{"id":19677,"date":"2025-12-06T15:19:48","date_gmt":"2025-12-06T14:19:48","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19677"},"modified":"2026-05-13T10:30:04","modified_gmt":"2026-05-13T08:30:04","slug":"deconstruction-costs","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-costs","title":{"rendered":"Deconstruction costs"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Deconstruction costs determine whether a demolition or special demolition remains economical and plannable. They arise from the first existing-condition survey through construction logistics and execution to disposal and recycling. The choice of method and tools &#8211; such as <em>concrete pulverizers<\/em> or <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/em> by Darda GmbH &#8211; directly affects cycle times, noise emission and vibration levels, demolition separation and thus overall costs. This applies in inner-city <em>concrete demolition and special demolition<\/em> as well as in <em>building gutting and concrete cutting<\/em>, in <em>rock excavation and tunnel construction<\/em>, in <em>natural stone extraction<\/em> and in <em>special demolition<\/em> scenarios. Transparent cost planning benefits from early risk identification, realistic performance assumptions and an emissions concept tailored to the site context.<\/p>\n<h2>Definition: What is meant by deconstruction costs?<\/h2>\n<p>Deconstruction costs comprise all expenditures incurred during the planned dismantling, demolition or selective deconstruction of structures, plants or rock formations. These include direct production costs (personnel, equipment, energy, wear), indirect costs (construction site setup, construction logistics, traffic safety), disposal and recycling costs as well as expenses for planning, verifications and officially required protective measures. Unlike pure demolition costs, the term covers the entire process &#8211; from hazardous substance investigation through demolition separation to the documented handover of the cleaned area. Deconstruction costs are shaped by object geometry, material mix (concrete, reinforcement, masonry, steel), accessibility, emission limits and the choice of deconstruction method. In practice, contingencies, permit and approval fees, insurance, and documentation obligations also contribute to the total, especially where selective dismantling and recycling targets are specified.<\/p>\n<h2>Cost structure in deconstruction: items and influencing factors<\/h2>\n<p>The cost structure consists of several blocks that influence each other. Decisive are performance values of the chosen method (e.g., crushing capacity of concrete pulverizers or splitting progress of hydraulic splitters), logistics, demolition separation and disposal. Precise quantity takeoff and early method selection reduce risks in the estimate. Digital surveys with point clouds or BIM-based takeoff increase certainty of quantities, while scenario calculations help to assess sensitivity to gate fees, transport distances and work window constraints.<\/p>\n<h3>Direct production costs<\/h3>\n<ul>\n<li>Personnel: qualification, team size, shift model, training needs for hydraulic tools<\/li>\n<li>Equipment: concrete pulverizers, hydraulic splitters, hydraulic shears, Multi Cutters, steel shears, tank cutters; associated hydraulic power packs<\/li>\n<li>Drilling and cutting preparation: boreholes for splitters, core drilling, saw cuts; drill bit and wire wear<\/li>\n<li>Energy and wear: hydraulic performance, chisel and blade wear, seals, oils<\/li>\n<li>Auxiliaries: water for dust suppression, coverings, release agents<\/li>\n<li>Personal protective equipment and safety gear: respiratory and hearing protection, fall protection, fire watch for hot work<\/li>\n<\/ul>\n<h3>Indirect costs<\/h3>\n<ul>\n<li>Construction site setup and traffic safety: access routes, cranes, lifting devices, barriers<\/li>\n<li>Logistics: transport routes, interim storage, container concept, crane times<\/li>\n<li>Planning and documentation: survey, work and safety concepts, measurements<\/li>\n<li>Temporary works: shoring, propping, edge protection, weather protection<\/li>\n<\/ul>\n<h3>Disposal, recycling and revenues<\/h3>\n<ul>\n<li>Disposal: mineral fractions, reinforcing steel, mixed waste, hazardous substances (to be considered in general)<\/li>\n<li>Recycling: processed recycled concrete, source-separated steel &#8211; often aided by clean separation with concrete pulverizers and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears<\/a><\/li>\n<li>Revenue offsets: credits for source-separated fractions reduce net costs<\/li>\n<li>Market and transport effects: gate fees, haulage distances, acceptance criteria and seasonal capacity influence net disposal costs<\/li>\n<\/ul>\n<h3>Regulatory and context costs<\/h3>\n<ul>\n<li>Limits on noise, dust and vibration: selection of low-vibration methods such as hydraulic splitters<\/li>\n<li>Monitoring and verifications: measurements, protocols, possible retrofits of safety measures<\/li>\n<li>Work windows: night or weekend work, restrictions due to residents and traffic<\/li>\n<li>Permits and fees: approvals, traffic management permits, environmental assessments, neighbor communication measures<\/li>\n<\/ul>\n<h2>Method selection and equipment selection: impact on deconstruction costs<\/h2>\n<p>The method determines productivity, emission levels, separation accuracy and the quality of subsequent recycling. Mechanical crushing with concrete pulverizers, hydraulic splitting with hydraulic splitters, cutting with hydraulic shears, steel shears or Multi Cutters and special cutting technology such as tank cutters constitute the main options. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Appropriately sized hydraulic power units<\/a> by Darda GmbH provide the required performance, influencing cycle times and energy consumption. A method matrix that weighs productivity, emissions, access constraints, separation quality and downstream recycling often leads to robust, defensible cost decisions.<\/p>\n<ul>\n<li><strong>Concrete pulverizers<\/strong>: efficient breaking of reinforced concrete, good ratio of removal and demolition separation, reduced vibrations compared with breaker hammers<\/li>\n<li><strong>Hydraulic splitters<\/strong>: low-vibration levels, controlled crack formation in concrete and rock; suitable for sensitive areas and precise removal control<\/li>\n<li><strong>Hydraulic shears<\/strong> and <strong>Multi Cutters<\/strong>: flexible separation of concrete, masonry and metals; fewer tool changes<\/li>\n<li><strong>Steel shears<\/strong>: rapid dismantling of steel sections, beams and reinforcement; promotes pure-grade steel fractions<\/li>\n<li><strong>Tank cutters<\/strong>: controlled opening and dismantling of vessels in special demolition<\/li>\n<li><strong>Hydraulic power packs<\/strong>: sizing influences stroke and cutting cycles, as well as fuel or power demand<\/li>\n<\/ul>\n<h3>Use concrete pulverizers purposefully<\/h3>\n<p>Concrete pulverizers are cost-efficient when reinforcement is visible or expected and clean demolition separation is targeted. They often reduce the need for secondary crushing and make it easier to extract reinforcing steel. In <em>concrete demolition and special demolition<\/em> as well as in <em>building gutting and concrete cutting<\/em> they support short cycle times and manageable emission levels. The cost impact shows up in lower disposal fees for clean fractions and in plannable hourly performance values. In addition, suitable jaw configurations can prepare feed material for mobile crushing plants, which improves on-site recycling economics.<\/p>\n<h3>Hydraulic splitters in the cost comparison<\/h3>\n<p>Hydraulic splitting excels where vibration, noise and dust are tightly limited or where a defined crack path is desired. In <em>rock excavation and tunnel construction<\/em> as well as in <em>natural stone extraction<\/em>, blocks can be released in a controlled manner, which can reduce stabilization and rework costs. In inner-city deconstruction, low-vibration splitting methods reduce follow-up costs from monitoring, post-installed anchors or sensitive neighboring structures. Borehole layout, spacing and penetration depth have a direct effect on splitting progress and thus on cost per cubic meter.<\/p>\n<h2>Application areas and typical cost profiles<\/h2>\n<p>Deconstruction costs vary by application area and context. Suitable equipment and method selection can meet constraints while keeping productivity high. Where multiple constraints overlap &#8211; such as restricted access and strict emission limits &#8211; hybrid approaches with staged pre-cutting and targeted splitting followed by pulverizing often provide the best value.<\/p>\n<ul>\n<li><strong>Concrete demolition and special demolition<\/strong>: high demands on low-vibration levels and separation accuracy. Concrete pulverizers and hydraulic shears create defined removal edges; splitters reduce risks at existing connections.<\/li>\n<li><strong>Building gutting and concrete cutting<\/strong>: selective strip-out, smaller cross-sections, restricted access. Multi Cutters and steel shears accelerate pre-cutting; hydraulic power packs must be compact and mobile.<\/li>\n<li><strong>Rock excavation and tunnel construction<\/strong>: controlled release and low vibrations. Hydraulic splitters minimize stabilization effort; logistics and haulage logistics dominate costs.<\/li>\n<li><strong>Natural stone extraction<\/strong>: blockwise release with split cylinders; the quality of fracture surfaces positively influences recycling revenues.<\/li>\n<li><strong>Special demolition<\/strong>: tank cutters for vessels, steel shears for massive sections; special protective and cleaning measures factor into the estimate.<\/li>\n<\/ul>\n<h2>Planning, estimating and procurement<\/h2>\n<p>Robust cost determination starts with the existing-condition analysis and method-secure quantity takeoff. Line items should reflect the actual work sequence: pre-cutting, splitting or pulverizing, separating, interim storage, loading, transport, disposal\/recycling, cleaning and documentation. Performance values derive from experience, field trial\/test or vendor-neutral benchmarks and are adjusted for object parameters (elevation, degree of reinforcement, accessibility). Awards consider not only unit prices but also cycle plans, emission concepts and emergency procedures. Legal and authority requirements must be checked in general and included in the estimate. Modern practice increasingly integrates 3D scans, non-destructive testing and model-based lookahead planning to lower contingencies and to structure procurement in scalable lots.<\/p>\n<h3>Performance indicators and cycle times<\/h3>\n<p>For hydraulic methods, stroke, pressing and cutting cycles are decisive. Concrete pulverizers deliver high removal rates on compact elements; with heavily reinforced cross-sections, cycle times increase due to additional cutting of steel portions. Hydraulic splitters depend in their performance on the borehole pattern, splitting force and geometry. Proper sizing of hydraulic power packs prevents downtime and reduces energy demand per ton of removal. Consistent KPI tracking (m<sup>3<\/sup>\/h, t\/h, energy per ton, tool wear per shift) and takt-aligned planning improve forecast accuracy and allow timely adjustments.<\/p>\n<h3>Construction logistics, access and infrastructure<\/h3>\n<p>Narrow access, load restrictions and limited storage areas increase logistics costs. Short hose runs for hydraulic power packs, coordinated crane windows and a well-considered container concept avoid waiting times. Construction site water supply and construction power supply, dust suppression and routing within existing structures should be clarified early. Just-in-time transport, defined waiting zones and synchronized waste pickup windows stabilize throughput in dense urban environments.<\/p>\n<h2>Environment, safety and permits as cost drivers<\/h2>\n<p>Limits on noise, dust and vibration shape the choice of deconstruction method. Low-vibration methods such as hydraulic splitters can cap monitoring and stabilization costs. In noise-sensitive locations, concrete pulverizers are often advantageous over percussive methods. Protective measures (protective enclosure, mist cannons, ground vibration monitoring) and organizational requirements (work windows, traffic management) are cost-relevant and should be integrated methodically. Where applicable, documentation for environmental performance and circularity targets influences method statements and may unlock recycling credits or reduce fees.<\/p>\n<h3>Hazardous substance remediation and demolition separation<\/h3>\n<p>Materials containing hazardous substances must be considered separately. Selective deconstruction with clean cut and break edges facilitates separation. Concrete pulverizers and steel shears support detaching adherences and reinforcement, thereby potentially lowering disposal costs and improving recycling revenues. Statements here are general and not case-specific. Compliance requires trained personnel, chain-of-custody documentation and interface management with remediation contractors to avoid double handling and schedule conflicts.<\/p>\n<h3>Recycling and utilization<\/h3>\n<p>The purer the fractions, the cheaper the disposal and the higher the possible revenues. Concrete pulverizers often generate recyclable particle sizes; steel shears and hydraulic shears separate metals efficiently. A coordinated concept for the crushing plant, haulage logistics and the waste management chain stabilizes costs. Acceptance criteria, quality control of recycled aggregates and reliable outlets for metals and mineral fractions reduce pricing volatility.<\/p>\n<h2>Cost optimization in practice<\/h2>\n<p>Costs can be reduced through methodological clarity, suitable equipment combinations and stringent logistics. Pre-cutting, splitting and subsequent pulverizing reduce rework. Modular hydraulic power packs support varying performance demands. Realistic cycle times, short setup changeovers and orderly material flows prevent downtime. Additional levers include early trials on representative elements, lean sequencing to minimize interface losses and value engineering focused on separation quality and transport efficiency.<\/p>\n<ol>\n<li>Record existing conditions, clarify constraints and requirements<\/li>\n<li>Conduct a method comparison (pulverizing, splitting, cutting) and set up a field trial\/test<\/li>\n<li>Size the equipment chain including hydraulic power packs and separating tools<\/li>\n<li>Plan construction logistics, interim storage and disposal routes<\/li>\n<li>Integrate performance values, cycle plans and the emissions concept into the estimate<\/li>\n<li>Organize demolition separation and recycling early<\/li>\n<li>Provide for post-calculation to enable ongoing optimization<\/li>\n<\/ol>\n<h2>Documentation and post-calculation<\/h2>\n<p>Ongoing performance capture, equipment and energy consumption, disposal records and emission measurements form the basis for a robust post-calculation. This makes it possible to verify key figures for concrete pulverizers, hydraulic splitters, hydraulic shears, steel shears, Multi Cutters and tank cutters and transfer them to future projects. The continuously updated data basis improves tenders, awards and schedules and stabilizes deconstruction costs throughout the entire project. Digital logbooks and standardized reporting enable benchmarking across projects, while lessons learned on cycle times, separation quality and logistics constraints feed directly into method selection and procurement for subsequent assignments.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Deconstruction costs determine whether a demolition or special demolition remains economical and plannable. They arise from the first existing-condition survey through construction logistics and execution to disposal and recycling. The choice of method and tools &#8211; such as concrete pulverizers or hydraulic rock and concrete splitters by Darda GmbH &#8211; <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-costs\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19677","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Deconstruction Costs | Demolition &amp; Recycling<\/title>\n<meta name=\"description\" content=\"Understand deconstruction costs for demolition and selective dismantling \u2713 methods, logistics, disposal and recycling.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-costs\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Deconstruction Costs | Demolition &amp; Recycling\" \/>\n<meta property=\"og:description\" content=\"Understand deconstruction costs for demolition and selective dismantling \u2713 methods, logistics, disposal and recycling.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-costs\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-13T08:30:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-costs\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-costs\",\"name\":\"Deconstruction Costs | Demolition & Recycling\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-06T14:19:48+00:00\",\"dateModified\":\"2026-05-13T08:30:04+00:00\",\"description\":\"Understand deconstruction costs for demolition and selective dismantling \u2713 methods, logistics, disposal and recycling.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-costs#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-costs\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-costs#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Deconstruction costs\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Deconstruction Costs | Demolition & Recycling","description":"Understand deconstruction costs for demolition and selective dismantling \u2713 methods, logistics, disposal and recycling.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-costs","og_locale":"en_US","og_type":"article","og_title":"Deconstruction Costs | Demolition & Recycling","og_description":"Understand deconstruction costs for demolition and selective dismantling \u2713 methods, logistics, disposal and recycling.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-costs","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-13T08:30:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-costs","url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-costs","name":"Deconstruction Costs | Demolition & Recycling","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-06T14:19:48+00:00","dateModified":"2026-05-13T08:30:04+00:00","description":"Understand deconstruction costs for demolition and selective dismantling \u2713 methods, logistics, disposal and recycling.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-costs#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/deconstruction-costs"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-costs#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Deconstruction costs"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19677","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19677"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19677\/revisions"}],"predecessor-version":[{"id":27367,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19677\/revisions\/27367"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19677"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}