{"id":19718,"date":"2025-12-10T13:07:11","date_gmt":"2025-12-10T12:07:11","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19718"},"modified":"2026-05-16T12:38:02","modified_gmt":"2026-05-16T10:38:02","slug":"bucket-wheel","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/bucket-wheel","title":{"rendered":"Bucket wheel"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The bucket wheel is a large, rotating intake tool with multiple buckets or pockets that continuously loosens and conveys material. It defines large-scale machine design in open-pit mining, is used as a reclaimer in stockyard technology, and is encountered in the construction and deconstruction industries wherever massive volumes of earth and rock must be moved or secondarily broken. In projects involving <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock excavation and tunnel construction<\/a>, or natural stone extraction, the working processes of the bucket wheel intersect with controlled follow-up operations using concrete demolition shears or rock and concrete splitters from Darda GmbH &#8211; not as competitors but as complementary methods for precision, safety, and low vibration. As a continuous digging concept, the bucket wheel emphasizes uniform material flow and process stability, which are decisive for throughput and low emissions.<\/p>\n<h2>Definition: What is meant by a bucket wheel?<\/h2>\n<p>A bucket wheel is understood to be a mechanical continuous tool whose circumferential buckets take up material, separate it, and hand it over to a conveying stream. Typical embodiments are the bucket wheel of large bucket wheel excavators in open-pit mining as well as the bucket wheel of reclaimers in stockyards. What these systems have in common is the combination of rotational motion, defined cutting path, and continuous material discharge. In soft to medium-strength unconsolidated rock, material is loosened directly; in tough or heterogeneous geology, upstream loosening and secondary breaking methods &#8211; such as splitting or shears &#8211; are used to increase efficiency and safety. The term also covers specialized wheel geometries adapted to bulk density, grain size, and target grading.<\/p>\n<h2>Design and operating principle of the bucket wheel<\/h2>\n<p>A bucket wheel consists of the wheel body, radially arranged buckets with cutting edges, wear protection, scrapers, and a discharge point into a chute or onto a belt. The drive is via gears and motors, the bearing via large-dimension rolling bearings. On engagement, the bucket edge shears off a chip depending on the geology; the filled bucket swings to the discharge position and empties into the conveying stream. Speed, penetration depth, and feed rate determine the performance parameters. <strong>Essential<\/strong> is the continuous material flow without shock peaks: this reduces loads on structures and neighboring assets &#8211; an argument for deployments near sensitive infrastructure, where complementary <em>low-vibration<\/em> rock and concrete splitters or concrete demolition shears are used for defined edges and precise inserts.<\/p>\n<ul>\n<li><strong>Main components<\/strong>: wheel body, hub and bearing, buckets and cutting edges, wear liners, scrapers, discharge chute, drive and gearing, monitoring sensors.<\/li>\n<li><strong>Key adjustment variables<\/strong>: bucket count and volume, rotational speed, cut thickness, wheel penetration, and bucket fill factor.<\/li>\n<li><strong>Control objective<\/strong>: uniform discharge at the transfer point with minimal recirculation and low specific energy.<\/li>\n<\/ul>\n<h2>Operating principle, cutting mechanics, and material flow<\/h2>\n<p>The cutting mechanics are based on shear and bending fracture along natural weaknesses. In cohesive soils, scrapers prevent carryback; in abrasive materials, carbide strips and replaceable wear parts provide protection. The specific cutting energy depends on tool angle, grain bonding, moisture, and the required grading. Uniform discharge at the transfer point minimizes blockage and wear. When bucket wheels encounter foreign bodies such as reinforced concrete or large boulders, controlled breakdown with concrete demolition shears or rock splitting cylinders often follows &#8211; keeping the conveying line clear and protecting the wheel.<\/p>\n<ul>\n<li><strong>Typical cycle<\/strong>: approach with defined penetration &#8211; chip formation &#8211; bucket filling &#8211; transport to discharge &#8211; cleanout by scraper &#8211; repeat.<\/li>\n<li><strong>Flow conditioning<\/strong>: baffles and guides at the transfer point stabilize the stream and reduce dust peaks.<\/li>\n<li><strong>Protection<\/strong>: torque and vibration monitoring enable timely intervention before structural overloads occur.<\/li>\n<\/ul>\n<h2>Applications of bucket wheels<\/h2>\n<p>Bucket wheels are used on a large scale in open-pit mining, in the stockyard technology of power plants and steelworks, and in specialized earthworks and hydraulic engineering measures. In tunnel construction there are overlaps when soft to medium geologies are mechanically loosened and conveyed away via belt systems. Wherever alternating layers, transitions to rock, or concrete remnants are found, concrete demolition shears, rock and concrete splitters, and rock splitting cylinders complement the process. Capacity and suitability are strongly influenced by deposit homogeneity, target piece size, and permissible emissions at the site.<\/p>\n<h3>Bucket wheel excavators in open-pit mining<\/h3>\n<p>In overburden and soft deposits, the bucket wheel enables continuous excavation with high hourly outputs. In hard inclusions or banked sections, the area is pre-scribed, split, or selectively secondary-broken. This protects the wheel and reduces downtime. Modern supervision integrates fill-level trends, energy per ton, and stoppage analysis to maintain throughput under changing geology.<\/p>\n<h3>Stockyard technology: reclaiming and homogenizing<\/h3>\n<p>Reclaimers with a bucket wheel draw bulk materials from stockpiles and feed conveyor belts. When converting stockyards, foundation demolition, slot openings, and breakthroughs in concrete are often required. Here, concrete demolition shears are used for reinforced components, and rock and concrete splitters for thick, crack-free concrete or natural stone. Homogenizing strategies benefit from steady reclaiming angles, adapted bucket pitching, and low-variance discharge rates.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In headings using mechanical loosening technology, a bucket wheel can take up material and convey it continuously. When work encounters over-strong rock, areas are selectively pre-weakened and broken with splitting cylinders, or in portal and shaft structures, reinforced concrete components are removed to precise dimensions using concrete demolition shears &#8211; low-vibration and without explosives. This combination ensures clean interfaces to lining, waterproofing, and subsequent fit-out trades.<\/p>\n<h2>Interfaces with rock and concrete demolition<\/h2>\n<p>The touchpoints in projects are diverse: oversize pieces from the bucket wheel\u2019s bite, concrete curbings at conveyor bridges, foundation beams of reclaimers, tunnel inverts with built-ins. For controlled opening, separation, and reduction to conveyor-suitable piece sizes, concrete demolition shears and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> are proven in practice. They work quietly, produce minimal disturbance in edge zones, and allow precise edges &#8211; important for follow-on trades and the stability of adjacent structures.<\/p>\n<ul>\n<li><strong>Typical objectives<\/strong>: keep transfer points free, protect belts and idlers, avoid rebound loads into the wheel structure.<\/li>\n<li><strong>Method selection<\/strong>: splitting for thick or brittle sections, shears for reinforced components and defined separations.<\/li>\n<li><strong>Quality<\/strong>: controlled fracture surfaces and dimensional accuracy reduce rework and rehandling.<\/li>\n<\/ul>\n<h3>Secondary breaking and dimensional correction<\/h3>\n<p>If boulders or concrete chunks arise during bucket wheel operation, they are laid down and split along intended fracture lines using splitting cylinders. This reduces breaker time, protects conveyor systems, and lowers dust and noise peaks. For reinforcement, concrete demolition shears are used; in steel areas, steel shears or multi cutters are considered. This staged approach preserves the advantages of continuous excavation while handling outliers efficiently.<\/p>\n<h3>Selective deconstruction at conveyor and wheel foundations<\/h3>\n<p>For retrofits on conveyor systems and bucket wheel undercarriages, selective deconstruction enables the step-by-step removal of concrete and steel. Concrete demolition shears cut reinforcement without damaging adjacent components. In special operations, such as in contaminated areas, the low vibration level is a safety plus. Sequenced cuts and defined opening lines facilitate fast reinstatement and minimize interface risks.<\/p>\n<h2>Planning, sizing, and performance metrics<\/h2>\n<p>Key variables are wheel diameter, number and volume of buckets, cut thickness, rotational speed, power demand, and the resulting material throughput. In soft materials, low specific energies are achievable, while heterogeneous layers require higher reserves and robust wear packages. Realistic performance planning accounts for transition zones, cleanout downtime, and the necessary secondary breaking. For reliable comparisons, consistent bulk density assumptions and fill factors must be documented.<\/p>\n<ul>\n<li><strong>Core KPIs<\/strong>: hourly throughput, specific energy per ton, bucket fill factor, availability, and utilization.<\/li>\n<li><strong>Design levers<\/strong>: bucket geometry, edge material, scraper configuration, and transfer point layout.<\/li>\n<li><strong>Operating windows<\/strong>: acceptable vibration levels, torque limits, and thermal envelopes for drives and bearings.<\/li>\n<\/ul>\n<h3>Influence of geology and moisture<\/h3>\n<p>Cohesive, moist materials tend to build up; scrapers and adapted bucket geometry help. Abrasive gravels increase wear. In rocky inclusions, sequencing with upstream splitting work is recommended to keep the wheel engagement homogeneous and to avoid edge breakouts on the tool. Moisture management via drainage or wetting strategies stabilizes discharge and reduces dust at the transfer point.<\/p>\n<h2>Wear, maintenance, and service life<\/h2>\n<p>Cutting edges, bucket bottoms, and scrapers are typical wear parts. Regular inspections, speed checks, and adjustment of scrapers minimize unexpected failures. A proactive spare parts strategy integrates secondary breaking tools to controllably downsize residual material during maintenance and restart the system quickly. Condition-based maintenance using torque, vibration, and temperature trends helps extend service life and align interventions with production windows.<\/p>\n<ul>\n<li><strong>Inspection focus<\/strong>: edge condition, liner thickness, bucket integrity, scraper pressure, and discharge wear zones.<\/li>\n<li><strong>Predictive signals<\/strong>: rising specific energy at constant geology, increasing slip, and heat at bearings or gear stages.<\/li>\n<li><strong>Turnaround practices<\/strong>: pre-positioned wear kits, clear laydown areas, and defined re-commissioning checks.<\/li>\n<\/ul>\n<h3>Safety and occupational safety<\/h3>\n<p>Work on the bucket wheel requires secured shutdowns, exclusion zones, and low-dust methods. For separation and demolition tasks near the machine, low-vibration methods are advantageous. Notes are of a general nature and do not replace project-specific risk assessments. Clear communication, verified lockout measures, and controlled material handling at laydown points are central to safe execution.<\/p>\n<ul>\n<li><strong>Controls<\/strong>: lockout-tagout, interlock verification, and access control during maintenance and secondary breaking.<\/li>\n<li><strong>Exposure reduction<\/strong>: water misting, local extraction, and remote positioning where feasible.<\/li>\n<li><strong>Stability<\/strong>: secure footing, slope compliance, and verified bearing supports before re-engagement.<\/li>\n<\/ul>\n<h2>Environmental aspects and emissions<\/h2>\n<p>Bucket wheels operate continuously and thereby cause fewer peak loads in noise and vibration. Dust is generated at the cut line and at the discharge. Water spraying, encapsulated transfer points, and controlled secondary breaking with splitting or shear tools reduce emissions. The goal is a uniform material flow with minimal rehandling. Variable speed strategies and well-tuned discharge chutes further lower energy intensity and dust.<\/p>\n<ul>\n<li><strong>Noise and vibration<\/strong>: smooth engagement and balanced buckets prevent resonance and structure-borne peaks.<\/li>\n<li><strong>Dust management<\/strong>: wetting at the face and transfer, optimized drop heights, and maintained skirt seals.<\/li>\n<li><strong>Resource efficiency<\/strong>: reduced rehandling and even feed protect downstream systems and save energy.<\/li>\n<\/ul>\n<h2>Alternative and combined methods<\/h2>\n<p>In very hard rock or heavily reinforced concrete, the bucket wheel reaches its limits. Drilling and splitting techniques, concrete demolition shears, or shears for steel are then used. In mixed geology, a combination has proven effective: loosen, convey with the bucket wheel, and downsize oversize pieces. This keeps conveyor systems protected and productivity high. Tool choice follows target geometry, emission constraints, and the acceptable cycle time for secondary steps.<\/p>\n<h2>Practice: Typical work sequence around the bucket wheel<\/h2>\n<p>The sequence begins with geological assessment and the definition of cutting parameters. This is followed by continuous excavation with ongoing control of speed, fill level, and discharge. Oversize pieces are set aside, downsized to spec with rock splitting cylinders or concrete demolition shears, and fed back into the conveying stream. Finally, cleanout, inspection, and preparation for the next cut take place.<\/p>\n<ol>\n<li>Assess geology, moisture, and constraints at sensitive assets.<\/li>\n<li>Set parameters for cut thickness, speed, and discharge setup.<\/li>\n<li>Excavate with continuous monitoring and adaptive control.<\/li>\n<li>Separate and downsize oversize pieces using splitting or shears, then reintroduce into flow.<\/li>\n<li>Clean, inspect wear elements, and document KPI trends for the next shift.<\/li>\n<\/ol>\n<h2>Terminological distinction and classification<\/h2>\n<p>The bucket wheel is to be distinguished from a milling head or cutting wheel system, which work with picks and discharge material only afterward. In hydraulic engineering practice, wheel forms with similar function exist but differ in geometry and operation. In construction and deconstruction projects, the bucket wheel primarily serves mass movement, while precise shaping and separation work are typically performed with concrete demolition shears or rock and concrete splitters. The classification depends on cutting element, discharge principle, and continuity of material flow.<\/p>\n<h2>Selection criteria in the context of bucket wheel operations<\/h2>\n<p>The choice of approach is based on target geometry, material strength, boundary conditions, and emission requirements. A structured evaluation of the following points has proven effective:<\/p>\n<ul>\n<li>Geology, strength, grain bonding, and moisture content<\/li>\n<li>Required piece sizes for the conveying line<\/li>\n<li>Distance to sensitive structures and permissible vibration levels<\/li>\n<li>Dust and noise control, water availability for wetting<\/li>\n<li>Accessibility for secondary breaking tools such as concrete demolition shears and splitting cylinders<\/li>\n<li>Maintenance windows, wear strategy, and spare parts logistics<\/li>\n<li>Available power, energy intensity targets, and operating windows for continuous duty<\/li>\n<li>Regulatory constraints, working hours, and transport or access limitations at the site<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The bucket wheel is a large, rotating intake tool with multiple buckets or pockets that continuously loosens and conveys material. It defines large-scale machine design in open-pit mining, is used as a reclaimer in stockyard technology, and is encountered in the construction and deconstruction industries wherever massive volumes of earth <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/bucket-wheel\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19718","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bucket Wheel - Mining &amp; Stockyard Reclaiming Guide<\/title>\n<meta name=\"description\" content=\"Explore bucket wheel excavation for mining &amp; stockyard reclaiming \u27a4 design, applications, safety, low vibration.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/bucket-wheel\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bucket Wheel - Mining &amp; Stockyard Reclaiming Guide\" \/>\n<meta property=\"og:description\" content=\"Explore bucket wheel excavation for mining &amp; stockyard reclaiming \u27a4 design, applications, safety, low vibration.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/bucket-wheel\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-16T10:38:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bucket-wheel\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bucket-wheel\",\"name\":\"Bucket Wheel - Mining & Stockyard Reclaiming Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-10T12:07:11+00:00\",\"dateModified\":\"2026-05-16T10:38:02+00:00\",\"description\":\"Explore bucket wheel excavation for mining & stockyard reclaiming \u27a4 design, applications, safety, low vibration.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bucket-wheel#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bucket-wheel\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bucket-wheel#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Bucket wheel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bucket Wheel - Mining & Stockyard Reclaiming Guide","description":"Explore bucket wheel excavation for mining & stockyard reclaiming \u27a4 design, applications, safety, low vibration.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/bucket-wheel","og_locale":"en_US","og_type":"article","og_title":"Bucket Wheel - Mining & Stockyard Reclaiming Guide","og_description":"Explore bucket wheel excavation for mining & stockyard reclaiming \u27a4 design, applications, safety, low vibration.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/bucket-wheel","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-16T10:38:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/bucket-wheel","url":"https:\/\/www.darda.de\/en\/knowledge\/bucket-wheel","name":"Bucket Wheel - Mining & Stockyard Reclaiming Guide","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-10T12:07:11+00:00","dateModified":"2026-05-16T10:38:02+00:00","description":"Explore bucket wheel excavation for mining & stockyard reclaiming \u27a4 design, applications, safety, low vibration.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/bucket-wheel#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/bucket-wheel"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/bucket-wheel#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Bucket wheel"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19718","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19718"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19718\/revisions"}],"predecessor-version":[{"id":27474,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19718\/revisions\/27474"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19718"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}