{"id":19660,"date":"2025-12-04T11:56:37","date_gmt":"2025-12-04T10:56:37","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=19660"},"modified":"2026-05-12T09:47:03","modified_gmt":"2026-05-12T07:47:03","slug":"pipeline-installation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/pipeline-installation","title":{"rendered":"Pipeline installation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Pipeline installation is a central trade in pipeline construction and combines planning precision with construction execution. Whether drinking water main, sewer, gas line, or district heating route: decisive factors are a robust <em>pipeline route<\/em>, compliant bedding, and low-emission construction methods &#8211; especially for works in existing structures, in rock, or in sensitive surroundings. In practice, earth and rock works often encounter concrete components, utility crossings, and steel elements. Here &#8211; depending on subsoil, component thickness, and boundary conditions &#8211; controlled, low-vibration separation and splitting methods are used. Tools such as <strong>concrete demolition shears<\/strong> or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> enable selective deconstruction, precise openings, and the safe exposure of utility zones without endangering the stability of adjacent structures. The goal is a durable, operationally safe pipeline with clear documentation and reproducible quality over its entire life cycle. In addition to technical accuracy, adherence to permits, noise and vibration limits, and traceable, georeferenced as-built data are increasingly decisive for acceptance and later asset management.<\/p>\n<h2>Definition: What is meant by pipeline installation?<\/h2>\n<p>Pipeline installation refers to the entirety of planning, earthworks, and assembly services to construct underground or above-ground pipelines for media such as water, wastewater, gas, district heating, or technical gases. This includes route planning, trenching or tunnel heading, shoring and <em>pit shoring<\/em>, bedding and position stabilization of the pipeline, joining and sealing of the pipes, connection to shafts and structures, testing (e.g., pressure or <em>leakage test<\/em>), as well as proper backfilling and surface reinstatement. Depending on the context, open-cut methods, trenchless methods (e.g., thrust boring, <em>pipe jacking<\/em>) or hybrid approaches are used. In urban environments, low-emission, low-vibration, and selective deconstruction methods play a key role, for example when opening concrete surfaces, penetrating foundations, or fitting <em>wall duct<\/em> penetrations. Typical ancillary tasks include temporary works and traffic management, coordination with utility owners, environmental management, and integration of digital surveying and documentation to ensure verifiable quality.<\/p>\n<h2>Planning, construction methods and execution of pipeline installation<\/h2>\n<p>The choice of construction method is determined by geology, groundwater, traffic management, load assumptions, pipe cross-section, radius requirements, and tie-in points. Open trenches are suitable for well-accessible routes and allow direct quality control of bedding and pipe position. Trenchless methods are preferred where traffic volumes are high, cover is large, water crossings are present, or surfaces are sensitive. Crucial are a well-thought-out <em>pipeline route<\/em>, defined pipe gradients (for gravity lines), sufficient cover and <em>frost protection<\/em>, the coordination of shoring, construction stages and lifting equipment, as well as low-emission handling of obstacles (concrete, steel, natural stone). Selective dismantling with <strong>concrete demolition shears<\/strong> and controlled splitting with <strong>rock and concrete splitting devices<\/strong> reduce vibrations, protect adjacent utilities, and allow precise installation dimensions for pipe trenches, shafts, and penetrations. For reliable execution, tolerances for gradient and line position must be specified in advance, monitored during construction, and verified in the as-built survey; interface management with traffic phases and delivery logistics prevents delays.<\/p>\n<h2>Subsoil, trench construction and shoring<\/h2>\n<p>The creation of a stable, dimensionally accurate trench is fundamental for the positional stability of the pipeline and the durability of the bedding. Soil classification, groundwater conditions, and traffic loads determine slope angles or the use of shoring (e.g., shoring elements, <em>sheet pile shoring<\/em>, <em>shoring box<\/em>). Excavation must be performed so that the pipe zone is not loosened and the planned bedding thicknesses are maintained. Trench width follows the pipe diameter plus allowances for bedding and compaction; where groundwater is present, temporary dewatering and filter-stable wellpoints are planned to avoid washout and base heave. Spoil is segregated, reusable fractions are stockpiled dry, and unsuitable material is disposed of in accordance with approvals.<\/p>\n<h3>Open cut method: excavation and securing<\/h3>\n<p>For open installation, deformations of trench walls are limited, existing utilities are secured, and settlements are minimized through controlled compaction of the backfill. Where obstructive components (e.g., concrete foundations, curbs, massive upstands) are present, a low-vibration reduction into transportable pieces has proven effective. Good practice includes edge protection for pavements, step-by-step excavation with immediate shoring closure, and mechanical support or temporary suspension of crossing utilities to maintain service and structural integrity.<\/p>\n<h3>Trenchless pipeline construction<\/h3>\n<p>Thrust boring, pilot tube methods, and <em>pipe jacking<\/em> minimize surface interventions. Entry and access shafts must be constructed precisely. In densely built-up areas, low-emission separation and splitting methods are advantageous to protect residents, infrastructure, and structures. Steering accuracy, settlement criteria, and permissible deviations at the reception point must be contractually defined; where necessary, ground improvement or lubrication concepts are used to control jacking forces and limit surface impact.<\/p>\n<h2>Dealing with obstacles: concrete, rock and steel in the pipeline trench<\/h2>\n<p>Pipeline trenches often intersect existing structures. Selective, controlled separation and splitting methods accelerate the construction process, ensure clean edge quality, and reduce vibrations. Prior to deconstruction, reinforcement detection and utility locating reduce damage risks; cuts and breaks follow predefined joint patterns to protect adjacent components.<\/p>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p><strong>Concrete demolition shears<\/strong> cut reinforced concrete with positional accuracy, for example when opening pavements, foundations, shafts, or for wall breakthroughs. The low vibration protects neighboring buildings and sensitive utilities. Depending on access, hydraulic handheld tools or carrier-mounted attachments are selected to achieve precise cuts and prevent microcracking at bearing surfaces.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p><strong>Rock and concrete splitting devices<\/strong> as well as <em>rock wedge splitter<\/em> create defined separation joints in natural stone and high-strength concrete. The method is low-vibration and thus suitable for inner-city zones, under traffic, and near sensitive installations. Staged splitting with intermediate cleaning of joints improves control over break lines and limits overbreak in tight installation envelopes.<\/p>\n<h3>Steel and composite structures<\/h3>\n<p><em>Combination shears<\/em>, <em>Multi Cutters<\/em> and <em>steel shear<\/em> cut reinforcing steel, sections, pipes, or cap reinforcement. <em>Tank cutters<\/em> are used for dismantling steel tanks, casing pipes, or large-diameter pipelines. <em>Hydraulic power pack<\/em> units supply the tools with the required performance in a compact design. In composite components, separation sequences and spark control are defined to protect coatings and prevent ignition sources.<\/p>\n<h2>Pipe materials, bedding and joining technology<\/h2>\n<p>Bedding distributes loads evenly into the ground and prevents point loads. Common practice uses layered, graded materials with defined grain distribution and moisture. Pipe materials &#8211; such as PE, PP, PVC-U, GRP, ductile cast iron, steel, or concrete &#8211; are selected based on medium, pressure rating, temperature, and chemical resistance. Connections range from push-on socket joints with sealing elements via welded and sleeve weld joints to flanged and mortar joints. Additional selection criteria include stiffness class for gravity lines, SDR or wall thickness for pressure lines, abrasion resistance for wastewater, UV stability during storage, and suitability for trenchless installation.<\/p>\n<h3>Installation classes and compaction<\/h3>\n<p>Installation classes define requirements for bedding thicknesses, encasement, and compaction. Compaction is performed in layers, documented, and controlled in the area of the pipe crown to limit pipe deformation. Typical specifications define layer thicknesses, target densities relative to Proctor values, and acceptance by density tests or plate load tests; adjacent to structures, vibration limits for compaction equipment are observed.<\/p>\n<h3>Corrosion and mechanical protection<\/h3>\n<p>Depending on the medium and soil, cathodic protection, wrappings, protective conduits, sliding plates, or <em>geotextile<\/em>s are used. Crossings are executed with load distributors, sand cushions, or protective plates. Stray current protection, insulating joints, and coating repair systems are defined project-specifically; at transitions between soil types, mechanical protection against differential settlement is provided.<\/p>\n<h2>Shafts, structures and wall ducts<\/h2>\n<p>Shafts serve inspection, venting, or changes in direction. Openings in existing structures require dimensionally accurate breakthroughs and clean bearing surfaces. Selective deconstruction with <strong>concrete demolition shears<\/strong> enables flat edges; controlled splitting minimizes microcracks. <em>Wall duct<\/em> penetrations are sealed against water and gas and supported either fixed or sliding &#8211; matching the structural connection. Bearing checks, corrosion protection in the cut edge area, and defined installation tolerances ensure leak-tightness under operating loads.<\/p>\n<h3>Core drilling and blockouts<\/h3>\n<p>For subsequent tie-ins, precise openings are required. In the vicinity of vibration-sensitive installations, splitting of concrete and natural stone is a suitable alternative to percussive methods. Cooling water and slurry are captured and treated; reinforcing steel is cut with appropriate clearance to preserve cover and prevent unintended load paths.<\/p>\n<h2>Testing, quality assurance and documentation<\/h2>\n<p>Before commissioning, position, gradient, tightness, and strength are tested. Quality assurance includes measurement records, CCTV inspections, pressure and <em>leakage test<\/em>s, material certificates, and <em>compaction test certificate<\/em>s. Complete documentation facilitates operation, maintenance, and future adjustments. Depending on the system, additional methods such as mandrel tests for thermoplastics, holiday detection for coatings, tracer gas or vacuum tests for gravity lines, and functional tests of valves and fittings are specified. A project-specific inspection and test plan defines responsibilities, acceptance criteria, and hold points.<\/p>\n<h3>Typical process steps<\/h3>\n<ul>\n<li>Preparation: utility line request, locating, subsoil investigation, traffic and emissions concept<\/li>\n<li>Execution: excavation, shoring, obstacle removal, bedding, installation, backfilling<\/li>\n<li>Completion: testing, as-built documentation, surface reinstatement<\/li>\n<\/ul>\n<h2>Occupational safety, emissions and environmental protection<\/h2>\n<p>Safety in shoring, load handling, media handling, and in confined spaces has priority. Emissions (noise, dust, vibrations) must be minimized; water law requirements and soil management must be planned proactively. Low-vibration methods &#8211; such as splitting with <strong>rock and concrete splitting devices<\/strong> &#8211; reduce risks to neighboring structures and utilities. Permit-to-work procedures, gas monitoring in confined spaces, and coordinated lifting plans are integral to execution planning.<\/p>\n<h3>Protective measures at a glance<\/h3>\n<ol>\n<li>Stable shoring and secured access<\/li>\n<li>Alignment of separation and splitting methods to the surroundings and construction states<\/li>\n<li>Dust and water management, material separation and recycling<\/li>\n<li><em>Ground vibration monitoring<\/em> during works on existing structures<\/li>\n<li>Energy isolation and medium control during tie-ins and cut-overs<\/li>\n<li>Emergency and rescue concept including gas detection for confined spaces<\/li>\n<\/ol>\n<h2>Pipeline installation in rock and tunnel construction<\/h2>\n<p>In rock, routes require defined bearings and controlled separation surfaces. <em>Rock wedge splitter<\/em> and <strong>rock and concrete splitting devices<\/strong> allow precise adjustments of pipe inverts, niches, and cable ducts with minimal vibrations. In tunnel structures, space, ventilation, and emissions management are limited &#8211; compact tools with powerful <em>hydraulic power pack<\/em>s support safe installation. Pre-grouting or sealing measures may be required to control water ingress; logistics and ventilation concepts are aligned with cycle times and dust control.<\/p>\n<h2>Strip-out, cutting and selective deconstruction in existing structures<\/h2>\n<p>In repurposing, refurbishments, and utility relocations in building environments, materials are often mixed (concrete, steel, masonry). <strong>Concrete demolition shears<\/strong> and <em>combination shears<\/em> enable the removal of components during ongoing operations, for example for new riser zones, utility corridors, or shafts. <em>Tank cutters<\/em> are used in deconstruction of tanks or large steel pipes, for example to clear the route. Sequenced cuts, temporary supports, and controlled dismantling reduce dust, vibration, and downtime for neighboring uses.<\/p>\n<h2>Cost-effectiveness, scheduling and life cycle<\/h2>\n<p>Economic pipeline installation considers construction time, emissions, material and disposal costs, and maintainability. Selective demolition and splitting methods shorten construction times in existing environments, improve edge quality, and reduce consequential damage. Early coordination of <em>pipeline route<\/em>, <em>construction logistics<\/em>, and tool selection lowers risks during construction. Life-cycle considerations include accessibility for maintenance, material recyclability, and the carbon footprint of construction methods and materials; realistic schedules include weather and approval buffers.<\/p>\n<h2>Normative and organizational notes<\/h2>\n<p>Applicable technical rules and guidelines govern planning, execution, testing, and occupational safety. Requirements for bedding, compaction, tightness, scope of testing, and documentation must be defined project-specifically. The information here is general in nature and does not replace project-specific planning or verification. A coordinated inspection and test plan, role definition, and interface management between design, site supervision, and specialist contractors ensure compliance and traceability.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Pipeline installation is a central trade in pipeline construction and combines planning precision with construction execution. Whether drinking water main, sewer, gas line, or district heating route: decisive factors are a robust pipeline route, compliant bedding, and low-emission construction methods &#8211; especially for works in existing structures, in rock, or <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pipeline-installation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-19660","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Pipeline Installation for Water, Wastewater &amp; Gas<\/title>\n<meta name=\"description\" content=\"Utility pipeline installation for water, sewer &amp; gas with precise trenching, low vibration methods \u2713 proven quality.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/pipeline-installation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pipeline Installation for Water, Wastewater &amp; Gas\" \/>\n<meta property=\"og:description\" content=\"Utility pipeline installation for water, sewer &amp; gas with precise trenching, low vibration methods \u2713 proven quality.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/pipeline-installation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-12T07:47:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipeline-installation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipeline-installation\",\"name\":\"Pipeline Installation for Water, Wastewater & Gas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2025-12-04T10:56:37+00:00\",\"dateModified\":\"2026-05-12T07:47:03+00:00\",\"description\":\"Utility pipeline installation for water, sewer & gas with precise trenching, low vibration methods \u2713 proven quality.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipeline-installation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipeline-installation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/pipeline-installation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Pipeline installation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pipeline Installation for Water, Wastewater & Gas","description":"Utility pipeline installation for water, sewer & gas with precise trenching, low vibration methods \u2713 proven quality.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/pipeline-installation","og_locale":"en_US","og_type":"article","og_title":"Pipeline Installation for Water, Wastewater & Gas","og_description":"Utility pipeline installation for water, sewer & gas with precise trenching, low vibration methods \u2713 proven quality.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/pipeline-installation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-05-12T07:47:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/pipeline-installation","url":"https:\/\/www.darda.de\/en\/knowledge\/pipeline-installation","name":"Pipeline Installation for Water, Wastewater & Gas","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2025-12-04T10:56:37+00:00","dateModified":"2026-05-12T07:47:03+00:00","description":"Utility pipeline installation for water, sewer & gas with precise trenching, low vibration methods \u2713 proven quality.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/pipeline-installation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/pipeline-installation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/pipeline-installation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Pipeline installation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19660","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=19660"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19660\/revisions"}],"predecessor-version":[{"id":27335,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/19660\/revisions\/27335"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=19660"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}