{"id":19695,"date":"2025-12-08T11:12:33","date_gmt":"2025-12-08T10:12:33","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19695"},"modified":"2026-05-14T12:53:03","modified_gmt":"2026-05-14T10:53:03","slug":"soil-compactor","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/soil-compactor","title":{"rendered":"Soil compactor"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Soil compactors are core compaction equipment for subsoil, road and path construction, as well as for backfilling excavation trenches. In combination with demolition and separation\/cutting works, such as those carried out with tools from Darda GmbH, they ensure the load-bearing capacity of layers-for example, when, after the use of concrete demolition shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-splitters\">rock and concrete splitters<\/a>, or combination shears, concrete components are deconstructed, recycled, and subsequently reinstalled as bulk material. In this way, they form the basis for stable subgrades in <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, during building gutting and cutting, in rock excavation and tunnel construction, in natural stone extraction, and for special assignments. Consistent, specification-compliant compaction limits differential settlement, improves frost resistance, and shortens construction phases by enabling earlier trafficking.<\/p>\n<h2>Definition: What is meant by a Soil Compactor?<\/h2>\n<p>A soil compactor (also vibratory plate, plate compactor, or vibratory compactor) is a self-propelled or hand-guided machine for the compaction of soils, gravel, frost protection layers, recycled material (RC), and asphalt. Using an eccentrically mounted shaft, it transfers vibrations to a baseplate, generating a combination of dynamic loading and dead weight that rearranges particles, reduces voids, and increases packing density. The result is higher load-bearing capacity and reduced settlement.<\/p>\n<p><em>Distinction<\/em>: Soil compactors primarily target unbound layer compaction. For highly cohesive soils or very thick lifts, alternative or supplementary compactors may be considered depending on soil properties and layer design.<\/p>\n<h2>Design and operating principle<\/h2>\n<p>The compaction principle is based on high vibration frequency and the resulting centrifugal force. The vibrations stimulate the granular structure; under the machine&#8217;s own weight and forward motion, particles migrate into a more densely packed arrangement. Decisive factors are frequency, amplitude, and the centrifugal force generated by the exciter-matched to soil type and layer thickness. Travel speed, contact pressure, and uniform pass overlap further influence the compaction outcome.<\/p>\n<h3>Main components<\/h3>\n<ul>\n<li><strong>Baseplate<\/strong>: Wear-resistant plate (usually cast steel) that transmits vibrations into the ground; optionally with a rubber mat for sensitive paving surfaces.<\/li>\n<li><strong>Exciter shaft<\/strong>: Eccentric shaft with bearings; determines frequency and amplitude.<\/li>\n<li><strong>Power unit<\/strong>: Combustion or electric drive; power transmission via V-belt or directly to the exciter.<\/li>\n<li><strong>Guidance and damping<\/strong>: Handle with vibration damping to reduce hand-arm vibrations.<\/li>\n<li><strong>Sprinkler\/water tank<\/strong>: For asphalt work to prevent sticking.<\/li>\n<li><strong>Frame and lashing points<\/strong>: Protective frame with defined lifting and tie-down points for safe handling and transport.<\/li>\n<li><strong>Optional compaction indication<\/strong>: Systems that visualize relative stiffness trends can support consistent pass numbers across an area.<\/li>\n<\/ul>\n<h2>Types and selection criteria<\/h2>\n<p>The appropriate soil compactor is selected based on the application, material, layer thickness, and required compaction quality. For installation situations in deconstruction-such as after removing floor slabs with concrete demolition shears from Darda GmbH-recycled concrete or natural aggregates are often used, requiring a differentiated selection. Key selection drivers include fines content, target layer thickness per lift, area size, and constraints near existing structures.<\/p>\n<h3>Forward-travel vs. reversible soil compactors<\/h3>\n<ul>\n<li><strong>Forward-travel<\/strong> machines are agile and light, ideal for narrow trenches, edge areas, bedding for paving, and smaller layer thicknesses.<\/li>\n<li><strong>Reversible<\/strong> soil compactors allow forward and reverse travel, as well as on-the-spot compaction; they are suitable for larger areas, greater layer thicknesses, and more cohesive materials.<\/li>\n<\/ul>\n<h3>Performance parameters<\/h3>\n<ul>\n<li><strong>Frequency<\/strong>: Higher frequencies work better on fine-grained materials; lower frequencies on coarse-grained materials. Typical ranges are around 70-100 Hz depending on the machine class.<\/li>\n<li><strong>Amplitude\/centrifugal force<\/strong>: Larger amplitudes promote depth effect; important for thicker lifts and coarse gradations. Centrifugal forces commonly range from approximately 15-100 kN.<\/li>\n<li><strong>Machine weight<\/strong>: Higher weight increases static line load; helpful for RC material after concrete demolition.<\/li>\n<li><strong>Plate width\/contact area<\/strong>: Wider plates cover more area but can reduce depth effect at the same energy input; match to the geometry and lift thickness.<\/li>\n<li><strong>Travel speed and overlap<\/strong>: Moderate speed with consistent overlap supports uniform density and surface quality.<\/li>\n<\/ul>\n<h2>Compaction in the context of concrete demolition and special demolition<\/h2>\n<p>In <em>special demolition<\/em>, reinforced concrete components are separated and sorted using concrete demolition shears, combination shears, or rock and concrete hydraulic wedge splitters from Darda GmbH. Broken-out concrete is often crushed and reused as recycled aggregate. Before new construction or provisional surface installation, professional compaction is essential to avoid later settlement and to achieve a load-bearing base course. Interfaces to remaining foundations and to utility corridors require careful pass planning, reduced amplitude, and stepwise transitions.<\/p>\n<h3>Work sequence<\/h3>\n<ol>\n<li>Remove\/separate concrete components (e.g., with concrete demolition shears or rock and concrete hydraulic wedge splitters) and separate the rebar with appropriate cutting tools.<\/li>\n<li>Restore the subgrade, place and spread RC or natural aggregates in layers.<\/li>\n<li>Compact with a suitable soil compactor in matched layer thicknesses; work carefully near building edges.<\/li>\n<li>Post-compaction at edges and detail points; surface leveling for subsequent trades.<\/li>\n<li>Document\/check compaction quality according to agreed procedures.<\/li>\n<li>Optional: condition moisture to near optimum and verify gradation to support target density.<\/li>\n<\/ol>\n<h2>Areas of application and typical uses<\/h2>\n<p>Soil compactors are relevant wherever, after demolition, cutting, or splitting works, new layers are installed or existing surfaces are upgraded. The following application fields of Darda GmbH illustrate the interfaces:<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>After cutting out floor openings or removing build-ups, backfills in floor slab areas or in the ground must be compacted in layers to create load-bearing connections and level subgrades. In interior spaces, limiting emissions (exhaust gases, noise) can be crucial. Electric drives and dust control by light wetting support work in enclosed zones.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>When deconstructing foundations, floor slabs, or trafficked surfaces, restoration of the formation follows separation and splitting. Soil compactors ensure the required packing density of frost protection and base course layers-especially when reusing crushed concrete. Edge areas and transitions to retained structures benefit from reduced amplitudes and additional passes in narrow strips.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In tunnel and gallery construction as well as at portals, provisional access roads, storage areas, and fills are created. Here, soil compactors are used to compact gravel base layers and the bedding for drainage or utility installations. Uniform compaction lowers maintenance needs for haul routes and stabilizes stacking areas.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>On yards, access roads, and storage areas with high axle loads, uniform compaction is indispensable. Soil compactors help maintain haul roads and create subgrades for natural stone storage and processing areas. Regular re-compaction mitigates rutting during wet seasons.<\/p>\n<h3>Special assignment<\/h3>\n<p>In narrow excavations, utility crossings, or sensitive edge zones (near existing foundations), hand-guided, potentially reversible soil compactors enable controlled compaction with limited vibration impact. Low-amplitude settings and careful sequencing minimize transmission to adjacent components.<\/p>\n<h2>Soil mechanics and compaction principles<\/h2>\n<p>Successful compaction is based on appropriate grain-size distribution, suitable water content, and layered processing. The goal is a dense, load-bearing structure without voids. Achieving a degree of compaction close to the material&#8217;s optimum state reduces long-term deformation and enhances frost resistance.<\/p>\n<ul>\n<li><strong>Grain-size distribution<\/strong>: Well-graded mixes (fine to coarse) achieve higher densities. Very uniform gradations are harder to compact.<\/li>\n<li><strong>Water content<\/strong>: Slightly moist material is easier to rearrange; too dry or too wet reduces effectiveness. Moisten or allow to dry as needed.<\/li>\n<li><strong>Layer thickness<\/strong>: Match to the machine class; layers that are too thick compact unevenly.<\/li>\n<li><strong>Cohesive soils<\/strong>: With high fines content, lower frequencies and higher amplitudes are advantageous; if necessary, consider alternative compactors.<\/li>\n<li><strong>Optimum range<\/strong>: Target water content and energy so that density increases with each pass until a plateau is reached; beyond that, additional passes offer diminishing returns.<\/li>\n<\/ul>\n<h2>Quality assurance of compaction<\/h2>\n<p>Quality should be agreed and documented on a project basis. In addition to experience (number of passes, surface response), simple field tests or dynamic methods can be considered. In critical areas, metrological control can be useful. Requirements should always be adapted to local conditions.<\/p>\n<ul>\n<li><strong>Field indicators<\/strong>: Surface firmness, machine response, and stable track marks are basic indicators for homogeneous areas.<\/li>\n<li><strong>Dynamic plate or LWD<\/strong>: Deflection-based assessment supports quick spot checks on base layers.<\/li>\n<li><strong>Plate load tests<\/strong>: Comparative bearing capacity values can be used for acceptance of heavily loaded areas.<\/li>\n<li><strong>Density checks<\/strong>: Where required, spot sampling or nuclear density gauges can verify relative compaction levels.<\/li>\n<li><strong>Documentation<\/strong>: Record machine type, settings, passes, lift thickness, moisture conditioning, and test results for traceability.<\/li>\n<\/ul>\n<h2>Safety, vibrations, and emissions<\/h2>\n<p>Soil compactors generate vibrations, noise, and dust. In built-up areas and existing structures, careful work is important to minimize impacts. Notes on vibrations are to be understood generally; depending on the structure and subsoil, differing assessments are possible.<\/p>\n<ul>\n<li><strong>Vibrations<\/strong>: Maintain distance from sensitive components, reduce number of passes, step transitions. Select lower amplitude near basements or brittle elements and observe any site-specific vibration limits.<\/li>\n<li><strong>Dust<\/strong>: Lightly moisten material; clean construction logistics supports air quality.<\/li>\n<li><strong>Noise<\/strong>: Observe working hours and noise control.<\/li>\n<li><strong>Operator protection<\/strong>: Pay attention to hand-arm vibrations, plan breaks and gloves; ensure stability and secure grips. Use safe lifting points and stable ground for starting, parking, and refueling or charging.<\/li>\n<li><strong>Exhaust and indoor work<\/strong>: Prefer low-emission operation in enclosed or sensitive areas and provide adequate ventilation when combustion drives are used.<\/li>\n<\/ul>\n<h2>Interfaces to products from Darda GmbH<\/h2>\n<p>Compaction with soil compactors is often directly connected to tools from Darda GmbH:<\/p>\n<ul>\n<li><strong>Concrete demolition shears<\/strong>: After grabbing and downsizing floor slabs and foundations, RC layers are placed and compacted; treat transitions to remaining foundations gently.<\/li>\n<li><strong>Rock and concrete hydraulic wedge splitters<\/strong>: Precise splitting reduces vibrations during deconstruction; the resulting material can, after processing, be installed as a load-bearing layer with the soil compactor.<\/li>\n<li><strong>Hydraulic power packs<\/strong>: They supply split cylinders and shears; the subsequent earthworks and placement operations conclude with appropriate compaction.<\/li>\n<li><strong>Combination shears, multi cutters, steel shears<\/strong>: After cutting rebar and sections, areas are prepared and compacted for subsequent trades.<\/li>\n<li><strong>Tank cutters<\/strong>: In tank demolition projects, backfills must be carefully compacted after removal; low-emission approaches are advantageous.<\/li>\n<li><strong>Rock splitting cylinders<\/strong>: In rock and natural stone quarries, break material is produced; for access roads and storage areas, compacting the fill layers with suitable plates is sensible.<\/li>\n<\/ul>\n<h2>Practical guide: layer thicknesses, transitions, and edge areas<\/h2>\n<p>Good compaction relies on proper lift placement and the treatment of critical detail zones. Especially where components were previously removed with concrete demolition shears, uniform packing densities are important.<\/p>\n<ol>\n<li><strong>Layer thickness<\/strong>: Choose lifts so the soil compactor effectively reaches the full depth; reduce lift height if needed.<\/li>\n<li><strong>Number of passes<\/strong>: Overlap uniformly; a cross pattern increases homogeneity.<\/li>\n<li><strong>Transitions<\/strong>: Compact interfaces to old layers and to building edges in smaller strips; form steps and terraces.<\/li>\n<li><strong>Edge compaction<\/strong>: Work with reduced amplitude at edges; protect sensitive surfaces with a rubber mat.<\/li>\n<li><strong>Asphalt\/pavers<\/strong>: Use the sprinkler on asphalt; for pavers, first compact the bedding and then compact with a protective mat.<\/li>\n<li><strong>Cold or wet conditions<\/strong>: Avoid compacting saturated or frozen material; adjust water content and energy input to seasonal conditions.<\/li>\n<li><strong>Recordkeeping<\/strong>: Document sequence, passes, and observations to support later acceptance and maintenance planning.<\/li>\n<\/ol>\n<h2>Maintenance, operation, and transport<\/h2>\n<p>Regular maintenance supports safety and compaction success. Visual inspections before and after use are recommended.<\/p>\n<ul>\n<li><strong>Technology<\/strong>: Check exciter oil level, V-belt, fasteners, bearings, and damping elements.<\/li>\n<li><strong>Baseplate<\/strong>: Keep clean and free of burrs; deformations impair results.<\/li>\n<li><strong>Sprinkler<\/strong>: Clean nozzles and tank.<\/li>\n<li><strong>Transport<\/strong>: Sling securely; mind the center of gravity.<\/li>\n<li><strong>Operational checks<\/strong>: Inspect throttle and vibration engagement, verify safety decals, and ensure emergency stop functionality where present.<\/li>\n<\/ul>\n<h2>Common issues and remedies<\/h2>\n<ul>\n<li><strong>Uneven compaction<\/strong>: Lifts too thick or too few passes; adjust layer thickness, choose a cross pattern.<\/li>\n<li><strong>&#8220;Pumping&#8221; ground<\/strong>: Water content too high; allow material to dry or change material.<\/li>\n<li><strong>Surface tearing<\/strong>: Amplitude too high or unsuitable gradation; check parameters and material.<\/li>\n<li><strong>Edge damage<\/strong>: Driving too hard at edges; reduce number of passes, use a protective mat.<\/li>\n<li><strong>Asphalt scuffing<\/strong>: Vibration engaged while stationary or at turns; disengage vibration before stopping and use light, straight passes for finishing.<\/li>\n<\/ul>\n<h2>Sustainability and recycled construction materials<\/h2>\n<p>Valuable recycled material is generated during deconstruction. Targeted separation with concrete demolition shears or rock and concrete hydraulic wedge splitters from Darda GmbH keeps aggregates cleaner and enables their reuse as recycled concrete (RC). Proper compaction with the soil compactor ensures long-term load-bearing capacity and conserves primary resources. Low-dust work practices and coordinated logistics support environmental protection. Careful removal of contaminants and balanced RC gradation improve compactability and performance in base layers.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Soil compactors are core compaction equipment for subsoil, road and path construction, as well as for backfilling excavation trenches. In combination with demolition and separation\/cutting works, such as those carried out with tools from Darda GmbH, they ensure the load-bearing capacity of layers-for example, when, after the use of concrete <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/soil-compactor\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19695","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Soil Compactor Machine | Vibratory Plate Guide<\/title>\n<meta name=\"description\" content=\"Expert guide to soil compactor machines \u2713 design, vibration basics, types, selection, and safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/soil-compactor\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Soil Compactor Machine | Vibratory Plate Guide\" \/>\n<meta property=\"og:description\" content=\"Expert guide to soil compactor machines \u2713 design, vibration basics, types, selection, and safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/soil-compactor\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-14T10:53:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-compactor\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-compactor\",\"name\":\"Soil Compactor Machine | Vibratory Plate Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-08T10:12:33+00:00\",\"dateModified\":\"2026-05-14T10:53:03+00:00\",\"description\":\"Expert guide to soil compactor machines \u2713 design, vibration basics, types, selection, and safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-compactor#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-compactor\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soil-compactor#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Soil compactor\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Soil Compactor Machine | Vibratory Plate Guide","description":"Expert guide to soil compactor machines \u2713 design, vibration basics, types, selection, and safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/soil-compactor","og_locale":"en_US","og_type":"article","og_title":"Soil Compactor Machine | Vibratory Plate Guide","og_description":"Expert guide to soil compactor machines \u2713 design, vibration basics, types, selection, and safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/soil-compactor","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-14T10:53:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/soil-compactor","url":"https:\/\/www.darda.de\/en\/knowledge\/soil-compactor","name":"Soil Compactor Machine | Vibratory Plate Guide","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-08T10:12:33+00:00","dateModified":"2026-05-14T10:53:03+00:00","description":"Expert guide to soil compactor machines \u2713 design, vibration basics, types, selection, and safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/soil-compactor#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/soil-compactor"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/soil-compactor#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Soil compactor"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19695","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19695"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19695\/revisions"}],"predecessor-version":[{"id":27405,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19695\/revisions\/27405"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19695"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}