{"id":19724,"date":"2025-12-11T13:26:11","date_gmt":"2025-12-11T12:26:11","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19724"},"modified":"2026-05-16T10:18:03","modified_gmt":"2026-05-16T08:18:03","slug":"shift-plan","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/shift-plan","title":{"rendered":"Shift plan"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A shift plan structures time, personnel, and equipment on construction sites and in yards. In concrete demolition, building gutting, rock excavation, and tunnel construction, it determines safety, on-time delivery, and cost-effectiveness. Especially when using concrete demolition shears, stone splitting machines and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, and the associated hydraulic power packs, a well-thought-out shift plan defines who performs which task when, which tools are ready, and how limits for noise emission, dust exposure, and low vibration levels are maintained. It also aligns work windows with permits, neighborhood protection, and logistics slots to ensure continuous, auditable compliance across all project phases.<\/p>\n<h2>Definition: What is meant by a shift plan?<\/h2>\n<p>A shift plan is the systematic assignment of working hours, qualifications, and resources (people, machines, aids) to specific tasks over days or weeks. It describes shift models (e.g., two- or three-shift operation), start and end times, handovers, breaks, maintenance windows, safety briefings, and emergency procedures. In practice, the shift plan links <em>personnel scheduling<\/em>, <em>equipment deployment planning<\/em>, and <em>workflow control<\/em> into a consistent, verifiable planning document. It is closely coupled with method statements and risk assessments and serves as a reference for permits, inspections, and documentation.<\/p>\n<ul>\n<li><strong>Planning artifacts:<\/strong> roster or schedule, equipment allocation list, maintenance calendar, handover checklist, and communication plan.<\/li>\n<li><strong>Change control:<\/strong> versioned updates with reasons for changes, impact on KPIs, and approval trail.<\/li>\n<\/ul>\n<h2>Shift planning in concrete demolition and special demolition<\/h2>\n<p>In <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, the shift plan defines the sequence of work steps &#8211; from exposing structural elements through cutting and splitting to crushing and construction logistics. Concrete demolition shears, stone splitting machines and concrete splitters, hydraulic demolition shears and concrete cutters are scheduled according to availability, performance, and permissible operating times. This allows noisy sections to be placed in suitable time windows, vibrations to be minimized, and bottlenecks in hydraulic power packs, power supply, or compressed air supply to be avoided. Temporary supports, load paths, and monitoring points are incorporated so that intermediate structural states remain stable and predictable throughout the sequence.<\/p>\n<h2>Objectives and benefits of a professional shift plan<\/h2>\n<p>A good shift plan serves multiple objectives that reinforce each other:<\/p>\n<ul>\n<li><strong>Safety:<\/strong> Orderly processes, clear responsibilities, defined exclusion and protection zones.<\/li>\n<li><strong>Efficiency:<\/strong> High equipment utilization, short setup times, coordinated construction logistics.<\/li>\n<li><strong>Quality:<\/strong> Appropriate tools for each work step, controlled cutting and splitting results.<\/li>\n<li><strong>On-time delivery:<\/strong> Realistic cycles, buffers for uncertainties, seamless handovers.<\/li>\n<li><strong>Environmental and neighbor protection:<\/strong> Noise control and dust protection, compliance with time windows.<\/li>\n<li><strong>Cost control:<\/strong> Transparent resource use, reduced rework and idle time, reliable productivity baselines.<\/li>\n<li><strong>Compliance and documentation:<\/strong> Traceable adherence to permits, working-time rules, and method statements.<\/li>\n<\/ul>\n<h2>Building blocks of a shift plan<\/h2>\n<p>A robust shift plan connects personnel, equipment, and constraints into a clear daily and weekly sequence. It translates risks and performance targets into practical, time-bound instructions for the site team and interfaces.<\/p>\n<h3>Personnel and qualification matrix<\/h3>\n<p>Qualifications are defined for each step: supervisors, operators for concrete demolition shears, operators of stone splitting machines and concrete splitters and hydraulic power packs, riggers, safety watch, metrology. The plan lists substitutes and regulates handovers between shifts. Authorizations, medical fitness, language capabilities, and fatigue management are documented to maintain safe staffing levels at all times.<\/p>\n<h3>Machine and tool allocation<\/h3>\n<p>The shift plan includes allocations for concrete demolition shears, stone splitting machines, hydraulic demolition shears, steel shear, concrete cutters, and cutting torch as well as the required hydraulic power packs. It considers setup times for tool changes, inspection intervals for hose lines and couplings, and defines rest or cooling times to prevent overheating and wear. <strong>Spare tools and wear parts<\/strong> (blades, chisels, hose lines, filters) are pre-positioned, and oil cleanliness plus hose routing are planned to avoid contamination and trip hazards.<\/p>\n<h3>Logistics, energy, and maintenance<\/h3>\n<p>Material flow (removal, intermediate storage), access routes, crane operations, and lifting devices must be coordinated with the work steps. Fueling and service windows are scheduled for hydraulic <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">power units<\/a>. Maintenance, visual inspections, and pressure tests are listed as fixed items in the shift plan. Waste segregation, water and dust management, access control, and lockout-tagout steps are synchronized to prevent conflicts and waiting times.<\/p>\n<h2>Shift models and operating times<\/h2>\n<p>The appropriate shift model results from project size, permits, and neighborhood protection.<\/p>\n<ul>\n<li><strong>Early\/Late shift (2-shift):<\/strong> For urban deconstruction with noise control windows. Schedule noisy activities (e.g., size-reduction with concrete demolition shears) for midday.<\/li>\n<li><strong>Three-shift operation:<\/strong> For tunnel construction or time-critical projects. Night work focuses on <em>low-vibration<\/em> processes, such as splitting with stone splitting machines and concrete splitters.<\/li>\n<li><strong>Weekend windows:<\/strong> For work requiring traffic or production interruptions, such as cutting torch work on tanks in industrial environments.<\/li>\n<li><strong>Split or hybrid shifts:<\/strong> For staggered crews and overlapping handovers to maintain continuity without breaching noise or traffic constraints.<\/li>\n<\/ul>\n<h3>Special aspects in tunnel and rock environments<\/h3>\n<p>In tunnels and rock excavation, setup and safety times are extended. The shift plan anchors access and ventilation rules, emergency exit routes, gas and dust measurements, and the sequence of tunnel heading, splitting, and loading. Refuge areas, tag-in and tag-out procedures, water ingress control, and minimum ventilation rates are defined with explicit timing and responsibility.<\/p>\n<h2>Equipment deployment in the shift plan: concrete demolition shears and stone splitting machines and concrete splitters<\/h2>\n<p>Concrete demolition shears enable controlled removal and separation of reinforced elements. Stone splitting machines and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> operate with low vibration levels and are suitable for sensitive environments or load-bearing structures that must be opened without secondary damage. The shift plan defines the sequence to leverage synergies and avoid downtime. Tolerances for cut and split lines, debris sizes, and protection of adjacent assets are specified.<\/p>\n<ol>\n<li>Block off, survey, safety briefing for the shift.<\/li>\n<li>Building gutting and preparations (utilities, attachments, cuts).<\/li>\n<li>Pre-breaking and exposing with concrete demolition shears; perform controlled rebar cutting.<\/li>\n<li>Low-vibration opening or separating with stone splitting machines and concrete splitters where required.<\/li>\n<li>Crushing to transport size, removal, visual and dimensional inspection.<\/li>\n<li>Maintenance, cleaning, documentation, handover to the next shift.<\/li>\n<\/ol>\n<h3>Hydraulic power packs and energy windows<\/h3>\n<p>The output and availability of hydraulic power packs determine cycle time and parallel operation. The shift plan includes energy and service windows to handle fueling, filter changes, and pressure tests without production loss. Redundancy for critical power units and telemetry for operating hours and pressure monitoring are planned to reduce unplanned stops.<\/p>\n<h3>Interfaces to hydraulic demolition shears, concrete cutters, steel shear, and cutting torch<\/h3>\n<p>Cutting operations on structural steel section, reinforcement, tanks, or pipelines are sequenced so that cutting and splitting processes do not interfere with each other. The plan clearly assigns when cutting technology is to be applied upstream or downstream of the concrete demolition shear or the splitting devices. Hot work permits, fire watches, shielding, and spark management are time-boxed and integrated with ventilation and housekeeping routines.<\/p>\n<h2>Application-specific shift planning<\/h2>\n<h3>Building gutting and cutting<\/h3>\n<p>Detailed planning with short cycles, frequent tool changes, and many interfaces. Focus on dust protection and noise control; firmly schedule breaks for cleaning and visual inspections. Hazardous substances and residual utilities are cleared via defined permits and isolation certificates before tools are energized.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>Sequences with concrete demolition shears for load-bearing elements and splitting devices for low-vibration openings. Intermediate structural states are considered; exclusion zones and communication routines are integral to the plan. Temporary works, monitoring of deflection and crack propagation, and defined stop criteria support safe progression.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Stone splitting machines for defined intended fracture lines, combined with material handling and ventilation. The shift plan regulates loading cycles, the transport route, and synchronization with safeguarding measures. Face mapping, convergence measurements, and mucking intervals are aligned to minimize rehandling and exposure times.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Splitting devices are matched to block quality and joint pattern. Shift planning ensures reproducible cycles of pilot borehole drilling, splitting, lifting, and loading with minimal damage. Seasonal weather effects, slope stability, and pad preparation are factored into daily decisions.<\/p>\n<h3>Special deployment<\/h3>\n<p>In sensitive areas (e.g., near protected building fabric), splitting technology is used to minimize vibrations. The shift plan keeps alternative methods and safety reserves ready. Trials on mock-ups and defined monitoring thresholds enable controlled adaptation when conditions deviate.<\/p>\n<h2>Safety, briefing, and communication<\/h2>\n<p>Safety is an integral part of the shift plan. Briefings, releases, and inspections are planned and documented as work packages.<\/p>\n<ul>\n<li>Shift start with safety briefing and release of the work area.<\/li>\n<li>Tool and equipment check (concrete demolition shears, splitting devices, hydraulic power packs).<\/li>\n<li>Measurements and logs (dust, noise, and, where applicable, gases in the tunnel).<\/li>\n<li>Handover processes with status report and residual hazards.<\/li>\n<li>Permit-to-work status review (isolation, hot work, confined space) and radio check with channel discipline.<\/li>\n<\/ul>\n<p>Legal requirements regarding working hours, rest periods, and noise control must be observed. The specific interpretation is project-specific and without guarantee; the shift plan reflects generally accepted rules of technology.<\/p>\n<h2>Key performance indicators and controlling<\/h2>\n<p>Clear KPIs make shifts controllable and comparable. They flow into daily and weekly planning and help with improvement.<\/p>\n<ul>\n<li>Throughput per shift (m\u00c2\u00b3 concrete, t material, number of cuts\/splits).<\/li>\n<li>Equipment utilization (concrete demolition shears, stone splitting machines and concrete splitters, hydraulic power packs).<\/li>\n<li>Setup and downtime, root cause analysis.<\/li>\n<li>Quality KPIs (cut\/split quality, rework).<\/li>\n<li>Safety KPIs (near misses, deviations).<\/li>\n<li>Stability of cycles and takt adherence (planned vs. actual duration per step).<\/li>\n<li>Environmental KPIs (noise exceedances, dust values, waste segregation rate).<\/li>\n<\/ul>\n<h3>Visual daily control<\/h3>\n<p>Visual boards and short shift meetings ensure transparency. Deviations are addressed immediately; follow-up plans adjust cycles, personnel, or equipment allocation. Escalation thresholds and decision rights are visible so that constraints are removed within the shift, not after it.<\/p>\n<h2>Digital shift planning in demolition and tunnel construction<\/h2>\n<p>Digital tools support capacity balancing, real-time resource planning, and documentation. Mobile capture on site, offline-capable entries, photos of cut and split locations, and automatic maintenance reminders for hydraulic power packs improve planning quality. Data on noise emission, fine dust, and vibrations can be integrated to adhere precisely to time windows. Interfaces to scheduling, BIM or a common data environment, plus audit-proof timestamps and role-based access, strengthen traceability without adding administrative burden.<\/p>\n<h2>Procedure: From site analysis to the shift plan<\/h2>\n<ol>\n<li>Clarify objectives and constraints (permits, noise control, logistics windows).<\/li>\n<li>Record structural elements and materials; define suitable methods (concrete demolition shear, concrete splitter, hydraulic demolition shear\/steel shear, cutting torch\/concrete cutter).<\/li>\n<li>Plan resources (personnel qualifications, equipment, hydraulic power packs, spare tools).<\/li>\n<li>Select the shift model, define buffers and maintenance windows.<\/li>\n<li>Divide the process into cycles; integrate handovers, exclusion, and inspection processes.<\/li>\n<li>Plan emergency and fallback levels (equipment failure, weather, supply bottlenecks).<\/li>\n<li>Define communication (shift start, interim updates, end-of-day).<\/li>\n<li>Implement controlling and continuous improvement.<\/li>\n<li>Run a dry run or pilot section and validate assumptions with stakeholders; update the plan and approvals accordingly.<\/li>\n<\/ol>\n<h2>Typical planning mistakes and how to avoid them<\/h2>\n<ul>\n<li>Missing maintenance windows for hydraulic power packs and tools.<\/li>\n<li>Unclear interfaces between building gutting, splitting, and crushing.<\/li>\n<li>Overloaded noise windows, no alternative cycles for sensitive periods.<\/li>\n<li>No substitutes for key qualifications (e.g., operator for concrete demolition shear).<\/li>\n<li>Underestimated setup times for tool changes and hose management (hydraulic hose line).<\/li>\n<li>Too little buffer for measurements, documentation, and handovers.<\/li>\n<li>Insufficient redundancy for critical energy sources and power units.<\/li>\n<li>Incomplete isolation and permit checks before hot work or confined activities.<\/li>\n<\/ul>\n<h2>Example shift structure for a deconstruction day<\/h2>\n<ol>\n<li>06:30-07:00 Briefing, release, equipment check.<\/li>\n<li>07:00-09:30 Pre-breaking with concrete demolition shears, parallel building gutting.<\/li>\n<li>09:30-10:00 Setup and inspection window, hydraulic check.<\/li>\n<li>10:00-12:30 Low-vibration splitting of sensitive areas with stone splitting machines and concrete splitters.<\/li>\n<li>13:00-15:00 Crushing, construction waste sorting, haulage logistics.<\/li>\n<li>15:00-15:30 Cleaning, maintenance, documentation, handover.<\/li>\n<\/ol>\n<p>Time windows are adapted to permits, neighborhood protection, and logistics slots. Buffers absorb variability in material properties, access, and weather without jeopardizing handovers or compliance.<\/p>\n<h2>Documentation and verification<\/h2>\n<p>A shift plan is only as good as its execution. Daily reports, measurement logs, maintenance records, and photo documentation ensure transparency. Deviations flow into the next planning cycle. In this way, a learning system emerges that continuously improves the safe and efficient use of concrete demolition shears, stone splitting machines and concrete splitters, hydraulic power packs, hydraulic demolition shears, concrete cutters, steel shear, and cutting torch &#8211; across all application areas. Formal sign-offs, versioned plan updates, and retention of evidence create an audit-ready trail for clients and authorities.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A shift plan structures time, personnel, and equipment on construction sites and in yards. In concrete demolition, building gutting, rock excavation, and tunnel construction, it determines safety, on-time delivery, and cost-effectiveness. Especially when using concrete demolition shears, stone splitting machines and hydraulic rock and concrete splitters, and the associated hydraulic <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/shift-plan\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19724","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Shift Plan for Construction &amp; Demolition Projects<\/title>\n<meta name=\"description\" content=\"Your shift plan for demolition, rock excavation &amp; tunnel construction \u2713 Safer work, on-time delivery, controlled costs.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/shift-plan\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Shift Plan for Construction &amp; Demolition Projects\" \/>\n<meta property=\"og:description\" content=\"Your shift plan for demolition, rock excavation &amp; tunnel construction \u2713 Safer work, on-time delivery, controlled costs.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/shift-plan\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-16T08:18:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shift-plan\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shift-plan\",\"name\":\"Shift Plan for Construction & Demolition Projects\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-11T12:26:11+00:00\",\"dateModified\":\"2026-05-16T08:18:03+00:00\",\"description\":\"Your shift plan for demolition, rock excavation & tunnel construction \u2713 Safer work, on-time delivery, controlled costs.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shift-plan#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shift-plan\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shift-plan#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Shift plan\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Shift Plan for Construction & Demolition Projects","description":"Your shift plan for demolition, rock excavation & tunnel construction \u2713 Safer work, on-time delivery, controlled costs.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/shift-plan","og_locale":"en_US","og_type":"article","og_title":"Shift Plan for Construction & Demolition Projects","og_description":"Your shift plan for demolition, rock excavation & tunnel construction \u2713 Safer work, on-time delivery, controlled costs.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/shift-plan","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-16T08:18:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/shift-plan","url":"https:\/\/www.darda.de\/en\/knowledge\/shift-plan","name":"Shift Plan for Construction & Demolition Projects","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-11T12:26:11+00:00","dateModified":"2026-05-16T08:18:03+00:00","description":"Your shift plan for demolition, rock excavation & tunnel construction \u2713 Safer work, on-time delivery, controlled costs.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/shift-plan#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/shift-plan"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/shift-plan#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Shift plan"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19724","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19724"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19724\/revisions"}],"predecessor-version":[{"id":27467,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19724\/revisions\/27467"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19724"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}