing access<\/strong>: do not overlook cleaning openings, safe ladders, and platforms for inspection.<\/li>\n<li><strong>Permitting late in the process<\/strong>: consider water discharge permits and waste acceptance early to avoid redesigns.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A sludge silo is a central component of construction logistics and plant logistics whenever mineral slurry is generated during concrete demolition, interior demolition, drilling, sawing, or natural stone extraction. It stores, separates, and conditions fine-grained water-solid mixtures from concrete and stone processing so that clarified water can be recovered for <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sludge-silo\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19739","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Sludge Silo for Concrete &amp; Stone Slurry Treatment<\/title>\n<meta name=\"description\" content=\"Advanced sludge silo \u2713 for demolition drilling and sawing slurry that separates solids &amp; recycles process water.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/sludge-silo\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sludge Silo for Concrete &amp; Stone Slurry Treatment\" \/>\n<meta property=\"og:description\" content=\"Advanced sludge silo \u2713 for demolition drilling and sawing slurry that separates solids &amp; recycles process water.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/sludge-silo\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-18T06:59:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sludge-silo\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sludge-silo\",\"name\":\"Sludge Silo for Concrete & Stone Slurry Treatment\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-12T13:41:16+00:00\",\"dateModified\":\"2026-05-18T06:59:03+00:00\",\"description\":\"Advanced sludge silo \u2713 for demolition drilling and sawing slurry that separates solids & recycles process water.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sludge-silo#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sludge-silo\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/sludge-silo#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Sludge silo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Sludge Silo for Concrete & Stone Slurry Treatment","description":"Advanced sludge silo \u2713 for demolition drilling and sawing slurry that separates solids & recycles process water.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/sludge-silo","og_locale":"en_US","og_type":"article","og_title":"Sludge Silo for Concrete & Stone Slurry Treatment","og_description":"Advanced sludge silo \u2713 for demolition drilling and sawing slurry that separates solids & recycles process water.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/sludge-silo","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-18T06:59:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/sludge-silo","url":"https:\/\/www.darda.de\/en\/knowledge\/sludge-silo","name":"Sludge Silo for Concrete & Stone Slurry Treatment","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-12T13:41:16+00:00","dateModified":"2026-05-18T06:59:03+00:00","description":"Advanced sludge silo \u2713 for demolition drilling and sawing slurry that separates solids & recycles process water.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/sludge-silo#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/sludge-silo"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/sludge-silo#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Sludge silo"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19739","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19739"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19739\/revisions"}],"predecessor-version":[{"id":27509,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19739\/revisions\/27509"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19739"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}