{"id":19673,"date":"2025-12-05T12:41:37","date_gmt":"2025-12-05T11:41:37","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19673"},"modified":"2026-05-13T15:19:03","modified_gmt":"2026-05-13T13:19:03","slug":"deconstruction-report","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-report","title":{"rendered":"Deconstruction report"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A deconstruction report is the structured documentation of a completed demolition or special deconstruction &#8211; from the initial survey and the chosen method through to complete traceability of all material flows, measurements, and protective measures. In practical day-to-day work, the report refers to selective dismantling, concrete demolition, building gutting, and non-explosive methods such as splitting concrete and rock. Wherever handheld or carrier-mounted tools such as <strong>concrete pulverizers<\/strong>, <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">non-explosive rock and concrete splitters<\/a><\/strong>, <em>hydraulic power packs<\/em>, combination shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">suitable multi cutters for cutting<\/a>, steel shears, tank cutters, or rock wedge splitters are used, the deconstruction report reflects the traceability of the approach and the effectiveness of the protection concepts. It aligns <em>measured outcomes<\/em> with predefined targets and regulatory constraints and provides an auditable narrative of the works performed.<\/p>\n<p>As <em>technical evidence<\/em>, a deconstruction report &#8211; also referred to as demolition documentation in some contexts &#8211; supports contract fulfillment, authority reviews, and knowledge transfer for comparable projects.<\/p>\n<h2>Definition: What is a deconstruction report?<\/h2>\n<p>A deconstruction report is a technical document that systematically records the <strong>actual sequence<\/strong> of a deconstruction project. It describes initial conditions, selected methods, equipment used, sequences, control and protective measures, waste and secondary raw materials, as well as the results of quality assurance. The report serves clients, site management, and authorities as <em>evidence of compliant, selective, and low-emission deconstruction<\/em>. In areas such as concrete demolition and special demolition, building gutting and cutting, rock excavation and tunnel construction, natural stone extraction, or special operations, it documents technical and organizational diligence. Clear, reproducible descriptions and consistent terminology increase <strong>verifiability<\/strong> and <em>comparability<\/em>.<\/p>\n<h2>Content and structure of a deconstruction report<\/h2>\n<p>A robust deconstruction report is clearly structured, uses consistent key figures, and links <em>method selection<\/em>, <em>equipment deployment<\/em>, and <em>results<\/em>. In addition to text sections, it includes plans, photos, material and measurement logs, weigh tickets, and acceptance records. The following structure has proven effective. In digital setups, cross-references to models, sensor data, and document control registers reduce ambiguity and strengthen traceability.<\/p>\n<h3>Project and existing-condition data<\/h3>\n<ul>\n<li>Project title, location, timeframe, stakeholders (client, specialist site management, disposal companies)<\/li>\n<li>Description of existing conditions: structure, components, cross-sections, reinforcement ratios, material properties, accessibility<\/li>\n<li>Investigations and clearance measurements, status of hazardous and interfering substances, structural and vibration sensitivities<\/li>\n<li>Permits and constraints: utility locates, as-built information, heritage or environmental restrictions<\/li>\n<li>Site logistics: access routes, lifting and staging areas, waste-container placement, traffic and pedestrian routing<\/li>\n<\/ul>\n<h3>Methodology and sequence<\/h3>\n<ul>\n<li>Justification of method (e.g., selective demolition, non-explosive splitting methods, pulverizer technology, cutting operations)<\/li>\n<li>Process and sequences: phases, dismantling order, separation cuts, drilling patterns, work areas<\/li>\n<li>Boundary conditions: space constraints, neighborhood protection, operating hours, emission limits<\/li>\n<li>Interfaces with adjacent trades and building operations, tie-ins and isolations<\/li>\n<li>Contingency planning and <em>stop-work criteria<\/em> for safety or quality deviations<\/li>\n<\/ul>\n<h3>Equipment and methods<\/h3>\n<p>The report lists the tools used and their parameters. At Darda GmbH, depending on the task, <strong>concrete pulverizers<\/strong>, <strong>rock and concrete splitters<\/strong>, rock wedge splitters, combination shears, steel shears, multi cutters, tank cutters, as well as suitable <em>hydraulic power packs<\/em> are used. It is important to document suitability with respect to component thickness, reinforcement, vibrations, and noise. Where applicable, include <em>unique equipment identifiers<\/em> (e.g., serial or fleet IDs) for end-to-end traceability.<\/p>\n<ul>\n<li>Equipment type, jaw\/splitting forces, weight, reach or installation depth<\/li>\n<li>Hydraulic parameters: operating pressure, flow rate, power pack type<\/li>\n<li>Drilling grid and hole diameter for splitting; jaw opening width for gripping\/crushing<\/li>\n<li>Rationale for choosing the method (e.g., non-explosive, low vibration levels, selective separation)<\/li>\n<li>Tool configuration and wear parts: jaw or blade type, tooth profile, hose lengths and protection<\/li>\n<\/ul>\n<h3>Safety and environmental protection<\/h3>\n<ul>\n<li>Exclusion and protection zones, shoring, load transfer, fall protection<\/li>\n<li>Dust suppression (mist, water), noise and vibration limitation, vibration measurements<\/li>\n<li>Handling of hazardous substances and contaminated materials, fluid containment and water protection<\/li>\n<li>Emergency procedures, alarm chains, and explicit stop-work criteria<\/li>\n<\/ul>\n<h3>Quality assurance, measurements and evidence<\/h3>\n<ul>\n<li>Photo documentation of the steps (before\/during\/after) with scales<\/li>\n<li>Measurement logs: vibrations, noise, water quality, airborne dust, if applicable crack monitoring<\/li>\n<li>Weigh tickets, accompanying documents, recycling and disposal certificates<\/li>\n<li>Acceptances of partial services, functional tests, releases for subsequent steps<\/li>\n<li>Calibration certificates for monitoring devices and method statements for measurement procedures<\/li>\n<li>Chain-of-custody for samples and data integrity notes (timestamps, sign-offs)<\/li>\n<\/ul>\n<h2>Equipment-specific documentation: examples from practice<\/h2>\n<p>Technology drives the report: it influences sequences, emissions, the separation accuracy of material flows, and the proof of compliance. Clear <em>equipment-specific documentation<\/em> increases traceability.<\/p>\n<h3>Concrete pulverizers in selective deconstruction<\/h3>\n<p><strong>Concrete pulverizers<\/strong> are suitable for biting, crushing, and separating reinforced concrete components. The report should record which components and load cases they were used on and how the reinforcement was separated. Where temporary supports or preloads are relevant, their sizing and release sequence should be noted.<\/p>\n<ul>\n<li>Component thicknesses and reinforcement ratio, jaw opening width and force<\/li>\n<li>Sequence: pre-separations, gripping, setting down, sorting<\/li>\n<li>Assessment of vibrations and noise compared to alternative methods<\/li>\n<li>Yield of concrete debris and scrap, purity levels of the fractions<\/li>\n<li>Measures against projectile risks when releasing rebar and strategies for on-site pre-crushing or downsizing<\/li>\n<\/ul>\n<h3>Rock and concrete splitters in inner-city applications<\/h3>\n<p><strong>Rock and concrete splitters<\/strong> as well as rock wedge splitters enable <em>non-explosive<\/em>, controlled opening of massive cross-sections with low vibrations &#8211; advantageous in sensitive neighborhoods or existing buildings.<\/p>\n<ul>\n<li>Drilling grid, hole diameter, splitting sequence and pressure stages<\/li>\n<li>Evidence of low vibration levels (measurement points, maximum recorded vibration velocities)<\/li>\n<li>Block piece sizes to facilitate removal and sorting<\/li>\n<li>Water and dust management during drilling and splitting operations<\/li>\n<li>Geotechnical assumptions for preferred splitting directions and anticipated crack propagation<\/li>\n<\/ul>\n<h3>Combination shears, steel shears, and multi cutters<\/h3>\n<p>For reinforced concrete and pure steel structures, combination shears, steel shears, and multi cutters are used for cutting and segmenting. The report documents cut-edge quality, residual stresses, spark control, and the protection of adjacent components. Where thermal effects may occur, limits for the heat-affected zone and checks of adjacent media lines are included.<\/p>\n<ul>\n<li>Cutting ranges, blade\/jaw wear, maintenance intervals<\/li>\n<li>Cutting sequence and pre-cuts, relief cuts to release stresses<\/li>\n<li>Fire protection measures for sparks, catch pans at media lines<\/li>\n<\/ul>\n<h3>Hydraulic power packs and energy supply<\/h3>\n<p><em>Hydraulic power packs<\/em> supply handheld and carrier-mounted tools with pressure and flow. Stability and sizing of the power packs influence cycle time, noise emission, and energy consumption. In many setups, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">appropriate hydraulic power units<\/a> ensure the required pressure and flow characteristics.<\/p>\n<ul>\n<li>Power pack type, pressure\/flow characteristic, operating hours<\/li>\n<li>Hose routing, couplings, drip-free operation, leak control<\/li>\n<li>Energy and emission data (consumption, operating times, noise insulation)<\/li>\n<li>Noise-control measures (e.g., enclosures), positioning relative to sensitive receptors<\/li>\n<\/ul>\n<h2>Material flows, separation and disposal<\/h2>\n<p>The deconstruction report specifies material flows by quantity and quality. Selective methods &#8211; such as controlled crushing with concrete pulverizers or splitting without secondary crushing &#8211; facilitate material purity and increase recycling rates.<\/p>\n<ul>\n<li>Concrete debris by grain size and potential recycling use<\/li>\n<li>Reinforcing steel, non-ferrous metals, cables, pipelines<\/li>\n<li>Wood, plastics, insulation materials, asphalt, masonry<\/li>\n<li>Hazardous waste (described in general terms), separate handling and documentation<\/li>\n<li>Temporary on-site storage concepts, contamination prevention, weather protection<\/li>\n<li>Optional sustainability metrics: transport distances, CO2e factors, recycling rates<\/li>\n<\/ul>\n<h2>Standards, guidelines and regulatory requirements<\/h2>\n<p>Deconstruction reports follow generally accepted engineering standards as well as regionally applicable safety, environmental, and waste regulations. Common practice includes documented protection and control concepts, selective deconstruction, proof of proper disposal, and a traceable methodology. Legal requirements may vary by location and project; presentation in the report should therefore be <strong>transparent, cautious and complete<\/strong>, yet <em>without legal force<\/em>. Consistent terminology aligned with permitting and tender documents streamlines authority reviews and audits.<\/p>\n<h2>Documentation formats, photos and digital models<\/h2>\n<p>Beyond text and measurement logs, structured appendices improve readability: photo locations tied to site layout, sequences marked in plans, digital quantity models, audit-proof file naming and timestamps. In model-based projects, geolocating work steps in digital component models supports the traceability of the selected equipment and parameters.<\/p>\n<h3>Versioning and data retention<\/h3>\n<ul>\n<li>Define a versioning scheme (e.g., MAJOR.MINOR), with change logs and responsible sign-offs<\/li>\n<li>Establish retention periods for raw measurements, photos, and approvals, including backups<\/li>\n<li>Use consistent file metadata (project ID, area, component, date-time, author) for searchability<\/li>\n<\/ul>\n<h2>Typical key figures and evaluation<\/h2>\n<ul>\n<li>Quantities: m\u00c2\u00b3 of concrete, t of steel, number of components, meters drilled, meters cut<\/li>\n<li>Performance: cycle times per work step, number of cycles, equipment utilization<\/li>\n<li>Quality: purity levels of the fractions, share of reused components<\/li>\n<li>Emissions: measured vibration velocities, sound levels, dust values<\/li>\n<li>Safety: incident-free shifts, approvals, protection-zone violations (zero-target)<\/li>\n<li>Sustainability: recycling rate vs. disposal, transport kilometers, CO2e per ton processed (if reported)<\/li>\n<\/ul>\n<h2>Checklist for preparing a deconstruction report<\/h2>\n<ol>\n<li>Record project and existing-condition data completely; attach investigations<\/li>\n<li>Justify method selection (e.g., concrete pulverizer, non-explosive splitting, cutting)<\/li>\n<li>Document equipment parameters (forces, pressures, grids, power supply)<\/li>\n<li>Present process, sequences, and protection zones; attach plans<\/li>\n<li>Define measurement concepts; describe limit or target values and measuring points<\/li>\n<li>Capture material flows; attach weigh tickets and recycling certificates<\/li>\n<li>Create photo documentation with location and timestamps<\/li>\n<li>Log acceptances\/tests; document approvals<\/li>\n<li>Evaluate key figures, lessons learned, comparison with targets<\/li>\n<li>Completeness and plausibility check, audit-proof filing<\/li>\n<li>Verify validity of monitoring calibrations and equipment inspections<\/li>\n<li>List residual risks, open items, and conditions for handover to subsequent trades<\/li>\n<\/ol>\n<h2>Relation to application areas: examples<\/h2>\n<h3>Building gutting and cutting<\/h3>\n<p>In building gutting, non-load-bearing components are removed and services are dismantled. For separation cuts and component-precise openings, <em>multi cutters<\/em> and combination shears are often used; the report documents cutting paths, protective measures against dust and water, and the separate recording of materials. For localized concrete removal, <strong>concrete pulverizers<\/strong> support selective dismantling. Water capture and filtration for wet cutting are specified where required.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>In sensitive existing structures, vibrations and noise are minimized. <strong>Rock and concrete splitters<\/strong> enable controlled, non-explosive opening of massive cross-sections. The deconstruction report presents the drilling and splitting strategy, measurement values, and the step-by-step relief of the structure. Sequencing is aligned with temporary support and load-path verification.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>For rock removal in sensitive environments, the report documents the reasons for non-explosive methods with rock wedge splitters, the monitoring of structural stability, and the removal of blocks. Hydraulic power packs, splitting pressures, and drilling patterns are presented transparently. Ventilation, water ingress control, and clearance for advancing headings are documented where applicable.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In natural stone extraction, documentation helps assess block quality, split surfaces, and offcuts. The report records splitting sequences, drilling patterns, and gentle separation steps to minimize material losses. Linking block identifiers to photos and measurement logs improves traceability from quarry to processing.<\/p>\n<h3>Special operations<\/h3>\n<p>For the deconstruction of special installations &#8211; such as steel tanks and large vessels &#8211; <em>tank cutters<\/em>, steel shears, and multi cutters are documented. Safety concepts (e.g., inerting, explosion protection) and the controlled segmentation into manageable sections are central elements of the report. Decontamination records and gas measurements are included before hot work is released.<\/p>\n<h2>Documented appendices and records<\/h2>\n<ul>\n<li>Plans with marked sequences, exclusion and protection zones<\/li>\n<li>Photo documentation with camera positions and scale reference<\/li>\n<li>Measurement and test evidence (noise, vibrations, dust, if applicable media tests)<\/li>\n<li>Equipment sheets and parameter settings (e.g., jaw forces, splitting pressures, power pack data)<\/li>\n<li>Weigh tickets, accompanying and disposal certificates per fraction<\/li>\n<li>Protocols for acceptances, approvals, and trainings<\/li>\n<li>Risk registers, method statements, and change logs for scope or sequencing<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A deconstruction report is the structured documentation of a completed demolition or special deconstruction &#8211; from the initial survey and the chosen method through to complete traceability of all material flows, measurements, and protective measures. In practical day-to-day work, the report refers to selective dismantling, concrete demolition, building gutting, and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-report\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19673","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Deconstruction Report - Demolition Documentation<\/title>\n<meta name=\"description\" content=\"Smart guide to a deconstruction report \u2713 for demolition methods, equipment, safety, compliance &amp; material tracking.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-report\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Deconstruction Report - Demolition Documentation\" \/>\n<meta property=\"og:description\" content=\"Smart guide to a deconstruction report \u2713 for demolition methods, equipment, safety, compliance &amp; material tracking.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-report\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-13T13:19:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-report\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-report\",\"name\":\"Deconstruction Report - Demolition Documentation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-05T11:41:37+00:00\",\"dateModified\":\"2026-05-13T13:19:03+00:00\",\"description\":\"Smart guide to a deconstruction report \u2713 for demolition methods, equipment, safety, compliance & material tracking.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-report#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-report\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-report#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Deconstruction report\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Deconstruction Report - Demolition Documentation","description":"Smart guide to a deconstruction report \u2713 for demolition methods, equipment, safety, compliance & material tracking.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-report","og_locale":"en_US","og_type":"article","og_title":"Deconstruction Report - Demolition Documentation","og_description":"Smart guide to a deconstruction report \u2713 for demolition methods, equipment, safety, compliance & material tracking.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-report","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-13T13:19:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-report","url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-report","name":"Deconstruction Report - Demolition Documentation","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-05T11:41:37+00:00","dateModified":"2026-05-13T13:19:03+00:00","description":"Smart guide to a deconstruction report \u2713 for demolition methods, equipment, safety, compliance & material tracking.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-report#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/deconstruction-report"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-report#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Deconstruction report"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19673","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19673"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19673\/revisions"}],"predecessor-version":[{"id":27391,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19673\/revisions\/27391"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19673"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}