{"id":19720,"date":"2025-12-10T15:09:19","date_gmt":"2025-12-10T14:09:19","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19720"},"modified":"2026-05-16T11:47:02","modified_gmt":"2026-05-16T09:47:02","slug":"shear-strength","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/shear-strength","title":{"rendered":"Shear strength"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p><strong>Shear strength<\/strong> describes a material\u2019s resistance to shearing along a potential slip plane. In the practice of concrete demolition, rock excavation, and natural stone extraction, it decisively determines how concrete, reinforced concrete, and rock behave under shear, compression, and tension. For applications with concrete demolition shear as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH, understanding shear strength is fundamental in order to predict fracture mechanisms, plan work sequences, and achieve controlled separations with minimal edge damage. Clear knowledge of <em>shear resistance<\/em> supports efficient sequencing, reduces rework, and enables low-impact separation surfaces.<\/p>\n<h2>Definition: What is meant by shear strength?<\/h2>\n<p>Shear strength is the maximum shear stress a material can sustain before a <em>shear fracture<\/em> occurs along a plane. It is generally defined as the limit value of shear stress and depends on internal bonding (cohesion), the surface roughness of potential cracks, and the normal stress on the shear plane. In concrete and rock, grain structure, moisture content, aging, temperature, and loading rate additionally influence the resulting shear capacity. Reinforced concrete exhibits complex behavior because reinforcement, aggregate roughness, and crack interlock (aggregate interlock) co-determine the shear load-bearing mechanism. In engineering practice, shear strength is frequently described by a frictional failure law with <em>cohesion<\/em> and an effective <em>friction angle<\/em>, reflecting the interplay of bond and roughness under normal stress.<\/p>\n<h2>Mechanical fundamentals and influencing factors<\/h2>\n<p>The shear strength of mineral-based construction materials results from the interplay of cohesive forces and frictional components on microscopic separation planes. With increasing normal stress, the friction component increases, allowing higher shear forces to be sustained. In heterogeneous materials such as concrete or natural stone, preferred slip planes form along transitions with lower bond strength, for example at grain interfaces, microcracks, or joints. The <em>dilation<\/em> tendency of rough crack faces contributes to resistance because sliding requires additional opening against the applied normal stress.<\/p>\n<h3>Key influencing variables<\/h3>\n<ul>\n<li><strong>Material composition:<\/strong> Cement paste matrix, aggregate, pore structure, and any fabric anisotropy determine shear capacity.<\/li>\n<li><strong>Moisture and temperature:<\/strong> Moisture often reduces cohesion; freeze-thaw cycles promote microdamage.<\/li>\n<li><strong>Loading rate:<\/strong> Faster loading can yield apparently higher strengths but more brittle fracture patterns.<\/li>\n<li><strong>Normal stress:<\/strong> Higher confinement increases the frictional share and thus the shear strength along rough fracture surfaces.<\/li>\n<li><strong>Crack roughness:<\/strong> Interlock on roughened or toothed separation planes increases shear resistance.<\/li>\n<li><strong>Reinforcement (in reinforced concrete):<\/strong> Transverse reinforcement, dowel action, and bond influence shear capacity and crack formation.<\/li>\n<li><strong>Time-dependent effects:<\/strong> Creep, fatigue, and chemical attack can reduce shear resistance over the life cycle.<\/li>\n<li><strong>Scale and boundary conditions:<\/strong> Specimen size, confinement, and proximity to free edges alter the apparent shear capacity.<\/li>\n<\/ul>\n<h2>Shear strength in concrete and reinforced concrete<\/h2>\n<p>Concrete shows a brittle fracture characteristic; shear cracks form preferentially along zones of low tensile strength and at transitions between aggregate and matrix. In reinforced concrete, transverse reinforcement, bond, and interlock effects add to increase shear capacity. For demolition this means: crack initiation, notch effects, and controlled guidance of the shear plane determine how efficiently and predictably components can be separated. Near supports, the interaction of shear with bending and axial restraint requires staged work steps to prevent unintended redistribution.<\/p>\n<h3>Relevance for concrete demolition shear<\/h3>\n<ul>\n<li>The arrangement of the cutting and crushing zones of concrete demolition shear aims to induce shear cracks and propagate them along the weakest planes.<\/li>\n<li>By pre-cracking and defining attack points, the effective local shear strength of a component can be reduced, lowering the force required for separation.<\/li>\n<li>In heavily reinforced sections, the bond between concrete and steel influences shear behavior; the approach therefore considers the interplay of shearing, crushing, and extracting the reinforcement.<\/li>\n<li>Edge distance and support conditions affect crack kinematics; adequate spacing helps avoid spalling and uncontrolled diagonal cracking.<\/li>\n<\/ul>\n<h2>Shear strength of natural stone and rock<\/h2>\n<p>Rocks have shear strengths that depend on material and bedding. Beyond intact strength, the joint network controls the actual shear capacity of the rock mass: roughness, infilling, water content, and the orientation of discontinuities are decisive. In rock excavation and tunnel construction, natural weaknesses are exploited to activate separation planes. Distinction is often made between <em>peak<\/em> shear strength at first slip and <em>residual<\/em> shear strength after polishing or crushing of asperities.<\/p>\n<h3>Relation to stone and concrete hydraulic splitter<\/h3>\n<ul>\n<li>Splitting wedges generate local tensile and compressive fields that activate existing joint systems; along these planes the rock fails under combined tension and shear.<\/li>\n<li>Targeted wedge positioning lowers the required splitting force because shear strength is reduced along already weakened planes.<\/li>\n<li>In natural stone extraction, accounting for bedding and shear resistance enables clean separation surfaces with minimal edge spalling.<\/li>\n<li>Borehole spacing and depth control the overlap of stress fields, improving crack coalescence along intended shear planes.<\/li>\n<\/ul>\n<h2>Test methods for determining shear strength<\/h2>\n<p>The determination of shear strength depends on material and project goals and uses various laboratory and field tests. Selection is guided by the structure of the construction material, the required accuracy, and site constraints. Where applicable, tests should record peak and residual parameters and document specimen moisture and temperature states.<\/p>\n<h3>Direct shear and ring shear tests<\/h3>\n<p>In direct shear or ring shear tests, a specimen is sheared under controlled normal stress. This allows cohesion and friction components to be separated and parameters to be derived for analytical estimates. Depending on setup, the normal load can be held constant or coupled to dilation stiffness, which influences the measured frictional contribution.<\/p>\n<h3>Triaxial and equivalent methods<\/h3>\n<p>Confined tests under lateral confinement provide information on shear resistance under different stress states such as those occurring in structures or rock masses. Variation of confinement yields a failure envelope from which friction angle and cohesion can be estimated; drained conditions are typically chosen for quasi-static assessments.<\/p>\n<h3>Component-level tests<\/h3>\n<p>Push-off, bond, or notched tests on concrete members capture realistic shear mechanisms, including interlock, bond, and reinforcement contribution. On site, indicative deconstruction trials can help assess fracture behavior and crack path for guiding the tools. Size effects and the influence of free edges should be considered when transferring results to large components.<\/p>\n<h2>Shear strength in concrete demolition and special demolition<\/h2>\n<p>In deconstruction, shear strength governs the choice of separation, the sequence of cuts, and the guidance of load paths. The goal is to initiate shear cracks in a controlled manner and extend them along defined planes to release components in sections and avoid collateral damage. Low-vibration techniques and staged load application help remain close to, but not beyond, the local shear limit.<\/p>\n<h3>Use of concrete demolition shear<\/h3>\n<ul>\n<li>Pre-scoring or pre-pressing steps weaken cross-sections, reduce local shear strength, and facilitate subsequent separation.<\/li>\n<li>For slabs, walls, and beams, the location of potential shear cracks (e.g., diagonal crack zones) is used to define attack directions and stages.<\/li>\n<li>In gutted areas, reduced restraint can lower shear capacity and ease lifting off segments.<\/li>\n<li>Sequencing preserves interim stability; temporary props or stays can prevent progressive shear failure during sectioning.<\/li>\n<\/ul>\n<h3>Stone and concrete hydraulic splitter in deconstruction<\/h3>\n<ul>\n<li>Wedge orientations transverse to expected slip planes support targeted crack guidance, ensuring shear fracture proceeds in a controlled way.<\/li>\n<li>In massive foundations, shear resistance can be reduced section by section by setting splitting points on a grid.<\/li>\n<li>The combination of splitting (crack initiation) and shear work with the jaws (crack propagation) makes optimal use of the reduced shear capacity.<\/li>\n<li>Maintain a suitable standoff from free surfaces to limit blowout and edge spalling when activating near-surface shear planes.<\/li>\n<\/ul>\n<h2>Building gutting and cutting: cut path vs. shear resistance<\/h2>\n<p>When gutting works and separating components, the cut path must be selected so that remaining residual cross-sections do not produce unintended shear cracks. Saw cuts, core drilling, and pre-cuts serve to unload shear paths and define controllable fracture edges. Concrete demolition shear can then work along prepared zones of weakness with reduced shear strength. Where necessary, <em>temporary supports<\/em> and defined release steps stabilize load paths between individual cuts.<\/p>\n<h2>Planning aids for rock excavation and tunnel construction<\/h2>\n<p>The arrangement of splitting points, the orientation of attack directions, and the sequence of steps are aligned with joint systems and their shear resistance. The aim is to activate shear planes without provoking uncontrolled spalling or deflection of the crack path. Kinematic checks for wedges or slabs along joint sets provide a robust basis for sequencing and wedge control.<\/p>\n<h3>Proven practices<\/h3>\n<ol>\n<li>Fabric analysis: determine the orientation and roughness of existing discontinuities.<\/li>\n<li>Preconditioning: preloading or pre-drilling creates defined initiation points.<\/li>\n<li>Force-path control: introduce splitting and shear forces so that cracks follow planned planes.<\/li>\n<li>Section-by-section separation: small steps reduce unintended shear redistributions.<\/li>\n<li>Monitoring: observe displacement, vibrations, and acoustic indications to detect early deviation from planned crack paths.<\/li>\n<\/ol>\n<h2>Influence of the hydraulics on shear loading<\/h2>\n<p>Hydraulic power pack parameters of pressure and flow rate define the relation between force, displacement, and speed. For concrete demolition shear as well as stone and concrete hydraulic splitter, reproducible pressure levels are essential to control crack initiation and shear fracture. Sensitive control with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units for controlled pressure<\/a> makes it easier to work near the shear limit without provoking sudden breaks. Controlled ramp rates and stable supply minimize pressure spikes that could trigger premature shear failure.<\/p>\n<h2>Typical damage patterns when shear strength is exceeded<\/h2>\n<ul>\n<li><strong>Diagonal cracks<\/strong> in beam and wall regions as an expression of combined bending and shear.<\/li>\n<li><strong>Shearing along joints<\/strong> or contact surfaces with low bond (e.g., construction joints, embedments).<\/li>\n<li><strong>Crack jumps<\/strong> at inhomogeneities when local shear strength varies strongly.<\/li>\n<li><strong>Spalling<\/strong> at edges when frictional shear collapses and transverse tension dominates.<\/li>\n<li><strong>Punching shear<\/strong> in slabs or footings around concentrated load or support zones.<\/li>\n<\/ul>\n<h2>Work and safety aspects<\/h2>\n<p>Approaching the shear limit requires careful procedures. Load redistributions, residual capacities, and site boundary conditions must be continuously monitored. Decisions on method and sequence should be project-specific, with measurements, visual inspections, and proven workflows helping to avoid uncontrolled shear fractures. Legal requirements and recognized rules of practice must always be observed. Clear interfaces between trades and defined hold points support safe transitions between work steps.<\/p>\n<ul>\n<li><strong>Risk management:<\/strong> pre-task briefings and method statements define permissible load steps and reaction to deviations.<\/li>\n<li><strong>Evidence-based control:<\/strong> measure opening of predefined notches or cracks to verify that shear planes progress as planned.<\/li>\n<li><strong>Contingency measures:<\/strong> prepare alternative separation paths and temporary support options for unexpected shear behavior.<\/li>\n<\/ul>\n<h2>Relation to further products and application areas<\/h2>\n<p>Combination shears, Multi Cutters, steel shear, and tank cutters operate with different mixes of cutting, tearing, and shearing depending on the material. Here, too, the shear strength of the target material-whether concrete, stone, steel, or composite-is a key parameter for cut sequence, attack direction, and required force. In special operations with limited access or sensitive surroundings, precise control of shear loading plays a central role in keeping vibrations, noise, and edge damage low. Matching tool kinematics and feed speed to the expected shear resistance improves efficiency and surface quality.<\/p>\n<h2>Practice-oriented preparation tips<\/h2>\n<ul>\n<li>Component and fabric analysis, including potential slip planes and bond zones.<\/li>\n<li>Define attack points that deliberately reduce local shear strength (pre-drilling, notches).<\/li>\n<li>Match tool geometry and force level to the expected shear capacity behavior.<\/li>\n<li>Stepwise approach with control of crack propagation after each load step.<\/li>\n<li>Document fracture patterns to optimize subsequent steps.<\/li>\n<li>Conduct small-scale mock-ups or pilot fields to calibrate spacing, force levels, and sequence.<\/li>\n<li>Plan exclusion zones and handling paths to accommodate possible sudden shear releases.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Shear strength describes a material\u2019s resistance to shearing along a potential slip plane. In the practice of concrete demolition, rock excavation, and natural stone extraction, it decisively determines how concrete, reinforced concrete, and rock behave under shear, compression, and tension. For applications with concrete demolition shear as well as hydraulic <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/shear-strength\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19720","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Shear Strength in Concrete &amp; Rock Demolition<\/title>\n<meta name=\"description\" content=\"Understand shear strength in materials science \u2713 definition, factors, testing &amp; uses in concrete, rock, and demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/shear-strength\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Shear Strength in Concrete &amp; Rock Demolition\" \/>\n<meta property=\"og:description\" content=\"Understand shear strength in materials science \u2713 definition, factors, testing &amp; uses in concrete, rock, and demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/shear-strength\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-16T09:47:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shear-strength\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shear-strength\",\"name\":\"Shear Strength in Concrete & Rock Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-10T14:09:19+00:00\",\"dateModified\":\"2026-05-16T09:47:02+00:00\",\"description\":\"Understand shear strength in materials science \u2713 definition, factors, testing & uses in concrete, rock, and demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shear-strength#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shear-strength\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shear-strength#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Shear strength\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Shear Strength in Concrete & Rock Demolition","description":"Understand shear strength in materials science \u2713 definition, factors, testing & uses in concrete, rock, and demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/shear-strength","og_locale":"en_US","og_type":"article","og_title":"Shear Strength in Concrete & Rock Demolition","og_description":"Understand shear strength in materials science \u2713 definition, factors, testing & uses in concrete, rock, and demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/shear-strength","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-16T09:47:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/shear-strength","url":"https:\/\/www.darda.de\/en\/knowledge\/shear-strength","name":"Shear Strength in Concrete & Rock Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-10T14:09:19+00:00","dateModified":"2026-05-16T09:47:02+00:00","description":"Understand shear strength in materials science \u2713 definition, factors, testing & uses in concrete, rock, and demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/shear-strength#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/shear-strength"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/shear-strength#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Shear strength"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19720","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19720"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19720\/revisions"}],"predecessor-version":[{"id":27471,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19720\/revisions\/27471"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19720"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}