{"id":19671,"date":"2025-12-05T16:23:56","date_gmt":"2025-12-05T15:23:56","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19671"},"modified":"2026-05-13T12:57:03","modified_gmt":"2026-05-13T10:57:03","slug":"deconstruction-supervision","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-supervision","title":{"rendered":"Deconstruction supervision"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Deconstruction supervision refers to the technical, organizational, and safety-related supervision of demolition works and dismantling across all project phases. It links analysis, planning, control, and monitoring with the selection of suitable methods and tools. Especially in <em>concrete demolition and special demolition<\/em>, in <em>building gutting<\/em>, or in <em>rock excavation and tunnel construction<\/em>, qualified supervision creates the basis for quiet, low-vibration, and resource-efficient deconstruction. A central focus is the methodical integration of hydraulic tools such as <strong>concrete pulverizers<\/strong> and <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong>, which play a key role in practice due to their precision and controlled effect. In addition, deconstruction supervision aligns interfaces with utilities, neighbors, traffic routing, and logistics to maintain <strong>low emissions<\/strong> and predictable progress.<\/p>\n<h2>Definition: What is meant by deconstruction supervision?<\/h2>\n<p>Deconstruction supervision means the continuous, independent, and documented management of a deconstruction project-project phases from investigation through planning to execution and acceptance. It includes the assessment of structural condition and materials, the selection of <em>suitable deconstruction methods<\/em>, coordination with stakeholders, monitoring of <em>occupational safety<\/em> and environmental protection, as well as quality assurance. In implementation, deconstruction supervision directs the use of methods such as <em>controlled demolition<\/em> with pulverizers, hydraulic splitting, or <em>concrete cutting<\/em> and ensures that tools-such as <strong>concrete pulverizers<\/strong>, <strong>rock wedge splitters<\/strong>, and associated <strong>hydraulic power packs<\/strong>-match the static boundary conditions, site requirements, and project targets. Typical deliverables include a deconstruction concept, method statements, RAMS documentation, measurement and monitoring plans, and a coordinated waste management strategy.<\/p>\n<h2>Process and tasks in deconstruction supervision<\/h2>\n<p>Deconstruction supervision structures the process from investigation to acceptance in clear steps. In the preparation phase, investigation and material concepts are developed; boundary conditions such as accessibility, vibration limits, and noise control are clarified. In the planning phase, deconstruction sequences, load transfer, and separation cuts are defined. During execution, the supervision monitors methodical implementation, adjusts equipment deployments, and documents measurements, waste streams, and evidence. Depending on the structural element, <strong>concrete pulverizers<\/strong> are used for selective separation, <strong>rock and concrete splitters<\/strong> for low-vibration opening of massive cross-sections, and, additionally, <strong>hydraulic demolition shears<\/strong>, <strong>Multi Cutters<\/strong>, <strong>steel shears<\/strong>, and <strong>tank cutters<\/strong> are scheduled. Where appropriate, interim releases and hold points are defined to verify stability, emissions, and quality before advancing to the next phase.<\/p>\n<ul>\n<li><strong>Preparation<\/strong>: diagnostic probing, surveys, constraints mapping, and feasibility of low-vibration methods.<\/li>\n<li><strong>Planning<\/strong>: method statements, sequencing, temporary works, and deconstruction aids such as shoring or carriers.<\/li>\n<li><strong>Execution<\/strong>: supervision of method compliance, on-site adaptations, and traceable documentation.<\/li>\n<li><strong>Closeout<\/strong>: acceptance, evidence of disposal routes, and verification of targets and KPIs.<\/li>\n<\/ul>\n<h2>Method selection: focus on low-vibration methods<\/h2>\n<p>A core task is method-safe selection. The goals are low vibration levels, controllable fracture lines, low emissions, and clean separation of material streams. Hydraulic methods make a significant contribution to this. Decisions are guided by <strong>component parameters<\/strong>, surroundings, and project goals and ensure that tools operate within their optimal working windows to protect adjacent assets and meet environmental thresholds.<\/p>\n<ul>\n<li><strong>Structural criteria<\/strong>: thickness, reinforcement density, composite zones, and residual load paths.<\/li>\n<li><strong>Site criteria<\/strong>: accessibility, carrier size, lifting points, and logistics windows.<\/li>\n<li><strong>Environmental criteria<\/strong>: vibration and noise limits, dust control, water protection, and air exchange.<\/li>\n<li><strong>Project criteria<\/strong>: schedule constraints, documentation needs, and recycling objectives.<\/li>\n<\/ul>\n<h3>Concrete pulverizers in selective deconstruction<\/h3>\n<p>Concrete pulverizers enable targeted removal of concrete while simultaneously exposing reinforcement. They are suitable for concrete slab and wall fields, cantilevers, <em>column heads<\/em>, and edges. Deconstruction supervision uses them when controlled edge quality, minimal <em>secondary breakage<\/em>, and repeatable processes are required-for example in <em>building gutting and cutting<\/em> as well as in <em>special demolition<\/em> when adjacent components must be preserved. Performance depends on jaw geometry, closing force, rotation capability, and carrier stability; water-assisted dust suppression and defined bite patterns improve <strong>edge quality<\/strong> and reduce rework. Exposed reinforcement can be cut separately to keep material streams clean.<\/p>\n<h3>Rock and concrete splitters for massive cross-sections<\/h3>\n<p>Hydraulic <strong>rock and concrete splitters<\/strong>-often with <strong>rock wedge splitters<\/strong> in pre-drilled holes-generate controlled splitting forces in the center of the component. They are particularly suitable for thick <em>foundations<\/em>, <em>abutments<\/em>, piers, or massive foundation slabs. The advantages include low vibration, reduced dust exposure, and clear delineation of the fractured body. In sensitive environments, such as existing buildings or in tunnels, splitting technology offers a precise, predictable alternative to percussive methods. Correct drilling diameter and spacing, staged pressurization, and permanent monitoring of splitting sequences increase predictability and protect surrounding structures.<\/p>\n<h3>Complementary tools: hydraulic demolition shears, Multi Cutters, steel shears, tank cutters<\/h3>\n<p>Depending on the material mix, <strong>hydraulic demolition shears<\/strong> and <strong>Multi Cutters<\/strong> are used for reinforced concrete composite zones, <strong>steel shears<\/strong> for sections, tanks, and beams, and <strong>tank cutters<\/strong> for large hollow bodies. Deconstruction supervision defines the sequence in which steel is cut and concrete is released to control load transfer and promote clean material streams. For tanks and enclosed bodies, prerequisite measures such as cleaning, degassing, and atmosphere control are specified to maintain safe conditions during cutting.<\/p>\n<h2>Deconstruction supervision in typical application areas<\/h2>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>In demanding concrete demolition, controlling load paths is crucial. Concrete pulverizers systematically separate structural parts, while splitters open massive zones. The supervision coordinates shoring, cutting paths, and phasing with <strong>hydraulic power packs<\/strong> for a stable <em>power supply<\/em>. Temporary bearing checks and sequential releases prevent unintended load redistribution and help maintain serviceability in adjacent structures.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>In building gutting, light, low-vibration methods are preferred. Concrete pulverizers and Multi Cutters support the selective separation of components. Where separation cuts are prepared, splitting technology facilitates initiating breaks before sawing or cutting processes begin. Components are detached in defined modules to enable <strong>source-pure sorting<\/strong> and short transport routes within restricted interiors.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In geologically sensitive areas, splitting technology minimizes the risk of uncontrolled cracks. The supervision aligns drilling patterns, splitting sequences, and monitoring (e.g., vibrations, crack widths). Concrete pulverizers are useful in linings, portal zones, and transition areas to concrete components. Geotechnical baseline data and continuous convergence or settlement checks support safe progress in constrained underground conditions.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>For releasing blocks from the formation, <strong>rock wedge splitters<\/strong> are planned with suitable drilling patterns. Deconstruction supervision defines dimensions, sequencing, and shoring to steer fracture faces and reduce material losses. Orientation along bedding planes and discontinuities increases yield and improves block quality.<\/p>\n<h3>Special application<\/h3>\n<p>With confined access, in noise-sensitive zones, or in time-critical measures, quiet, controllable methods are prioritized. The supervision plans equipment compatibility-for example the combination of small pulverizers with compact <strong>hydraulic power packs<\/strong>-and ensures clear changeover and emergency procedures. Defined work windows, lighting concepts, and reduced nighttime vibration modes maintain compliance in sensitive environments.<\/p>\n<h2>Safety, environmental, and permitting aspects<\/h2>\n<p>Deconstruction supervision ensures a coherent safety and environmental concept. This includes <em>hazard analysis<\/em>, protection against falling objects, low-dust and low-noise working methods, and the protection of adjacent components. Legal requirements and authority stipulations must always be reviewed on a project-specific basis; statements on this are of a general nature and do not replace a case-by-case review. Hydraulic methods with <strong>concrete pulverizers<\/strong> and <strong>rock and concrete splitters<\/strong> support compliance with low emission values through their controlled, low-vibration action. Where hazardous substances or contaminated building materials are present, specialist procedures and certified disposal routes are integrated into the work plan.<\/p>\n<ul>\n<li><strong>Protective measures<\/strong>: exclusion zones, edge protection, catch platforms, and machine guidance.<\/li>\n<li><strong>Emission control<\/strong>: misting, negative pressure enclosures, noise barriers, and traffic dust management.<\/li>\n<li><strong>Permitting<\/strong>: work permits, traffic and crane plans, water protection measures, and utility clearances.<\/li>\n<\/ul>\n<h2>Documentation, monitoring, and quality assurance<\/h2>\n<p>Quality assurance includes plan updates, site reports, measurement logs, and proof of proper <em>disposal<\/em>. Deconstruction supervision defines monitoring concepts: ground vibration monitoring, dust, <em>noise emission<\/em>, <em>crack monitoring<\/em>, settlements. In case of deviations, methods are adjusted, for example smaller splitting widths, changed pulverizer jaw positioning, or modified phasing of the <strong>hydraulic power packs<\/strong>. Digital photo logs, sensor dashboards, and threshold-based alarms contribute to transparent decision-making and quick corrective action.<\/p>\n<h2>Practical guide: step by step<\/h2>\n<ol>\n<li>Investigation and assessment: structural diagnostics, material and reinforcement layout, boundary conditions.<\/li>\n<li>Method concept: selection of pulverizer demolition, splitting technology, cutting, and complementary tools.<\/li>\n<li>Structural analysis and phasing: <em>load transfer<\/em>, shoring, <em>separation cuts<\/em>, sequence.<\/li>\n<li>Equipment configuration: sizing of <strong>concrete pulverizers<\/strong>, <strong>rock wedge splitters<\/strong>, and <strong>hydraulic power packs<\/strong> to suit component thickness and accessibility.<\/li>\n<li>Site setup: routing, protective and catch measures, utilities supply.<\/li>\n<li>Monitoring and release: measurement concepts, thresholds, release points per deconstruction cycle.<\/li>\n<li>Execution and adjustment: ongoing control, methodological fine-tuning, documentation.<\/li>\n<li>Acceptance and evidence: quality, material flows, deconstruction targets, final report.<\/li>\n<li>Post-processing and sorting: on-site processing, interim storage, and documentation of material quality.<\/li>\n<li>Closeout and lessons learned: evaluation of KPIs, method review, and archiving of evidence.<\/li>\n<\/ol>\n<h2>Typical risks and how deconstruction supervision addresses them<\/h2>\n<ul>\n<li>Unknown reinforcement or embedded parts: probing, trial exposure with concrete pulverizers, adjusted <em>separation cuts<\/em>.<\/li>\n<li>Unexpected <em>crack formation<\/em>: reduced splitting forces, tighter drilling pattern, intermediate shoring.<\/li>\n<li>Vibration sensitivity of the surroundings: priority for splitting technology, reduced phasing, monitoring.<\/li>\n<li>Dust and noise emissions: wet processes, <em>protective enclosure<\/em>, choosing hydraulic instead of percussive methods.<\/li>\n<li>Confined workspace: compact tools, sequential <em>dismantling<\/em>, clear communication and safety routes.<\/li>\n<li>Uncharted utilities or services: non-destructive testing, vacuum excavation, and revised sequencing.<\/li>\n<li>Weather impacts: wind and temperature constraints, covers, and adjusted curing or cutting times.<\/li>\n<\/ul>\n<h2>Key performance indicators and success criteria<\/h2>\n<p>The quality of deconstruction supervision is reflected in goal achievement and controllability: on-schedule cycles, minimal rework, compliance with emission limits, <em>construction waste separation<\/em>, minimized secondary damage, and traceable documentation. The selection of cleanly separating methods-such as <strong>concrete pulverizers<\/strong> for precise edges and <strong>rock and concrete splitters<\/strong> for defined fracture bodies-measurably improves these indicators. Further metrics include vibration peak particle velocity within limits, dust concentrations under agreed thresholds, and high recovery rates of aggregates and metals with minimal contamination.<\/p>\n<h2>Tool and process selection based on component parameters<\/h2>\n<h3>Material and reinforcement<\/h3>\n<p>With dense <em>reinforcement<\/em>, concrete pulverizers favor exposure and separate rebar cutting. For lightly reinforced, massive cross-sections, splitting technology is efficient because splitting forces act in the core of the component. Supplementary diagnostics such as cover meters or ground-penetrating radar reduce uncertainty and help define drilling and cutting patterns.<\/p>\n<h3>Component geometry and dimension<\/h3>\n<p>Slender walls and slabs: pulverizer demolition with controlled edge guidance. Massive blocks and foundations: splitters with a coordinated drilling pattern and splitter-cylinder spacing. Composite zones: a combination of pulverizers, <strong>hydraulic demolition shears<\/strong>, and <strong>Multi Cutters<\/strong>. For cantilevers and discontinuous supports, temporary measures and residual capacity checks are integrated into phasing.<\/p>\n<h3>Accessibility and surroundings<\/h3>\n<p>In interiors or densely built environments, quiet, compact solutions are needed. Deconstruction supervision plans <em>hydraulic hose lines<\/em>, power pack positions, and safe handling routes. Where human exposure must be minimized, remote-controlled carriers and optimized tool reach increase safety and reduce setup times.<\/p>\n<h3>Environmental and protection requirements<\/h3>\n<p>Under strict requirements, choose a method with low emissions and controlled energy input: splitting or pulverizer demolition instead of percussive methods, aligned with monitoring and <em>dust suppression<\/em>. Water-sensitive areas require controlled slurry collection and treatment; air-sensitive interiors demand ventilation concepts and filter selection appropriate to particle size.<\/p>\n<h2>Sustainability in deconstruction<\/h2>\n<p>Deconstruction supervision promotes circularity of mineral materials by prioritizing methods with high separation precision. <strong>Concrete pulverizers<\/strong> and splitting technology facilitate source-pure separation of concrete and reinforcement. This improves the <em>recycling rate<\/em>, reduces transport and disposal costs, and helps achieve environmental objectives. Documented sorting quality and predictable fragment sizes enable higher-value reuse options and support verifiable contributions to project-level carbon and resource targets.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Deconstruction supervision refers to the technical, organizational, and safety-related supervision of demolition works and dismantling across all project phases. It links analysis, planning, control, and monitoring with the selection of suitable methods and tools. Especially in concrete demolition and special demolition, in building gutting, or in rock excavation and tunnel <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-supervision\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19671","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Deconstruction Supervision for Demolition Projects<\/title>\n<meta name=\"description\" content=\"Get expert deconstruction supervision for demolition \u2713 method selection, low vibration hydraulics, safety and compliance.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-supervision\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Deconstruction Supervision for Demolition Projects\" \/>\n<meta property=\"og:description\" content=\"Get expert deconstruction supervision for demolition \u2713 method selection, low vibration hydraulics, safety and compliance.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-supervision\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-13T10:57:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-supervision\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-supervision\",\"name\":\"Deconstruction Supervision for Demolition Projects\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-05T15:23:56+00:00\",\"dateModified\":\"2026-05-13T10:57:03+00:00\",\"description\":\"Get expert deconstruction supervision for demolition \u2713 method selection, low vibration hydraulics, safety and compliance.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-supervision#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-supervision\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction-supervision#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Deconstruction supervision\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Deconstruction Supervision for Demolition Projects","description":"Get expert deconstruction supervision for demolition \u2713 method selection, low vibration hydraulics, safety and compliance.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-supervision","og_locale":"en_US","og_type":"article","og_title":"Deconstruction Supervision for Demolition Projects","og_description":"Get expert deconstruction supervision for demolition \u2713 method selection, low vibration hydraulics, safety and compliance.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-supervision","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-13T10:57:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-supervision","url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-supervision","name":"Deconstruction Supervision for Demolition Projects","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-05T15:23:56+00:00","dateModified":"2026-05-13T10:57:03+00:00","description":"Get expert deconstruction supervision for demolition \u2713 method selection, low vibration hydraulics, safety and compliance.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-supervision#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/deconstruction-supervision"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction-supervision#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Deconstruction supervision"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19671","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19671"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19671\/revisions"}],"predecessor-version":[{"id":27379,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19671\/revisions\/27379"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}