{"id":19685,"date":"2025-12-06T14:21:42","date_gmt":"2025-12-06T13:21:42","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19685"},"modified":"2025-12-06T14:21:42","modified_gmt":"2025-12-06T13:21:42","slug":"retention-system","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/retention-system","title":{"rendered":"Retention system"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Retention systems are a central element of occupational safety in demolition, deconstruction, and natural stone extraction. They prevent uncontrolled movements of tools, lines, components, or rock blocks and enable planned, controlled operations\u2014from selective concrete demolition through special deconstruction to rock excavation. In combination with hydraulic tools such as <strong>concrete demolition shears<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong>, retention systems support a precise, low-damage workflow and reduce hazards to people and surroundings.<\/p>\n<h2>Definition: What is meant by retention system<\/h2>\n<p>By a <em>retention system<\/em> one understands all technical and organizational measures that serve to deliberately limit and safely hold forces, movements, or components. This includes, for example, tool retention (securing hand and attachment tools), component retention (catch and safety ropes, catch nets, shoring\/props), line retention (hose catch to prevent whipping in case of pressure loss), as well as personnel protection in the form of restraint or fall-arrest systems. The goal is always to dissipate energy in the system in a controlled manner, prevent uncontrolled changes of position, and make the work steps reproducibly safe.<\/p>\n<h2>Functional principle and objectives of a retention system<\/h2>\n<p>Retention systems act by safely taking up loads, limiting paths of movement, and directing the forces that occur so that neither persons nor equipment are endangered. Core objectives are: <strong>control of breaking and separation processes<\/strong>, <strong>reduction of impact and pendulum forces<\/strong>, <strong>protection against secondary hazards<\/strong> (e.g., whipping hoses, falling components), and <strong>securing the cutting and splitting line<\/strong> through defined holding points and pre-hold measures. In practice, retention systems are often combined from multiple elements to achieve redundant safety.<\/p>\n<h3>Typical fields of application<\/h3>\n<ul>\n<li>Concrete demolition and special deconstruction: component catching when releasing with <strong>concrete demolition shears<\/strong>, retention of slab segments, controlled removal of wall panels.<\/li>\n<li>Strip-out and cutting: tool retention and component securing when working with combination shears, multi-cutters, and steel shears.<\/li>\n<li>Rock excavation and tunnel construction: break control and block retention when splitting with <strong>stone and concrete splitters<\/strong> or stone splitting cylinders.<\/li>\n<li>Natural stone extraction: safe release and controlled placing of raw blocks including blocking and catching measures.<\/li>\n<li>Special application: line retention on hydraulic systems, segment catching when using tank cutters.<\/li>\n<\/ul>\n<h2>Retention systems in concrete demolition and special deconstruction<\/h2>\n<p>In concrete demolition, planned separation and gripping processes are paramount\u2014consistent with best practice in <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a>. While the tool cuts or breaks the structure, the retention system ensures that released parts are held, guided, or set down in a defined manner. This applies to load-bearing components as well as secondary elements that are mobilized by vibration, cutting, or splitting forces.<\/p>\n<h3>Concrete demolition shears: holding components in a controlled way<\/h3>\n<p>When detaching wall or slab segments with a <strong>concrete demolition shear<\/strong>, holding points and pull directions must be defined in advance. A two-step approach is sensible: first, structure the component with cutting or breaking lines; then secure it using catch lines, anchorage points, or auxiliary spreader beams. This reduces swinging, edge breaks, and uncontrolled load transfers. Retention systems allow small, safe step sizes\u2014instead of large separations that are difficult to control.<\/p>\n<ul>\n<li>Catch and guiding ropes sized to the component mass, with sufficient edge and abrasion protection.<\/li>\n<li>Redundant securing where load paths are unclear (e.g., second catch line, backup anchorage point).<\/li>\n<li>Planned tipping axes and defined set-down areas to dissipate residual energy in a targeted manner.<\/li>\n<\/ul>\n<h3>Stone and concrete splitters: break control in rock and concrete<\/h3>\n<p><strong>Stone and concrete splitters<\/strong> generate high, locally confined splitting forces. The retention system supports the desired fracture guidance through correct alignment of the splitting axis, by pre-hold and counter-hold measures, and by securing pieces that may be released. In rock and heavily reinforced concrete, two-stage splitting with small opening angles has proven effective, supplemented by blocking chains, timber posts, or catch nets to avoid uncontrolled block movements.<\/p>\n<ul>\n<li>Pre-tensioning of safety ropes in the expected direction of movement to limit initial and swing paths.<\/li>\n<li>Protecting the splitting zone against spalling by coverings and defined clearances.<\/li>\n<li>Pressure relief steps and re-tensioning of the retention between splitting cycles.<\/li>\n<\/ul>\n<h2>Components of a retention system<\/h2>\n<p>An effective retention system consists of several building blocks that are combined depending on the task. Crucial are proper sizing, compatible interfaces, and controlled force introduction into load-bearing structures.<\/p>\n<ul>\n<li><strong>Anchorage points<\/strong>: permanent or temporary, with sufficient load capacity and unambiguous load transfer.<\/li>\n<li><strong>Connecting means<\/strong>: chains, ropes, webbing, or strops adapted to abrasion, edges, and temperature.<\/li>\n<li><strong>Damping elements<\/strong>: to reduce impact forces (e.g., defined elongation, friction paths, intermediate layers).<\/li>\n<li><strong>Catching and guiding means<\/strong>: catch lines, diversion points, auxiliary spreader beams for movement limitation.<\/li>\n<li><strong>Secondary safeguards<\/strong>: redundant holding points, catch nets, shoring\/props.<\/li>\n<\/ul>\n<h3>Design criteria<\/h3>\n<ul>\n<li>Mass and geometry of the component, expected fracture or cutting line, center of gravity location.<\/li>\n<li>Impact and pendulum factors, possible edge loads, friction and redirection effects.<\/li>\n<li>Environmental conditions: moisture, temperature, chemicals, sparks.<\/li>\n<li>Compatibility with tool forces and holding angles of concrete demolition shears or splitting cylinders.<\/li>\n<li>Verification of the load-bearing capacity of the anchorage structure and clear definition of the load path.<\/li>\n<\/ul>\n<h2>Retention systems for lines and hydraulic power packs<\/h2>\n<p>Hydraulic demolition technology uses powerful <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/strong> and lines. In pressure surges or coupling errors, hoses can whip. <strong>Line retention<\/strong> by hose catch devices, safety cables, or suitable coupling locks limits movements and protects personnel. In addition, depressurized shutdown and orderly pressure relief of the lines are effective. Power packs are to be set up with stable footing and secured against unintended shifting.<\/p>\n<ul>\n<li>Hose catch devices near the coupling and at movement transitions.<\/li>\n<li>Edge protection and routing of lines away from the cutting and splitting zone.<\/li>\n<li>Defined pressure relief and shutdown sequence before changing attachments or disconnecting.<\/li>\n<\/ul>\n<h2>Procedure: planning, installation, testing<\/h2>\n<ol>\n<li>Hazard assessment: analyze component weight, fracture direction, fall paths, rebound and swing spaces.<\/li>\n<li>Selection of retention components: check capacities, lengths, edge and temperature resistance.<\/li>\n<li>Installation: establish anchorage points, define load paths, account for friction and redirection losses.<\/li>\n<li>Function test: test pull direction, elongation paths, and clearances under low load.<\/li>\n<li>Execution: work steps in small, controlled sequences; adaptively follow up the retention.<\/li>\n<li>Documentation and follow-up: visual inspection, record, labeling, and interval inspections.<\/li>\n<\/ol>\n<h2>Fields of application and practice-oriented examples<\/h2>\n<p>Retention systems accompany the entire life cycle of a demolition or extraction project: from strip-out through cutting and splitting to the precise placing of segments or blocks.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>When cutting beams, lines, and installations\u2014for example with combination shears, multi-cutters, or steel shears\u2014tool retention and component securing prevent uncontrolled rotational or falling movements. Segmented cuts with intermediate catching increase control, especially overhead.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Stone splitting cylinders enable controlled fracture formation. Retention chains, shoring, and defined clearances keep loose blocks secured. On inclined terrain, guiding points and short catch lines are crucial to minimize sliding paths.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>When releasing raw blocks, the alignment of the splitting line must be matched to natural joints. Retention systems limit the initial block movement, enable gentle placing, and protect the edge quality of the stones.<\/p>\n<h3>Special application<\/h3>\n<p>When opening vessels with tank cutters, segment retention is essential to avoid plate distortion and uncontrolled movements. Blocking and catching measures must be matched to the material behavior (e.g., springback of sheet metal).<\/p>\n<h2>Common mistakes and how to avoid them<\/h2>\n<ul>\n<li>Insufficient anchorage points: load capacity and load paths not verified.<\/li>\n<li>Catch lines too long: large swing paths and high impact loads; better short, guided systems.<\/li>\n<li>Missing edge protection: premature wear and capacity loss of ropes\/webbing.<\/li>\n<li>Single safeguard without redundancy: always provide a backup when fracture paths are unclear.<\/li>\n<li>Lines in the work area: missing routing creates tripping and whipping hazards.<\/li>\n<\/ul>\n<h2>Maintenance, inspection, and documentation<\/h2>\n<p>Retention systems must be inspected regularly. Visual checks before starting work and recurring inspections according to manufacturer specifications and recognized rules of technology are essential. Inspection intervals, results, and repairs are documented, components are labeled, and damaged items are removed from service without delay. Training and instruction of personnel ensure correct application.<\/p>\n<h2>Selection and interaction with tools from Darda GmbH<\/h2>\n<p>The effectiveness of a retention system depends on its coordination with the tool in use. With <strong>concrete demolition shears<\/strong>, robust, short-guided catch lines and defined tipping axes are sensible. With <strong>stone and concrete splitters<\/strong>, fracture guidance is the focus: blocking and counter-hold secure the desired splitting direction. For combination shears, multi-cutters, steel shears, and tank cutters, material springback, segment size, and edge stability must also be considered. <strong>Hydraulic power packs<\/strong> and lines are retained separately and routed so that they never enter the cutting or splitting zone.<\/p>\n<h2>Normative and organizational aspects<\/h2>\n<p>Retention systems are to be selected and operated in accordance with applicable occupational safety regulations, recognized rules of technology, and the specific conditions of use. This includes the hazard assessment, documentation of anchorage and load paths, and the definition of clear responsibilities. Legal requirements can vary by country, industry, and activity; it is advisable to comply with locally applicable provisions and, where necessary, obtain expert advice.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Retention systems are a central element of occupational safety in demolition, deconstruction, and natural stone extraction. They prevent uncontrolled movements of tools, lines, components, or rock blocks and enable planned, controlled operations\u2014from selective concrete demolition through special deconstruction to rock excavation. In combination with hydraulic tools such as concrete demolition <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/retention-system\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19685","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Retention System for Demolition &amp; Deconstruction<\/title>\n<meta name=\"description\" content=\"Safety-focused retention systems for demolition and rock excavation \u2713 control tools, lines and blocks for precise work.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/retention-system\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Retention System for Demolition &amp; Deconstruction\" \/>\n<meta property=\"og:description\" content=\"Safety-focused retention systems for demolition and rock excavation \u2713 control tools, lines and blocks for precise work.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/retention-system\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/retention-system\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/retention-system\",\"name\":\"Retention System for Demolition & Deconstruction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-06T13:21:42+00:00\",\"description\":\"Safety-focused retention systems for demolition and rock excavation \u2713 control tools, lines and blocks for precise work.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/retention-system#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/retention-system\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/retention-system#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Retention system\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Retention System for Demolition & Deconstruction","description":"Safety-focused retention systems for demolition and rock excavation \u2713 control tools, lines and blocks for precise work.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/retention-system","og_locale":"en_US","og_type":"article","og_title":"Retention System for Demolition & Deconstruction","og_description":"Safety-focused retention systems for demolition and rock excavation \u2713 control tools, lines and blocks for precise work.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/retention-system","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/retention-system","url":"https:\/\/www.darda.de\/en\/knowledge\/retention-system","name":"Retention System for Demolition & Deconstruction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-06T13:21:42+00:00","description":"Safety-focused retention systems for demolition and rock excavation \u2713 control tools, lines and blocks for precise work.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/retention-system#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/retention-system"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/retention-system#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Retention system"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19685","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19685"}],"version-history":[{"count":1,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19685\/revisions"}],"predecessor-version":[{"id":20914,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19685\/revisions\/20914"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19685"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}