{"id":19727,"date":"2025-12-11T08:43:57","date_gmt":"2025-12-11T07:43:57","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19727"},"modified":"2026-05-16T09:07:02","modified_gmt":"2026-05-16T07:07:02","slug":"valve-housing","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/valve-housing","title":{"rendered":"Valve housing"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Valve housings are central components in fluid power systems. They guide and protect the spool or valve body, direct flows, and safeguard the pressure balance. In demolition and splitting technology as used by Darda GmbH, valve housings connect hydraulic power packs with tools such as concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>. They help ensure that forces are precisely metered, movements safely controlled, and media losses minimized-even under harsh environmental conditions on construction sites, in tunnels, or in natural stone extraction. Their geometry and surface quality have a measurable effect on cycle times, energy efficiency, and the operational reliability of attachments.<\/p>\n<h2>Definition: What is meant by a valve housing?<\/h2>\n<p>A valve housing is the housing of a slide or spool valve (directional or flow control valve). It forms the pressure-bearing structure, contains the control bores and channels, accommodates seals, and ensures the precise guidance of the spool (spool, slider body). In hydraulic applications, the valve housing controls the flow of pressurized fluid between pump, working cylinders, and tank. In practice, the term is also used for the housings of gate valves in pipelines; in mobile hydraulics- such as with concrete demolition shears, rock splitters, or combi shears-the focus is usually the housing of a directional control valve or a valve manifold. In compact manifolds, several functions are integrated in one housing to reduce interfaces, leakage paths, and installation space.<\/p>\n<h2>Design and operating principle<\/h2>\n<p>The valve housing contains precisely machined bores and channels. The spool moves axially within them. Depending on its position, the spool geometry connects or isolates individual ports (P, T, A, B). In this way, the direction of motion, speed, and holding function of hydraulic cylinders are defined. Center positions can provide fail-safe states, for example all ports closed for load holding or P to T open for depressurization, depending on the application.<\/p>\n<h3>Key components<\/h3>\n<ul>\n<li><strong>Housing body<\/strong> with pressure channels, connection threads, or flange faces<\/li>\n<li><strong>Spool<\/strong> with control edges for switching<\/li>\n<li><strong>Sealing elements<\/strong> (O-rings, backup rings, wipers) to minimize leakage<\/li>\n<li><strong>Actuation<\/strong> (manual, hydraulic, electric) for spool adjustment<\/li>\n<li><strong>Return elements<\/strong> (springs), optional for a center position<\/li>\n<li><strong>End caps and bushings<\/strong> for axial guidance and to accommodate actuation forces<\/li>\n<li><strong>Ports and markings<\/strong> with clear identification of P, T, A, B and flow direction to support correct installation<\/li>\n<\/ul>\n<h3>Flow and sealing concept<\/h3>\n<p>Flow occurs across control edges with defined overlap. Surface quality and geometric accuracy in the housing determine leakage and friction behavior. A suitable sealing concept reduces internal leakage and protects against external emissions without impairing the spool\u2019s ease of movement. Typical clearance fits and fine surface finishes in guide bores limit stick-slip, while filtration and cleanliness classes prevent abrasive wear on control edges.<\/p>\n<h2>Valve housings in demolition and splitting technology<\/h2>\n<p>Hydraulic tools from Darda GmbH operate with high pressures and varying loads. Valve housings in the valves of the tools or the hydraulic power packs must therefore be robust, precise, and service-friendly. Short flow paths, optimized cross-sections, and accessible interfaces facilitate maintenance and stable performance under shock and vibration.<\/p>\n<h3>Concrete demolition shears<\/h3>\n<p>In concrete demolition shears, valve housings control the pressurization and relief of the hydraulic fluid for opening and closing the jaws. The housings must withstand pressure spikes from cutting reinforcement, impact loads when biting in, and ingress of debris. Low internal leakage helps keep <em>hold functions<\/em> stable, for example when securing a concrete element. Integrated load-holding or check functions in the housing can prevent unintended jaw movement when loads change abruptly.<\/p>\n<h3>Rock and concrete splitters<\/h3>\n<p>In splitting, reproducible pressure profiles are crucial. The valve housing of a directional or pressure control valve supports precisely metered pressurization of the splitting cylinders. Sensitive switching behavior promotes controlled crack growth in the rock and reduces undesirable impact effects. Ramped switching and pressure-limiting stages implemented in the housing contribute to repeatability and protect the system against overload.<\/p>\n<h3>Combi shears, multi cutters, steel shears, and tank cutters<\/h3>\n<p>These tools require reliable switching under load, often in alternating operation. Valve housings with optimized flow cross-sections limit pressure losses and heating. In tank-cutting applications, the media compatibility of the housing material and the seals can play a particular role. Smooth internal transitions and debris-tolerant designs support consistent actuation even when fine particles or residual media are present.<\/p>\n<h2>Design features and materials<\/h2>\n<p>Valve housings are pressure-bearing and functionally precise. The choice of material and machining is based on pressure level, flow rate, and environment.<\/p>\n<ul>\n<li><strong>Materials<\/strong>: Quenched and tempered steel (e.g., 42CrMo4) for high strength; spheroidal cast-iron housings for damping; aluminum for low weight (at moderate pressures); stainless steel for media or corrosion resistance.<\/li>\n<li><strong>Wall thicknesses and ribs<\/strong>: to absorb internal pressure and bending loads from hose forces.<\/li>\n<li><strong>Surfaces<\/strong>: finely ground guides for the spool; suitable coatings for corrosion protection and wear reduction.<\/li>\n<li><strong>Seal grooves<\/strong>: sized according to manufacturer specifications, with backup rings for extrusion resistance at high pressure.<\/li>\n<li><strong>Connections<\/strong>: threads, screw-in cartridges (cartridge), or flanges per common interfaces, matched to the hydraulic power packs and tools of Darda GmbH.<\/li>\n<li><strong>Heat treatment and stress relief<\/strong>: controlled processes to achieve dimensional stability under pressure and temperature cycling.<\/li>\n<li><strong>Identification<\/strong>: durable marking of type, flow direction, and pressure ratings to support correct selection and service.<\/li>\n<\/ul>\n<h2>Selection criteria and design<\/h2>\n<p>The correct design of a valve housing supports efficiency, service life, and safety.<\/p>\n<ol>\n<li><strong>Rated pressure and load spectra<\/strong>: take into account static and dynamic pressure spikes; plan safety margins.<\/li>\n<li><strong>Flow rate and pressure loss<\/strong>: size flow channels to avoid heating and cavitation.<\/li>\n<li><strong>Control characteristics<\/strong>: overlap of control edges (under-, equal-, or over-lapped) appropriate to the desired sensitivity, e.g., when positioning a concrete demolition shear.<\/li>\n<li><strong>Media compatibility<\/strong>: mineral oils or rapidly biodegradable hydraulic fluids; check seal compatibility.<\/li>\n<li><strong>Temperature range<\/strong>: consider viscosity effects and thermal expansion.<\/li>\n<li><strong>Actuation<\/strong>: manual (lever), hydraulic, pneumatic, or electric (solenoid valve) depending on the application environment.<\/li>\n<li><strong>Contamination tolerance<\/strong>: robust clearances and good filtration; important in concrete demolition and natural stone extraction.<\/li>\n<li><strong>Standards and compliance<\/strong>: design in line with applicable fluid power safety rules and documentation requirements.<\/li>\n<li><strong>Noise and vibration<\/strong>: reduce throttling points and avoid resonance-prone geometries to limit airborne and structure-borne noise.<\/li>\n<li><strong>Serviceability<\/strong>: provide test ports, space for torque tools, and accessible fasteners for quicker troubleshooting and seal replacement.<\/li>\n<\/ol>\n<h2>Manufacturing, machining, and testing<\/h2>\n<p>The functional quality of a valve housing depends on machining accuracy.<\/p>\n<ul>\n<li><strong>Machining<\/strong>: drilling, reaming, honing for guides and control bores; coaxiality and straightness are critical.<\/li>\n<li><strong>Cleaning<\/strong>: low-particle assembly through thorough deburring and flushing of channels.<\/li>\n<li><strong>Pressure and leak testing<\/strong>: verification of strength and leakage limits; if necessary, functional testing of switching positions.<\/li>\n<li><strong>Documentation<\/strong>: traceability of material, batches, and test parameters supports maintenance of Darda GmbH\u2019s tools.<\/li>\n<li><strong>Metrology<\/strong>: CMM checks and surface roughness measurements to verify tolerances in guide bores and sealing faces.<\/li>\n<li><strong>Endurance validation<\/strong>: pressure impulse and temperature cycling to assess fatigue strength and dimensional stability.<\/li>\n<\/ul>\n<h2>Installation in hydraulic power packs and tools<\/h2>\n<p>The installation location influences function and maintainability. In <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a>, valve housings are often integrated as a valve manifold; in tools they are located close to the actuator for short line runs and fast response. Mechanical decoupling and strain-free mounting prevent distortion of the housing and guide bores.<\/p>\n<h3>Assembly notes<\/h3>\n<ul>\n<li>Clean sealing faces, correct tightening torque, suitable bolt quality.<\/li>\n<li>Observe installation orientation to avoid air pockets and facilitate venting.<\/li>\n<li>Vibration protection and mechanical decoupling against impact loads in concrete demolition.<\/li>\n<li>Filtration: fine filters in pressure and return lines, wipers in exposed locations.<\/li>\n<li>Use only approved thread sealants and protect bores against the ingress of sealant residue.<\/li>\n<li>Flush the hydraulic circuit after installation and perform a documented functional test.<\/li>\n<\/ul>\n<h2>Maintenance, cleaning, and servicing<\/h2>\n<p>Regular care preserves switching precision and extends service life in demanding applications such as rock demolition and tunnel construction or strip-out.<\/p>\n<ul>\n<li><strong>Inspection<\/strong>: visual check for leakage, corrosion, cracks; functional test of switching positions.<\/li>\n<li><strong>Oil quality<\/strong>: monitor particle count and water content; replace oil and filters at set intervals.<\/li>\n<li><strong>Cleaning<\/strong>: gentle external cleaning; no aggressive chemicals that could attack seals.<\/li>\n<li><strong>Seal service<\/strong>: replace O-rings and backup rings when pressure-holding capability declines.<\/li>\n<li><strong>Documentation<\/strong>: record service loads and operating hours to plan maintenance.<\/li>\n<li><strong>Fastener check<\/strong>: re-torque mounting screws after initial operation where specified to maintain sealing integrity.<\/li>\n<li><strong>Condition data<\/strong>: where sensors are integrated, review operating temperature, cycle counts, and switching times for early anomaly detection.<\/li>\n<\/ul>\n<h2>Typical failure patterns and causes<\/h2>\n<ul>\n<li><strong>Sluggish or stiff switching<\/strong>: contamination, burr formation, incorrect viscosity, or worn guides.<\/li>\n<li><strong>Internal leakage<\/strong>: worn spool edges\/guides, unsuitable seals, thermal distortion.<\/li>\n<li><strong>External leakage<\/strong>: pinched O-rings, insufficient tightening torque, damaged sealing faces.<\/li>\n<li><strong>Cavitation\/noise<\/strong>: excessive flow velocities, unfavorable cross-sections, air in the system.<\/li>\n<li><strong>Corrosion<\/strong>: insufficient protection in wet and dusty environments, incompatible media.<\/li>\n<li><strong>Excessive pressure drop and heating<\/strong>: undersized channels, sharp edges, or misaligned ports in the housing.<\/li>\n<li><strong>Thread damage at ports<\/strong>: over-torque, galling, or contamination during assembly.<\/li>\n<\/ul>\n<h2>Safety aspects<\/h2>\n<p>Valve housings are safety-relevant because malfunctions can affect tool movements. In general: observe the manufacturer\u2019s specifications, allow installation only by trained personnel, and avoid changes to control systems. Depressurize and secure against restart before working on the system. Document tests after maintenance. Consider residual energy in actuators and use protective caps or covers where moving parts are exposed.<\/p>\n<h2>Environmental and sustainability aspects<\/h2>\n<p>A tight, precisely manufactured valve housing reduces oil losses and thus environmental impacts on construction sites. Media-compatible seals support the use of rapidly biodegradable hydraulic fluids. Durable materials, replaceable sealing elements, and repair-friendly designs improve the carbon footprint over the life cycle. Remanufacturing of housings and recycling of metallic materials conserve resources when tools are overhauled.<\/p>\n<h2>Trends and further developments<\/h2>\n<p>Modern valve housings increasingly integrate sensors for condition monitoring (e.g., position, temperature, pressure). Improved surfaces and coatings reduce friction and wear. Flow-optimized geometries lower pressure losses, which in Darda GmbH\u2019s mobile hydraulic systems supports energy efficiency and keeps oil temperature within the permissible range-important for continuous operations in natural stone extraction or in specialized deconstruction. Additional trends include compact multifunction manifolds, data interfaces for predictive maintenance, and design methods that leverage simulation to balance responsiveness, robustness, and low leakage.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Valve housings are central components in fluid power systems. They guide and protect the spool or valve body, direct flows, and safeguard the pressure balance. In demolition and splitting technology as used by Darda GmbH, valve housings connect hydraulic power packs with tools such as concrete demolition shears or rock <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/valve-housing\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19727","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Valve Housing for Hydraulic Spool Valves<\/title>\n<meta name=\"description\" content=\"Discover valve housing for hydraulic spool valves \u27a4 functions, design, materials, maintenance for robust fluid control.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/valve-housing\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Valve Housing for Hydraulic Spool Valves\" \/>\n<meta property=\"og:description\" content=\"Discover valve housing for hydraulic spool valves \u27a4 functions, design, materials, maintenance for robust fluid control.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/valve-housing\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-16T07:07:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/valve-housing\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/valve-housing\",\"name\":\"Valve Housing for Hydraulic Spool Valves\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-11T07:43:57+00:00\",\"dateModified\":\"2026-05-16T07:07:02+00:00\",\"description\":\"Discover valve housing for hydraulic spool valves \u27a4 functions, design, materials, maintenance for robust fluid control.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/valve-housing#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/valve-housing\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/valve-housing#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Valve housing\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Valve Housing for Hydraulic Spool Valves","description":"Discover valve housing for hydraulic spool valves \u27a4 functions, design, materials, maintenance for robust fluid control.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/valve-housing","og_locale":"en_US","og_type":"article","og_title":"Valve Housing for Hydraulic Spool Valves","og_description":"Discover valve housing for hydraulic spool valves \u27a4 functions, design, materials, maintenance for robust fluid control.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/valve-housing","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-16T07:07:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/valve-housing","url":"https:\/\/www.darda.de\/en\/knowledge\/valve-housing","name":"Valve Housing for Hydraulic Spool Valves","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-11T07:43:57+00:00","dateModified":"2026-05-16T07:07:02+00:00","description":"Discover valve housing for hydraulic spool valves \u27a4 functions, design, materials, maintenance for robust fluid control.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/valve-housing#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/valve-housing"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/valve-housing#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Valve housing"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19727","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19727"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19727\/revisions"}],"predecessor-version":[{"id":27463,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19727\/revisions\/27463"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19727"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}