{"id":19678,"date":"2025-12-06T08:41:46","date_gmt":"2025-12-06T07:41:46","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19678"},"modified":"2026-09-12T19:53:23","modified_gmt":"2026-09-12T17:53:23","slug":"deconstruction-planning","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-planning","title":{"rendered":"Deconstruction planning"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Deconstruction planning is the strategic and technical preparation for the orderly dismantling of structures, plants, and natural stone formations. It links existing-condition assessment, safety concept, method selection, and construction logistics into a coherent sequence that minimizes emissions, conserves resources, and keeps schedule and costs under control. In practice, planning decisions are closely aligned with the tools and procedures used &#8211; such as with <strong>concrete pulverizer<\/strong> for reinforced concrete or with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> for low-vibration separation work. Clear outcomes are planning documents and method statements that make execution verifiable, auditable, and safe.<\/p>\n<h2>Definition: What is meant by deconstruction planning?<\/h2>\n<p>Deconstruction planning refers to the systematic, documented preparation of the selective dismantling of structures, components, or geological formations. It includes recording the as-built condition, risk assessment, the selection of suitable deconstruction methods, the assignment of appropriate tools, as well as the organization of occupational safety, demolition sorting, disposal, and recycling. The objective is a safe, efficient, and as low-emission as possible process that takes into account requirements from permit, environmental protection, and structural analysis &#8211; from concrete demolition in existing buildings to building gutting, from rock breakout to natural stone extraction. Deliverables typically include a deconstruction concept, a risk register, sequencing and temporary works design, and evidence for monitoring and waste management.<\/p>\n<h2>Process and phases of deconstruction planning<\/h2>\n<p>Deconstruction planning is divided into successive phases: existing-condition survey, concept development, work and safety planning, logistics, and execution preparation. Each phase influences the choice of methods &#8211; for example, whether to work selectively with concrete pulverizer or whether a blasting-free splitting technique with stone splitter and concrete splitter has the least impact on the surroundings and the load-bearing structure. Decision gates, trial cuts or splits, and feedback from monitoring are used to iteratively refine the concept.<\/p>\n<h3>Pre-investigation and data basis<\/h3>\n<ul>\n<li>Collection of structure data, load-bearing systems, material types, and reinforcement<\/li>\n<li>Recording of utilities, media, built-in components, and potential hazardous substances (general, not case-specific)<\/li>\n<li>Environmental conditions: sensitivity to vibration, noise control, accessibility, load paths<\/li>\n<li>Geology and block size for rock breakout and natural stone extraction<\/li>\n<li>As-built documentation from surveys, scans, or models<\/li>\n<li>Permitting and operational constraints such as time windows and quiet hours<\/li>\n<\/ul>\n<h3>Concept and method selection<\/h3>\n<ul>\n<li>Selective deconstruction vs. large-volume removal<\/li>\n<li>Use of specific tools: <em>concrete pulverizer<\/em>, <em>stone splitter and concrete splitter<\/em>, combination shear, Multi Cutters, steel shear, cutting torch<\/li>\n<li>Combination of cutting, splitting, crushing, and shearing to minimize vibration and dust<\/li>\n<li>Structural analysis and sequence planning: stable, anti-tilt order, temporary shoring<\/li>\n<li>Compatibility with adjacent operations and occupancy (e.g., ongoing production or traffic)<\/li>\n<li>Tool availability, changeover times, and spare-part logistics<\/li>\n<\/ul>\n<h3>Occupational, health, and environmental protection (general)<\/h3>\n<ul>\n<li>Hazard analysis, safety measures, access and exclusion zones<\/li>\n<li>Dust suppression, noise reduction measures, vibration control<\/li>\n<li>Water and media management, containment and retention systems<\/li>\n<li>Method statements, rescue plans, and compliance with the applicable legal framework<\/li>\n<\/ul>\n<h3>Construction logistics and execution preparation<\/h3>\n<ol>\n<li>Site setup, traffic and crane logistics, load and transport routes<\/li>\n<li>Dimension the hydraulic power pack and plan the power supply<\/li>\n<li>Define sequences, takt times, and personnel allocation<\/li>\n<li>Monitoring: define crack monitoring, noise emissions, and ground vibration monitoring<\/li>\n<li>Permits, time windows, and information routes for stakeholders and neighbors<\/li>\n<li>Emergency access, evacuation routes, and fire safety integration<\/li>\n<\/ol>\n<h2>Technical methods and tool selection in deconstruction<\/h2>\n<p>The choice of methods follows the principle: as selective as necessary, as low-emission as possible. The focus is on hydraulic separation and crushing techniques that work precisely and in a controlled manner. Tool selection feeds into planning early on, because it significantly influences structural reactions, emissions, cycle times, and construction logistics. Where feasible, mock-ups and pilot areas validate assumptions before full rollout.<\/p>\n<h3>Concrete pulverizer in selective concrete demolition<\/h3>\n<ul>\n<li>Targeted separation and downsizing of reinforced concrete components<\/li>\n<li>Good control on fa\u00c3\u00a7ades, slab edges, and in interiors<\/li>\n<li>Reduced secondary damage through controlled crushing and biting<\/li>\n<li>Supports clean rebar recovery and material sorting<\/li>\n<\/ul>\n<h3>Stone and concrete splitters as well as rock wedge splitter<\/h3>\n<ul>\n<li>Low-vibration, blasting-free splitting technique in existing structures and in rock<\/li>\n<li>Ideal near sensitive neighboring buildings, historic structures, and tunnel excavation<\/li>\n<li>Controlled crack propagation; block and component sizes can be planned and separated<\/li>\n<li>Defined drill-hole patterns enable predictable progress and accurate separation planes<\/li>\n<li>Very low airborne dust compared with percussive methods when combined with wet drilling<\/li>\n<\/ul>\n<h3>Combination shears and Multi Cutters<\/h3>\n<ul>\n<li>Combination of crushing and cutting for mixed components<\/li>\n<li>Separation of structural steel sections, reinforcement, sheet metal, and pipes<\/li>\n<li>Flexible for building gutting and selective strip-out<\/li>\n<li>Optimized with quick-change systems for short setup and idle times<\/li>\n<\/ul>\n<h3>Steel shear and cutting torch<\/h3>\n<ul>\n<li>Dismantling massive steel components, vessels, silos, and tanks<\/li>\n<li>Planning-relevant aspects: cutting sequence, stability, residual stresses, media-free condition<\/li>\n<li>Safe integration into the disposal and recycling concept<\/li>\n<li>Hot-work permits, fire watch, and gas monitoring where required<\/li>\n<\/ul>\n<h2>Application areas and their influence on planning<\/h2>\n<p>The boundary conditions in the application areas control methods, sequences, and tool selection. This results in different priorities in deconstruction planning, risk profiles, and monitoring densities:<\/p>\n<ul>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">Concrete demolition and special deconstruction<\/a><\/strong>: detailed structural analysis, segment-by-segment work with concrete pulverizer and splitting technique to reduce vibration; clear control of falling masses and interfaces.<\/li>\n<li><strong>Building gutting and cutting<\/strong>: selective dismantling, precise separation with Multi Cutters and combination shears, clear material streams; utilities isolation and contamination avoidance are central.<\/li>\n<li><strong>Rock breakout and tunnel construction<\/strong>: controlled splitting with rock wedge splitter, consideration of stress states and subsequent support; monitoring of overbreak and convergence where relevant.<\/li>\n<li><strong>Natural stone extraction<\/strong>: plannable block sizes with splitters, preserving material quality, gentle removal; reduced microcracking preserves value.<\/li>\n<li><strong>Special operations<\/strong>: special restrictions (e.g., proximity to infrastructure), specific sampling, tight monitoring; short time windows and stakeholder communication plans.<\/li>\n<\/ul>\n<h2>Structural analysis, vibration, and emissions<\/h2>\n<p>Deconstruction changes load paths and can cause oscillations, noise, and dust. Planning accounts for reserves and shoring, defines a safe sequence, and controls emissions through suitable methods. <em>stone splitter and concrete splitter<\/em> and <em>concrete pulverizer<\/em> are particularly relevant for low-vibration deconstruction. Predictive checks for dynamic amplification and prevention of progressive collapse are integral to the sequencing concept.<\/p>\n<h3>Vibration and noise reduction<\/h3>\n<ul>\n<li>Splitting technique and crushing instead of percussive methods wherever possible<\/li>\n<li>Sequencing of cuts and splits to control crack formation<\/li>\n<li>Pre-separation of components to reduce drop heights and impacts<\/li>\n<li>Use real-time monitoring to adjust process parameters within defined limits<\/li>\n<\/ul>\n<h3>Dust, water, and media<\/h3>\n<ul>\n<li>Targeted dust suppression, wet cutting, enclosures<\/li>\n<li>Containment, sealing, and retention systems for process water<\/li>\n<li>Safe isolation and emptying of lines and vessels before cutting<\/li>\n<li>Handling and disposal of slurry and fines according to site rules<\/li>\n<\/ul>\n<h2>Hydraulic power pack as a planning factor<\/h2>\n<p>The hydraulic power pack supplies the tools with energy. Planning considers flow rate, operating pressure, number of attachments operated in parallel, hydraulic hose line lengths, and interfaces to the carrier machine. This allows cycle times, tool changes, and safety distance to be defined reliably, and dedicated <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> to be integrated effectively. Noise control, placement with sufficient airflow, and safe hose routing are planned from the outset.<\/p>\n<h3>Sizing and integration<\/h3>\n<ul>\n<li>Plan performance reserve for peak loads<\/li>\n<li>Thermal management and duty cycle per takt<\/li>\n<li>Ergonomics, connection systems, and transport routes<\/li>\n<li>Redundancy or fast switchover concepts for critical paths<\/li>\n<\/ul>\n<h2>Material separation, disposal, and recycling<\/h2>\n<p>Deconstruction planning structures material flows and enables a high recycling rate. Mechanical separation steps are scheduled so that materials are cleanly separated and transports are consolidated. Clear labeling and coding of fractions improves traceability and reduces rework.<\/p>\n<ol>\n<li>Early separation of concrete, reinforcement, masonry, metals, and special fractions<\/li>\n<li>Plan dimensions: graspable and transportable piece sizes<\/li>\n<li>Interim storage, weighing, documentation, and traceability<\/li>\n<li>Assign waste and material codes according to contract and specification<\/li>\n<li>Plan backhauls and consolidations to reduce empty trips<\/li>\n<\/ol>\n<h2>Project organization, schedule, and logistics<\/h2>\n<p>A clear structure reduces interface risks. Responsibilities, communication paths, and cycle plans must be set transparently, including emergency and incident management. Defined roles, decision-making powers, and escalation paths prevent delays on the critical path.<\/p>\n<h3>Sequence and takt planning<\/h3>\n<ul>\n<li>Define work areas, avoid conflicts (e.g., cutting and lifting)<\/li>\n<li>Buffers for weather, measurements, and testing<\/li>\n<li>Routes for haulage logistics and delivery, load classes of routes<\/li>\n<li>Visual management via digital takt boards or 4D simulations<\/li>\n<\/ul>\n<h2>Monitoring, quality assurance, and documentation<\/h2>\n<p>Accompanying measurements and tests secure execution. Deviations are detected early and measures are adapted. Clean documentation accelerates evidence and billing. Acceptance criteria and hold points are defined per phase to ensure consistent quality.<\/p>\n<ul>\n<li>Ground vibration monitoring, crack monitoring, and noise emission with limit and warning values<\/li>\n<li>Control points for cutting and splitting progress<\/li>\n<li>Photo documentation, as-built measurements, quantity takeoff<\/li>\n<li>Defined acceptance criteria and hold points tied to release for next steps<\/li>\n<\/ul>\n<h2>Typical planning errors and how to avoid them<\/h2>\n<ul>\n<li>Unclear component sequence: define cut and split lines early<\/li>\n<li>Underestimated emissions: prefer methods with low vibration levels<\/li>\n<li>Imprecise logistics: define load paths, load-bearing capacities, and grasping sizes<\/li>\n<li>Insufficient energy reserve: size the hydraulic power pack adequately<\/li>\n<li>Missing alternative method: plan a backup procedure (e.g., switch from pulverizer to splitter)<\/li>\n<li>Permit and utility clearance lead times underestimated: integrate them into the schedule baseline<\/li>\n<li>Stakeholder communication not embedded: define information routes and responsibilities<\/li>\n<\/ul>\n<h2>Practice-oriented checklist for deconstruction planning<\/h2>\n<ol>\n<li>Fully record the existing conditions, environmental conditions, and risks<\/li>\n<li>Define the deconstruction concept with methods and tools (concrete pulverizer, stone splitter and concrete splitter, combination shears, Multi Cutters, steel shear, cutting torch)<\/li>\n<li>Define structural analysis, sequence, and safeguards<\/li>\n<li>Plan emission reduction: dust, noise, vibration<\/li>\n<li>Dimension hydraulic power pack, power supply, and connections<\/li>\n<li>Organize material flows, dimensions, and recycling routes<\/li>\n<li>Set occupational safety, access, and exclusion zones (general)<\/li>\n<li>Structure monitoring, quality assurance, and documentation<\/li>\n<li>Create a schedule and logistics concept with buffers<\/li>\n<li>Determine alternatives and emergency measures<\/li>\n<li>Secure permits, utility clearances, and time windows<\/li>\n<li>Plan method trials or mock-ups where uncertainty exists<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Deconstruction planning is the strategic and technical preparation for the orderly dismantling of structures, plants, and natural stone formations. It links existing-condition assessment, safety concept, method selection, and construction logistics into a coherent sequence that minimizes emissions, conserves resources, and keeps schedule and costs under control. In practice, planning decisions <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-planning\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19678","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Deconstruction Planning for Demolition &amp; Quarrying<\/title>\n<meta name=\"description\" content=\"Clear guide to deconstruction planning for demolition of structures \u2713 methods, safety, low-vibration tools &amp; logistics.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-planning\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Deconstruction Planning for Demolition &amp; Quarrying\" \/>\n<meta property=\"og:description\" content=\"Clear guide to deconstruction planning for demolition of structures \u2713 methods, safety, low-vibration tools &amp; logistics.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-planning\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:23+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-planning\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-planning\",\"name\":\"Deconstruction Planning for Demolition & Quarrying\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-06T07:41:46+00:00\",\"dateModified\":\"2026-09-12T17:53:23+00:00\",\"description\":\"Clear guide to deconstruction planning for demolition of structures \u2713 methods, safety, low-vibration tools & logistics.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-planning#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-planning\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-planning#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Deconstruction planning\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Deconstruction Planning for Demolition & Quarrying","description":"Clear guide to deconstruction planning for demolition of structures \u2713 methods, safety, low-vibration tools & logistics.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-planning","og_locale":"en_US","og_type":"article","og_title":"Deconstruction Planning for Demolition & Quarrying","og_description":"Clear guide to deconstruction planning for demolition of structures \u2713 methods, safety, low-vibration tools & logistics.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-planning","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:23+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-planning","url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-planning","name":"Deconstruction Planning for Demolition & Quarrying","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-06T07:41:46+00:00","dateModified":"2026-09-12T17:53:23+00:00","description":"Clear guide to deconstruction planning for demolition of structures \u2713 methods, safety, low-vibration tools & logistics.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-planning#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/deconstruction-planning"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-planning#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Deconstruction planning"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19678","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19678"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19678\/revisions"}],"predecessor-version":[{"id":29320,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19678\/revisions\/29320"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19678"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}