{"id":19669,"date":"2025-12-05T11:37:28","date_gmt":"2025-12-05T10:37:28","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19669"},"modified":"2026-05-13T13:55:03","modified_gmt":"2026-05-13T11:55:03","slug":"deconstruction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction","title":{"rendered":"Deconstruction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Deconstruction refers to the planned, orderly, and as low-emission as possible disassembly of structures, facilities, and building components. The focus is on safety, resource conservation, and targeted material separation. Unlike conventional demolition, the intervention is controlled, sectional, and low-vibration &#8211; using, for example, <strong>concrete pulverizers<\/strong>, <strong>hydraulic wedge splitters<\/strong>, and other hydraulic tools. This allows load-bearing structures to be released in a controlled manner, recycling streams to be secured, and sensitive environments &#8211; such as in densely built neighborhoods, industrial plants, or in tunnel construction &#8211; to be protected.<\/p>\n<ul>\n<li><strong>Safety and control:<\/strong> stepwise dismantling with defined load paths and monitored temporary states.<\/li>\n<li><strong>Circularity:<\/strong> high-quality separation at the source enables reuse and closed-loop recycling.<\/li>\n<li><strong>Compliance:<\/strong> methodical handling of hazardous substances and project-specific permits.<\/li>\n<li><strong>Reduced impacts:<\/strong> minimized vibration, noise, and dust for operations in sensitive surroundings.<\/li>\n<\/ul>\n<h2>Definition: What is meant by deconstruction?<\/h2>\n<p>Deconstruction is understood as the systematic dismantling and size reduction of buildings and technical installations in clearly defined work steps. The aim is the safe separation of load-bearing and non-load-bearing components, the low-contaminant removal of hazardous substances, and the source-separated recovery of mineral and metallic fractions. The process generally includes survey, strip-out, partial demolition, crushing, sorting, logistics, and follow-up. Compared with blasting works, deconstruction provides greater controllability, reduced vibrations, and better material quality for recycling. It is also referred to as <em>selective dismantling<\/em> or <em>disassembly<\/em> and typically starts with a pre-deconstruction audit and a documented method statement.<\/p>\n<h2>Methods and procedures in deconstruction<\/h2>\n<p>Deconstruction combines mechanical separation, cutting, and splitting methods, selected according to component geometry, reinforcement ratio, accessibility, and environmental constraints. Hydraulic <em>concrete pulverizers<\/em> grip, crush, and break reinforced elements in a controlled manner; <em>hydraulic wedge splitters<\/em> generate high, locally confined forces via split cylinders to open massive cross-sections with minimal vibration. In addition, combination shears, multi cutters, steel shears, and tank cutters are used for sections, lines, vessels, and composite structures. Compared with percussion hammers, splitting and shearing processes reduce noise and vibration levels and increase the separation accuracy between concrete and reinforcement. Where access is restricted or exposure must be minimized, remote-operated equipment and cold-cutting techniques are preferred.<\/p>\n<ul>\n<li><strong>Selection matrix:<\/strong> match method to thickness, reinforcement, and proximity to sensitive structures.<\/li>\n<li><strong>Cut-by-cut strategy:<\/strong> define sequence, supports, and handover of loads before each intervention.<\/li>\n<li><strong>Low-impact execution:<\/strong> prioritize splitting and shearing when vibration and noise limits are tight.<\/li>\n<li><strong>Interface planning:<\/strong> coordinate with logistics, waste management, and utilities isolation.<\/li>\n<\/ul>\n<h2>Tools and equipment in deconstruction<\/h2>\n<p>The choice of equipment determines the quality, speed, and environmental impact of the work. Hydraulic power packs supply the required power for mobile and hand-held tools. Decisive factors are operating pressure, flow rate, weight, and hose management, especially in confined or overhead work areas. Quick-change systems, low-noise operation, and data logging for runtime and load help optimize utilization and maintenance.<\/p>\n<ul>\n<li><strong>Energy concept:<\/strong> electric drives for interior areas and emission-sensitive zones.<\/li>\n<li><strong>Handling:<\/strong> compact dimensions, ergonomic grips, and balanced center of gravity for overhead tasks.<\/li>\n<li><strong>Compatibility:<\/strong> tuned hoses, filters, and couplings to minimize pressure loss and wear.<\/li>\n<\/ul>\n<h3>Concrete pulverizers<\/h3>\n<p><strong>Concrete pulverizers<\/strong> crush concrete components and separate reinforcement using integrated cutting edges. They are ideal for selective concrete demolition and special deconstruction, for example for ceiling openings, wall breakthroughs, or foundation trimming. Advantages include controlled force introduction, good accessibility, and the combination of crushing and cutting in a single step. Clean separation improves downstream sorting and shortens processing times.<\/p>\n<h3>Rock and concrete splitters<\/h3>\n<p><strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">Rock and concrete splitters<\/a><\/strong> operate with wedge-driven split cylinders. Inserted into boreholes, they generate high splitting forces with low noise and minimal vibration. The method is suitable for massive elements, high-strength concrete, natural stone, and situations with strict vibration limits &#8211; such as in rock excavation and tunnel construction or in sensitive existing buildings. Typical boreholes are laid out in a defined pattern to guide crack propagation and achieve predictable block sizes without explosive effects.<\/p>\n<h3>Hydraulic power packs<\/h3>\n<p>Hydraulic power packs reliably feed mobile tools with pressure and flow. Key criteria are power reserve, thermal management, energy supply (e.g., electric for interior areas), and transportability. A tuned hydraulic system avoids power loss, reduces wear, and increases process safety. Noise-reduced enclosures and efficient filtration extend operating windows in sensitive settings.<\/p>\n<ul>\n<li><strong>Pressure and flow stability:<\/strong> constant delivery under varying loads.<\/li>\n<li><strong>Thermal design:<\/strong> cooling capacity sized for duty cycle and ambient conditions.<\/li>\n<li><strong>Serviceability:<\/strong> accessible filters, clear diagnostics, and robust connectors.<\/li>\n<\/ul>\n<h3>Combination shears and multi cutters<\/h3>\n<p>Combination shears and multi cutters cover a wide range of materials: reinforcement bars, sections, sheet metal, cable trays, or lightweight concrete components. They support strip-out and cutting work in buildings and plants and shorten material flows through pre-sized pieces for recycling and transport. Interchangeable jaw geometries enable adaptation to changing materials on site.<\/p>\n<h3>Steel shears<\/h3>\n<p>Steel shears cut beams, pipes, rails, and components made of high-strength steels. In the deconstruction of industrial halls or bridges, sections are first segmented and then captured as source-separated fractions. Clean cut faces facilitate the marketing of scrap. Controlled sectioning reduces residual stresses and improves handling safety.<\/p>\n<h3>Tank cutters<\/h3>\n<p>Tank cutters, such as the <a href=\"https:\/\/www.darda.de\/en\/product\/tank-cutter-tc120\">Tank Cutter<\/a>, are used for the controlled dismantling of tanks, silos, and large-volume apparatus. Combined with gas-free, cleaned systems and appropriate approvals, mechanical cutting enables spark-reduced, controlled removal &#8211; especially in special operations, on plant sites, or for dismantling with elevated protection requirements. Continuous gas monitoring and defined ventilation concepts add an additional safety layer.<\/p>\n<h2>Process steps in deconstruction<\/h2>\n<ol>\n<li>Inventory and planning: structural analysis, utility location, material and hazardous substances investigations, access and load concepts.<\/li>\n<li>Strip-out and separation: removal of non-load-bearing elements, selective dismantling of technical systems, initial sorting.<\/li>\n<li>Partial demolition and size reduction: use of <strong>concrete pulverizers<\/strong> and splitting technology, opening of cross-sections, exposing the reinforcement.<\/li>\n<li>Material handling and logistics: intermediate buffers, dust-reduced transport routes, load pickup and haulage logistics.<\/li>\n<li>Follow-up: surface cleaning, documentation of material flows, preparatory measures for new construction or recultivation.<\/li>\n<\/ol>\n<p>Each phase is supported by a written method statement, risk assessment, and acceptance criteria.<\/p>\n<ul>\n<li><strong>Planning deliverables:<\/strong> survey reports, sequence plans, and permits.<\/li>\n<li><strong>Execution records:<\/strong> shift logs, monitoring data, and waste transfer notes.<\/li>\n<li><strong>Handover:<\/strong> clearance certificates and as-built updates for subsequent works.<\/li>\n<\/ul>\n<h2>Planning, structural analysis, and safety<\/h2>\n<p>Deconstruction requires structure-related planning with clear interfaces. Temporary states, load redistributions, and partial removals must be evaluated structurally. Protection concepts take into account fall protection, dust suppression and noise reduction measures, vibration limits, fire protection, and utility isolation. Legal requirements and permits are regionally different and must be checked on a project-specific basis. A step-by-step, documented approach increases occupational safety and traceability.<\/p>\n<ul>\n<li><strong>Monitoring:<\/strong> noise, dust, and ground vibration with threshold-based alarms.<\/li>\n<li><strong>Operational controls:<\/strong> exclusion zones, lifting plans, and lockout-tagout for utilities.<\/li>\n<li><strong>Emergency preparedness:<\/strong> defined stop criteria, muster points, and communication chains.<\/li>\n<li><strong>Competency:<\/strong> task-specific briefings and documented qualifications for operators.<\/li>\n<\/ul>\n<h2>Material separation and circular economy<\/h2>\n<p>Source-separated fractions are central to high-quality recovery. Mechanical <em>splitting<\/em> and <em>shearing methods<\/em> promote clean separation of concrete and steel. Concrete debris can be processed into recycled concrete; reinforcement and sections enter the metal scrap cycle. For natural stone, splitting technology enables the recovery of large-format, reusable pieces. Clean cut faces and reduced fines improve the quality of the material streams. Reuse of intact components has priority over downcycling where feasible.<\/p>\n<ul>\n<li><strong>On-site pre-sorting:<\/strong> defined collection points and labeled containers avoid cross-contamination.<\/li>\n<li><strong>Quality checks:<\/strong> visual inspections, magnetic separation, and sieve analysis for grading.<\/li>\n<li><strong>Traceability:<\/strong> mass balance of incoming and outgoing material flows.<\/li>\n<\/ul>\n<h2>Deconstruction in special application areas<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>In inner-city areas or at vibration-sensitive locations, low-vibration methods have priority. <strong>Concrete pulverizers<\/strong> and <strong>hydraulic wedge splitters<\/strong> reduce noise and vibration and keep adjacent structures and utilities protected. Continuous monitoring and staged pre-weakening further limit impacts on neighbors and critical infrastructure.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In selective interior demolition, components and installations are separated. Multi cutters, combination shears, and <strong>concrete pulverizers<\/strong> produce precise separation cuts, for example for door and ceiling openings, without unnecessarily weakening the load-bearing structure. Where ignition sources are restricted, cold mechanical cutting is favored and dust capture is integrated close to the tool.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In underground areas or rock removal, split cylinders minimize vibrations, avoid blasting-induced vibrations, and protect existing structures. Controlled force introduction helps define desired fracture lines and remove material in a targeted manner. Ventilation, water management, and convergence measurements complement the safety concept in confined spaces.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Splitting technology enables gentle release of blocks along natural joints. Lower microcracking increases the reusability and surface quality of the recovered stones. Careful layout of drill patterns and water runoff minimizes waste and preserves valuable faces.<\/p>\n<h3>Special operations<\/h3>\n<p>Where access is limited, in facilities with sensitive infrastructure, or with potentially hazardous residues, lightweight, mobile systems are needed. Tank cutters, portable demolition shears, and suitable hydraulic power packs allow segment-by-segment work with high control. Remote actuation and small step sizes reduce risk and accommodate tight exclusion zones.<\/p>\n<h2>Typical challenges and solutions<\/h2>\n<ul>\n<li>Heavily reinforced concrete: predrilling, splitting, and then targeted cutting of the reinforcement improves separation accuracy.<\/li>\n<li>Prestressed concrete elements: work only with appropriate specialist concepts and controlled stress-release procedures; plan stepwise, symmetrical load reduction.<\/li>\n<li>Confined access: choose compact tools, modular hydraulic power packs, short hose runs, and reduced mass.<\/li>\n<li>Emission control: wet methods, localized enclosures, and prioritize low-noise methods such as splitting and shearing.<\/li>\n<li>Unknown as-built conditions: verify with scanning and trial openings; adapt the sequence based on findings.<\/li>\n<li>Hazardous substances: isolate zones, use negative pressure where required, and ensure certified disposal routes.<\/li>\n<li>Ground bearing and stability: check temporary load cases for machines, buffers, and containers; reinforce where necessary.<\/li>\n<\/ul>\n<h2>Technical parameters and selection criteria for tools<\/h2>\n<ul>\n<li>Member thickness and concrete strength: determine splitting force, jaw opening, and cutting capacity.<\/li>\n<li>Reinforcement ratio and steel grades: define cutting edges and shear geometry.<\/li>\n<li>Accessibility and position: adapt tool weight, dimensions, and handling.<\/li>\n<li>Energy and media supply: consider hydraulic pressure, flow rate, noise emission, and exhaust-free operation (e.g., electric in indoor areas).<\/li>\n<li>Environmental requirements: plan for vibration, dust exposure, and noise limits methodically.<\/li>\n<li>Changeover and versatility: quick-couplers and modular jaws reduce downtime between tasks.<\/li>\n<li>Control and reach: remote operation, fine metering, and suitable boom geometry for precision.<\/li>\n<li>Maintenance and durability: wear-part availability, protection against fines ingress, and oil cleanliness.<\/li>\n<\/ul>\n<h2>Documentation and verification<\/h2>\n<p>Complete documentation of work steps, material consignments, disposal routes, and test certificates creates transparency. Measurement data on noise, dust, and ground vibration monitoring, photo documentation, and delivery notes contribute to legal certainty and support quality control of the deconstruction process. Digital logs consolidate approvals, method statements, and monitoring records to streamline audits.<\/p>\n<ul>\n<li><strong>Core records:<\/strong> permits, risk assessments, toolbox talks, and method statements.<\/li>\n<li><strong>KPI tracking:<\/strong> recycling rates, deviation reports, and compliance with limit values.<\/li>\n<li><strong>Handover package:<\/strong> clearance certificates, updated plans, and mass balance summaries.<\/li>\n<\/ul>\n<h2>Future trends in deconstruction<\/h2>\n<p>Digital as-built models, sensor-based monitoring, and adaptive hydraulics increase process control. More precise <strong>concrete pulverizers<\/strong>, performance-optimized <strong>hydraulic wedge splitters<\/strong>, and energy-efficient <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> promote quiet, material-conserving methods. This connects resource efficiency, occupational safety, and high execution quality &#8211; from strip-out through special deconstruction to rock excavation, tunnel construction, and natural stone extraction. Further development focuses on electrification, teleoperation, and integrated data capture for predictive maintenance and continuous improvement.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Deconstruction refers to the planned, orderly, and as low-emission as possible disassembly of structures, facilities, and building components. The focus is on safety, resource conservation, and targeted material separation. Unlike conventional demolition, the intervention is controlled, sectional, and low-vibration &#8211; using, for example, concrete pulverizers, hydraulic wedge splitters, and other <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-19669","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Deconstruction in Construction | Methods &amp; Tools<\/title>\n<meta name=\"description\" content=\"Selective building dismantling \u2713 deconstruction for safe, low vibration &amp; resource-smart recovery.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Deconstruction in Construction | Methods &amp; Tools\" \/>\n<meta property=\"og:description\" content=\"Selective building dismantling \u2713 deconstruction for safe, low vibration &amp; resource-smart recovery.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/deconstruction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-13T11:55:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction\",\"name\":\"Deconstruction in Construction | Methods & Tools\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-05T10:37:28+00:00\",\"dateModified\":\"2026-05-13T11:55:03+00:00\",\"description\":\"Selective building dismantling \u2713 deconstruction for safe, low vibration & resource-smart recovery.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/deconstruction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Deconstruction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Deconstruction in Construction | Methods & Tools","description":"Selective building dismantling \u2713 deconstruction for safe, low vibration & resource-smart recovery.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction","og_locale":"en_US","og_type":"article","og_title":"Deconstruction in Construction | Methods & Tools","og_description":"Selective building dismantling \u2713 deconstruction for safe, low vibration & resource-smart recovery.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-13T11:55:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction","url":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction","name":"Deconstruction in Construction | Methods & Tools","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-05T10:37:28+00:00","dateModified":"2026-05-13T11:55:03+00:00","description":"Selective building dismantling \u2713 deconstruction for safe, low vibration & resource-smart recovery.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/deconstruction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/deconstruction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Deconstruction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19669","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19669"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19669\/revisions"}],"predecessor-version":[{"id":27381,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19669\/revisions\/27381"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19669"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}