{"id":19700,"date":"2025-12-09T11:22:12","date_gmt":"2025-12-09T10:22:12","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19700"},"modified":"2026-05-15T09:28:02","modified_gmt":"2026-05-15T07:28:02","slug":"formwork-timber","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/formwork-timber","title":{"rendered":"Formwork timber"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Formwork timber is an indispensable aid in construction practice &#8211; not only in conventional formwork fabrication for fresh concrete, but also in concrete demolition, special demolition, and strip-out. As a temporary load-bearing and protective material, it provides defined spacings, load distribution, supports, wedges, and protection for adjacent components. In connection with the product ranges of Darda GmbH &#8211; such as <em>Concrete Pulverizers<\/em>, <em>Rock and Concrete Splitters<\/em>, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Darda Hydraulic Power Units<\/a>, Combi Shears, Multi Cutters, Steel Shears, and Tank Cutters &#8211; formwork timber supports planned separation and controlled handling of components and materials in different fields of application. In professional practice it is also known as <em>cribbing<\/em>, <em>packing timber<\/em>, or <em>shoring blocks<\/em> and contributes to reproducible processes, reduced damage, and efficient reuse cycles.<\/p>\n<h2>Definition: What is meant by formwork timber?<\/h2>\n<p>Formwork timber refers to wooden components that are used temporarily in the fabrication, fixation, or protection of formwork and building elements. This includes planks, squared timbers, battens, wedges, and spacer blocks that serve as shims, props, spacers, or edge-fiber protection. Formwork timber is mainly made from softwood and is characterized by robust, easily workable quality with sufficient load-bearing capacity. In deconstruction and demolition works, formwork timber also decouples tools and components, cushions forces, keeps split joints open, and protects adjacent surfaces from damage. In doing so, it supports a safe, orderly sequence of separation, splitting, and cutting processes &#8211; for example when using Concrete Pulverizers or Rock and Concrete Splitters. It is a <strong>temporary auxiliary<\/strong> and not a substitute for engineered permanent structures; any use must remain within the intended function and foreseeable loads.<\/p>\n<h2>Composition, wood species, and quality classes<\/h2>\n<p>Formwork timber is predominantly manufactured from readily available softwoods. Decisive properties are adequate load-bearing capacity, dimensional stability, and a surface finish that reliably fulfills the respective tasks (shimming, damping, edge protection, wedging). In practice, straight sections with minimal cracks and knots and clean-sawn edges have proven effective. For moisture-exposed applications, select a moisture content suitable for the use case and ensure proper storage. For temporary load-bearing improvisations, use sized members and observe the generally recognized rules of engineering; temporary auxiliary timbers should only be used within their intended function. Untreated, clean timber is preferable where friction and non-marring contact are required, while coated or oiled surfaces reduce slip resistance and should be avoided for bearings unless an interlayer is used.<\/p>\n<h2>Typical designs and dimensions<\/h2>\n<p>Different forms of formwork timber are used depending on the purpose. Common solutions are planks and squared timbers as bearings and beams, battens as spacers and distance blocks, and wedges for sensitive height or pressure adjustment. Multiple timbers are often combined to create a non-slip, pressure-distributing, and well-accessible work area. Dimensions are determined by load level, bearing area, and the clearance required for tools such as Concrete Pulverizers or rock splitting cylinders. Grain direction, contact area cleanliness, and the use of anti-slip interlayers influence the achievable friction and should be planned accordingly for predictable behavior.<\/p>\n<h3>Functional differences<\/h3>\n<ul>\n<li><strong>Supports\/load distribution:<\/strong> Planks and squared timbers distribute compressive forces over an area, protect edges, and enable defined bearings on uneven ground. Crosswise stacking increases resistance to rolling and improves accessibility for tools.<\/li>\n<li><strong>Spacer blocks:<\/strong> Battens create safe clearances so that tools can work freely and components do not jam uncontrollably. Placed at marked reference points, they keep kerfs and joint openings reliably accessible.<\/li>\n<li><strong>Wedge timbers:<\/strong> Wedges prevent joints from closing, adjust heights, and secure split gaps. Opposing wedge pairs allow precise height control under load with minimal movement.<\/li>\n<li><strong>Protective timbers:<\/strong> Protect sensitive surfaces and tool edges from direct contact with mineral edges. Non-splintering faces and clean cut edges reduce imprinting and surface damage.<\/li>\n<\/ul>\n<h2>Formwork timber in concrete demolition and special demolition<\/h2>\n<p>In the controlled deconstruction of concrete elements, formwork timber supports safe gripping, splitting, and setting down of parts. It serves as a defined bearing, spacer, and damping layer and helps make cut and split lines <em>readable<\/em>. Especially with members of significant thickness and sharp edges, formwork timber proves its worth as edge and surface protection. Clearly marked bearing points and protected tool approaches reduce unintended spalling and assist in maintaining the planned sequence of operations.<\/p>\n<h3>Use with Concrete Pulverizers<\/h3>\n<ul>\n<li><strong>Bearing and protection:<\/strong> Shim under slabs or beams so the jaws of the Concrete Pulverizer can be applied without slipping and to avoid edge spalling. Continuous timber pads reduce point loads on brittle corners.<\/li>\n<li><strong>Spacers:<\/strong> Distance blocks create clearance for closing the crusher and prevent unwanted jamming with adjacent components. Defined spacings safeguard tool travel and evacuation of debris.<\/li>\n<li><strong>Fragment control:<\/strong> Targeted shimming can influence fracture planes and limit the sliding of fragments. Where necessary, combine with wedges to hold crack openings in the desired geometry.<\/li>\n<\/ul>\n<h3>Use with Rock and Concrete Splitters<\/h3>\n<ul>\n<li><strong>Keeping joints open:<\/strong> Wedges keep developing joints open and secure the desired crack propagation direction. Sequenced placement supports stepwise release without shock.<\/li>\n<li><strong>Load transfer:<\/strong> Wooden planks spread localized splitting forces over a larger area and reduce local pressure peaks. This protects adjacent faces and maintains alignment.<\/li>\n<li><strong>Damping:<\/strong> The elastic nature of wood reduces rebound and vibration when releasing segments. Resulting movements remain more predictable and less damaging.<\/li>\n<\/ul>\n<h2>Formwork timber in strip-out and cutting<\/h2>\n<p>In strip-out, separation cuts, and dismantling, formwork timber protects components and tools and facilitates orderly workflows. Bearing planks, spacer battens, and wedges keep kerfs open and reduce the risk of saws or cutting tools binding. Non-conductive wooden interlayers also help to separate workpieces from substrates and reduce incidental contact or transfer of vibration to adjoining parts.<\/p>\n<h3>Relation to Multi Cutters, Combi Shears, and Tank Cutters<\/h3>\n<ul>\n<li><strong>Shimming and fixing:<\/strong> When sawing or cutting sheets, pipes, or concrete elements, formwork timber provides non-slip, defined bearings. Marked bearing lines support repeatable positioning during multi-step cuts.<\/li>\n<li><strong>Securing cut channels:<\/strong> Spacer blocks prevent the kerf from closing and blocking the tool. Where appropriate, opposing wedges maintain the opening uniformly along the cut depth.<\/li>\n<li><strong>Contact protection:<\/strong> Wood mechanically isolates conductively connected components and reduces unintended contact with substrates. This limits burr transfer, grinding marks, and collateral chipping on adjacent elements.<\/li>\n<\/ul>\n<h2>Rock demolition, tunnel construction, and natural stone extraction<\/h2>\n<p>Formwork timber is also widely used as an auxiliary material in rock and natural stone operations. It serves as a buffer between tool and stone surface, as a wedge for opening natural joints, and as a support when handling blocks. Robust blocks and pads create non-marring interfaces on saw tables, in transport cradles, and during temporary staging in confined underground environments.<\/p>\n<h3>Practical reference to rock splitting cylinders<\/h3>\n<ul>\n<li><strong>Protect edges:<\/strong> Wooden pads prevent spalling on exposed faces and support targeted crack guidance. Smooth, clean contact faces minimize print-through on softer stones.<\/li>\n<li><strong>Hold joints:<\/strong> Wedges secure split openings until the next cylinder is applied. Incremental widening maintains control over block geometry and release sequence.<\/li>\n<li><strong>Prepare for transport:<\/strong> Bearing planks stabilize blocks on pallets and facilitate rigging for logistics. Crosswise timbering improves load distribution and forklift access.<\/li>\n<\/ul>\n<h2>Selection criteria: How to find suitable formwork timber<\/h2>\n<p>The suitability of formwork timber depends on the task, load level, and environmental conditions. Careful selection increases safety, quality, and reusability.<\/p>\n<ul>\n<li><strong>Load-bearing capacity and condition:<\/strong> Visual inspection for cracks, crush marks, fiber breaks, and warping; use only intact timbers. Reject pieces with oil contamination or embedded metal.<\/li>\n<li><strong>Wood moisture:<\/strong> Choose moisture content appropriate to the application; timber that is too wet or too dry can deform. Keep moisture differences within a stack low to avoid uneven settlement.<\/li>\n<li><strong>Dimensional accuracy:<\/strong> Straight, parallel-sawn sections make safe shimming and stacking easier. Prefer square, repeatable dimensions for modular setups.<\/li>\n<li><strong>Slip resistance:<\/strong> Match surface properties to the task; use interlayers where necessary. Rough-sawn faces typically provide higher friction than planed surfaces.<\/li>\n<li><strong>Reuse:<\/strong> Prefer robust sections with long service life; consistently sort out damaged pieces. Mark service status and lengths for quick selection on site.<\/li>\n<\/ul>\n<h2>Occupational safety and usage notes<\/h2>\n<p>The use of formwork timber requires attention and safe working methods. The following points are general in nature and do not replace project-specific planning or a hazard assessment.<\/p>\n<ul>\n<li><strong>Stability:<\/strong> Place supports securely against tipping and with full bearing; consider load paths and avoid pinch points. Arrange stacks with flat, clean contact faces and avoid eccentric loading.<\/li>\n<li><strong>Fixation:<\/strong> Secure wedges against slipping out; arrange elements to prevent uncontrolled movement. Use opposing wedges only as pairs and under observable load.<\/li>\n<li><strong>Tool clearance:<\/strong> Plan sufficient space so that Concrete Pulverizers, Rock and Concrete Splitters, or cutting tools can work freely. Account for tool closing paths and the evacuation of fragments.<\/li>\n<li><strong>Personal protective equipment:<\/strong> Wear suitable protective equipment; observe safe handling and gripping techniques. Keep hands outside potential crush zones at all times.<\/li>\n<li><strong>Hydraulics in view:<\/strong> When using Hydraulic Power Units, protect lines from crushing and abrasion; use wood as spacers or edge protection. Route hoses to eliminate tripping and snagging hazards.<\/li>\n<\/ul>\n<h2>Methodology: How formwork timber supports processes<\/h2>\n<p>Formwork timber improves the predictability of interventions by defining gripping points, split joints, and bearings. Processes become more calculable, and components can be released, set down, and sorted step by step. Clearly labeled timber sets for standard tasks accelerate setup and reduce variability between shifts.<\/p>\n<ol>\n<li><strong>Preparation:<\/strong> Check component geometry, define bearing points, and provide suitable timber sections. Verify that required clearances and contact protections are available.<\/li>\n<li><strong>Positioning:<\/strong> Place supports so that tools such as Concrete Pulverizers or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-and-concrete-splitters\">Rock and Concrete Splitters<\/a> can be applied safely. Align timber orthogonally to expected force directions.<\/li>\n<li><strong>Opening and securing:<\/strong> Keep developing joints open with wedges; use spacer blocks to prevent binding. Monitor crack behavior and adjust wedges stepwise to maintain control.<\/li>\n<li><strong>Set-down and transport:<\/strong> Use wooden pads for gentle set-down; consider load distribution for removal. Stabilize transport positions with crosswise timbering before lifting.<\/li>\n<\/ol>\n<h3>Common setup patterns<\/h3>\n<ul>\n<li><strong>Flat bearing:<\/strong> Single planks to increase bearing area on uneven ground and protect edges.<\/li>\n<li><strong>Crosswise stack:<\/strong> Two or more layers placed at right angles for improved stability and access beneath components.<\/li>\n<li><strong>Box crib:<\/strong> Modular, orthogonal stacks for temporary elevation where a defined working gap and stability are required within the limits of the auxiliary function.<\/li>\n<\/ul>\n<h2>Product and application reference at Darda GmbH<\/h2>\n<p>In practical use with tools and equipment from Darda GmbH, formwork timber proves to be a versatile complement. With Concrete Pulverizers it facilitates low-tear gripping and fragment-reduced detachment of slabs. In combination with Rock and Concrete Splitters it stabilizes split joints and supports targeted crack guidance. Hydraulic Power Units benefit from protectively arranged wooden battens that keep hoses and couplings away from sharp edges. Combi Shears, Multi Cutters, and Steel Shears operate more reliably when spacer blocks secure kerfs and prevent unwanted binding. With Tank Cutters, wooden supports enable safe positioning of cylindrical components and reduce contact with abrasive substrates. In the fields of <strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special demolition<\/a><\/strong>, <strong>strip-out and cutting<\/strong>, <strong>rock demolition and tunnel construction<\/strong>, <strong>natural stone extraction<\/strong>, and in <strong>special applications<\/strong>, formwork timber thus contributes to orderly, well-controlled workflows. Standardized timber kits matched to the respective tool families shorten setup times and support consistent quality.<\/p>\n<h2>Storage, reuse, and sustainability<\/h2>\n<p>Proper storage extends service life and improves usability. Formwork timber should be stored dry, ventilated, and on a level surface. Moisture exposure can be reduced with spacers and covers. Intact timbers can be reused many times; damaged pieces must be sorted out. For disposal, observe local regulations and distinctions between untreated and treated wood assortments. Careful documentation of timber use &#8211; especially when the material served as temporary bracing or bearing &#8211; facilitates later inspections and decisions on further use. Cleaning off slurry or oil after use and separating contaminated pieces support both safety and recyclability.<\/p>\n<h3>Documentation and traceability<\/h3>\n<ul>\n<li><strong>Identification:<\/strong> Mark lengths, cross-sections, and condition classes directly on the timber.<\/li>\n<li><strong>Usage logs:<\/strong> Record critical uses and loads where auxiliary bearings or cribs were applied.<\/li>\n<li><strong>Inspection cycles:<\/strong> Define intervals for checks of straightness, edge integrity, and surface contamination.<\/li>\n<\/ul>\n<h2>Quality assurance during ongoing operations<\/h2>\n<p>Regular visual inspection, marking, and orderly storage directly support safety and efficiency. Simple, robust markings for lengths and sections, stackable sets for standard tasks, and defined inspection points (straightness, edge integrity, crush marks) have proven themselves. Combined with clear procedures and trained personnel, formwork timber remains a reliable part of daily work &#8211; whether gripping with Concrete Pulverizers, splitting with Rock and Concrete Splitters, or cutting and stripping complex structures. Consistent feedback from operations into procurement and preparation further improves fit-for-purpose selection and reduces reject rates over time.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Formwork timber is an indispensable aid in construction practice &#8211; not only in conventional formwork fabrication for fresh concrete, but also in concrete demolition, special demolition, and strip-out. As a temporary load-bearing and protective material, it provides defined spacings, load distribution, supports, wedges, and protection for adjacent components. In connection <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/formwork-timber\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19700","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Formwork Timber Uses in Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Expert guide to formwork timber for construction &amp; demolition \u2713 uses, selection, safety, and best practices.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/formwork-timber\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Formwork Timber Uses in Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Expert guide to formwork timber for construction &amp; demolition \u2713 uses, selection, safety, and best practices.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/formwork-timber\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-15T07:28:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/formwork-timber\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/formwork-timber\",\"name\":\"Formwork Timber Uses in Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-09T10:22:12+00:00\",\"dateModified\":\"2026-05-15T07:28:02+00:00\",\"description\":\"Expert guide to formwork timber for construction & demolition \u2713 uses, selection, safety, and best practices.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/formwork-timber#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/formwork-timber\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/formwork-timber#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Formwork timber\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Formwork Timber Uses in Construction & Demolition","description":"Expert guide to formwork timber for construction & demolition \u2713 uses, selection, safety, and best practices.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/formwork-timber","og_locale":"en_US","og_type":"article","og_title":"Formwork Timber Uses in Construction & Demolition","og_description":"Expert guide to formwork timber for construction & demolition \u2713 uses, selection, safety, and best practices.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/formwork-timber","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-15T07:28:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/formwork-timber","url":"https:\/\/www.darda.de\/en\/knowledge\/formwork-timber","name":"Formwork Timber Uses in Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-09T10:22:12+00:00","dateModified":"2026-05-15T07:28:02+00:00","description":"Expert guide to formwork timber for construction & demolition \u2713 uses, selection, safety, and best practices.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/formwork-timber#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/formwork-timber"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/formwork-timber#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Formwork timber"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19700","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19700"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19700\/revisions"}],"predecessor-version":[{"id":27431,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19700\/revisions\/27431"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19700"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}