{"id":19688,"date":"2025-12-08T12:36:53","date_gmt":"2025-12-08T11:36:53","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19688"},"modified":"2026-05-14T13:44:03","modified_gmt":"2026-05-14T11:44:03","slug":"foundation-trimming","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/foundation-trimming","title":{"rendered":"Foundation trimming"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Foundation trimming (also known as <em>foundation cropping<\/em> or <em>edge reduction<\/em>) refers to the targeted, controlled reduction of foundation edges, projections, or partial cross-sections made of concrete. Typical reasons include repurposing, extensions and conversions, tolerance adjustments, keeping corridors clear, or creating new connection details. In practice, the intervention is usually carried out in existing structures and requires precise execution to ensure load-bearing capacity, serviceability, and a robust construction process. In selective deconstruction, <strong>concrete pulverizers<\/strong> and <strong>hydraulic splitter (wedge)<\/strong> units from Darda GmbH are frequently used &#8211; including solutions such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> &#8211; as they enable controlled removal steps in confined space with low vibration levels.<\/p>\n<p>Compared with percussive removal, low-vibration hydraulic methods help preserve adjacent structural elements, limit secondary cracking, and maintain process control when working close to sensitive equipment or active operations. This supports predictable sequencing, fewer unplanned interfaces, and cleaner subsequent construction steps.<\/p>\n<h2>Definition: What is meant by foundation trimming?<\/h2>\n<p>\u201cFoundation trimming\u201d means the partial removal of an existing foundation &#8211; such as a strip, isolated, or slab foundation edge &#8211; without removing the entire foundation. The objective is to locally adapt the geometry, eliminate upstands, create bearing surfaces, or expose reinforcement for a <em>rebar connection<\/em>. Foundation trimming is distinct from complete demolition and underpinning: while underpinning adds new load-bearing sections, trimming reduces existing component areas while complying with structural, design, and construction-operations constraints.<\/p>\n<h2>Use cases and objectives for trimming foundations<\/h2>\n<p>Typical use cases range from clearing movement space (e.g., for a <em>machine foundation<\/em> or installation areas) and tolerance corrections to the preparation of shaft, utility line, and foundation connections. In damage repair &#8211; such as edge spalling of concrete, corrosion of reinforcement, or local repairs &#8211; a precise trim is also beneficial. In <em>concrete demolition and special demolition<\/em> as well as in <em>building gutting and concrete cutting<\/em>, targeted removal allows the preservation of load-bearing functions while processing only the scope actually required. In areas with rock contact or within a tunnel context, the low-vibration principle of removal can be transferred from <em>rock excavation and tunnel construction<\/em> &#8211; for example, by hydraulic splitting, as also practiced in <em>natural stone extraction<\/em>.<\/p>\n<p>Further objectives include achieving clean rebates and bearing shelves, aligning top-of-concrete elevations for machinery or rails, and creating defined surface profiles for subsequent bonding or sealing systems.<\/p>\n<h2>Planning and structural analysis: Boundary conditions before foundation trimming<\/h2>\n<p>Before starting, the load-bearing conditions and the planned change in use must be assessed. This includes:<\/p>\n<ul>\n<li>Survey of component geometry, concrete compressive strength class, reinforcement layout, and existing built-in components<\/li>\n<li>Verification of load transfer, load redistributions, and reserves when reducing the cross-section<\/li>\n<li>Need for temporary shoring, load diversion, or interim construction stages<\/li>\n<li>Definition of cut lines, tolerances, surface requirements, and edge quality<\/li>\n<li>Coordination with subsoil, groundwater level, and adjacent components (risk of cracking and settlement)<\/li>\n<li>Detection of embedded services by non-destructive testing and reconciliation with as-built documentation<\/li>\n<li>Assessment of existing damage patterns (cracks, corrosion, delamination) and their influence on trim stability<\/li>\n<li>Planning of access, debris logistics, and emission control in confined or occupied environments<\/li>\n<\/ul>\n<p>Legal and normative requirements must be considered on a project-specific basis. Statements regarding approvals, verification obligations, or site protection are always of a general nature; concrete decisions lie with the planning and execution stakeholders. Where interfaces to subsequent trades are critical, early agreement on acceptance criteria and test methods prevents rework.<\/p>\n<h2>Methods and tools for trimming foundations<\/h2>\n<h3>Low-vibration concrete splitting<\/h3>\n<p><strong>Hydraulic splitter (wedge)<\/strong> units with suitable split cylinders operate via borehole splitting and are suitable for massive foundations, thick edges, or hard-to-reach areas. The concrete is split in a controlled manner without extensive microcracking in adjacent zones. Advantages include low vibration levels, reduced noise emission, and good control over fracture paths.<\/p>\n<h3>Targeted removal and edge finishing<\/h3>\n<p><strong>Concrete pulverizers<\/strong> allow the step-by-step biting-off of edges, upstands, and projections &#8211; particularly advantageous in selective deconstruction within tight surroundings, such as along existing walls or in facilities that remain in operation. For exposed inserts and reinforcement, steels can be separated with steel shears or a rebar cutter. Comparable outcomes can be achieved with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">concrete crushers for selective removal<\/a>.<\/p>\n<h3>Hydraulics as the system base<\/h3>\n<p>A hydraulic power pack provides the necessary power supply for split cylinders, pulverizers, and shears, typically delivered by <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a>. The combination enables a graduated approach: pre-cutting, splitting, edge removal, fine finishing.<\/p>\n<ul>\n<li>Selection criteria: available pressure and flow, hose length and quick-couplers, weight and transport concept<\/li>\n<li>Operational aspects: oil temperature management, filter maintenance, and energy supply coordination<\/li>\n<\/ul>\n<h3>Separation and preparatory works<\/h3>\n<p>Depending on requirements, separation cuts are placed to steer cracks, boreholes are created, and the trimming line is marked. For heavily reinforced foundations, exposing and orderly cutting of the reinforcement is an essential step to achieve a clean edge.<\/p>\n<h3>Complementary cutting and drilling<\/h3>\n<p>Diamond saw cuts and core drilling can confine fracture zones, define corners, and create starter holes for split cylinders. Pre-cuts reduce edge spalling, while cores enable precise placement of splitting tools in congested reinforcement.<\/p>\n<h2>On-site sequence: step by step<\/h2>\n<ol>\n<li>Define the trimming geometry, marking, survey reference, and protection of the surroundings<\/li>\n<li>Create boreholes for split cylinders or place separation cuts along defined lines<\/li>\n<li>Hydraulic splitting for controlled crack guidance, relief, and preconditioning<\/li>\n<li>Edge removal with concrete pulverizers; orderly extraction of partial segments<\/li>\n<li>Cut exposed reinforcement; safe handling and debris clearance of the broken pieces<\/li>\n<li>Post-processing of cut edges: leveling, chamfering, surface profile for subsequent works<\/li>\n<li>Cleaning, tolerance checks, documentation, and release for the further construction process<\/li>\n<li>If required, application of corrosion protection on exposed steel and temporary edge protection<\/li>\n<\/ol>\n<h2>Quality assurance and tolerances<\/h2>\n<p>Flatness, squareness, and edge quality are decisive for subsequent use. Typical criteria include:<\/p>\n<ul>\n<li>Deviations from the trimming line and permissible dimensional tolerances<\/li>\n<li>Surface roughness and bond requirements for subsequent topping or grouting works<\/li>\n<li>Prevention of spalling at edges through suitable pre-cuts or coordinated split spacing<\/li>\n<li>Adequate concrete cover and protection of the remaining reinforcement<\/li>\n<li>Verification methods such as straightedge checks, template gauges, and pull-off tests where bonding is required<\/li>\n<\/ul>\n<p>Accompanying measurement &#8211; such as control dimensions, edge alignment, and crack monitoring &#8211; improves process reliability. For safety-relevant components, appropriate verifications and acceptance are to be planned. Mock-ups on non-critical test sections help calibrate split spacing, tool selection, and achievable edge quality before working on final geometries.<\/p>\n<h2>Safety, environment, and emissions<\/h2>\n<p>In foundation trimming, the focus is on minimizing vibrations, dust, and noise, as well as safely handling heavy segments. Hydraulic splitting works with low vibration levels and reduces secondary damage to adjacent components. Dust generation is limited through suitable dust extraction or wetting measures. The mineral demolition material must be collected in a single-fraction manner; reinforcing steel is separated for recycling. If groundwater is encountered, protection and sealing measures must be taken into account. Safety aspects such as crushing hazard and cut hazards, hydraulic pressure, load handling, and the stability of temporary shoring states must be addressed in the hazard assessment.<\/p>\n<ul>\n<li>Define exclusion zones and lifting plans for segment handling<\/li>\n<li>Use wet cutting or extraction to control respirable dust and maintain visibility<\/li>\n<li>Monitor noise exposure and schedule high-emission steps to minimize disruption<\/li>\n<li>Plan spill containment for hydraulic oils and implement routine hose inspections<\/li>\n<\/ul>\n<h2>Special situations and structural contexts<\/h2>\n<h3>Confined spaces in existing structures<\/h3>\n<p>In basements, production areas, or facilities in operation, compact handheld tools and a modular equipment setup are advantageous. <strong>Concrete pulverizers<\/strong> and <strong>hydraulic splitter (wedge)<\/strong> units from Darda GmbH enable step-by-step removal sequences with high control.<\/p>\n<h3>Foundations with a high reinforcement ratio<\/h3>\n<p>With dense reinforcement, a combination of pre-cutting, splitting, and shearing helps. The sequence influences edge quality and the forces introduced into the existing structure.<\/p>\n<h3>Contact with rock or heterogeneous subsoil<\/h3>\n<p>Varying stiffness at the foundation base requires adapted split spacing and controlled load diversion. Experience from <em>rock excavation and tunnel construction<\/em> is transferable, especially for low-vibration procedures.<\/p>\n<p>For sensitive environments &#8211; such as heritage elements or vibration-critical facilities &#8211; preliminary trials and real-time monitoring reduce risk and support documentation-based decision making.<\/p>\n<h2>Interfaces to application areas<\/h2>\n<ul>\n<li><strong>Concrete demolition and special demolition:<\/strong> Selective removal with a focus on component preservation and defined fracture edges.<\/li>\n<li><strong>Building gutting and concrete cutting:<\/strong> Preparation of openings, breakthroughs, and system adjustments at foundations.<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> Splitting methodology to reduce vibrations around sensitive structures.<\/li>\n<li><strong>Natural stone extraction:<\/strong> Transferred splitting techniques for controlled joints and piece-size control.<\/li>\n<li><strong>Special operations:<\/strong> Works under difficult conditions, such as restricted access or elevated protection requirements.<\/li>\n<li><strong>Infrastructure retrofits:<\/strong> Local geometry adjustments at plinths, pedestals, or abutment zones without full replacement.<\/li>\n<\/ul>\n<h2>Typical sources of error and how to avoid them<\/h2>\n<ul>\n<li>Insufficient analysis of load paths prior to trimming leads to unintended settlements or crack formation.<\/li>\n<li>Missing crack steering and unsuitable split spacing cause spalling at exposed edges.<\/li>\n<li>Uncoordinated reinforcement exposure complicates removal and impairs edge quality.<\/li>\n<li>Underestimated emissions (dust, noise) burden ongoing operations and the surroundings.<\/li>\n<li>Uncoordinated tolerances hinder subsequent trades and installations.<\/li>\n<li>Skipping trial sections and parameter calibration results in unpredictable fracture behavior.<\/li>\n<\/ul>\n<h2>Documentation, verification, and handover<\/h2>\n<p>Structured documentation includes the trimming geometry, methods used, check dimensions, photos of construction states, and disposal certificates for the demolition fractions. For subsequent works &#8211; such as casting, installing machinery, or sealing &#8211; the agreed interface characteristics (dimensions, flatness, surface roughness) must be recorded. This makes the functionality of the remaining foundation transparent and the further <em>construction process<\/em> plannable.<\/p>\n<p>Digital records from measurement points, monitoring logs, and as-built models enhance traceability and support coordination with downstream trades. Defined acceptance protocols, including edge-protection measures and corrosion-control status where relevant, facilitate a clean handover.<\/p>\n<p>A proven approach is a graduated procedure that combines hydraulic splitting with targeted edge removal. <strong>Concrete pulverizers<\/strong> and <strong>hydraulic splitter (wedge)<\/strong> units from Darda GmbH cover key work steps &#8211; from controlled crack initiation to a clean edge &#8211; and support precise, low-vibration work in existing structures.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Foundation trimming (also known as foundation cropping or edge reduction) refers to the targeted, controlled reduction of foundation edges, projections, or partial cross-sections made of concrete. Typical reasons include repurposing, extensions and conversions, tolerance adjustments, keeping corridors clear, or creating new connection details. In practice, the intervention is usually carried <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/foundation-trimming\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19688","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Foundation Trimming | Concrete Methods &amp; Safety<\/title>\n<meta name=\"description\" content=\"Expert guide to foundation trimming in concrete construction \u27a4 safe methods, planning, low-vibration work, clean edges.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/foundation-trimming\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Foundation Trimming | Concrete Methods &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Expert guide to foundation trimming in concrete construction \u27a4 safe methods, planning, low-vibration work, clean edges.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/foundation-trimming\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-14T11:44:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/foundation-trimming\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/foundation-trimming\",\"name\":\"Foundation Trimming | Concrete Methods & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-08T11:36:53+00:00\",\"dateModified\":\"2026-05-14T11:44:03+00:00\",\"description\":\"Expert guide to foundation trimming in concrete construction \u27a4 safe methods, planning, low-vibration work, clean edges.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/foundation-trimming#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/foundation-trimming\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/foundation-trimming#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Foundation trimming\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Foundation Trimming | Concrete Methods & Safety","description":"Expert guide to foundation trimming in concrete construction \u27a4 safe methods, planning, low-vibration work, clean edges.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/foundation-trimming","og_locale":"en_US","og_type":"article","og_title":"Foundation Trimming | Concrete Methods & Safety","og_description":"Expert guide to foundation trimming in concrete construction \u27a4 safe methods, planning, low-vibration work, clean edges.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/foundation-trimming","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-14T11:44:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/foundation-trimming","url":"https:\/\/www.darda.de\/en\/knowledge\/foundation-trimming","name":"Foundation Trimming | Concrete Methods & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-08T11:36:53+00:00","dateModified":"2026-05-14T11:44:03+00:00","description":"Expert guide to foundation trimming in concrete construction \u27a4 safe methods, planning, low-vibration work, clean edges.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/foundation-trimming#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/foundation-trimming"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/foundation-trimming#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Foundation trimming"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19688","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19688"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19688\/revisions"}],"predecessor-version":[{"id":27413,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19688\/revisions\/27413"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19688"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}