{"id":19696,"date":"2025-12-08T14:39:49","date_gmt":"2025-12-08T13:39:49","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19696"},"modified":"2026-09-12T19:53:23","modified_gmt":"2026-09-12T17:53:23","slug":"rammer","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/rammer","title":{"rendered":"Rammer"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Rammers &#8211; also called vibrating rammers or trench rammers &#8211; are compact compaction devices for confined areas, stiff soils, and layer thicknesses that are unfavorable for vibratory plates. In the context of concrete demolition, strip-out, rock excavation, and natural stone extraction, they close gaps in the process chain: After separating and breaking components with tools such as concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH, backfill material is often placed in layers and compacted with the rammer to achieve load-bearing capacity, flatness, and settlement stability. In practice, rammers also serve for spot compaction when reinstating utility cuts and for stabilizing narrow working platforms where maneuvering space is limited.<\/p>\n<h2>Definition: What is a rammer?<\/h2>\n<p>A rammer is a handheld compaction device that introduces vertical blows into the ground via a rapidly stroking, spring-mounted tamping foot plate. The energy acts predominantly as impulses in depth. This makes it possible to compact cohesive soils (loam, clay) and narrow trenches effectively. In contrast to the vibratory plate compactor (predominantly horizontal oscillation, area excitation), the rammer achieves <em>deeper impulse compaction<\/em> with a small working width. Typical applications are pipeline construction, foundation backfills, trench compaction, edge zones of structures, and hard-to-reach areas on deconstruction and tunneling sites. Rammers are sometimes referred to as tampers in site jargon, reflecting their point-load, stroke-driven operating mode.<\/p>\n<h2>Design and operating principle of a rammer<\/h2>\n<p>At the heart is a power unit (usually 4-stroke gasoline, diesel, or electric\/battery) that generates a vertical stroke via an eccentric or crank drive system. A spring pack stores part of the energy and releases it abruptly at the tamping foot. This produces high impact forces at moderate amplitude. Important assemblies: engine\/power unit, gearbox\/eccentric, spring pack, guide housing, handle frame with damping, tamping foot with replaceable sole. Key parameters are blows per minute, stroke, dynamic force, machine weight, and foot width. Narrow feet concentrate the energy, wide feet increase area output. Modern machines reduce <strong>hand-arm vibrations<\/strong> through decoupled handles and tuned elastomers.<\/p>\n<ul>\n<li>Typical specification ranges: 500 &#8211; 800 blows\/min, stroke approx. 40 &#8211; 80 mm, operating weight about 30 &#8211; 80 kg, foot widths around 150 &#8211; 330 mm.<\/li>\n<li>Power supply and runtime: combustion engines enable long shifts with refueling; battery systems favor low-emission operation in enclosed spaces with defined runtime per pack.<\/li>\n<li>Wear parts: tamping foot soles and intake filters are the most frequent service items; easy access reduces downtime.<\/li>\n<\/ul>\n<h2>Areas of application in deconstruction, earthworks, and tunnel heading<\/h2>\n<p>Rammers are versatile, but particularly strong in tight, deep, or structurally sensitive zones. In connection with the products and fields of application of Darda GmbH, clear interfaces arise. The devices close sequencing gaps between breaking, clearing, backfilling, and final compaction, especially in edge and transition zones.<\/p>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>After cutting and breaking foundations, slabs, or walls &#8211; e.g., with concrete demolition shears from Darda GmbH &#8211; excavation pits, utility trenches, or bearing recesses are created. These are backfilled in layers with suitable material. The rammer compacts the lifts in edge areas, at corners, under penetrations, and wherever larger rollers or plates cannot reach. This reduces subsequent settlements and secures the load transfer of new components. Controlled, layer-wise compaction also protects adjacent structures from vibration-sensitive damage.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>For the deconstruction of interior floors, shafts, and installation ducts, small dimensions are crucial. After removing screeds or cutting floor openings, backfill material is placed. The rammer compacts precisely without excessively loading the building fabric. In cut areas previously processed with hydraulically operated tools, this creates a load-bearing base for new build-ups. Low-emission drives are advantageous here to meet indoor air and noise criteria.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In tunnel and gallery construction, niches, utility trenches, and shoulders are created. After separating or splitting with rock and concrete splitters from Darda GmbH, compaction of backfills, cable routes, or drainage beds is essential. Rammers work safely in narrow geometries, on ramps, or in switchbacks. Due to impulse-type compaction, ambient vibration remains low, which is advantageous in underground works. This approach aligns with established practices in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>. In addition, the vertical blow pattern supports stable bedding around ducts and anchor points without over-exciting the surrounding rock mass.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>When loosening and positioning blocks as well as creating working tracks in quarries, the formation level must be stable. Rammers compact shoulder and edge areas that larger compactors cannot reach. After using rock splitting cylinders from Darda GmbH, working surfaces can be restored quickly. Spot compaction along transport paths reduces raveling and preserves the geometry of the working platform.<\/p>\n<h3>Special applications<\/h3>\n<p>In areas with limited access &#8211; under pipe bridges, between existing foundations, or in sensitive facilities &#8211; the rammer is often the only practical compaction device. In combination with hydraulic power packs from Darda GmbH that drive splitters or shears, site logistics can be coordinated so that compaction and backfilling take place immediately after cutting. This minimizes open time of excavations and improves overall process reliability in confined work phases.<\/p>\n<h2>Interaction with concrete demolition shears, rock and concrete splitters, and other tools<\/h2>\n<p>In deconstruction projects, compaction follows a standardized sequence. The rammer functionally complements tools such as concrete demolition shears, rock and concrete splitters, combination shears, or multi cutters from Darda GmbH without replacing them. Clear handover criteria between steps &#8211; geometry, lift height, and target moisture &#8211; prevent rework.<\/p>\n<ol>\n<li>Cutting\/size reduction: Components are separated in a controlled manner (e.g., with concrete demolition shears) or split (e.g., with rock and concrete splitters); hydraulic power packs provide the energy.<\/li>\n<li>Clearance and subgrade preparation: Remove material, create the formation level, optionally add gravel or reduce fines content.<\/li>\n<li>Layered placement: Adjust lift thickness to the rammer (typically 10 &#8211; 25 cm depending on machine and soil class).<\/li>\n<li>Compaction: Work with overlapping passes, treat edges first, protect embedded components\/utilities.<\/li>\n<li>Control: Simple field checks (footprint, penetration depth) and, if required, measurement methods such as dynamic plate load test or lightweight falling weight device.<\/li>\n<\/ol>\n<h2>Selection criteria: Which rammer for which task<\/h2>\n<p>The choice is based on soil, geometry, quality requirement, and site conditions. The goal is a sufficient <strong>degree of compaction<\/strong> with economical working methods.<\/p>\n<ul>\n<li>Soil class and moisture: Cohesive soils benefit from higher impact energy and moderate frequency; the <em>optimum water content<\/em> (near Proctor optimum) is decisive. High fines content requires conservative lift heights.<\/li>\n<li>Lift height\/layer thickness: Select lifts so that the energy reaches the subbase; thinner for very cohesive soils.<\/li>\n<li>Tamping foot: Narrow for trenches and deep zones, wider for area output in edge regions.<\/li>\n<li>Weight class: Lighter machines for delicate edge locations; heavier when high depth and density are required.<\/li>\n<li>Drive: Gasoline for outdoor jobsites; diesel for specific requirements; electric\/battery for interior spaces with emission restrictions.<\/li>\n<li>Vibration and noise control: Handle damping, low hand-arm vibration values, sound attenuation for sensitive environments.<\/li>\n<li>Service accessibility: Keep filters, wear sole, and lubrication points easy to access.<\/li>\n<li>Site constraints: Ceiling loads, ventilation, and transport routes influence feasible machine weight and drive type.<\/li>\n<\/ul>\n<h2>Operation, ergonomics, and emissions<\/h2>\n<h3>Starting and working<\/h3>\n<p>Before use, perform visual and functional checks, assess the subgrade, and pre-distribute materials. Set the rammer straight, work with slight forward feed, overlap passes. Treat edges, penetrations, and utility zones in multiple passes. If there is significant excess water, stop work and condition the material. On slopes, work across the incline with controlled step-ups and maintain secure footing at all times.<\/p>\n<h3>Hand-arm vibrations<\/h3>\n<p>Plan usage times so that <strong>hand-arm vibrations<\/strong> exposure remains within allowable limits. Use equipment with vibration-decoupled handles, schedule regular breaks, and wear gloves with good grip. Subgrade condition influences feedback &#8211; overly dry, coarse-grained layers can increase exposure. Keep tools sharp and soles intact to avoid unnecessary reaction forces.<\/p>\n<h3>Noise, exhaust gases, dust<\/h3>\n<p>Comply with project-specific noise control requirements. In interior or poorly ventilated areas, choose zero- or low-emission drives and limit dust development by wetting. Respiratory, hearing, and eye protection are standard. When processing cementitious materials, apply suitable dust control to reduce respirable fractions.<\/p>\n<h3>Common operating mistakes and how to avoid them<\/h3>\n<ul>\n<li>Overly thick lifts: leads to insufficient depth effect &#8211; reduce lift height and increase the number of passes.<\/li>\n<li>Working on saturated soils: postpone compaction and condition material until excess pore water dissipates.<\/li>\n<li>Insufficient overlap: causes density stripes &#8211; maintain approx. 1\/3 foot-width overlap.<\/li>\n<li>Continuous full-throttle in sensitive zones: modulate feed and passes instead to limit transmitted vibration.<\/li>\n<\/ul>\n<h2>Safety, site organization, and legal notes<\/h2>\n<p>Operate rammers only on stable ground. Maintain distance from slope failures and trench edges, mark utilities. Wear personal protective equipment. Observe device-specific operating manuals. Requirements from relevant regulations, standards, and site-specific instructions must be followed; these notes are general and do not replace project-specific instruction. For transport and handling, observe ergonomic lifting techniques or use aids for heavier units.<\/p>\n<h2>Quality assurance and compaction control<\/h2>\n<p>The required load-bearing capacity is ensured through accompanying tests. In practice, visual assessment, simple field tests, and &#8211; if base or formation layers are specified &#8211; methods such as lightweight falling weight test or dynamic plate load test are common. Laboratory tests (Proctor, water content) define target values; the site adjusts via layer thickness, number of passes, and material conditioning. Document moisture conditioning, lift heights, and test results to establish traceability and to support handover requirements.<\/p>\n<h2>Practical tips for efficient compaction in the context of deconstruction works<\/h2>\n<ul>\n<li>Set material properly: moisture near optimum; for cohesive soils, crush clods beforehand.<\/li>\n<li>Define lifts: start thinner until the interaction between soil and machine is reliably established.<\/li>\n<li>Guide edges: edges first, then area; compact transitions to existing structures in multiple passes.<\/li>\n<li>Maintain overlap: overlap passes by approx. 1\/3 foot width.<\/li>\n<li>Coordinate tool sequence: After using concrete demolition shears or rock and concrete splitters, transition seamlessly into the compaction pass to avoid idle times.<\/li>\n<li>Check wear: Inspect tamping foot sole and filters regularly so that the <em>compaction energy<\/em> reaches the ground.<\/li>\n<li>Avoid over-compaction: excessive passes can cause heave in confined areas &#8211; stop once target response is achieved.<\/li>\n<li>Stage logistics: place backfill close to the work face to minimize handling and idle travel.<\/li>\n<\/ul>\n<h2>Limits of the rammer and sensible alternatives<\/h2>\n<p>Very coarse-grained, highly gravelly layers with strong interlocking are often more economical to process with vibratory plates or rollers. On large areas, the rammer\u2019s area output is limited; it then complements compaction in edge zones. For water-saturated cohesive soils, material conditioning (leaning, drying) before compaction helps. For massive concrete slabs or rock, using a rammer is not sensible; here, tools such as concrete demolition shears, rock and concrete splitters, steel shears, combination shears, multi cutters, or tank cutters from Darda GmbH are used beforehand for cutting, depending on material and geometry. In frost-susceptible soils, attention to drainage and staging is critical, as impulse compaction cannot compensate for thaw weakening.<\/p>\n<h2>Checklist: preparation and execution<\/h2>\n<ul>\n<li>Assess the soil and set moisture.<\/li>\n<li>Define layer thickness appropriate to the machine class.<\/li>\n<li>Select the tamping foot (wide\/narrow) and check condition.<\/li>\n<li>Plan the working path: edges first, overlap passes.<\/li>\n<li>Document the number of passes and perform simple field checks.<\/li>\n<li>Consider occupational safety, emissions, and neighbor protection.<\/li>\n<li>Secure transport, fueling, and charging logistics for the selected drive type.<\/li>\n<li>Schedule quality control points and acceptance criteria before backfilling begins.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Rammers &#8211; also called vibrating rammers or trench rammers &#8211; are compact compaction devices for confined areas, stiff soils, and layer thicknesses that are unfavorable for vibratory plates. In the context of concrete demolition, strip-out, rock excavation, and natural stone extraction, they close gaps in the process chain: After separating <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/rammer\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19696","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rammer | Tamping Compactor for Trenches &amp; Soil<\/title>\n<meta name=\"description\" content=\"Learn how a handheld tamping rammer compacts trenches &amp; cohesive soils \u27a4 design, safe use, and quality control.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/rammer\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rammer | Tamping Compactor for Trenches &amp; Soil\" \/>\n<meta property=\"og:description\" content=\"Learn how a handheld tamping rammer compacts trenches &amp; cohesive soils \u27a4 design, safe use, and quality control.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/rammer\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:23+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rammer\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rammer\",\"name\":\"Rammer | Tamping Compactor for Trenches & Soil\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-08T13:39:49+00:00\",\"dateModified\":\"2026-09-12T17:53:23+00:00\",\"description\":\"Learn how a handheld tamping rammer compacts trenches & cohesive soils \u27a4 design, safe use, and quality control.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rammer#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rammer\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rammer#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Rammer\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rammer | Tamping Compactor for Trenches & Soil","description":"Learn how a handheld tamping rammer compacts trenches & cohesive soils \u27a4 design, safe use, and quality control.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/rammer","og_locale":"en_US","og_type":"article","og_title":"Rammer | Tamping Compactor for Trenches & Soil","og_description":"Learn how a handheld tamping rammer compacts trenches & cohesive soils \u27a4 design, safe use, and quality control.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/rammer","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:23+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/rammer","url":"https:\/\/www.darda.de\/en\/knowledge\/rammer","name":"Rammer | Tamping Compactor for Trenches & Soil","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-08T13:39:49+00:00","dateModified":"2026-09-12T17:53:23+00:00","description":"Learn how a handheld tamping rammer compacts trenches & cohesive soils \u27a4 design, safe use, and quality control.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/rammer#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/rammer"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/rammer#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Rammer"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19696","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19696"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19696\/revisions"}],"predecessor-version":[{"id":29323,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19696\/revisions\/29323"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19696"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}