{"id":19684,"date":"2025-12-06T09:13:54","date_gmt":"2025-12-06T08:13:54","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19684"},"modified":"2026-05-14T08:12:03","modified_gmt":"2026-05-14T06:12:03","slug":"coverage-ratio-construction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/coverage-ratio-construction","title":{"rendered":"Coverage ratio construction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The coverage ratio construction describes how well a construction or deconstruction project is safeguarded against technical, organizational, financial, and legal risks. This metric helps clients, site management, and specialist contractors assess the <em>predictability<\/em> and <em>controllability<\/em> of works &#8211; especially in sensitive application areas such as <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, gutting works and cutting, rock excavation and tunnel construction, or natural stone extraction. The choice of appropriate methods and tools &#8211; such as the targeted use of concrete demolition shear or hydraulic wedge splitter &#8211; directly influences the coverage ratio construction because they make fracture behavior, vibrations, noise, dust, and the force flow in the structural element more controllable. As a leading indicator in project governance, it supports early intervention via hold points and escalation paths.<\/p>\n<h2>Definition: What is meant by coverage ratio construction?<\/h2>\n<p>The coverage ratio construction is a <strong>percentage metric<\/strong> that indicates the extent to which the identified requirements, residual risks, and boundary conditions of a project are <strong>covered by measures, resources, redundancies, and evidence<\/strong>. It can be determined separately for partial aspects (e.g., costs, schedule, technology\/structural analysis, occupational safety, environmental requirements) and then assessed as a whole. One possible basic principle is: <em>secured need<\/em> divided by <em>expected need<\/em> &#8211; multiplied by 100. In a deconstruction context, this includes, among other things, structural stability, controlled separation, load transfer, emission limitation, equipment deployment planning (including hydraulic power packs), release and emergency processes, as well as regulatory requirements. The higher the coverage ratio construction, the more robust the project is against disruptions and deviations.<\/p>\n<p>To sharpen interpretability, <em>weightings<\/em> and <em>maturity levels<\/em> can be defined (e.g., 0 &#8211; identified, 1 &#8211; planned, 2 &#8211; resourced, 3 &#8211; verified on site). Assumptions and dependencies should be logged transparently so that updates can be traced.<\/p>\n<h2>Metrics, calculation, and significance<\/h2>\n<p>In practice, the coverage ratio construction is formed via sub-metrics that are consolidated in project controlling. Examples include cost coverage ratio (secured financing + reserves vs. forecast costs), schedule coverage ratio (buffers vs. potential delays), safety coverage ratio (effectiveness of measures vs. hazards), environmental coverage ratio (protective measures vs. limits\/emissions), and technical coverage ratio (method suitability, tools, redundancy, proof). The metric is a <strong>management instrument<\/strong>, not a guarantee; it depends on the quality of risk identification, method selection, and ongoing updates during construction execution.<\/p>\n<ul>\n<li>Aggregation should follow a consistent method (e.g., weighted average with minimum thresholds for safety and environment).<\/li>\n<li>Data sources include method statements, permits, budget reports, look-ahead schedules, and measurement records.<\/li>\n<li>Avoid false precision: report ranges and confidence where appropriate and define clear red-amber-green triggers.<\/li>\n<\/ul>\n<h3>Example calculation (simplified)<\/h3>\n<p>For a selective concrete demolition of a 35 cm thick concrete slab, the following technical needs are determined: low-vibration removal (1), controlled fracture pattern (2), shoring (3), dust limitation (4), equipment availability\/redundancy (5). Planned measures: concrete demolition shear for edge-near, controlled nibbling (1\/2), temporary shoring (3), negative-pressure sections with curtains (4), a second hydraulic power pack as backup (5). All five needs are <em>covered<\/em>: 5\/5 \u2192 100% technical coverage ratio. In the overall system, the coverage ratio construction may be lower if, for example, schedule buffers or environmental requirements are not yet fully secured. The statement is <strong>indicative<\/strong> and should be updated regularly.<\/p>\n<p>In practice, 100% values tend to be <em>momentary<\/em> and require continuous verification during execution, including assumption tracking and adaptation of resources when boundary conditions change.<\/p>\n<h2>Influencing factors in construction and deconstruction<\/h2>\n<p>The coverage ratio construction is shaped by site conditions, component properties, and method selection. Essential factors can be controlled in planning and execution; others result from the project environment and approvals.<\/p>\n<ul>\n<li>Structural and subsoil behavior, stress redistribution, edge restraints<\/li>\n<li>Reinforcement layout, material mix (reinforced concrete, prestressed concrete, masonry, natural stone)<\/li>\n<li>Environmental constraints: vibration, noise, and dust limit values; ground vibration monitoring<\/li>\n<li>Accessibility, construction logistics, lifting and disposal routes, work areas<\/li>\n<li>Method selection (e.g., concrete demolition shear, hydraulic wedge splitter, attachment shear, Multi Cutters)<\/li>\n<li>Equipment availability, redundancy concepts, and hydraulic power pack sizing<\/li>\n<li>Personnel qualification, operating instructions, release and stop processes<\/li>\n<li>Documentation, measurement concepts, evidence preservation, and communication<\/li>\n<li>Interfaces to existing structures and utilities, including temporary load paths and protection<\/li>\n<li>Weather and seasonal constraints, daylight and temperature windows, water ingress management<\/li>\n<\/ul>\n<h2>Coverage ratio construction in concrete demolition and special demolition<\/h2>\n<p>In concrete demolition, the <strong>control of load path and crack propagation<\/strong> determines safety and predictability. Methods with controlled material removal increase the coverage ratio construction because they minimize unintended fractures and enable step-by-step load transfer. Concrete demolition shear supports the selective removal of concrete elements along defined edges; gentle, hydraulic processing reduces vibrations. Hydraulic wedge splitters are suitable for weakening massive components with low stress before further separation or lifting. In combination, components can be divided into logical segments, which increases the coverage ratio construction technically (fracture control), in terms of schedule (better takt), and organizationally (clear construction waste logistics). Complementary measures include rebar exposure and cutting concepts, structural releases before each cut, and vibration or crack-width monitoring in sensitive surroundings.<\/p>\n<h3>Targeted use of concrete demolition shear<\/h3>\n<p>Concrete demolition shears show their benefits at edge areas, ceiling openings, interior wall breakthroughs, and on components that can be removed in sections. Preparations such as temporary shoring, defined separation cuts, and a regulated gripping and cutting plan are crucial. The result is a more predictable fracture pattern &#8211; a core aspect of a high coverage ratio construction. Where reinforcement concentrations are expected, pre-scanning and targeted pre-cuts reduce pinch risks and tool downtime.<\/p>\n<h3>Rock and concrete splitting devices for massive components<\/h3>\n<p>Hydraulic splitting is suitable for thick walls, foundations, massive blocks, or rock. Through borehole drilling patterns and splitting sequences, the component is <em>selectively weakened<\/em> without using blasting technology. This reduces vibrations, facilitates subsequent removal with concrete demolition shear or similar tools, and stabilizes the construction process. Proper sizing of the hydraulic power pack is essential to avoid peak loads and ensure availability; oil temperature management and hose routing contribute to stable performance.<\/p>\n<h2>Coverage ratio construction in gutting works and cutting<\/h2>\n<p>In gutting works and the separation of installations, <strong>selectivity<\/strong> is key. Attachment shear and Multi Cutters support precise separation in mixed constructions made of steel sections, pipes, sheets, and light concrete components. A high coverage ratio construction is achieved through clear separation matrices, dust protection and fire protection concepts, regulated material flow, and redundancy in cutting tools. For more massive concrete portions, preparatory splitting can reduce cutting time and the risk of jammed tools. Hot work and spark management must be planned via permits, fire watch, and defined cool-down times.<\/p>\n<h2>Coverage ratio construction in rock excavation and tunnel construction<\/h2>\n<p>In rock excavation and tunnel construction, the rule is: low vibration, controlled, predictable. Rock wedge splitter and hydraulic wedge splitter enable opening rock along defined drill patterns. This promotes orderly removal, reduces impacts on surrounding structures, and improves schedule and safety coverage. In tunnels, airflow control, water management, emergency exit routes, monitoring and warning systems, and precise takt planning are additionally decisive for a high coverage ratio construction. Instrumentation (e.g., convergence measurements and settlement benchmarks) and clear alarm thresholds support timely intervention.<\/p>\n<h2>Coverage ratio construction in natural stone extraction<\/h2>\n<p>In natural stone extraction, the fracture pattern must ensure quality and yield. By splitting along natural joints, blocks are cleanly released. This increases the technical coverage (few micro-cracks), economic coverage (better yield), and environmental coverage (less vibration and dust) &#8211; important building blocks of a high coverage ratio construction in extraction operations. Orientation to bedding and vein directions, as well as planned wedge sequencing, further improves predictability.<\/p>\n<h2>Operational measures to increase the coverage ratio construction<\/h2>\n<p>The coverage ratio construction can be systematically increased through clear methods, redundancies, and measurement. Important levers are:<\/p>\n<ul>\n<li>Method planning with work and separation sequences, load transfer, and emergency criteria<\/li>\n<li>Pre-investigation: utility lines, ground-penetrating radar (GPR), material samples, anchor and post-tensioning systems<\/li>\n<li>Redundant hydraulic power pack and spare tools to secure availability<\/li>\n<li>Field trial\/test (mock-up) to verify fracture pattern, noise, and dust development<\/li>\n<li>Measurement concepts (ground vibration monitoring, dust, noise), complete documentation<\/li>\n<li>Clean construction logistics: separated material flow, short routes, defined interim storage<\/li>\n<li>Approvals, stop rules, and escalation paths for deviations<\/li>\n<li>Interface and responsibility matrix (who approves what, when, and with which evidence)<\/li>\n<li>Defined hold points with go\/no-go criteria and sign-off requirements<\/li>\n<li>Digital checklists and photo documentation to standardize recurring steps<\/li>\n<\/ul>\n<ol>\n<li>Identify and weight risks<\/li>\n<li>Select suitable methods and tools (e.g., concrete demolition shear, hydraulic wedge splitter)<\/li>\n<li>Size resources and redundancies (hydraulic power pack, power supply, personnel)<\/li>\n<li>Stepwise execution with measurement and release hold points<\/li>\n<li>Controlling: continuously update KPIs, readjust measures<\/li>\n<\/ol>\n<p>Clear ownership for each sub-metric, a fixed review cadence, and a structured change process align all parties and stabilize execution quality.<\/p>\n<h2>Documentation, proof, and communication<\/h2>\n<p>A reliable coverage ratio construction requires traceable documentation: work and inspection plans, approvals, measurement records, photo documentation, acceptance reports. Regular site meetings, clear interfaces, and transparent decisions increase acceptance by the client, site supervision, and the surrounding environment &#8211; and thus the safeguarding of the project. Version control, retention periods, and standardized file naming strengthen auditability and speed up approvals.<\/p>\n<h2>Legal and normative aspects<\/h2>\n<p>The design of the coverage ratio construction always considers the <strong>applicable regulations<\/strong> on occupational safety, noise control and vibration protection, hazardous substances, waste management, and the technical building regulations. Requirements may vary by country, region, and project. Statements on the coverage ratio construction are generally of a general nature and do not replace project-specific reviews or official approvals. Project permits, notification duties, and any special restrictions (e.g., working hours, groundwater protection, sensitive neighbors) must be reflected in both method and measurement concepts.<\/p>\n<h2>Typical sources of error &#8211; and how to avoid them<\/h2>\n<p>Hidden reinforcement, stresses in the structural element, utility line routing, weather influences, and logistics bottlenecks are often underestimated. Lack of redundancy in hydraulic power pack, unclear separation sequences, or insufficient shoring quickly lead to schedule or safety risks. The remedy is early investigations, field trials, redundant equipment, and a disciplined approval chain.<\/p>\n<ul>\n<li>Verify load paths and shoring before each cut, including re-checks after stage changes.<\/li>\n<li>Plan tool changes and access routes to avoid dead ends and unplanned lifts.<\/li>\n<li>Protect critical interfaces (e.g., adjacent structures, fa\u00e7ade elements) with monitoring and barriers.<\/li>\n<\/ul>\n<h2>KPIs in project controlling<\/h2>\n<p>Separate and aggregated KPIs are suitable for control: cost coverage ratio, schedule coverage ratio, safety coverage ratio, environmental coverage ratio, and technical coverage ratio. A high overall coverage ratio construction requires that <em>all<\/em> sub-metrics reach a viable level; individual weaknesses can only be compensated to a limited extent by other areas. Define threshold values per KPI and a reporting rhythm (e.g., daily for safety, weekly for schedule\/cost) to keep deviations visible and actionable.<\/p>\n<h2>Tool selection and coverage ratio construction by application area<\/h2>\n<ul>\n<li>Concrete demolition and special demolition: concrete demolition shear for controlled removal, supplemented by hydraulic wedge splitter for massive components<\/li>\n<li>Gutting works and cutting: attachment shear and Multi Cutters for selective separation in mixed constructions<\/li>\n<li>Rock excavation and tunnel construction: rock wedge splitter and hydraulic wedge splitter for low-vibration openings<\/li>\n<li>Natural stone extraction: splitting technology for a defined fracture pattern and high yield<\/li>\n<li>Special deployment: steel shear and tank cutters for specific material and safety requirements<\/li>\n<\/ul>\n<h2>Hydraulics and energy: planning with a view to availability<\/h2>\n<p>Hydraulic power packs are the takt giver for many tools. Sizing, hydraulic hose line routing, quick coupling systems, maintenance windows, and temperature management influence failure risks and thus directly the coverage ratio construction. A <strong>second supply line<\/strong> or a standby power unit is a field-proven building block for high availability. Power supply concepts (electrical capacity, mobile generators, load management) and cable protection must be coordinated with logistics and safety planning.<\/p>\n<h2>Qualification and teamwork<\/h2>\n<p>Trained handling of concrete demolition shear, hydraulic wedge splitter, and other tools, clear roles (lead, equipment operation, safety, measurement service), as well as regular instructions and briefings on site increase the effectiveness of measures &#8211; and thus the real safeguarding on the construction site. Toolbox talks, stop-work authority, and refreshers after incidents or change events reinforce safe and predictable execution.<\/p>\n<h2>Term delineation and classification<\/h2>\n<p>The coverage ratio construction differs from purely financial metrics such as contribution margin or pure safety factors from structural analysis. It is an integrated, project-specific view that brings together risks, resources, and methods. In combination with a risk matrix, construction schedule, and quality records, a complete picture for control and proof emerges &#8211; particularly for works within the Darda GmbH product world such as concrete demolition shear and hydraulic wedge splitter in the application areas mentioned. Unlike a single safety factor, the coverage ratio construction captures the interplay of preparedness, redundancy, and verification across disciplines and over time.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The coverage ratio construction describes how well a construction or deconstruction project is safeguarded against technical, organizational, financial, and legal risks. This metric helps clients, site management, and specialist contractors assess the predictability and controllability of works &#8211; especially in sensitive application areas such as concrete demolition and special deconstruction, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/coverage-ratio-construction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19684","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Coverage Ratio Construction - Project Risk KPI<\/title>\n<meta name=\"description\" content=\"Learn how the coverage ratio in construction &amp; deconstruction \u2713 quantifies risk control, safety, schedule &amp; costs.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/coverage-ratio-construction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Coverage Ratio Construction - Project Risk KPI\" \/>\n<meta property=\"og:description\" content=\"Learn how the coverage ratio in construction &amp; deconstruction \u2713 quantifies risk control, safety, schedule &amp; costs.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/coverage-ratio-construction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-14T06:12:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/coverage-ratio-construction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/coverage-ratio-construction\",\"name\":\"Coverage Ratio Construction - Project Risk KPI\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-06T08:13:54+00:00\",\"dateModified\":\"2026-05-14T06:12:03+00:00\",\"description\":\"Learn how the coverage ratio in construction & deconstruction \u2713 quantifies risk control, safety, schedule & costs.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/coverage-ratio-construction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/coverage-ratio-construction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/coverage-ratio-construction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Coverage ratio construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Coverage Ratio Construction - Project Risk KPI","description":"Learn how the coverage ratio in construction & deconstruction \u2713 quantifies risk control, safety, schedule & costs.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/coverage-ratio-construction","og_locale":"en_US","og_type":"article","og_title":"Coverage Ratio Construction - Project Risk KPI","og_description":"Learn how the coverage ratio in construction & deconstruction \u2713 quantifies risk control, safety, schedule & costs.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/coverage-ratio-construction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-14T06:12:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/coverage-ratio-construction","url":"https:\/\/www.darda.de\/en\/knowledge\/coverage-ratio-construction","name":"Coverage Ratio Construction - Project Risk KPI","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-06T08:13:54+00:00","dateModified":"2026-05-14T06:12:03+00:00","description":"Learn how the coverage ratio in construction & deconstruction \u2713 quantifies risk control, safety, schedule & costs.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/coverage-ratio-construction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/coverage-ratio-construction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/coverage-ratio-construction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Coverage ratio construction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19684","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19684"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19684\/revisions"}],"predecessor-version":[{"id":27397,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19684\/revisions\/27397"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19684"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}