{"id":19674,"date":"2025-12-06T10:12:16","date_gmt":"2025-12-06T09:12:16","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19674"},"modified":"2026-09-12T19:53:22","modified_gmt":"2026-09-12T17:53:22","slug":"deconstruction-company","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-company","title":{"rendered":"Deconstruction company"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A deconstruction company plans and executes the orderly removal of structures, facilities, and rock formations. It combines a structured approach with fit-for-purpose procedures to dismantle materials separately, minimize emissions, and protect structural analysis and surroundings. Depending on the material and constraints, different hydraulic tools are used &#8211; from <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> to concrete pulverizers and shears for steel and composite components. The focus is on safety, predictability, and the reuse of recovered materials. Clear method statements, permit-compliant execution, and transparent documentation further support schedule reliability and stakeholder acceptance.<\/p>\n<h2>Definition: What is meant by a deconstruction company?<\/h2>\n<p>A deconstruction company is a specialized contractor that selectively, controllably, and compliantly dismantles buildings, plant components, or natural rock formations. The goal is planned deconstruction up to complete site clearance &#8211; including strip-out, separation cuts, material-appropriate dismantling, interim logistics, and documentation. The work includes both <strong>concrete demolition and special demolition<\/strong> as well as <strong>strip-out and cutting<\/strong>, <strong>rock excavation and tunnel construction<\/strong>, <strong>natural stone extraction<\/strong>, and <strong>special operations<\/strong> in sensitive environments. Based on structural analysis, component spectrum, and environmental requirements, a deconstruction company decides whether to crush, cut, blast (if permitted), or <em>hydraulically split<\/em> &#8211; the latter is particularly low vibration and often low dust. In contrast to conventional demolition, selective deconstruction prioritizes <em>component-by-component removal<\/em>, source-separated material flows, and verifiable compliance with emission thresholds.<\/p>\n<h2>Tasks and service profile in deconstruction<\/h2>\n<p>The service profile ranges from the existing-conditions assessment through the deconstruction concept to execution and proof of compliance. Core elements are: structured planning, selection of suitable <strong>hydraulic tools<\/strong> (e.g., concrete pulverizers, hydraulic splitters), safe construction logistics, emission control, sequencing in structurally safe work steps, and source-separated sorting for the circular economy. Typical additions include pre-demolition audits, value engineering for method selection, and stakeholder communication with authorities, neighbors, and facility operators.<\/p>\n<h2>Techniques and methods in concrete demolition<\/h2>\n<p>Concrete demolition requires methods that differ in noise, vibration, precision, and production rate. A deconstruction company chooses the method to suit member thickness, degree of reinforcement, accessibility, and environmental sensitivity. Additional selection factors are residual load-bearing capacity during interim stages, water management, and achievable dimensional tolerances at interfaces to remaining structures.<\/p>\n<h3>Chiseling and sawing compared with splitting<\/h3>\n<p>Conventional chiseling is robust but generates noise and vibration. Wire and wall saws deliver precise cuts but create cooling-water use and slurry. Hydraulic <strong>splitting<\/strong> with hydraulic splitters works very quietly, with low vibration, and often without water. It applies controlled splitting forces that define cracks and release members along planned axes &#8211; beneficial near sensitive neighboring buildings, heritage structures, or indoors. In practice, hybrid sequences are common: pre-sawing or drilling for control, followed by splitting or pulverizing to complete the separation with minimal disturbance.<\/p>\n<h3>Use of concrete pulverizers<\/h3>\n<p><strong>Concrete pulverizers<\/strong> grip, crush, and break concrete including reinforcement. They are suitable for selective demolition of walls, slabs, and foundations. In the <em>strip-out and cutting<\/em> phase, they separate members into manageable segments; in <em>special demolition<\/em> they enable controlled load reduction before removing load-bearing elements. Where space is tight and low vibration is required, concrete pulverizers are often combined with compact <em>carrier machines<\/em> and precise hydraulics. Features such as 360-degree rotation, optimized jaw geometry, and quick-change systems increase throughput while keeping bite control precise.<\/p>\n<h3>Hydraulic splitters in selective deconstruction<\/h3>\n<p><strong>Hydraulic splitters<\/strong> &#8211; including <em>splitting cylinders<\/em> &#8211; generate high splitting forces that release massive members without explosives and without significant vibration. They are ideally suited for thick foundations, high-strength concretes, noise-sensitive areas, hospitals, city centers, and in tunnels where vibration and dust must be strictly minimized. In <em>rock excavation and tunnel construction<\/em>, they open fractures along natural planes of weakness; in <em>natural stone extraction<\/em>, they promote the recovery of large, crack-controlled blocks. Carefully designed drilling patterns, correct wedge alignment, and incremental pressurization deliver predictable crack propagation and efficient block release.<\/p>\n<h2>Equipment in a deconstruction company: hydraulic tools and power packs<\/h2>\n<p>Hydraulic systems form the backbone of many deconstruction methods. <strong>Hydraulic power packs<\/strong> supply tools with pressure and flow, while interchangeable attachments handle material processing. A well-matched system improves efficiency, precision, and occupational safety. Configuration choices include electric or low-emission drives for indoor work, remote-control options for stand-off safety, and sound insulation for urban sites.<\/p>\n<h3>Hydraulic power packs: power supply and controllability<\/h3>\n<p>Modern <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> provide the pressure required for splitting cylinders, <strong>concrete pulverizers<\/strong>, <em>combination shears<\/em>, <em>multi cutters<\/em>, <em>steel shears<\/em>, and <em>tank cutters<\/em>. Important factors are demand-based power levels, fine control, and reliable safety functions. Noise and exhaust management are particularly important indoors and in densely built-up areas. Practical considerations include hose routing and protection, pressure and flow monitoring, and compatibility with quick-coupling systems to reduce changeover time.<\/p>\n<h3>Tool selection by material and interface<\/h3>\n<ul>\n<li>Concrete with\/without reinforcement: <strong>concrete pulverizers<\/strong> for crushing and cracking; <strong>hydraulic splitters<\/strong> for low-vibration release of thick cross-sections (with predrilling where required).<\/li>\n<li>Steel and composite members: <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">precision steel shears<\/a> for sections, reinforcement, and plate; <em>multi cutters<\/em> for mixed materials and varying cross-sections (including staged cutting to control residual stresses).<\/li>\n<li>Masonry and lightweight materials: <em>combination shears<\/em> for varying material hardness and clean separation (often combined with dust suppression near interfaces).<\/li>\n<li>Vessels, tanks, pipelines: <em>tank cutters<\/em> for contour-accurate separation with controlled spark and heat development, aligned with the hazard analysis (including inerting or purging if stipulated).<\/li>\n<\/ul>\n<h2>Application areas and typical scenarios<\/h2>\n<p>Deconstruction companies work in varied environments &#8211; from industrial plants to tunnel heading. Methods and tools are adapted to the specific environment and protection goals. Operating windows, access restrictions, and emission caps often dictate method choice and sequencing.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>When dismantling load-bearing members, structural analysis, load paths, and vibration protection take priority. <strong>Concrete pulverizers<\/strong> reduce members in a controlled manner, while <strong>hydraulic splitters<\/strong> quietly release massive blocks. This protects neighboring buildings, machine foundations, or sensitive installations. Where necessary, monitoring with vibration sensors and settlement markers provides real-time feedback for safe progress.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>Before structural demolition, fit-out trades are removed and members separated. Shears, pulverizers, and cutting methods prepare for source-separated sorting. Indoors, low-emission tools with precise hydraulic control help minimize dust, noise, and vibration. Coordinated removal of MEP, hazardous materials clearance where applicable, and safe isolation of utilities are integral steps.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In massive rock or in tunnels, <strong>hydraulic splitters<\/strong> are a quiet alternative to blasting where it is not possible or not desired. They create intended fracture lines, facilitate removal of large pieces, and reduce impacts at the tunnel face and on the support. Ventilation concepts, water ingress management, and face stability assessments complement the method choice.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Targeted splitting enables the recovery of dimensionally stable raw blocks with high yield. Aligning the wedges with natural bedding and joints promotes quality and dimensional accuracy. Reduced microcracking enhances downstream processing and marketable yield.<\/p>\n<h3>Special operations<\/h3>\n<p>During deconstruction in live production, in hospitals, or in heritage buildings, low-vibration and quiet methods are crucial. <strong>Hydraulic splitters<\/strong> and precisely controlled <strong>concrete pulverizers<\/strong> allow selective interventions with low environmental risk. Additional barriers, negative-pressure enclosures, and clean work protocols protect adjacent operations.<\/p>\n<h2>Planning, structural analysis, and sequencing<\/h2>\n<p>A robust deconstruction concept prioritizes safety, material flow, and documentation. The order of work steps is aligned with load-bearing behavior and site logistics. Interfaces to design and operations are clarified early, and digital models can be used to visualize sequences and clash risks.<\/p>\n<ol>\n<li>Existing-conditions assessment: drawings, probes, and material samples clarify cross-sections, reinforcement, and embedded items. Where records are incomplete, targeted openings and non-destructive testing provide validation.<\/li>\n<li>Hazard analysis: general considerations of emissions, load cases, utility lines, and potential hazardous substances. Access, egress, and work-at-height controls are defined in the method statement.<\/li>\n<li>Separation and dismantling concept: definition of methods &#8211; e.g., <strong>splitting<\/strong> instead of chiseling in sensitive areas; <strong>concrete pulverizers<\/strong> for reinforced concrete. Temporary load redistribution and step-by-step release are documented.<\/li>\n<li>Temporary stabilization: shoring, underpinning, load release, and defined load paths. Verification includes checks of allowable deformation and anchor pull-out where applicable.<\/li>\n<li>Cut and split planning: splitting hole patterns, pulverizer bite points, grip points, fall protection, and controlled lowering of loads. Edge protection, exclusion zones, and lift plans are coordinated.<\/li>\n<li>Emission control: noise and dust reduction, ground vibration monitoring, neighborhood protection. Water management and capture of fines prevent secondary contamination.<\/li>\n<li>Logistics and material flow: routing, interim storage, container service, source-separated sorting. Short transport routes and well-placed interim buffers reduce cycle times.<\/li>\n<li>Monitoring and documentation: measurements, photo documentation, weight tickets, and acceptance stages. Digital logs and dashboards improve traceability and enable rapid adjustments.<\/li>\n<\/ol>\n<h2>Low-emission and low-vibration operations<\/h2>\n<p>In urban and sensitive areas, low vibration, low noise levels, and reduced dust generation are decisive. <strong>Hydraulic splitters<\/strong> and precisely controlled <strong>concrete pulverizers<\/strong> often fulfill these requirements particularly well. In addition, dust-suppressing measures, targeted enclosures, and optimized hydraulic management help protect the work environment and raise dismantling quality. Electric power packs, negative-pressure units, and fine mist systems with correct droplet sizing further decrease environmental impact.<\/p>\n<h2>Safety and general conditions<\/h2>\n<p>Occupational safety has top priority. This includes clear responsibilities, secured work areas, personal protective equipment, load releases, self-protection at edge work, and prudent energy management of the <strong>hydraulic power packs<\/strong>. Legal and normative requirements must be observed as applicable; this overview does not replace binding legal advice. For potentially contaminated components, appropriate investigations and clearances are required before starting. Training, tool-specific instruction, and lockout-tagout for utilities are mandatory elements of a professional setup.<\/p>\n<h2>Digitalization and documentation<\/h2>\n<p>Digital as-built models, sensor monitoring, and continuous documentation support planning and execution. Load and vibration data, photo and video records, and the tracking of material flows improve transparency, quality, and schedule control. Data from the use of <strong>concrete pulverizers<\/strong> or <strong>hydraulic splitters<\/strong> &#8211; for example, cycle time &#8211; feed into the optimization of future projects. Centralized data environments, QR-coded container tracking, and telematics from power packs enhance data quality and reduce administrative effort.<\/p>\n<h2>Sustainability and circular economy in deconstruction<\/h2>\n<p>Selectivity is the key to high-quality reuse. <strong>Concrete pulverizers<\/strong> and <strong>hydraulic splitters<\/strong> often separate materials in large, clean pieces, simplifying processing. Source-separated fractions &#8211; concrete, steel, non-ferrous metals, rock, wood &#8211; reduce disposal costs and increase recycling rates. Precise dismantling supports the reuse of components and reduces transport and energy demand. Documented recovery rates and material passports facilitate subsequent use and contribute to robust sustainability reporting.<\/p>\n<h2>Practical tool selection in the project workflow<\/h2>\n<p>At project start, the tool portfolio is tailored to the boundary conditions: restricted access, floor load capacity, available power, permissible emissions, and target dates. Common combinations are <strong>concrete pulverizer<\/strong> for reinforced concrete, <strong>hydraulic splitter<\/strong> for massive cross-sections, <em>steel shear<\/em> for reinforcement and sections, <em>multi cutters<\/em> for mixed materials, and <em>tank cutters<\/em> for vessels and pipelines. Proper coordination with the <strong>hydraulic power pack<\/strong> ensures the required performance. Small-scale trials and calibration runs help validate assumptions on cycle times and achievable separation quality.<\/p>\n<h2>Quality criteria and metrics in deconstruction<\/h2>\n<p>Quality is measured by safety, dimensional accuracy, emission levels, and fidelity to material flow. Important metrics include cycle times by member category, secured cut and split meters per shift, utilization of the <strong>hydraulic power packs<\/strong>, tool changeover times, purity of fractions, and compliance with permissible vibration and noise levels. Additional indicators include schedule adherence, rework rates at interfaces, and documented recovery percentages by fraction.<\/p>\n<h2>Skills and team in the deconstruction company<\/h2>\n<p>A capable team combines planning expertise, machinery and hydraulics know-how, experience in structural analysis and construction methods, and careful on-site work. Operators skilled with <strong>concrete pulverizers<\/strong> and splitting techniques, specialists for cutting and shearing work, and coordination for logistics and documentation together ensure a safe and efficient project workflow. Regular toolbox talks, cross-functional reviews, and continuous improvement based on measured site data strengthen both safety and productivity.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A deconstruction company plans and executes the orderly removal of structures, facilities, and rock formations. It combines a structured approach with fit-for-purpose procedures to dismantle materials separately, minimize emissions, and protect structural analysis and surroundings. Depending on the material and constraints, different hydraulic tools are used &#8211; from hydraulic rock <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-company\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19674","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Deconstruction Company | Demolition &amp; Dismantling<\/title>\n<meta name=\"description\" content=\"Expert selective demolition \u2713 by a deconstruction company for structures and rock using low-vibration hydraulic tools.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-company\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Deconstruction Company | Demolition &amp; Dismantling\" \/>\n<meta property=\"og:description\" content=\"Expert selective demolition \u2713 by a deconstruction company for structures and rock using low-vibration hydraulic tools.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-company\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:22+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-company\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-company\",\"name\":\"Deconstruction Company | Demolition & Dismantling\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-06T09:12:16+00:00\",\"dateModified\":\"2026-09-12T17:53:22+00:00\",\"description\":\"Expert selective demolition \u2713 by a deconstruction company for structures and rock using low-vibration hydraulic tools.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-company#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-company\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-company#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Deconstruction company\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Deconstruction Company | Demolition & Dismantling","description":"Expert selective demolition \u2713 by a deconstruction company for structures and rock using low-vibration hydraulic tools.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-company","og_locale":"en_US","og_type":"article","og_title":"Deconstruction Company | Demolition & Dismantling","og_description":"Expert selective demolition \u2713 by a deconstruction company for structures and rock using low-vibration hydraulic tools.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-company","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:22+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-company","url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-company","name":"Deconstruction Company | Demolition & Dismantling","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-06T09:12:16+00:00","dateModified":"2026-09-12T17:53:22+00:00","description":"Expert selective demolition \u2713 by a deconstruction company for structures and rock using low-vibration hydraulic tools.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-company#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/deconstruction-company"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-company#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Deconstruction company"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19674","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19674"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19674\/revisions"}],"predecessor-version":[{"id":29319,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19674\/revisions\/29319"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19674"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}