{"id":19676,"date":"2025-12-06T14:39:54","date_gmt":"2025-12-06T13:39:54","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19676"},"modified":"2026-09-12T19:53:23","modified_gmt":"2026-09-12T17:53:23","slug":"deconstruction-permit","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-permit","title":{"rendered":"Deconstruction permit"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The deconstruction permit is the formal key to kick-off in many projects of concrete demolition, building gutting, and special demolition. It defines the legal framework within which structures, plant components, and infrastructure may be deconstructed, separated, and disposed of. For methods using <strong>concrete demolition shears<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong>, compliance with regulatory dust, noise, vibration and other limits must be demonstrated for the project. In some jurisdictions, the term is used interchangeably with demolition permit, although scope and documentation depth may differ. This article situates the term professionally, explains the typical process, and shows how the choice of method and the tools used from Darda GmbH affect planning, permitting, and execution.<\/p>\n<h2>Definition: What is meant by a deconstruction permit?<\/h2>\n<p>A deconstruction permit is the administrative permission to dismantle buildings, building components, or technical installations completely or in sections. It typically includes conditions for protecting people, neighbors, and the environment, for construction waste separation and recycling, as well as for ensuring structural stability and the working area. Depending on project size and location, supplementary permits (e.g., traffic- or environment-related approvals) may be required. The deconstruction permit usually ties into a <em>deconstruction concept<\/em> describing the approach, machinery and tooling, noise and dust management, vibration limitation, disposal routes, and emergency measures. In practice, validity periods, milestone-based releases, and requirements for communication and monitoring are frequently defined to ensure traceable compliance.<\/p>\n<h2>Permitting process and required documents<\/h2>\n<p>The permitting procedure begins with a robust condition survey and ends with the authority\u2019s release for execution. Between these points lie review, proof, and the technical specification of the deconstruction method. Careful preparation reduces addenda, accelerates the procedure, and facilitates site supervision. Early pre-application discussions and digital submissions &#8211; including precise method statements, drawings, and measurement concepts &#8211; increase planning certainty.<\/p>\n<h3>Typical components of the application dossier<\/h3>\n<ul>\n<li>Project description with justification for deconstruction (full or partial deconstruction, phases, time windows)<\/li>\n<li>Deconstruction and disposal concept (demolition separation and construction waste sorting strategy, recycling rates, transport routes)<\/li>\n<li>Stability verification during deconstruction as well as securing adjacent structural elements<\/li>\n<li>Contaminant survey and remediation plan (e.g., asbestos, PCB, PAH) with work and protection measures<\/li>\n<li>Immission control plan: noise, dust, and vibration management including measurement and threshold concept<\/li>\n<li>Construction logistics: access, storage, crane and lifting areas, traffic-related orders<\/li>\n<li>Occupational safety and health concept (safety and health plan, emergency and rescue routes)<\/li>\n<li>Equipment and method description (e.g., use of <strong>concrete demolition shears<\/strong>, <strong>hydraulic wedge splitters<\/strong>, <em>hydraulic power packs<\/em>, <em>rock wedge splitters<\/em>)<\/li>\n<li>Proof of expertise and qualification of the contractors<\/li>\n<li>Method statement and risk assessment (RAMS), including sequencing, interfaces, and hold points<\/li>\n<li>Phasing schedule with milestones, working hours, and dependencies on neighbor operations<\/li>\n<li>Monitoring and reporting concept: baseline measurements, calibration, alert levels, and documentation workflow<\/li>\n<li>Stakeholder and neighborhood communication plan for information on time windows and expected emissions<\/li>\n<\/ul>\n<h3>Step-by-step sequence<\/h3>\n<ol>\n<li>Condition survey and hazard analysis (structural analysis, utilities, contaminants, surroundings)<\/li>\n<li>Pre-application dialogue with authorities to clarify scope, evidence, and site-specific constraints<\/li>\n<li>Selection of method and tooling concept (e.g., concrete demolition with concrete demolition shears vs. splitting technology)<\/li>\n<li>Preparation and submission of application documents<\/li>\n<li>Authority review, possible additional requests and conditions<\/li>\n<li>Neighbor and stakeholder notification in line with immission control and traffic concepts<\/li>\n<li>Release, site setup, start under monitoring of conditions<\/li>\n<li>Documentation, evidence (disposal records, measurement logs), notice of completion and formal closeout<\/li>\n<\/ol>\n<h2>Influence of the deconstruction method on the deconstruction permit<\/h2>\n<p>The choice of method is a central permitting topic because it affects emissions, occupational safety, and schedule. Mechanical, hydraulic, and thermal methods are assessed differently. Tools such as <strong>concrete demolition shears<\/strong> or <strong>hydraulic wedge splitters<\/strong> must be evaluated against the project-specific emission limits and permitting requirements. High-energy methods typically raise thresholds for noise and vibration management, while selective hydraulic techniques support compliance with separation and recycling targets.<\/p>\n<h3>Method profile at a glance<\/h3>\n<ul>\n<li><strong>Concrete demolition shears<\/strong>: selective concrete removal, controlled separation of concrete and reinforcement, reduced noise, low vibrations; suitable for <em>concrete demolition and special demolition<\/em>, <em>building gutting and cutting<\/em>, urban projects. Enable precise work close to sensitive installations and on intermediate floors.<\/li>\n<li><strong>Hydraulic wedge splitters<\/strong> or <em>rock wedge splitters<\/em>: controlled splitting without explosives, very low vibrations, precise splitting of rock and concrete; ideal for <em>rock excavation and tunnel construction<\/em> as well as <em>special operations<\/em> in sensitive areas. Promote crack control and reduce fines.<\/li>\n<li><em>Combination shears<\/em>, <em>Multi Cutters<\/em>, <em>hydraulic demolition shears<\/em>: steel and composite separation, economical dismantling in industrial and bridge deconstruction; relevant for conditions concerning spark emission, cut edges, and handling of remnants.<\/li>\n<li><em>Tank cutters<\/em>: cold cutting of tanks, pipelines, and vessels with a focus on avoiding ignition sources; important where explosion protection requirements apply in industrial plants.<\/li>\n<li><em>Hydraulic power packs<\/em>: power units for the aforementioned tools; decisive for energy efficiency, noise emission, and safe controllability. Variable power settings support adaptive emission control.<\/li>\n<\/ul>\n<h2>Meeting regulatory conditions technically<\/h2>\n<p>Conditions in the deconstruction permit often concern noise, dust, vibrations, media management, working hours, and traffic management. With method-appropriate tool selection and process control, these requirements can be addressed in a targeted manner. Real-time monitoring with documented response strategies strengthens compliance during execution.<\/p>\n<h3>Noise and dust management<\/h3>\n<ul>\n<li>Mechanical crushing with <strong>concrete demolition shears<\/strong> instead of impact-intensive methods reduces peak levels.<\/li>\n<li>Splitting technology (<strong>hydraulic wedge splitters<\/strong>) minimizes dust and noise emissions with massive components.<\/li>\n<li>Targeted wetting, enclosure of work areas, extracted cutting operations (especially with <em>Multi Cutters<\/em> and <em>hydraulic demolition shears<\/em>).<\/li>\n<li>Use low-noise <em>hydraulic power packs<\/em> with acoustic shielding and continuous sound level logging.<\/li>\n<\/ul>\n<h3>Vibration and neighborhood protection<\/h3>\n<ul>\n<li>Low-vibration methods (<strong>concrete demolition shears<\/strong>, <strong>rock wedge splitters<\/strong>) protect existing structures, utilities, and sensitive facilities.<\/li>\n<li>Section-by-section deconstruction with temporary bracing to secure adjacent structural elements.<\/li>\n<li>Install settlement points and vibration sensors with alert levels linked to intervention measures.<\/li>\n<\/ul>\n<h3>Explosion and fire protection in industrial deconstruction<\/h3>\n<ul>\n<li>Ensure media-free status (draining, inerting, gas-free measurements), then deploy <em>tank cutters<\/em> for cold separations.<\/li>\n<li>Avoid ignition sources, control spark emission, observe permit procedures for hot\/special works.<\/li>\n<li>Classify work zones, verify gas-free certificates, and coordinate isolation of energy sources before cutting.<\/li>\n<\/ul>\n<h2>Deconstruction planning: from building gutting to selective removal<\/h2>\n<p>An approvable concept first separates components containing hazardous and interfering substances, removes materials sorted by type, and reduces risks prior to structural removal. Tools from Darda GmbH support selective work in confined spaces, on intermediate floors, and on vertical surfaces. Clear sequencing, temporary supports, and access concepts ensure stability and safe material flow throughout the operation.<\/p>\n<h3>Typical sequence<\/h3>\n<ol>\n<li>Decoupling and building gutting (utilities, fit-out, non-concrete components)<\/li>\n<li>Selective concrete removal with <strong>concrete demolition shears<\/strong>, separation of reinforcement with <em>Multi Cutters<\/em> or <em>hydraulic demolition shears<\/em><\/li>\n<li>Split massive components locally (<strong>hydraulic wedge splitters<\/strong>) and release in a controlled manner<\/li>\n<li>Sectional dismantling of steel and composite parts (<em>combination shears<\/em>)<\/li>\n<li>Defined quality and safety hold points before each phase transition, including measurement checks<\/li>\n<li>Sorted removal, scale tickets, recycling<\/li>\n<\/ol>\n<h2>Areas of application and permitting nuances<\/h2>\n<p>The deconstruction permit varies by context and component. In urban settings, noise and traffic conditions dominate; in subsurface work, vibrations and dewatering; in industrial plants, explosion protection and media management. Heritage protection and fa\u00e7ade retention can introduce additional constraints and require more granular method statements.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>In urban projects, <strong>concrete demolition shears<\/strong> are often advantageous due to their controlled operation. Low vibration levels and targeted separation support strict immission requirements and shorten downtimes of sensitive neighboring operations. Windowed working hours and compact equipment footprints help integrate works into dense environments.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>In existing buildings with limited load-bearing capacity, compact hydraulic tools &#8211; supplied via <em>hydraulic power packs<\/em> &#8211; allow a step-by-step approach. The permitting authority often requires evidence for interim structural stability and load management. Floor-by-floor logistics and debris control measures are typically documented in the method statement.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Underground and in rock, vibrations and water management are in focus. <strong>Hydraulic wedge splitters<\/strong> provide low-vibration progress without explosives, which can ease conditions concerning safety distances and ground vibration monitoring. Drainage and sediment control plans are commonly tied to measurement and reporting duties.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>When extracting natural stone in sensitive landscapes, noise, dust, and vibrations are strictly regulated. Splitting technology with <strong>rock wedge splitters<\/strong> enables precise work with a reduced emission profile. Access routes, revegetation obligations, and seasonal constraints may be integrated into the permit.<\/p>\n<h3>Special operations<\/h3>\n<p>For tanks, pressure vessels, or contaminated sites, specific releases are common. <em>Tank cutters<\/em> and low-spark separation methods support compliance with explosion and fire protection requirements. Isolation, purging, and atmosphere monitoring are documented before each cutting step.<\/p>\n<h2>Disposal, verifications and circular economy<\/h2>\n<p>Permits are regularly tied to a consistent waste hierarchy. The choice of tools influences separation quality and material purity &#8211; both are decisive for recycling rates. Early coordination with disposal partners and clear waste coding streamline transport and acceptance.<\/p>\n<ul>\n<li>Concrete separated, reinforcement cleanly cut (<strong>concrete demolition shears<\/strong>, <em>Multi Cutters<\/em>): higher recycling quality.<\/li>\n<li>Chunk-wise release by <strong>hydraulic wedge splitters<\/strong>: fewer fines, reduced dust exposure, better sortability.<\/li>\n<li>Complete documentation: scale tickets, disposal and recovery certificates, consignment notes.<\/li>\n<li>Waste classification per applicable codes and pre-acceptance tests for materials requiring special handling.<\/li>\n<\/ul>\n<h2>Occupational safety and neighborhood protection in the permitting context<\/h2>\n<p>The deconstruction permit reflects the obligation to minimize hazards. It usually requires clear roles, safe procedures, and coordinated communication &#8211; internally and externally. Competence management, toolbox briefings, and interface control between trades are integral to risk reduction.<\/p>\n<h3>Practical measures<\/h3>\n<ul>\n<li>Safe positioning and mounting of tools, matched hydraulic power (<em>hydraulic power packs<\/em>)<\/li>\n<li>Barriers, access control, visual and radio signals<\/li>\n<li>Measurement and monitoring concepts (noise, dust, vibration) with defined intervention thresholds<\/li>\n<li>Transparent information for residents about time windows and emissions<\/li>\n<li>Permit-to-work system with dynamic risk assessment for non-routine operations<\/li>\n<\/ul>\n<h2>Checklist for structured preparation<\/h2>\n<p>A systematic preparation creates clarity and saves time in the permitting process. The following list serves as non-binding guidance and does not replace legal advice.<\/p>\n<ul>\n<li>Existing conditions and risks captured (structural analysis, utilities, contaminants, surroundings)?<\/li>\n<li>Deconstruction method methodically justified (e.g., <strong>concrete demolition shears<\/strong> vs. <strong>hydraulic wedge splitters<\/strong>)?<\/li>\n<li>Immission control technically substantiated (noise, dust, vibrations)?<\/li>\n<li>Disposal routes contractually secured, evidence prepared?<\/li>\n<li>Construction logistics and traffic management coordinated?<\/li>\n<li>Occupational safety and health as well as emergency management defined?<\/li>\n<li>Measurement and documentation concept planned?<\/li>\n<li>Pre-application meeting held and authority feedback integrated?<\/li>\n<li>Stakeholder and neighborhood communication scheduled and documented?<\/li>\n<li>Baseline measurements and calibration plans prepared for monitoring equipment?<\/li>\n<\/ul>\n<h2>Common pitfalls in dealing with the deconstruction permit<\/h2>\n<p>Experience shows that incomplete documents, methods lacking justification, and unclear interfaces lead to delays. A technically documented method &#8211; for example with <strong>concrete demolition shears<\/strong> or <strong>hydraulic wedge splitters<\/strong> &#8211; should state the selected controls, predicted emissions and monitoring plan for communication with the permitting authority. Overly optimistic schedules and missing baseline data frequently result in additional conditions or restricted working hours.<\/p>\n<h3>Tips from practice<\/h3>\n<ul>\n<li>Clarify early where measurement points for noise\/vibrations will be placed and which triggers apply.<\/li>\n<li>Plan deconstruction in small, controlled sequences; include temporary bracing.<\/li>\n<li>Provide tool changes and power levels in the concept to react flexibly to conditions.<\/li>\n<li>Conduct baseline surveys for noise, dust, and vibration; carry out trial cuts or test splits.<\/li>\n<li>Include schedule float to accommodate weather, findings, and authority inspections.<\/li>\n<\/ul>\n<h2>Documentation, monitoring and closeout<\/h2>\n<p>The deconstruction permit requires ongoing documentation: progress reports, measurement logs, waste and recovery records. Clean closeout documentation &#8211; including photo logs, material balances, and clearance reports &#8211; creates legal certainty and forms the basis for subsequent construction phases. Defined retention periods and a transparent audit trail support later verifications and claims management.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The deconstruction permit is the formal key to kick-off in many projects of concrete demolition, building gutting, and special demolition. It defines the legal framework within which structures, plant components, and infrastructure may be deconstructed, separated, and disposed of. For methods using concrete demolition shears or hydraulic rock and concrete <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-permit\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19676","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Deconstruction Permit - Demolition Rules &amp; Process<\/title>\n<meta name=\"description\" content=\"Guide to deconstruction permits \u2713 steps, documents, compliance, and controls for dust, noise and vibration.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-permit\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Deconstruction Permit - Demolition Rules &amp; Process\" \/>\n<meta property=\"og:description\" content=\"Guide to deconstruction permits \u2713 steps, documents, compliance, and controls for dust, noise and vibration.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-permit\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:23+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-permit\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-permit\",\"name\":\"Deconstruction Permit - Demolition Rules & Process\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-06T13:39:54+00:00\",\"dateModified\":\"2026-09-12T17:53:23+00:00\",\"description\":\"Guide to deconstruction permits \u2713 steps, documents, compliance, and controls for dust, noise and vibration.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-permit#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-permit\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-permit#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Deconstruction permit\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Deconstruction Permit - Demolition Rules & Process","description":"Guide to deconstruction permits \u2713 steps, documents, compliance, and controls for dust, noise and vibration.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-permit","og_locale":"en_US","og_type":"article","og_title":"Deconstruction Permit - Demolition Rules & Process","og_description":"Guide to deconstruction permits \u2713 steps, documents, compliance, and controls for dust, noise and vibration.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-permit","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:23+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-permit","url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-permit","name":"Deconstruction Permit - Demolition Rules & Process","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-06T13:39:54+00:00","dateModified":"2026-09-12T17:53:23+00:00","description":"Guide to deconstruction permits \u2713 steps, documents, compliance, and controls for dust, noise and vibration.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-permit#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/deconstruction-permit"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-permit#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Deconstruction permit"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19676","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19676"}],"version-history":[{"count":3,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19676\/revisions"}],"predecessor-version":[{"id":29128,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19676\/revisions\/29128"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}